This is a Task Assignment (TA) document executed under Contract Number HW687 between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. The TA authorizes work at the Imperial Cleaners (former) site located at 10055 North Dale Mabry Highway, Tampa, Florida (ERIC_4789). The Department Project Manager is Dean Cox (850-245-8969), and the Contractor's Project Manager is Donna Cline (813-321-0340). The TA was executed on July 14, 2022, with a completion date of November 30, 2022.
This Task Assignment authorizes costs for SVE (Soil Vapor Extraction) system pulsing/bumping and sampling, sample shipping and analysis, and associated equipment. The total TA value is $4,418.54, comprised of a Fixed Unit Rate of $3,418.54 and Cost Reimbursement of $1,000.00. The scope includes 15.10 hours of labor distributed across three subtasks: Subtask 1 (Project Management), Subtask 2 (System Bump & Evaluation), and Subtask 3 (Utilities). Labor costs total $1,675.95, laboratory costs total $1,235.00, and utility costs total $1,265.00. Deliverables consist of an email with system sampling analytical report, O&M checklist, field notes, and SVE system evaluation and recommendations due by August 31, 2022. Invoicing is conditioned upon FDEP approval of the email deliverable and receipt of utility invoices. The scope was reduced from the initial proposal based on review of the Tetra Tech Semi-Annual O&M Report, focusing the work on a bump/pulse-only evaluation with anticipated results indicating system shutdown.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC017A Completion November 30, 2022
This Task Assignment (TA) authorizes costs for SVE system pulsing/bumping & sampling, sample shipping & analysis, and associated equipment.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_4789
10055 North Dale Mabry Highway, Tampa
Imperial Cleaners (former)
✔ $ 3,418.54 ✔ $ 1,000.00
$ 4,418.54
Scope of Work
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.07.13 12:31:20 -04'00'
N/A dlcline Typewriter Donna Cline
Senior Remediation Engineer
7/14/2022
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Email with system sampling analytical report, O&M checklist, field notes, and SVE system evaluation & recommendations. 08/31/2022
FDEP approval of email with system sampling analytical report, O&M checklist, field notes, and SVE system evaluation & recommendations (Subtask 1 Project Management and Subtask 2 System Bump & Evaluation).
$ 3,153.54
FDEP receipt of utility invoices - Utilities Cost Reimbursement not to exceed $1000;
Utilities Initiation Fee $225; Utilities Handling Fee $40 (Subtask 3 Utilities) $ 1,265.00
$ 4,418.54
HW687
DC017A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: SVE System Bump/Pulse & Evaluation (DC017A)
DATE: 7/7/2022
This Task Assignment (TA) authorizes costs for SVE system pulsing/bumping & sampling, sample shipping & analysis, and associated equipment. The total cost of this TA is $4,418.54 and $1,000.00 of this total is cost reimbursement for utilities. There are
15.10 hours of labor in this TA.
The scope of the initial proposal for this TA was changed based on WSCS PE review of the latest Tetra Tech Semi-Annual O&M Report (period ending in June 2022) – the scope was reduced to a bump/pulse-only TA. Results of the bump are anticipated to indicate system shutdown. Site access has been verified.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 7/6/2022 Task #: HW687 DC017A SubTask 1 Project Management SubTask 6
Site: Imperial Cleaners (Former) ERIC_4789 SubTask 2 System Bump & Evaluation SubTask 7 Activity/Phase: System Bump & Evaluation SubTask 3 Utilities SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 Labor Rate Category
$64.50 Project Manager Donna Cline 1.10 1.10 $0.00 Administrative 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0 0 0 0 0
$22.25 CADD Specialist Andy Schifano 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0 0 0 0 0
$17.50 Environmental Technician Corey Olson 6.50 6.50 0.00 0.00 0 0 0 0 0 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0 0 0 0 0
$64.50 Senior Engineer Donna Cline 6.00 6.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0 0 0 0 0
$29.33 Staff Engineer Ricker Lamphier 1.50 1.50 0.00 0.00 0 0 0 0 0 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
Total Hours 15.10 1.10 14.00 0.00 0.00 0 0 0 0 0
Direct Labor $615.57 $70.82 $544.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $714.06 $82.15 $631.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $346.32 $39.84 $306.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $1,675.95 $192.81 $1,483.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 7/6/2022
Task #: HW687 DC017A SubTask 1 Project Management SubTask 6 Site: Imperial Cleaners (Former) ERIC_4789 SubTask 2 System Bump & Evaluation SubTask 7
Activity/Phase: System Bump & Evaluation SubTask 3 Utilities SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 Travel
Vehicle Rental $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $1,000.00 $0.00 1,000.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Initiation Fee $225.00 $0.00 225.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,225.00 $0.00 $1,225.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $40.00 $0.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,265.00 $0.00 $1,265.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,165.00 1,165.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $70.00 70.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,235.00 $1,235.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $75.00 75.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $75.00 $75.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,250.95 $192.81 $2,793.14 $1,265.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $167.59 $19.28 $148.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,418.54 $212.09 $2,941.45 $1,265.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Imperial Cleaners (Former) ERIC_4789 SUBTASK 2: System Bump & Evaluation
PROPOSAL NO. PH4227040
DATE: 7/6/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning/Initial Site Visit/Month 1 O&M Staff Engineer RL 1.00 Staff Engineer RL 0.50 Senior Engineer DC Mobilization (from Tampa - included with Village Laundry) 0.00 Senior Engineer DC System Startup / Initial Visit / Inventory Equipment / Evaluate System Operation 3.00 Environmental Technician CO Load/unload 0.50 Environmental Technician CO Mobilization (from Tampa - included with Village Laundry) 0.00 Environmental Technician CO System O&M, optimize system 3.00 Environmental Technician CO Collect soil vapor samples for laboratory analysis 3.00 Senior Engineer DC 3.00
*All mobilization are included with Village Laundry, an adjacent site TOTAL LABOR 14.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (Environmental Technician) 120 day 0 -$ Truck (Senior Engineer) 120 day 0 -$
TOTAL VEHICLE -$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL SUBCONTRACTOR -$
Request sample kit PreTask Planning, prepare field sampling SOW/coordinate site access
System bump data, evaluation & recommendations (sent in an email)
SUBTASK 2: System Bump & Evaluation
PROPOSAL NO. PH4227040
DATE: 7/6/2022
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
VOCs 200.00$ 5 1,000.00$
Summa Canister 33.00$ 5 165.00$ Sample Shipping Large (2 day) 70.00$ 1 70.00$
TOTAL LAB 1,235.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction / O&M / Pilot Test Kit 360.00$ day 0 -$ Construction / O&M Supplies 75.00$ day 1 75.00$ Expendables 40.00$ day 0 -$
TOTAL EQUIPMENT 75.00$
TO-15 (VEW-1, -2, -3, -4 Influent)
SUBTASK 4: Utilities
PROPOSAL NO. PH4227040
DATE: 7/6/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0.0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE -$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Duke Initiation Fee 225.00$ lump sum 1 225.00$ Duke Electric 500.00$ Month 2 1,000.00$
Subcontractor Handling Fee 20.00$ Month 2 40.00$
TOTAL SUBCONTRATOR 1,265.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT -$
| DC017A.pdf |
| HW687 DC017A.pdf |
| DC017A memo.pdf |
| DC017A CEF-LOE 220706.pdf |
| Cost Estimate |
| LOE Subtask 2 O&M |
| LOE Subtask 3 Utilities |
| DC017Aproposal220706_Page_5.pdf |
| DC017Aproposal220706_Page_6.pdf |