This is a Task Assignment (TA) document executed between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc. for groundwater sampling and monitoring services at the Dadeland Cleaners facility (ERIC_4461) located at 8695 South Dixie Highway in Miami, Florida. The task assignment is issued under Contract Number HW687 and is identified as TA Number DC023A with an effective date of November 10, 2022, and a completion date of May 30, 2023. Dean Cox serves as the FDEP project manager, while Donna Cline serves as the contractor's project manager.
The scope of work authorizes costs for volatile organic hydrocarbon (VOH) groundwater sampling and monitoring, including associated expenses for equipment, sample analysis, sampling waste disposal, and sampling results evaluation and reporting. The contractor will collect groundwater samples from five monitoring wells (MW101, MW102D, MW104, MW106, and MW107) and prepare a comprehensive Annual Groundwater Monitoring Report with field notes, updated site tables and figures, certified laboratory reports, and site recommendations within 20 business days of receiving analytical results. The total task assignment value is $3,056.37 on a fixed unit rate basis, representing a 59 percent reduction from the originally proposed costs due to overlap with a separate PFAS groundwater sampling task at the same site. Laboratory costs of $425.00 include VOH analytical testing and sample shipping, with field expenses of $389.00 for expendables and analytical-related equipment. Payment is conditioned upon FDEP approval of the completed Groundwater Monitoring Report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC023A Completion May 30, 2023
This TA authorizes costs for groundwater sampling/monitoring, along with associated costs for equipment, sample analysis, sampling waste disposal, and sampling results evaluation & reporting. The total cost of this TA is $3,056.37 and all costs are fixed unit rate.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_4461
8695 South Dixie Highway, Miami
Dadeland Cleaners (former)
✔ $ 3,056.37
$ 3,056.37
Scope of Work
David Phillips Digitally signed by David Phillips Date: 2022.11.08 12:13:39 -05'00'
N/A
Cline, Donna L Typewriter Donna Cline
Sr. Remediation Engineer
11/10/22
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report, including field notes & forms, updated site tables & figures, certified laboratory report, sampling data summary, and site recommendations; Project Management.
01/31/2023
FDEP approval of Groundwater Monitoring Report (Subtask 1 Project Management and Subtask 2 Groundwater Sampling/Monitoring & Reporting). $ 3,056.37
$ 3,056.37
HW687
DC023A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: Groundwater Sampling DC023A for Dadeland Cleaners (former) ERIC_4461
DATE: 11/7/2022
This task assignment (TA) authorizes costs for volatile organic hydrocarbon (VOH) groundwater sampling/monitoring, along with associated costs for equipment, sample analysis, sampling waste disposal, and sampling results evaluation & reporting. The total cost of this TA is $3,056.37 and all costs are fixed unit rate. The costs for this TA were negotiated. The originally proposed costs are reduced in this TA by $4,452.52 or 59%.
The TA costs are reduced in part because travel and some equipment and field work overlaps with that required for a separate PFAS groundwater sampling TA – sampling for VOHs and PFAS will occur as one site sampling event. This sampling event was not due to occur until after the PFAS sampling TA was executed as part of an initial FY2023 PFAS sampling initiative. So, rather than combining the sampling effort into an HW funded TA as has been done for subsequent FY2023 groundwater sampling involving VOHs and PFAS, this TA is a DC funded TA while the PFAS TA is an HW funded TA.
This site had only one monitoring well with a COC above a GCTL in 2021, 3.8 ug/L PCE in MW107. This sampling event is part of ongoing sampling to verify site rehabilitation completion. Site access was verified as accurate & current.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 10/4/2022 Task #: SubTask 1 Project Management SubTask 6
Site: Dadeland Cleaners, ERIC_4661 SubTask 2 Groundwater Monitoring and Reporting SubTask 7 Activity/Phase: GW Monitoring and Reporting SubTask 3 SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$64.50 Project Manager Donna Cline 1.26 1.26 Administrative Susan Delgado 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.25 CADD Specialist Chelsea Fugate 4.50 4.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$32.00 Project Geologist Joshua Feltner 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$26.06 Project Scientist Farina Mackliff 13.50 13.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$44.90 Senior Scientist Paul Thornbury 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 22.26 1.26 21.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $708.67 $81.53 $627.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $822.05 $94.57 $727.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $398.70 $45.87 $352.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $1,929.42 $221.97 $1,707.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 10/4/2022
Task #: SubTask 1 Project Management SubTask 6 Site: Dadeland Cleaners, ERIC_4661 SubTask 2 Groundwater Monitoring and Reporting SubTask 7
Activity/Phase: GW Monitoring and Reporting SubTask 3 SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $315.00 $315.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $425.00 $425.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $46.50 $46.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $342.50 $342.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $389.00 $389.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $2,863.42 $221.97 $2,641.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $192.95 $22.20 $170.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $3,056.37 $244.17 $2,812.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dadeland Cleaners, ERIC_4661 SUBTASK 2: Groundwater Sampling & Reporting (coord w PFAS sampling tasked separately)
PROPOSAL NO. PHF227024
DATE: 11/7/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Groundwater Sampling Senior Scientist PT 0.50 Senior Scientist PT 0.50
Project Scientist FM Load/unload 0.50 Project Scientist FM Access wells and install locks (7 wells) 1.00 Project Scientist FM Collect groundwater levels ( 9 wells [includes 2 pizometers],10 minutes per well) 1.50 Project Scientist FM Collect GW samples (5 wells [MW101, MW102D, MW104, MW106, MW107), 1.5 hrs each) 4.50 Project Scientist FM Containerize IDW 0.50 , p p Report Deliverable Project Scientist FM Prepare report tables, trend graphs and draft maps 1.50 Senior Scientist FM Prepare report 4.00 Senior Scientist PT QA/QC field and laboratory data 0.50 Senior Scientist PT Evaluate and Summarize Water Quality Parameters 0.50 Senior Scientist PT Evaluate and Summarize Groundwater Analytical Results 0.50 Senior Scientist PT Conclusions/Recommendations 0.50
CADD Specialist CF Prepare initial base figures (convert TetraTechs) 2.00 CADD Specialist CF Prepare Exhibits (groundwater flow and concentrations) 2.50
LABOR BY EMPLOYEE PT 3.00 FM 13.5 CF 4.5 TOTAL LABOR 21.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling) 120 day 1 $120.00
TOTAL VEHICLE $120.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs (Short List) EPA 8260 63.00$ 5 $315.00 Sample Shipping Small Cooler (1 day) 110.00$ 1 $110.00
TOTAL LAB $425.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 1 $40.00
Ice (Sample shipping) 6.50$ 1 $6.50
Analytical Related Shallow groundwater samp 290.00$ day 1 $290.00 Tubing, HDPE 0.30$ ft 145 $43.50 Tubing, silicon (3/16 x 3/8) 3.00$ ft 3 $9.00
TOTAL EQUIPMENT $389.00
Request sample kit Prepare Health and Safety Plan
3559 Timberlane School Rd
Tallahassee, FL 32312
P (850) 692-7185
F (813) 692-7186
Terracon.com
October 4, 2022
Florida Department of Environmental Protection
Waste Cleanup Program
Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Mr. Dean Cox, Environmental Consultant
E: Dean.Cox@FloridaDep.gov
W: 850-245-8969
M: 727-686-6502
Re: Proposal for Annual Groundwater Monitoring and Reporting – Revised Combined with a Separate PFAS Sampling Event
Dadeland Cleaners, Inc.
8695 S. Dixie Highway
Miami, Dade County, Florida
ERIC_4461
Task Assignment HW687
Terracon Proposal No. PHF227024
Dear Mr. Cox:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the
Florida Department of Environmental Program (FDEP) Waste Cleanup Program to conduct Annual
Groundwater Monitoring and Reporting for the Dadeland Cleaners, Inc. (ERIC_4461) facility located at
8695 S. Dixie Highway in Miami, Dade County, Florida.
Scope of Services
◼Field task planning, mobilize to site, perform groundwater sampling and laboratory analysis of 5 existing monitoring wells
(MW101, MW102D, MW104, MW106, and MW107) – with the combined PFAS proposal, 3 additional groundwater samples will be collected since 2 are included with the PFAS proposal.
◼ Review data and prepare an Annual Groundwater Monitoring
Report including updated tables and groundwater flow and concentration exhibits. See attached LOE for details
Schedule
Deliverable Annual Groundwater Monitoring Report within 20 business days following receipt of laboratory results.
Compensation
See attached CEF for details.
mailto:Dean.Cox@FloridaDep.gov
Proposal for Annual Groundwater Monitoring and Preparation of Report, Revised for separate PFAS event
Dadeland Cleaners, ERIC_4461 ■ Miami, FL
October 4, 2022 ■ Terracon Proposal No. PHF227024
SITE RECOMMENDATIONS
Recent site assessment activities were reported in a Site Assessment Report, Revision 1 in June 2021, prepared by Tetra Tech. A summary of the findings is provided below:
▪ Site monitoring wells are currently located within the vicinity of the CVS drive through, will need to coordinate site access with the site owner.
▪ Soil laboratory analysis reported no volatile organic halocarbon (VOH) concentrations exceeding the applicable soil cleanup target levels (SCTL).
▪ MAGS data identified tetrachloroethene (PCE) concentrations from 0.9 milligrams per meters cubed (mg/m3) to 2.5 mg/m3. The highest level of 2.25 mg/m3 was recorded at MAGS-08, which would have been reportedly located near the back door of the former facility. Further direction from FDEP will be necessary to understand if an Interim Source Removal for a Soil Vapor Extraction system will need to be prepared.
▪ The drycleaning constituents of interest (COI’s) includes PCE, which was detected above the
GCTL from Monitoring well MW107. The conceptual site model suggests that the groundwater concentrations of PCE in groundwater that were reported 1996 appear to have naturally attenuated after the reported interim source removal at the backdoor of the facility.
▪ This proposal has been revised to be performed with a separate PFAS groundwater sampling event. Thus, the CEF/LOE reflects reductions in staff time for the initial site visit, pre-task planning, mobilizations, groundwater sampling, IDW coordination. Additionally, reductions are reflected in vehicle usage, IDW disposal, expendables, analytical related equipment, and IDW related equipment.
Terracon recommends sampling and gauging the monitoring wells identified in the Scope of Services.
An evaluation of current groundwater quality data from these wells will provide a clearer and more comprehensive strategy for a path forward.
DELIVERABLES
The Annual Groundwater Monitoring Report will detail and summarize the sampling activities, field observations, and results of monitoring well analysis and will include updates to the site’s historical data tables and updated exhibits of groundwater flow and well concentrations. Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities should the results indicate the onsite plume is nearing eligibility for Risk
Management Option (RMO) I closure.
SCHEDULE
It is estimated that the wells could be sampled within two weeks from TA authorization and report issued within 20 business days of receipt of analytical data.
| DC023A.pdf |
| Binder1.pdf |
| DC023A.pdf |
| DC023A memo.pdf |
| Pages from DC023Aproposal221104final-2.pdf |
| ST2LOEfinalFormat.pdf |
| LOE Subtask 2 |
| Pages from DC023Aproposal221104final-3.pdf |
| DC023Aproposal221104final_Page_7.pdf |
| IDWbids.pdf |
| ErwinRemediation Quote - Terracon - Drum - All Regions - 03.04.2022 |
| Clean Earth |
| Whatever Waste - Drum Quote Proposal 030822.1 |
| Whatever Waste Proposal 030822.2 - South Region |