This is a Task Assignment (TA) document under the Florida Department of Environmental Protection's Waste Cleanup Program (WCP) Contract No. HW687. The assignment authorizes Terracon Consultants, Inc. to conduct groundwater sampling and reporting activities at the Village Laundry and Cleaners site located at 10235 Lake Carroll Way, Tampa, Hillsborough County, Florida (ERIC_4743). The work is administered by the State of Florida Department of Environmental Protection with Gabriel Sostre serving as the Department Project Manager and Donna Cline as the Contractor's Project Manager. The task assignment is effective through August 8, 2025.
The scope of work authorizes Terracon to conduct groundwater monitoring for Volatile Organic Hydrocarbons (VOHs) and per- and polyfluorinated substances (PFAS) analysis, with a total task assignment value of $18,126.96 on a fixed unit rate basis. Deliverables include two subtasks: Subtask 1 & 2 for Project Management, VOH Groundwater Sampling (due 03/14/2025) at $16,384.67, and Subtask 3 for PFAS Sampling (due 05/02/2025) at $1,742.29. The work comprises 100.66 total labor hours allocated across project management, field sampling, and report preparation. Invoicing is contingent upon Florida Department of Environmental Protection approval of submitted Groundwater Monitoring Reports. The cost estimate includes direct labor ($11,337.23), overhead (116%), fringe benefits (56.26%), vehicle charges ($840.00), subcontractor costs for investigative-derived waste disposal ($310.00), laboratory analytical costs ($1,862.00), and field equipment and expendables ($2,613.00).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW687
DC014F August 8, 2025
This Task Assignment authorizes Terracon to conduct Groundwater Sampling at the
Village Laundry and Cleaners site.
Gabriel Sostre 850-245-8749 Terracon Consultants, Inc.
Donna Cline 904-479-7415
ERIC_4743
10235 Lake Carroll Way, Tampa, Hillsborough County
Village Laundry and Dry Cleaners
$ 18,126.96
$ 18,126.96
Scope of Work
Terracon Consultants, Inc.
Donna Cline
Senior Associate / Remediation Engineer
01/07/2025
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.12.17 15:32:00 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Secretary
Memorandum
TO:
FROM:
Negotiation File
ERIC
, Project Manager
SUBJECT: Negotiation Summary
DATE:
Task Assignment (HW687)
FDEP COST ESTIMATE
Contractor: Terracon
Date: 12/16/2024
Task #: SubTask 1 Project Management
Site: Village Laundry and Dry Cleaners ERIC_4743 SubTask 2 VOH Groundwater Sampling
Activity/Phase: Groundwater Sampling and Reporting SubTask 3 PFAS Sampling
Project Manager: Gabriel Sostre SubTask 4
SubTask 5
Totals 1 2 3 4 5 6
Labor Rate Category
$55.29 Project Manager Fabio Fortes 8.66 8.66
$33.31 CADD Specialist Chelsea Fugate 7.00 6.00 1.00 0.00 0.00 0.00
$31.85 Staff Engineer Eddy Lion 28.50 28.50 0.00 0.00 0.00 0.00
$41.30 Senior Scientist Ryan Fetter 42.50 40.50 2.00 0.00 0.00 0.00
$70.14 Senior Engineer Donna Cline 1.00 0.00 1.00 0.00 0.00 0.00
$55.29 Senior Engineer Fabio Fortes 13.00 6.00 7.00 0.00 0.00 0.00
Total Hours 100.66 8.66 81.00 11.00 0.00 0.00 0.00
Direct Labor $4,164.12 $479.06 $3,111.98 $573.08 $0.00 $0.00 $0.00
Overhead 116.00% $4,830.38 $555.71 $3,609.90 $664.77 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 56.26% $2,342.73 $269.52 $1,750.80 $322.41 $0.00 $0.00 $0.00
Total Labor $11,337.23 $1,304.29 $8,472.68 $1,560.26 $0.00 $0.00 $0.00
Travel
Vehicle charge $840.00 840.00$ $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $840.00 $840.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW - Petrotech $310.00 310.00$ $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $310.00 $310.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $31.00 $31.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $341.00 $341.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $1,752.00 1,752.00$ -$ $0.00 $0.00 $0.00
Encore Sampler $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $110.00 110.00$ -$ $0.00 $0.00 $0.00
Total Laboratory $1,862.00 $1,862.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $185.00 159.00$ 26.00$ $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 -$ $0.00 $0.00 $0.00
Equipment (IDW related) $100.00 100.00$ $0.00 $0.00 $0.00 $0.00
Equipment (Other) $2,328.00 2,328.00$ $0.00 $0.00 $0.00 $0.00
Total Field Expenses $2,613.00 $2,587.00 $26.00 $0.00 $0.00 $0.00
Subtotal $16,993.23 $1,304.29 $14,102.68 $1,586.26 $0.00 $0.00 $0.00
Completion Fee $1,133.73 $130.43 $847.27 $156.03 $0.00 $0.00 $0.00
Total Estimated Cost $18,126.96 $1,434.72 $14,949.95 $1,742.29 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Village Laundry and Dry Cleaners ERIC_4743
SUBTASK 2: VOH Groundwater Sampling
PROPOSAL NO. PH4237303
DATE: 12/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Staff Engineer EL 1.00
Senior Scientist RF 1.00
Senior Engineer FF 3.00
Groundwater Sampling
Senior Scientist RF 2.00
Staff Engineer EL 3.00
Senior Scientist RF 1.00
Staff Engineer EL 1.00
Senior Scientist RF 3.00
Staff Engineer EL 3.00
Senior Scientist RF 17.50
Staff Engineer EL 17.50
Staff Engineer EL 2.00
Senior Scientist RF 1.00
Staff Engineer EL 1.00
GWM Report Deliverable
Senior Scientist RF 4.00
Senior Scientist RF 7.00
Senior Scientist RF 1.00
Senior Scientist RF 3.00
Senior Engineer FF 3.00
CADD Specialist CF 6.00
Personnel: RF EL FF CF DC
Hours: 40.50 28.50 6.00 6.00 0.00 TOTAL LABOR 81.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (RF) GW Sampling 120.00$ day 3 360.00$
Truck (EL) GW Sampling 120.00$ day 3 360.00$
Truck (EL) IDW pick up 120.00$ day 1 120.00$
TOTAL VEHICLE 840.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Petrotech IDW Disposal 310.00$ each 1 310.00$
TOTAL SUBCONTRACTOR 310.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW TOTALS
Halocarbons (short list) EPA 8260 73.00$ 23 1,752.00$
Sample shipment Small, overnight 110.00$ 1 0 110.00$
TOTAL LAB 1,862.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 3 120.00$
Ice (Sample preservation, 2 bags/day) 6.50$ day 6 39.00$
Equipment (others) Shallow Groundwater Sampling Kit 325.00$ day 6 (2 people x 3 days) 1,950.00$
Tubing, HDPE 0.30$ ft 1100 330.00$
Tubing, silicon (3/16 x 3/8) 3.00$ ft 16 48.00$
IDW Related 55-gallon drum, new 100.00$ each 1 100.00$
TOTAL EQUIPMENT 2,587.00$
Conclusions and reccomendations
Prepare Figures and Exhibits
Prepare report tables, draft groundwater elevation and analytical isoconcentration figures
Prepare report
QA/QC field and laboratory data
Summarize groundwater analytical results
Collect water levels from 34 monitoring wells @ 10 minutes per well
Kickoff meeting and field work organization
Kickoff meeting and field work organization
Mobilization/Demobilization (from Tampa)
Field documents organization
Field documents organization
Request the VOH Sample Kit and PreTask Planning, remotely turn off the SVE system the day before the mobilization, and prepare field sampling and Field Work Request.
Load/unload equipment and check equipment calibration
Pickup drum for IDW from drum wholesale. Load/unload equipment, and check equipment calibartion
Mobilization/Demobilization (from Tampa)
Collect water levels from 34 monitoring wells @ 10 minutes per well
Collect 23 VOH Groundwater Samples @ 1.5 hrs per well
Collect 23 VOH Groundwater Samples @ 1.5 hrs per well
Containerize IDW,coordinate with current Tenant, turn on the SVE system at the end of the GW sampling activities
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Village Laundry and Dry Cleaners ERIC_4743
SUBTASK 3: PFAS Sampling
PROPOSAL NO. PH4237303
DATE: 12/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning
Senior Engineer FF 2.00
Groundwater Sampling activities included in LOE 2
IDW Coordination Senior Engineer FF 1.00 Staff Engineer EL 2.00
Email Deliverable for PFAS Sampling
Senior Engineer FF QA/QC field and laboratory data 2.00
Senior Engineer FF Evaluate and summarize groundwater analytical results 2.00
Senior Engineer DC Conclusions and Recommendations for PFAS analysis 1.00
CADD Specialist CF Prepare PFAS exhibit (showing PFOA, PFOS and PFOA+PFAS for each well) 1.00
Personnel: EL FF DC CF
Hours: 2.00 7.00 1.00 1.00 TOTAL LABOR 11.00
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE -$
LABORATORY COSTS
PARAMETER RATE # SAMPLES IDW
TOTAL LAB -$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 0 -$
Ice (Sample Preservation 2 bags/day) 6.50$ each 4 26.00$
Analytical related Groundwater Sampling Kit 290.00$ day 0 -$
Tubing, HDPE 0.30$ ft 0 -$
Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 -$
TOTAL EQUIPMENT 26.00$
Request Sample Kit, Coordinate Lab Availability
Prepare IDW Waste Characterization/Generator Profile, schedule and coordinate pickup Meet Transporter onsite and sign manifest
File details come from the government source that posted it. Updated .