This is a Task Assignment (TA) under Florida Department of Environmental Protection (FDEP) Contract Number HW687, executed between the State of Florida Department of Environmental Protection and Terracon Consultants, Inc. The task is designated TA Number DC012B and is effective through August 31, 2023. The work is located at Palace Drycleaners, 733 S. Orange Blossom Trail, Apopka, Florida (ERIC_5049). The Department Project Manager is Dean Cox (850-245-8969), and the Contractor's Project Manager is Donna Cline (813-321-0340).

The Task Assignment authorizes Terracon Consultants, Inc. to perform soil vapor extraction (SVE) system repair, shutdown evaluation, and operation and maintenance services. The work includes procuring and installing a new programmable logic controller (PLC), a 5-kilovolt step-up transformer, and a cellular-based Sensaphone Sentinel telemetry system with remote shutdown capability; conducting system startup and shutdown evaluation sampling per FDEP procedures; completing system component replacement and property reporting documentation; and providing one month of operation and maintenance visits and utility costs. The total TA value is $13,147.61, comprised of $12,147.61 in fixed unit rate charges and $1,000.00 in cost reimbursement for utilities. The contract was negotiated at 3 percent below the original proposal cost. Deliverables are due by May 31, 2023, with invoicing contingent upon FDEP approval of documentation and receipt of utility invoices. The work is authorized under FDEP's indefinite delivery/indefinite quantity contract vehicle for environmental remediation services.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010A.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048A.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC012B Completion August 31, 2023

This TA authorizes costs associated with SVE system blower step-up transformer installation and telemetry upgrade. The total cost of this TA is $13,147.61 with $1,000 of cost reimbursement included in this total cost.

Dean Cox 850-245-8969 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 813-321-0340

ERIC_5049

733 S. Orange Blossom Trail, Apopka

Palace Drycleaners

✔ $ 12,147.61 ✔ $ 1,000.00

$ 13,147.61

Scope of Work

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.03.08 14:13:02 -05'00'

N/A

Cline, Donna L Typewriter Donna Cline Sr. Remediation Engineer

03/08/2023

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Notes & before/after photos for transformer, PLC and telemetry installs; notes/forms for startup and 1st month O&M; updated O&M tables; SVE eval email; lab report for startup sampling; property docs (ST1 Proj Mgmt and ST2 SVE Repair, Eval & O&M).

05/31/2023

DEP approval of notes & photos for transformer, PLC and telemetry installs;

notes/forms for startup and 1st O&M; updated O&M tables; SVE eval email; lab report for startup; property docs (ST1 Proj Mgmt & ST2 SVE Repair, Eval & O&M).

$ 12,107.61

DEP receipt of utility invoices - Utilities Cost Reimbursement not to exceed $1000;

Utilities Handling Fee $40 (Subtask 3 Utilities) $ 1,040.00

$ 13,147.61

HW687

DC012B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Interim Secretary

Memorandum

TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC012B Palace Drycleaners (ERIC_5049) SVE Repair & Upgrade

DATE: 11/22/2022

This TA authorizes costs associated with SVE system blower step-up transformer installation and telemetry upgrade. The total cost of this TA is $13,147.61 with $1,000 of cost reimbursement included in this total cost. This TA was negotiated - the total cost is $469.17 or 3% less than originally proposed. Details of the scope of this task are provided below. The soil gas levels are low, so the system samples tasked have a good chance of indicating the system can be removed. Site access was confirmed current.

The previous Task Assignment (DC012A-1) included replacing the SVE blower and troubleshooting the system after the blower was operational. The following issues were identified after the blower was replaced.

• The system was unable to operate in Auto mode due to a programmable logic controller (PLC) malfunction.

• The telemetry system was effectively inoperable because it is integrated with the PLC and is based on obsolete technology (analog modem).

• A variance was identified between the voltage supply (208 VAC) and demand (blower rated for 230 VAC), which may have contributed to the previous blower’s failure. The previous blower may have drawn excessive amperage to compensate for the low voltage condition.

Terracon will replace the existing malfunctioning PLC and install a cellular-based telemetry system and a step-up transformer. This will allow for remote system monitoring and shutdown.

This TA also includes system startup, O&M, sample collection, and one monthly O&M visit. Sample collection will be performed in accordance with the FDEP SVE System Shutdown procedures, which include restarting the system and collecting (summa) samples after purging approximately 1 pore volume. The system will continue running during the sample analysis and evaluation period. Terracon will submit an email summary and evaluation of system performance and sampling results.

Terracon will complete a WSCS Major Component Replacement Form (10-10), etch the SVE system property number on the step-up transformer and telemetry components (as possible), and will include these items on the DEP Property Reporting Form (55-211). These forms and their required associated documentation will be submitted as one of the required Subtask 2 deliverables. Terracon will explore scrapping opportunities for any existing telemetry components that are removed.

FDEP COST ESTIMATE

Contractor: Terracon

Date: 3/7/2023 Task #: HW687 DC012B SubTask 1 Project Management SubTask 6

Site: Palace Cleaners ERIC_5049 SubTask 2 System Repair, Shutdown Evaluation, and Monthly O&M SubTask 7 Activity/Phase: System Repair, Shutdown Evaluation, O&M SubTask 3 Utilities SubTask 8

Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$64.50 Project Manager Donna Cline 2.24 2.24 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

$31.25 CADD Specialist Chelsea Fugate 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

$24.75 Environmental Technician Peter Christenson 16.00 16.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

$64.50 Senior Engineer Donna Cline 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

$40.87 Senior Scientist Michael Mui 17.50 17.50 0.00 0.00 0.00 0 0 0 0 0 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

Total Hours 35.74 2.24 33.50 0.00 0.00 0.00 0 0 0 0 0

Direct Labor $1,255.69 $144.46 $1,111.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $1,456.60 $167.57 $1,289.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $706.45 $81.27 $625.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,418.74 $393.30 $3,025.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 3/7/2023

Task #: HW687 DC012B SubTask 1 Project Management SubTask 6 Site: Palace Cleaners ERIC_5049 SubTask 2 System Repair, Shutdown Evaluation, and Monthly O&M SubTask 7

Activity/Phase: System Repair, Shutdown Evaluation, O&M SubTask 3 Utilities SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $320.00 320.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $320.00 $320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $1,000.00 $0.00 1,000.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SVE PLC, telemetry, and transformer procurement & install $5,850.00 5,850.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $6,850.00 $5,850.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $625.00 $585.00 40.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $7,475.00 $6,435.00 $1,040.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $932.00 932.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $70.00 70.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,002.00 $1,002.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 80.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $510.00 510.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $590.00 $590.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $12,805.74 $393.30 $11,372.44 $1,040.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $341.87 $39.33 $302.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $13,147.61 $432.63 $11,674.98 $1,040.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Palace Cleaners ERIC_5049 SUBTASK 2: System Repair, Shutdown Evaluation, and Monthly O&M

PROPOSAL NO. PH1227122

DATE: 3/8/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

SVE System Repair, System Startup, and Collect Shutdown Evaluation Samples Environmental Technici PC 1.00 Environmental Technici PC Mobilization (from Winter Park) 1.50 Senior PM/Engineer MM Mobilization (from Tampa) 4.00 Senior PM/Engineer MM Oversee installation of new system components, and SVE startup 6.00 Environmental Technici PC Oversee component installation, conduct O&M, optimize performance, and collec 8.00 samples for lab analysis Senior PM/Engineer MM Monthly recording of system data and laboratory data into the operational tables 2.00 Senior PM/Engineer MM 2.00 Senior PM/Engineer MM Complete Component Replacement and Property Reporting Forms with 2.50 associated documentation

Monthly O&M Environmental Technici PC PreTask planning, Load/unload 1.00 Environmental Technici PC Mobilization (from Winter Park) 1.50 Environmental Technici PC Perform System O&M, optimize system 3.00 Senior PM/Engineer MM Monthly recording of system data into the operational tables 1.00

Personnel: PC MM Hours: 16.00 17.50 TOTAL LABOR 33.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Environmental Technician) 120 day 2 240.00$ Auto (Engineer) 80 day 1 80.00$

TOTAL VEHICLE 320.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Remedial Systems Integrated (RSI)

Procure and install PLC, telemetry, and transformer ######## lump sum

5,850.00$

TOTAL SUBCONTRACTOR 5,850.00$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS

VOCs 200.00$ 4 800.00$

Summa Canister 33.00$ 4 132.00$ Sample Shipping Large (2 day) 70.00$ 1 70.00$

TOTAL LAB 1,002.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction / O&M / Pilot Test Kit 360.00$ day 1 360.00$ Construction / O&M Supplies 75.00$ day 2 150.00$ Expendables 40.00$ day 2 80.00$

TOTAL EQUIPMENT 590.00$

TO-15 (VEW-1, -2, -3, Influent)

PreTask planning, Load/unload

System evaluation and recommendations (sent in an email)

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Palace Cleaners ERIC_5049 SUBTASK 3: Utilities

PROPOSAL NO. PH1227122

DATE: 3/8/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0.0

TOTAL PER DIEM -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

FPL Electric 500.00$ Month 2 1,000.00$ Subcontractor Handling Fee 20.00$ Month 2 40.00$

TOTAL SUBCONTRATOR 1,040.00$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT -$

5463 West Waters Avenue, Suite 830

Tampa, FL 33584

P (813) 221-0050 F (813) 221-0051

Terracon.com

March 2, 2023

Florida Department of Environmental Protection Waste Cleanup Program Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Attn: Mr. Dean Cox, Environmental Consultant E: Dean.Cox@FloridaDep.gov W: 850-245-8969 M: 727-686-6502

Re: Proposal for SVE System Repair, Shutdown Evaluation, and O&M

Palace Dry Cleaners 733 S. Orange Blossom Trail Apopka, Florida

ERIC_5049

Task Assignment HW687 DC012B Terracon Proposal No PH1227122

Dear Mr. Cox:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Protection (FDEP) Waste Cleanup Program to repair a soil vapor extraction (SVE) system and conduct FDEP SVE system shutdown procedures.

The previous Task Assignment (DC012A-1) included replacing the SVE blower and troubleshooting the system once the blower was operational. The following issues were identified after the blower was replaced:

The system was unable to operate in Auto mode due to a programmable logic controller (PLC) malfunction.

The telemetry system was effectively inoperable because it is integrated with the PLC and is based on obsolete technology (analog modem).

A variance was identified between the voltage supply (208 VAC) and demand (blower rated for 230 VAC), which may have contributed to the previous blower’s failure. The previous blower may have drawn excessive amperage to compensate for the low voltage condition.

Terracon recommends removing the currently installed PLC and installing three new components: a PLC, a cellular-based telemetry system, and a step-up transformer. The quoted services include incorporating remote shutdown capability in the telemetry system.

This proposal also includes system startup, O&M, sample collection, and one monthly O&M visit after the startup event. Sample collection will be performed in accordance with the FDEP SVE System Shutdown procedures, which includes restarting the system and collecting summa samples after purging approximately 1 pore volume. The system will continue running during the sample analysis

Proposal for SVE System Repair, Shutdown Evaluation, and O&M Palace Dry Cleaners, ERIC_5049 ■ Apopka, FL March 2, 2023 ■ Terracon Proposal No. PH1227122 and evaluation period. Terracon will submit an email summary and evaluation of system performance and sampling results within 5 business days of receiving the analytical results.

The proposed scope includes one monthly O&M visit after the startup event to either continue routine O&M, or turn off and secure the system, depending on the results of the SVE shutdown evaluation.

O&M activities will be conducted in either case to allow system performance to be evaluated after all the new components have been able to operate continuously for one month.

Scope of Services

Subtask 2 includes procurement and installation of a new programmable logic controller (PLC), step-up transformer, and Sensaphone Sentinel telemetry system.

Subtask 3 includes two Operation and Maintenance (O&M) site visits. The first site visit includes restarting the system and collecting soil vapor samples in accordance with the FDEP SVE shutdown evaluation procedures. The second site visit is proposed to either continue routine O&M, or turn off and secure the system, depending on the results of the SVE shutdown evaluation.

Subtask 4 includes utility services. Two months of utilities are included to allow the system to continue operating during the laboratory analysis, data evaluation, and report review period.

See attached LOE for details

Schedule The email summary will be submitted within 5 business days of receipt of analytical results.

Compensation See attached CEF for details.

DELIVERABLES

The deliverable for Subtask 2 includes the field notes and FDEP system component replacement documentation. The deliverable for Subtask 3 will include an email summary and evaluation of the SVE system repairs, operating performance and sampling results. The email summary will include the O&M checklist(s), field notes, updated operational tables, and laboratory analytical report.

SCHEDULE

It is estimated that system repairs will be performed in March or April 2023, depending on Task authorization and subcontractor scheduling availability, with an email summary deliverable by April or May 2023.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a TA will be issued to authorize us to perform this work.

Proposal for SVE System Repair, Shutdown Evaluation, and O&M Palace Dry Cleaners, ERIC_5049 ■ Apopka, FL March 2, 2023 ■ Terracon Proposal No. PH1227122

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments, please contact either of the undersigned at 813-221-0050.

Sincerely, Terracon Consultants, Inc.

Michael Mui Donna Cline, P.E.

Remediation Engineer Senior Remediation Engineer

Attachments: Cost Spreadsheet Level of Effort 3-Bid Summary and Vendor Quotes

ESD

Waste2Water RES RSI

New standard BRX PLC 954.00 800.00 Install and program PLC 1,500.00 1,250.00 New 5kva transformer 580.00 1,200.00 Install transformer 1,500.00 300.00 New Sensaphone Sentinel 1,892.00 1,750.00 Install and program Sensaphone 1,400.00 550.00 Total 7,826.00 5,850.00

3-Bid Summary SVE System Repair

Palace Cleaners (ERIC_5049)

No Bid

Page 1 of 1 Terracon Project No. H1227122

Quote Date: ____________________

Company Name: ____________________

Contact Phone or Email: ____________________

Description Lead Time

(weeks) Amount

New standard BRX PLC

Install and program PLC on-site, including additional materials

New 5kva Transformer

Install transformer on-site, including additional materials

New Sensaphone Sentinel

Install and program Sensaphone on-site, including remote start/stop functionality and additional materials

TOTAL

SVE System Repair Quote Palace Cleaners (ERIC_5049)

733 South Orange Blossom Trail, Apopka, FL 32703 Terracon Project No. H1227122

6 $954.00

6 $1,500.00

6 $580.00

6 $1,500.00

6 $1,892.00

6 $1400.00

02/28/2023

ESD Waste2Water.inc dustinwhitt@waste2water.com

$7,826.00

Mui, Michael

From: ddennis resflorida.com <ddennis@resflorida.com> Sent: Tuesday, February 28, 2023 2:28 PM To: Mui, Michael Subject: Re: RFQ - SVE Upgrade/Repair

I'm gonna pass Mike, thanks.

Regards, Dave Dennis Remediation Equipment Services, LLC 290 Dempsey Road Palm Harbor, FL 34683

PH: (727) 458-6808

FAX: (727) 638-9186

ddennis@resflorida.com www.resflorida.com

From: Mui, Michael <Michael.Mui@terracon.com> Sent: Monday, February 27, 2023 2:26 PM To: ddennis resflorida.com <ddennis@resflorida.com> Subject: RE: RFQ - SVE Upgrade/Repair

Hi Dave, Would you be interested in submitting a bid to repair/upgrade an SVE system in Apopka? If so, please see details below and complete the attached bid form.

After the blower was replaced last year, problems were identified with the PLC and voltage supply. The system runs fine in hand mode but does not work in auto mode. The PLC is an EOS ProControl unit with no LCD display and an analog modem. We are looking at replacing it with a standard BRX PLC and a Sensaphone Sentinel. A variance was also noted between the voltage supply (208 VAC) and demand (blower rated for 230 VAC), which may have contributed to the failure of the previous blower.

Scope:

1. Procure and install a new standard BRX PLC. The control panel section from the O&M Manual is attached for reference.

2. Procure and install a 5 kva step-up transformer.

3. Procure and install a new Sensaphone Sentinel telemetry system, including remote start/stop functionality.

Please include all applicable sales tax, shipping and handling fees, and mobilization fees in your quote.

Thanks for your time. Please let me know if you need any additional information.

SVE System Repair Quote

Palace Cleaners (ERIC_5049)

733 South Orange Blossom Trail, Apopka, FL 32703 Terracon

Project No. H1227122

Quote Date: _______3/1/2023_____________

Company Name: Remedial Systems Integrated LLC

Contact Phone or Email: simo@remedial-systems.com, 813-585-8769

Description

Lead

Time

(weeks) Amount

New standard BRX PLC 2 $800.00

Install and program PLC on-site, including additional materials $1,250.00

New 5kva Transformer 2 $1,200.00

Install transformer on-site, including additional materials $300.00

New Sensaphone Sentinel 1 $1,750.00

Install and program Sensaphone on-site, including remote start/stop functionality and additional materials

$550.00

TOTAL

$5,850.00 mailto:simo@remedial-systems.com

DC012B memo2.pdf
HW687 DC012B.pdf
DC012B CEFinal230307.pdf
Cost Estimate
LOE Subtask 2 O&M
LOE Subtask 3
HW687 DC012B.pdf
DC012B.pdf

File details come from the government source that posted it. Updated .