CN-370000-HW687-DC013B.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW687|519929c0c8a00e44396dc1d8f5fa086b
Contract number
HW687
Issued by
Florida

About this file

This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. for environmental remediation services at the Webbs Cleaners facility located at 1601 Broadway Avenue, Riviera Beach, Palm Beach County, Florida. The Task Assignment DC013B is issued under the underlying Contract Number HW687 and authorizes work to be completed by January 24, 2025. The project is identified as ERIC_5175 and involves coordination between Patrick McGrane (FDEP Project Manager) and Donna Cline (Terracon Project Manager).

Terracon will conduct annual groundwater monitoring and expanded per- and polyfluorinated substances (PFAS) sampling at the site in accordance with the June 14, 2024 Scope of Work, Cost Estimate, and Bid Documentation. The total Task Assignment value is $15,199.52 on a fixed unit rate basis, comprised of Subtasks 1 and 2 valued at $12,765.31 (Project Management and VOH Groundwater Sampling including submittal and FDEP approval of the Annual Groundwater Monitoring Report) and Subtask 3 valued at $2,434.21 (Expanded PFAS Sampling including submittal and FDEP approval of the PFAS analysis section of the Annual Groundwater Monitoring Report). Both deliverables have a due date of November 22, 2024. The work includes sampling from eight monitoring wells for volatile organic halocarbons via EPA Method 8260 and expanded PFAS analysis from nine wells, with laboratory analysis performed by FDEP's laboratory and reporting delivered within 20 business days of receipt of analytical results.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC013B Completion January 24, 2025

This Task Assignment authorizes Terracon Consultants, Inc. (Terracon) to conduct Annual Groundwater Monitoring and expanded PFAS Sampling at Webbs Cleaners in accordance with the June 14, 2024 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 904-479-7415

ERIC_5175

1601 Broadway Avenue, Riviera Beach, Palm Beach County

Webbs Cleaners

✔ $ 15,199.52

$ 15,199.52

Scope of Work

Donna Cline

Senior Associate / Remediation Engineer Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2024.06.26 16:07:50 -04'00'

Cline, Donna L

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.06.26 14:24:38 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW687

DC013B

Subtasks 1 & 2 - Project Management; VOH Groundwater Sampling 11/22/2024

Subtask 3 - Expanded PFAS Sampling 11/22/2024

Subtasks 1 & 2 - Project Management; Submittal and FDEP approval of the Annual Groundwater Monitoring Report $ 12,765.31

Subtask 3 - Submittal and FDEP approval of the PFAS analysis section of the Annual Groundwater Monitoring Report $ 2,434.21

$ 15,199.52

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File

Webbs Cleaners Riviera Beach, Palm Beach County

ERIC_5175

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment DC013B (HW687)

DATE: June 25, 2024

This Task Assignment authorizes Terracon Consultants, Inc. (Terracon) to conduct Groundwater Monitoring and Expanded PFAS sampling at the Webbs Cleaner site.

The total cost for this project is $15,199.52 with approximately 99 total labor hours. All work is to be completed in accordance with the June 14, 2024, Scope of Work, Cost Estimate, and Bid Documentation.

Terracon may invoice according to the included schedule.

Subtask 1:

Project Management is automatically calculated as a percentage of total labor in accordance with Contract HW687.

Subtask 2:

Following verification of an accurate access agreement with the current real property owner, Terracon will collect groundwater samples from eight monitoring wells. All eight wells will be analyzed for Volatile Organic Halocarbons via EPA Method 8260. Expanded PFAS sampling is being conducted due to exceedances in the Provisional Groundwater Cleanup Target Levels for PFOA/PFOS/PFOA+PFOS observed during the 2022 screening event. See attached Scope of Services for sample well IDs and the corresponding analysis.

Following the groundwater sampling event, Terracon will submit a Groundwater Monitoring Report summarizing their findings with updated analytical results and tables as well as their conclusions and recommendations based on the most recent data.

Subtask 3:

Includes costs for PFAS sampling and subsequent reporting as described in the Subtask 3 deliverable and Scope of Services.

FDEP COST ESTIMATEContractor: Terracon Date: 6/25/2024

Task #: HW687 SubTask 1 Project Management SubTask 6 Site: Webbs Cleaners (Former) ERIC_5175 SubTask 2 VOH Groundwater Sampling SubTask 7

Activity/Phase: GW Sampling/PFAS Screening SubTask 3 Expanded PFAS Sampling SubTask 8 Project Manager: Patrick Mcgrane SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$51.92 Project Manager Shawn Ouellette 9.45 9.45 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

$33.31 CADD Specialist Chelsea Fugate 6.00 4.00 2.00 0.00 0.00 0 0 0 0 0 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

$34.10 Environmental Technician Billy Phillips 20.00 20.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Scientist/Engineer 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

$51.92 Senior Geologist Shawn Ouellette 18.00 10.00 8.00 0.00 0.00 0 0 0 0 0 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

$42.55 Senior Staff Scientist Jessica Endicott 46.00 38.50 7.50 0.00 0.00 0 0 0 0 0 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0

Total Hours 99.45 9.45 72.50 17.50 0.00 0.00 0 0 0 0 0

Direct Labor $4,264.31 $490.58 $2,972.62 $801.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $4,946.60 $569.07 $3,448.24 $929.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $2,399.10 $276.00 $1,672.40 $450.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,610.01 $1,335.65 $8,093.26 $2,181.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 6/25/2024

Task #: HW687 SubTask 1 Project Management SubTask 6 Site: Webbs Cleaners (Former) ERIC_5175 SubTask 2 VOH Groundwater Sampling SubTask 7

Activity/Phase: GW Sampling/PFAS Screening SubTask 3 Expanded PFAS Sampling SubTask 8 Project Manager: Patrick Mcgrane SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $560.00 560.00$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $560.00 560.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Initiation Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Capitol Environmental $165.00 165.00$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $165.00 $165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $16.50 $16.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $181.50 $181.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $657.00 657.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 110.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $767.00 $767.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $106.00 106.00$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $679.00 679.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 100.00$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $35.00 $0.00 35.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $920.00 $885.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $14,038.51 $1,335.65 $10,486.76 $2,216.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,161.01 $133.57 $809.33 $218.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $15,199.52 $1,469.22 $11,296.09 $2,434.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Webbs Cleaners, ERIC_3915 SUBTASK 2: VOH Groundwater Sampling Proposal No PHD237076

DATE: 6/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Groundwater Sampling Senior Geologist SO 1.00 Senior Geologist SO 3.00 Groundwater Sampling Senior Staff Scientist JE Load/unload 2.00 Senior Staff Scientist JE Mobilization/Demobilization (from PSL) 4.00 Senior Staff Scientist JE Collect water levels from 9 monitoring wells @ 10 minutes per well (including MW102) 1.50 Senior Staff Scientist JE Collect 8 VOH Groundwater Samples (MW001, MW003, MW004, MW005, MW006, MW009, MW100 and MW101) 12.00 Senior Staff Scientist JE Containerize IDW in the Central Area 0.50 Senior Technician BP Assist in GW Sampling due to Safety in heavily Urbanized Area 20.00 IDW Coordination Senior Geologist SO Prepare IDW Waste Characterization/Generator Profile 1.00 Senior Staff Scientist JE Coordinate IDW T&D Meet Transporter onsite 4.50 Report Deliverable Senior Staff Scientist JE Prepare report tables, draft groundwater elevation and analytical isoconcentration figures 4.00 Senior Staff Scientist JE Prepare report 6.00 Senior Staff Scientist JE QA/QC field and laboratory data 2.00 Senior Staff Scientist JE Summarize groundwater analytical results 2.00 Senior Geologist SO Summarize groundwater geochemistry field results 1.00 Senior Geologist SO Conclusions/Recommendations 4.00 Cadd Specialist CF Prepare Figures and Exhibits 4.00

SO BP JE CF

Hours: 10.00 20.00 38.50 4.00 TOTAL LABOR 72.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Sampling) 2 Trucks 2 personell 120.00$ day 4 480.00$ Car IDW Pick Up 80.00$ day 1 80.00$

TOTAL VEHICLE 560.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Captiol Environmental IDW Disposal 165.00$ Drum 1 165.00$

Subcontractor Markup 10% 1 16.50$

TOTAL SUBCONTRACTOR 181.50$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS

Halocarbons (short list) EPA 8260 73.00$ 8 0 1 657.00$ Sample Shipping Large Cooler 110.00$ 1 0 0 110.00$

TOTAL LAB $ 767.00

* No charge for trip blanks

EQUIPMENT ITEM RATE COSTING UNITUSEAGE TOTALS

Expendables Expendables 40.00$ day 2 80.00$

Ice 6.50$ Bag 4 26.00$ Analytical Related Shallow Groundwater Sampling Kit 290.00$ day 2 580.00$

Tubing, HDPE 0.30$ ft 250 75.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 8 24.00$

IDW 55-gallon drum, new 100.00$ drum 1 100.00$

TOTAL EQUIPMENT 885.00$

Request Sample Kit PreTask Planning, prepare field sampling and Field Work Request

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Webbs Cleaners (Former) , ERIC_5175 SUBTASK 3: Expanded PFAS Sampling Proposal No PHD237076

DATE: 6/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning Groundwater Sampling Senior Geologist SO 1.50 Senior Geologist SO 2.00 Groundwater Sampling Senior Staff Scientist JE Load/unload 0.00 Senior Staff Scientist JE Mobilization/Demobilization (from WPB) 0.00 Senior Staff Scientist JE Collect 9 PFAS Groundwater Samples (MW001, MW003, MW004, MW005, MW006, MW009, 1.50

MW100, MW101 and MW102), MW102 is only additional well for PFAS only Senior Staff Scientist JE Containerize IDW in the Central Area 0.00 IDW Coordination Senior Geologist SO Prepare IDW Waste Characterization/Generator Profile 0.50 Senior Staff Scientist JE Coordinate IDW T&D Meet Transporter onsite 0.00 Email Deliverable for PFAS Sampling Senior Staff Scientist JE QA/QC field and laboratory data 2.00 Senior Staff Scientist JE Evaluate and summarize groundwater analytical results 4.00 Senior Geologist SO Conclusions and Recommendations for PFAS analysis 4.00 Cadd Specialist CF Prepare PFAS exhibit (showing PFOA, PFOS and PFOA+PFAS for each well) 2.00

SO BP JE CF

Hours: 8.00 0.00 7.50 2.00 TOTAL LABOR 17.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Sampling) $120.00 day 0 -$ Car IDW Pick Up 80 day 0 -$

TOTAL VEHICLE -$

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

IDW Disposal -$ Drum 0 -$ Subcontractor Markup 10% 0 -$

TOTAL SUBCONTRACTOR -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS

PFAS Analysis FDEP Laboratory -$ 9 1 1 -$

(MW001, MW003, MW004, MW005, MW006, MW009, MW100, MW101 and MW102) Sample Shipping Small Cooler -$ 9 -$

TOTAL LAB -$

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 0 -$

Ice 6.50$ Bag 4 26.00$ Analytical Related Shallow Groundwater Sampling Kit 290.00$ day 0 -$

Tubing, HDPE 0.30$ ft 20 6.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 1 3.00$

IDW 55-gallon drum, new 100.00$ drum 0 -$

TOTAL EQUIPMENT 35.00$

Request Sample Kit, Coordinate Lab Availability PreTask Planning, prepare field sampling and Field Work Request

645 NW Enterprise Dr, Suite 107

Port Saint Lucie, FL 34984

P (772) 343-9787 F (772) 343-9404

Terracon.com

June 14, 2024

Florida Department of Environmental Protection Waste Cleanup Program Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Attn: Mr. Patrick McGrane, Environmental Specialist III

E: Patrick.Mcgrane@FloridaDep.gov W: 850-245-8899

Re: Proposal for Combined VOH and Expanded PFAS Groundwater Sampling and

Reporting Webbs Cleaners

1601 Broadway Avenue Riviera Beach, Palm Beach County, Florida

ERIC_5175

Task Assignment HW687 DC00_ Terracon Proposal No. PHD237076

Dear Mr. Cox:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program Waste Cleanup Program (FDEP WCP) to conduct groundwater monitoring for volatile organic halocarbons (VOH) and to conduct expanded groundwater sampling for per-and polyfluorinated substances (PFAS) analysis, and reporting, for the Webb’s Cleaners (ERIC_5175) facility located at 1601 Broadway Avenue, Riviera Beach, Palm Beach County, Florida.

Scope of Services

Field preparation, update health and safety plan for drilling and well installation, and combined PFAS and VOH groundwater sampling;

Mobilize to site, perform groundwater sampling of eight (8) monitoring wells MW001, MW003, MW004, MW005, MW006, MW009, MW100, and MW101 for VOH analysis;

Include PFAS analysis in the collected groundwater samples and collected additional groundwater sample from MW102 for PFAS;

Collect water levels from 9 wells MW001, MW003, MW004, MW005, MW006, MW009, MW100, MW101, and MW102;

Submit PFAS samples in cooler preserved on ice by overnight courier to FDEP’s laboratory for sample analysis;

Review data and prepare a Groundwater Monitoring Report including updated tables, groundwater flow, and concentration exhibits;

Include PFAS sampling evaluation in separate report section to include an exhibit, certified lab report, field notes and forms, and a

Proposal for Combined VOH and PFAS Groundwater Sampling and Reporting Webb’s Cleaners, ERIC_5175 ■ Riviera Beach, FL June 14, 2024 ■ Terracon Proposal No. PHD237076 summary of the QA/QC and groundwater analytical results. The exhibit will include text boxes (showing PFOA, PFOS, and PFOA+PFOS concentration for each well)

See attached LOE for details

Schedule

Deliverable Annual Groundwater Monitoring Report submitted within 20 business days following receipt of laboratory results.

Compensation

See attached CEF for details.

SITE RECOMMENDATIONS

During the December 2022 sampling activities, MW001, MW003, MW006 (deep well), MW009, MW100 and MW101 were gauged and sampled for VOHs (Drycleaning short-list). In general, the drycleaning COIs were reported below the Table I, GCTLs of Chapter 62-777, F.A.C., with the exception of source area (side gradient) monitoring well MW001 and downgradient MW005. Vinyl Chloride (VC) was detected in the groundwater sample collected from MW001 (screened at 20-30) and MW005 (screened at 37-47) at a concentration of 18 µg/L and 2.3 µg/L, respectively, which is above the 1 µg/L prescribed GCTL for VC. The VC concentration of 18 µg/L reported in MW001 is an increase from the

0.75 µg/L that was reported in the groundwater sample collected in June 2021 by TetraTech.

Monitoring well MW005 reported a VC concentration of 2.3 µg/L which represents a decrease in VC concentrations from the 4.43 µg/L value reported in MW005 in October 2019 by TetraTech. Since this groundwater sampling event identified vinyl chloride above the Chapter 62-777, Table I, F.A.C, GCTL in two monitoring wells (MW001 and MW005), Terracon recommends conducting groundwater monitoring on an annual basis at MW001 and MW005 to monitor if the concentrations fall below the GCTL for VC. Terracon also recommends sampling MW004, to confirm horizontal delineation to the south.

In addition, Terracon also performed PFAS sampling activities during the December 2022 sampling event. PFAS was reported in MW001, MW003, MW005, MW100 and MW101 above the provisional GCTL of 70 ng/L for PFOA+PFOS. Based on this reported data, Terracon has recommended expanded PFAS groundwater sampling.

DELIVERABLES

The Groundwater Monitoring Report will detail and summarize the groundwater sampling activities, field observations, and results of monitoring well analysis and will include updates to the site’s historical data tables and updated exhibits of groundwater flow and well concentrations. Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities should the results indicate the onsite plume is nearing eligibility for Risk Management Option (RMO) I closure.

Proposal for Combined VOH and PFAS Groundwater Sampling and Reporting Webb’s Cleaners, ERIC_5175 ■ Riviera Beach, FL June 14, 2024 ■ Terracon Proposal No. PHD237076

SCHEDULE

It is estimated that the wells could be sampled within two weeks from TA authorization and report issued within 20 business days of receipt of analytical data.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 772-343-9787.

Sincerely, Terracon Consultants, Inc.

Shawn Ouellette, P.G. Donna Cline, P.E.

Senior Geologist Senior Remediation Engineer

Attachments: Cost Spreadsheet Level of Effort

IDW BIDS

Capitol 3520 NW 43rd street Environmental Gainesville FL 32606 Services, Inc. 352-792-6064 x 112 www.capitolenv.com

EXPERTISE SUSTAINABILITY SOLUTIONS

Shawn Ouellette Terracon 12-15-2023 Port St Lucie

Scope of Work: Provide drum pickup, transportation, and disposal from various non Hazardous waste material from dry cleaning sites in Florida.

As directed by site Manager.

DESCRIPTION

Estimated Quantity

UM Price $ Total $

IDW water disposal drums 55 gallon 1-20 Per Drum $165.00

IDW solids / sludge disposal drums 55 gallon 1-20 Per Drum $165.00

Drums must be on hard surface IE Concrete, asphalt. Or, Additional loading time $155.00 per hour

Fuel Charge and Tax Charge. Equipment and Personnel billed Portal to Portal. Actual time

Sincerely Yours, Mike Anderson manderson@capitolenv.com

Preliminary Proposal

18500 N. Allied Way Phoenix, AZ 85054 | RepublicServices.com | Environmental Services, Recycling & Waste

Rev.060123

PROPOSAL #: MS-121823-TAM

COMPANY: Terracon

ADDRESS: 645 NW Enterprise Dr

Port St Lucie, FL 34986

CONTACT: Shawn Ouellette

PHONE: (561) 689-4299

EMAIL: shawn.ouellette@terracon.com

12/18/23

Dear Shawn Ouellette:

Republic Services appreciates this opportunity to provide you with environmental solutions. Following up on our earlier discussion, we are pleased to present this preliminary proposal.

Republic Services now offers comprehensive environmental solutions, including waste treatment, field and industrial services and 24/7 emergency response services. With a network of 40,000 employees and more than 175 dedicated Environmental Solutions locations, our customers benefit from working with an industry leader that can provide innovative solutions for hazardous and regulated waste, in addition to our recycling and waste services you have relied on for years.

Republic Services’ Tampa Facility offers a single source option for your waste management needs, providing premier service to companies in a wide variety of industries. This RCRA Part B facility manages most waste codes and specializes in lab packing, pharmaceutical wastes, small quantity services (LTL and household hazardous waste), waste generated by the travel/tourism industry, remediation, emergency response, and industrial cleaning.

We understand you need a professional, integrated solution, and we have designed this proposal to meet those needs. Our best-in-class customer service leverages our industry-leading capabilities and will allow us to deliver the strongest solution available in the market today. We look forward to supporting you on this project!

Scope of Work:

Republic Services’ Tampa Facilities group is please to submit this proposal to provide, labor material, and equipment necessary to properly package, transport, and dispose of designated waste materials from your location in West Palm Beach, FL. Republic Services proposes to perform the following work:

• Properly segregate and label all designated waste materials in accordance with all applicable regulations (as necessary)

• Provide all necessary shipping documents and transport the materials in licensed vehicles.

• Customer/Generator prepared material must be in DOT-shippable containers.

• Pricing applicable on all containers (percentage of 55-gallon drum price): 5-15 Gallons 35%;

16-30 Gallons 75%; 31-55 Gallons 100%; 56-85 Gallons 150%; CYB 300%

18500 N. Allied Way Phoenix, AZ 85054 | RepublicServices.com | Environmental Services, Recycling & Waste

Rev.060123

Facility: Republic Services Tampa Facility

Treatment Type: Landfill

Rates:

Description Size Unit Rate Quantity Minimums Ext Cost

IDW Liquids – PFAS 55 Gal $255.00 2 $510.00

Profile / Paperwork Fee $150.00 1 $150.00

Environmental Insurance Recovery Fee 20% $102.00

RCRA Haz Waste Fee - Haz Waste only 3%

E-Manifest Fee $20.00

Estimated Disposal Subtotal $762.00

Transportation – West Palm Beach, FL to Tampa, FL

Size Unit Rate Quantity Ext Cost

Transportation Minimum $350.00 $350.00

Container Rate 55 Gal $45.00 2

Fuel Surcharge - Varies Weekly 35% $122.50

Demurrage - After 1 Hour Free Hour $175.00

Estimated Transportation Total $472.50

Estimated Project Total $1,234.50

Additional Charges:

18500 N. Allied Way Phoenix, AZ 85054 | RepublicServices.com | Environmental Services, Recycling & Waste

Rev.060123

TERMS & CONDITIONS

This preliminary proposal is valid for 90 days and is subject to execution of Republic Services’ standard contract, which governs the services described herein. After expiration of this quote, the offer to perform services, and the prices, are subject to change or withdrawal. In the event of any conflict between the terms in this quote and those contained in the contract covering these quoted services, the terms of the contract shall govern. When a waste approval is granted, you will receive a Pricing

Addendum specifying the applicable price and billing unit. Payment terms are Net 30 days. Final pricing is subject to credit approval and standard credit terms.

PROPOSAL CONDITIONS:

• Prices and services are contingent upon credit approval and waste acceptance approval from the receiving facility. Approval of waste materials will be based on a completed and signed waste profile, an MSDS or analytical report, and an evaluation of a representative sample (if required) for a treatability study.

• Surcharges may apply if waste varies from its original profile or is re-characterized or reclassified on site at the TSDF.

• Additional fees may apply at the time of delivery for assistance with off-loading or due to non-conforming waste.

• Improperly classified and/or rejected waste will be returned to the customer, or managed in an alternative manner, at the customer’s expense.

• Quoted bulk disposal charges for solid materials will be billed by the cubic yard if the truckload density is less than 2,000 pounds per cubic yard. If the truckload density is greater than 2,000 pounds per cubic yard, then bulk charges will be billed by the ton, regardless of the approved container. Republic Services’ personnel will monitor all shipments.

• Due to the U.S. EPA’s e-manifest regulations, a fee will be assessed to all customers for shipments utilizing a hazardous waste manifest.

• An Energy, Insurance and Recovery (EIR) Fee will apply to all waste recycling, treatment and disposal fees.

• Standard non-hazardous disposal pricing does not include PFOS/PFAS contaminants.

• The contractor reserves the right to modify pricing if the scope changes in any manner.

TRANSPORTATION TERMS AND CONDITIONS:

• A fuel surcharge, based on the weekly DOE posted rate, will apply to all diesel-powered equipment, unless quoted otherwise.

• In the event that the scope of work changes from that specified above, out-of-scope work shall be charged at cost plus 15% or at rates mutually agreed upon in writing before work continues.

The work site must be accessible for the size and type of truck ordered.

• Washout/cleanout charges for tankers and/or containers shall be billed at Republic Services’

Standard Rates, unless previously quoted.

18500 N. Allied Way Phoenix, AZ 85054 | RepublicServices.com | Environmental Services, Recycling & Waste

Rev.060123

• Expenses related to waiting time at the work site or work stoppage outside of Republic Services’ control will be the responsibility of the customer and will be billed at quoted rates, or at cost plus 15% if not quoted.

• All shipping containers must be non-leaking and D.O.T. approved.

Thank you for this opportunity – we appreciate your interest in our services. I believe this preliminary proposal meets your specifications, but please contact me if you have any questions. We are prepared to proceed with the above-described work upon signing the pricing addendum and execution of an appropriate contract and/or subsequent issuance of a mutually agreeable purchase order.

Republic Services Sales Representative: Marco Sapone

Phone: (386) 530-9891

Email: marco.sapone@usecology.com

Customer Name

Signature

Print Name

Title

Date mailto:marco.sapone@usecology.com

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, FL 32223 United States 904.881.1957

Rachael Greller Staff Scientist Terracon 1675 Lee Road Winter Park 32789 United States

Proposal Number 033023.1

Overview RE: Drycleaner Waste Drum Cleanup Program Non-haz IDW Drum Transport & Disposal LOC: Statewide including Florida Keys

Good day Ms. Greller, Whatever Waste is pleased to provide non-haz IDW soil and water drum transport & disposal services to you and Terracon in regions throughout Florida including the Keys

Pricing

Notes

Proposal Date 03/30/2023

Description Rate Qty Line Total

North Region: NH IDW Soil & Water 55-gallon drums - each (No Stop Fee)

$140.00 1 $140.00

Central Region:NH IDW Soil & Water 55-gallon drums - each (South of Ocala; North of Sarasota/Port St. Lucie) (Stop fee $150; 2 drums or less)

$140.00 1 $140.00

South Region: NH IDW Soil & Water 55-gal drums - each (South of Sarasota/Port St. Lucie) (Stop fee $200; 2 drums or less)

$225.00 1 $225.00

Florida Keys: NH IDW Soil & Water 55-gal drums - each (Stop Fee - $250)

$275.00 1 $275.00

Subtotal

Tax

780.00

0.00

Proposal Total (USD) $780.00

Whatever Waste will assist with IDW profiling and require VOCs, and RCRA 4 metals for IDW drycleaner site soils; and VOCs only for IDW drycleaner site water.

DOT shippable drums at each location must be accessible in one area and on a hard surface.

No-load run charges to locations if called off in transit or upon arrival would be the stop fee in Central, South Regions and the Keys. In the North Region the no-load charge would be $100.

Terms

Actual amounts will be invoiced unless minimum quantities and associated fees apply Rates under contract are valid for 6 months Payment terms are 30 days after receiving emailed invoice with associated documents

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss or liability arising out of the party's breach of this agreement except for gross negligence, willful misconduct or bad faith.

COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf
Table 1 for SAWP
Monitoring Well Locations
Utility Locate Bids_Compiled.pdf
Geosyntec Utility-272_Geotek_1500
Geoview Utility Quote_2000_COT FTF SIS
Tallahassee Fire Training Division_V1_Bloodhound_3700
Drilling Bids_Compiled.pdf
PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic)
Direct Push
City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email
Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844
GW Protection_Geosyntec (T) 1022060 S.pdf
Invoice
Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf
Sheet1
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf
Table 1 for SAWP
Monitoring Well Locations

File details come from the government source that posted it. Updated .