This document is a Task Assignment (TA) entered into between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc., pursuant to Contract Number HW687. The TA is identified as DC016B and is effective through July 31, 2024. The project is located at 1911 South Adams Street, Tallahassee, Florida, at the Concord Custom Cleaners #715 facility (ERIC_4866). The Department Project Manager is Dean Cox (850-245-8969), and the Contractor's Project Manager is Donna Cline (813-321-0340).

The TA authorizes costs for monitoring well installation, sampling, and reporting services on a fixed unit rate basis with a total value of $15,513.23. The scope includes installation of replacement monitoring well MW001R, groundwater sampling of three monitoring wells (MW001R, MW003, and MW009), water level measurements at seven monitoring wells, and preparation of a comprehensive monitoring report due by April 30, 2024. The total cost is allocated as follows: Subtask 1 (Project Management) $786.98, Subtask 2 (Monitoring Well Installation/MW Sampling) $11,890.66, and Subtask 3 (Report) $2,835.59. The cost was negotiated downward by $4,365.25 (22 percent) from Terracon's original proposal. Deliverables include well construction/boring logs, field notes and forms, updated tables and figures, certified laboratory reports, and investigation derived waste manifests. The work was scheduled for completion with well installation targeted for March 4, 2024, and reporting within 20 business days of receiving laboratory results.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010A.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048A.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

Donna Cline

Senior Associate / Remediation Engineer

2/20/24

HW687

DC016B Completion July 31, 2024

This TA authorizes costs for monitoring well installation, sampling & reporting.

The total cost of this TA is $15,513.23 and this entire cost is fixed unit rate.

Dean Cox 850-245-8969 Contractor Terracon Consultants, Inc. Contractor

Contractor Donna Cline Contractor 813-321-0340

ERIC_4866

1911 South Adams, Tallahassee

Concord Custom Cleaners #715 (former)

Contractor Contractor

✔ $ 15,513.23

$ 15,513.23

Scope of Work

Terracon Consultants, Inc.

Contractor

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=General Users, email=Donna.Cline@terracon.com Date: 2024.02.20 07:50:22 -05'00'

Cline, Donna L

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.02.19 11:08:36 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Monitoring well installation and sampling report, including description of activities, field notes & forms, well construction/boring log(s), updated tables & figures, certified laboratory report, and investigation derived waste (IDW) manifest.

04/30/2024

DEP approval of monitoring well installation and sampling report (Subtask 1 Project Management and Subtask 2 Monitoring Well Installation/MW Sampling and Subtask 3 Report).

$ 15,513.23

$ 15,513.23

HW687

DC016B

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawnn Hamilton Interim Secretary

Memorandum

TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC016B MW Install & Sampling – Concord Custom Cleaners (former) ERIC_4866

DATE: 2/14/24

This task assignment (TA) authorizes costs for replacement & sampling of MW001, a source area well in a location likely to have the highest COC concentrations, and NAM sampling of two additional monitoring wells, along with associated costs and reporting.

This TA is based on the associated Terracon proposal. The total cost of this TA is $15,513.23 and this entire cost is fixed unit rate.

The cost of this TA was negotiated. The total cost of this TA is $4,365.25 or 22% less than the original proposal. This groundwater monitoring TA is designed to facilitate NAM and site closure. Site access has been verified.

MW001 replacement was approved by the WSCS PG in the annual contractor site review meeting. This well had 5.4 ug/L PCE in 2017 but could not be located since.

PCE was detected onsite in MW003 above the GCTL in the most recent groundwater monitoring events completed in 2020 (7.57 ug/L) and 2022 (9.2 ug/L).

FD

EP

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra co n

D at e:

2/

8/

Ta sk

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

Si te

C on co rd

C us to m

C le an er s #7

Su bT as k

M on ito rin g W el l (

M W

) I ns ta lla tio n/

M W

S am pl in g Su bT as k

Ac tiv ity /P ha se

W el l I ns ta lla tio n/ M on ito rin g/

R ep or tin g Su bT as k

R ep or t

Su bT as k

Pr oj ec t M an ag er

D ea n

C ox as k

Su bT as k

Su bT as k

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$7 5.

Pr oj ec t M an ag er

To m L ew is

3.

3.

$0 .0

Ad m in is tra tiv e

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Br ow nf ie ld

C on su lta nt 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

2.

C

AD

D S pe ci al is t C he ls ea F ug at e 3.

0.

3.

0.

0.

0.

0.

0.

0.

0.

$0

.0

D at a An al ys t & V is ua liz at io n

Sp ec ia lis t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

En vi ro nm en ta l T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Fi el d

G eo lo gi st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

5.

Fi el d Sc ie nt is t

R en ee E dd in s

.0

.0

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

G

IS

T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Pr in ci pa l C on su lta nt

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Pr oj ec t G eo lo gi st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Pr oj ec t I nd us tri al

H yg ie ni st 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Pr oj ec t S ci en tis t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Se ni or

E ng in ee r 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7

5.

Se ni or G eo lo gi st

To m

L ew is 4.

0.

4.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Se ni or G

IS

A na lys t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Se ni or In du st ria l H yg ie ni st

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 7.

Se ni or

S ci en tis t Si d O

'N ea l

.0

.5

.5

0.

0.

0.

0.

0.

0.

0.

$0 .0

St af f E ng in ee r

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

En v Te ch ni ci an

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

.4

3.

.5

.5

0.

0.

0.

0.

0.

0.

0.

D ire ct L ab or

$2

,2

.1

$2

.7

$1 ,0

.5

$9

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

6.

$2

,6

.6

$3

.8

$1 ,2

.4

$1

,0

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.2

6% $1

,2

.0

$1

.8

$6

.5

$5

.6

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$6

,2

.8

$7

.4

$2 ,9

.6

$2

,5

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

R

EV

C

EF

T

ER

R A

C O

N P ag e

C O

S T

ES

TI

M A

TE

C on tra ct or

Te rra co n at e:

2/

8/

Ta sk as k

Pr oj ec t M an ag em en t

Su bT as k

Si te

C on co rd

C us to m

C le an er s #7

Su bT as k

M on ito rin g W el l (

M W

) I ns ta lla tio n/

M W

S am pl in g Su bT as k

Ac tiv ity /P ha se

W el l I ns ta lla tio n/ M on ito rin g/

R ep or tin g Su bT as k

R ep or t

Su bT as k

Pr oj ec t M an ag er

D ea n

C ox as k

Su bT as k

Su bT as k

Su bT as k

To ta ls

Tr av el

Ve hi cl e

R en ta l

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pe r d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em en t) ril lin g

(C on ve nt io na

l) W

H $6

,1

.0

$6 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$5

.0

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $6

,6

.0

$6 ,6

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$6

.5

$6

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$7 ,3

.5

$7

,3

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry

An al yt ic al C os ts

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$5 2.

$5

2.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d Ex pe ns es

Pe rs on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$5 3.

$5

3.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( D ril lin g re la te

d) $2

5.

$2 5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ic al re la te

d) $4

.0

$4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$2

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $7

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bt ot al

$1 4, 1.

$7

.4

$1

1, 8.

$2 ,5

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Co m pl et io n

Fe e

$6

.8

$7 1.

$2

.5

$2

.7

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$1 5, 3.

$7

.9

$1

1, 0.

$2 ,8

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

R

EV

C

EF

T

ER

R A

C O

N P ag e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Concord Custom Cleaners #715 SUBTASK 2: Replacement Well Installation/MW Sampling

PROPOSAL NO. PHF247001

DATE: 2/8/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Monitoring Well Installation Senior Scientist SO 0.50 Senior Scientist SO 1.00 Staff Scientist RE 1 day loading/unload 0.50 Staff Scientist RE mobilization/Demobilization (from Tallahassee) 2.00 Senior Scientist SO 1 day loading/unload 0.50 Staff Scientist RE 1 day of well installation oversight 4.00 Senior Scientist SO 1 day of well installation oversight 8.00 Survey Monitoring Well Top of Casing Senior Scientist SO 2.00 Staff Scientist RE 2.00 Monitoring Well Groundwater Sampling Staff Scientist RE Load/unload 1.00 Staff Scientist RE Mobilization/Demobilization (from Tallahassee) 1.00 Staff Scientist RE Collect groundwater levels ( 7 wells,10 minutes per well) 1.00 Staff Scientist RE Collect groundwater samples (3 wells, 1.5 hours each) 4.50 Staff Scientist RE Coordinate sample pickup 0.00 Staff Scientist RE Containerize IDW 1.00 Coordinate IDW T&D Senior Scientist SO 0.50 Staff Scientist RE 2.00 Staff Total hours

TL 0

SO 12.5

RE 19 TOTAL LABOR 31.50

VEHICLE TYPE RATE UNIT USEAGE

Truck (Well Installation/ sampl 120 day 2 $240.00 Truck (IDW pickup) 120 day 1 $120.00

TOTAL VEHICLE $360.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation IDW Disposal 110.00$ each 5 $550.00 Walker-Hill Hollow-Stem Auger 6,135.00$ LS 1 $6,135.00

TOTAL $6,685.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs (short list) EPA 8260D 63.00$ 3 $189.00 Sample Shipping Small Cooler (2 day) 52.00$ 1 $52.00

TOTAL LAB $241.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables 40.00$ day 1 $40.00

Ice (Sample Shipping) 6.50$ each 2 $13.00 Equipment (drilling) Monitoring well installation kit 325.00$ day 0 $0.00 Equipment (drilling) Water Level Indicator 25.00$ day 1 $25.00 Equipment(analytical) Deep groundwater sampling ki 415.00$ day 1 $415.00

Tubing, HDPE 1/5" to 5/8" 0.40$ ft 0 $0.00 Equipmement(other) Total Survey Station 50.00$ day 1 $50.00 Equipmement(other) GPS 175.00$ day 1 $175.00 IDW 55-gallon drum, new 100.00$ drum 0 (driller provided) $0.00

TOTAL EQUIPMENT $718.00

Survey new monitoring well (1) and acquire GPS coordinates for three (3) sampled wells

Prepare waste characterization/Generator Profile Coordinate IDW T&D: Meet transporter for pickup

Prepare Health and Safety Plan PreTask Planning, prepare field sampling SOW/coordinate site access

Survey new monitoring well (1) and acquire GPS coordinates for three (3) sampled wells

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Concord Custom Cleaners #715 SUBTASK 3: Report

PROPOSAL NO. PHF247001

DATE: 2/8/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Data Review Senior Scientist SO 2.00 Senior Geologist TL 2.00 Deliverable

Senior Scientist SO 4.00 Senior Scientist SO Review and Summarize Water Quality Parameters 1.00 Senior Scientist SO Review and Summarize Groundwater Analytical Results 1.00 Senior Scientist SO 3.50 QA/QC and Review Senior Geologist TL Prepare Conclusions and Recommendations 2.00

CADD

CADD Specialist CF Create updated exhibits, groundwater elevation 3.00 Staff Total hours

TL 4

SO 11.5

RE 0

CF 3 TOTAL LABOR 18.50

Prepare draft exhibits, prepare report

Summary Tables, including table of GPS coordinates for three (3) sampled wells Summary tables, analytical results, and report

Incorporate field notes, well construction boring logs, calibration records, gw sampling logs into report

3559 Timberlane School Rd Tallahassee, FL 32312

P (850) 692-7185 F (813) 692-7186

Terracon.com

February 8, 2024

Florida Department of Environmental Protection Waste Cleanup Program Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Attn: Mr. Dean Cox, Environmental Consultant E: Dean.Cox@FloridaDep.gov W: 850-245-8969 M: 727-686-6502

Re: Proposal for Replacement Monitoring Well Installation and Annual Groundwater Monitoring and Reporting Concord Custom Cleaners #715 1911 South Adams Street Tallahassee, Leon County, Florida

ERIC_4866

Task Assignment HW687 Terracon Proposal No. PHF247001

Dear Mr. Cox:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Cleanup Section to replace monitoring well MW001R and perform Annual Groundwater Monitoring and Reporting for the Concord Custom Cleaners #715 (ERIC_4866) facility located at 1911 South Adams Street in Tallahassee, Leon County, Florida.

Scope of Services

Install Replacement Monitoring Well MW001R (2-inch dia.;

screened 50-60 ft bgs)

Field preparation, mobilize to site, perform groundwater sampling and laboratory analysis of six (3) existing monitoring wells (MW001R, MW003, and MW009) for VOH analysis (short list) by EPA Method 8260 and water level measurements at seven (7) monitoring wells

Review data and prepare an Annual Groundwater Monitoring Report including updated tables and groundwater flow and concentration exhibits. See attached LOE for details

Schedule Deliverable Annual Sampling Report within 20 business days following receipt of laboratory results.

Compensation See attached CEF for details.

Proposal for Replacement Monitoring Well Installation and Annual Groundwater Monitoring and Preparation of Report Concord Custom Cleaners #715, ERIC_4866 ■ Tallahassee, FL February 8, 2024 ■ Terracon Proposal No. PHF247001

SITE RECOMMENDATIONS

Install replacement source monitoring well MW001R to similar specifications as destroyed monitoring well MW001. Perform annual groundwater monitoring of three (3) existing monitoring wells (MW001R, MW003, and MW009) and submit samples for analysis by VOHs short list by EPA Method 8260.

Collect water level measurement at seven (7) monitoring wells.

DELIVERABLES

The Annual Groundwater Monitoring Report will detail and summarize the well installation, groundwater sampling activities, field observations, and results of monitoring well analysis and will include updates to the site’s historical data tables and updated exhibits of groundwater flow and well concentrations. Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities should the results indicate the onsite plume is nearing eligibility for Risk Management Option (RMO) I closure.

SCHEDULE

It is estimated that the wells installation will be able to be completed within 4 weeks, and then samples at least 48 hours after installation. The report will be issued within 20 business days of receipt of analytical data.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 813-221-0050.

Sincerely, Terracon Consultants, Inc.

FOR

Sid O’Neal Tom Lewis, P.G.

Senior Scientist Principal

Attachments: Cost Spreadsheet Level of Effort

QUOTES – Subtask 2

W as te C le an up P ro gr am C

O M

PE

TI

TI

VE

B

ID

W O

R K

SH

EE

T

Pr oj ec t N am e/

Ad dr es s:

C on co rd

C us to m

C le an er s

ER

IC

_4

6, So ut h

Ad am s St re et

, T al la ha ss ee

, F L

D at e:

/2 3/

D et ai le d de sc rip tio n of g oo ds o r s er vi ce s re qu ire d

(in cl ud in g to ta l q ua nt ity , s iz e, d el iv er y re qu ire m en ts , a nd a ll ot he r s pe ci fic at io ns

In st al la tio n of re pl ac em en t w el l M W

1R

2-in ch d ia

. w el l sc re en ed

0-fe et b gs w ith p re pa ck ed

.0

-in ch s cr ee n

- 1 /2 h ou r d ev el op m en t, no s oi l s am pl in g, h an d cl ea r t o fe et b gs , d ru m w at er /s oi l I

D W

Ve nd or N am e:

Q ua nt ity

D es cr ip tio n W al ke r-H ill

ED

S

PD

S

C on ta ct

N am e:

Te rry O rs o

C ar l L eo nh ar dt Ke vi n

Bo na cu m

C on ta ct

N um be r:

0-

4-

7-

5-

7-

1-

W rit te n

Q uo te (y es /n o)

Ye s

Ye s

Ye s

Te le ph on e Q uo te

(y es

/n o)

N o N o N o

M ob ili za tio n

R ou nd tri p

0.

2, 0.

0.

r D ie m

, P er

C re w , P er N ig ht

Pe r J ob

0.

ril lin g

D ai ly R at e da y 3, 0.

3, 0.

W el l M at er ia l

2" x

0'

P

VC

; s cr ee ne d

-6 0'

0.

2, 0.

1, 0.

W el l C om pl et io n

(D ev el op m en t, 8-in ch m an ho le

2x pa d, lo ck in g w el l c ap

0.

5.

5.

O

T

-g al lo n dr um ea ch

5.

rm its ea ch

0.

.0

.0

Se rv ic e/

G oo d C os t:

Ta xe s (7

.5

Sh ip pi ng

H an dl in g/ D ro p

Fe es

TO

TA

L

C O

ST

6, 5.

6, 5.

6, 5.

VE

N

D O

R S

EL

EC

TE

D

W al ke r- H ill B as is o f S el ec tio n:

Lo w es t b id ot e:

A ll ite m s co st in g

$1 ,0 o r m or e w ill be

-b id

M or e th an th re e bi ds w ill be n ec es sa ry if a ny v en do r n o-bi ds a re qu es t.

If ad eq ua te b id s ca nn ot b e ob ta in ed

, a fu ll ex pl an at io n m us t b e in cl ud ed w ith th is b id fo

Cost Proposal Date

1/9/2024

Proposal #

18022

Name / Address

TERRACON CONSULTANTS, INC.

10841 S Ridgeview Road Olathe, KS 66061

Re:

Drilling

PO Box 1147 Foxworth, MS 39483

Total

Subtotal

Tax (0.0%)

Customer Acceptance of Cost Proposal

Authorized Signature Date

*Payment Terms NTE 30 days upon project completion.

*1.5% Interest will be charged monthly to all overdue invoices.

Walker-Hill Environmental, Inc Milton, FL Office

Phone: (850) 564-1876 Email: terry@whenv.com

Description Unit Qty Rate Total

DPT Rig & Crew Geoprobe 3230DT Per Day 1 3,250.00 3,250.00T 2" PVC Well Materials Per Foot 60 16.00 960.00T Surface Completion Ea 1 250.00 250.00T Mobilize/Demobilize Ea 1 500.00 500.00T Per-Diem Per Day 1 600.00 600.00T Permits Ea 1 100.00 100.00T 55 Gallon Drums Ea 5 95.00 475.00T

$6,135.00

$6,135.00

$0.00

Preferred Drilling Solutions, Inc.

8820 66th St, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

SONIC DRILLING TECHNOLOGY QUOTE FORM

Date: 1/10/24 FAC ID#:

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price per day $4,500.00 -$ per day $3,500.00 1 3,500.00$ per foot $18.00 -$ per foot $25.00 60 1,500.00$ per foot $35.00 -$ each $150.00 -$ per well $125.00 1 125.00$ roundtrip $950.00 1 950.00$ per crew / per night $550.00 -$ each $70.00 4 280.00$ each $40.00 1 40.00$

TOTAL QUOTE PRICE $6,395.00

Notes: 1. Includes caps, plugs, tubing, saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator

MISCELLANEOUS

(1) 2" x 60' MW with 10' .010 screen, no soil cores, drum soil & water, pad and 8" bolt down manhole

Sonic Daily Rate & Crew (up to 10 hours on site)

Sonic Half Day Rate & Crew (up to 5 hours on site)

1" PVC Well Installation (includes all materials)

2" PVC Well Installation (includes all materials) 4" PVC Well Installation (includes all materials)

Pre-Packed Well Screen (includes all materials) ID 2" 5' Length

Well Completion (includes MH w/ cover, concrete pad, and locking well cap)

Consultant Name: Terracon

Site Name and Location: Concord Custom Cleaners # 175 1911 South Adams Street, Tallahassee, Leon County, FL

PROPOSED SCOPE OF WORK:

Equipment Type: Geoprobe 8150LS, Terrasonic 150CC

SONIC DRILLING TECHNOLOGY

Other (specify)

Other (specify)

Days to Complete Scope of Work: .5

Mobilization Per Diem

DOT Approved 55-gal Drum

Permits

Other (specify) as Park, FL 33782

W as te C le an up P ro gr am C

O M

PE

TI

TI

VE

B

ID

W O

R K

SH

EE

T

Pr oj ec t N am e/

Ad dr es s:

C on co rd

C us to m

C le an er s

ER

IC

_4

6, So ut h

Ad am s St re et

, T al la ha ss ee

, F L

D at e:

/2 3/

D et ai le d de sc rip tio n of g oo ds o r s er vi ce s re qu ire d

(in cl ud in g to ta l q ua nt ity , s iz e, d el iv er y re qu ire m en ts , a nd a ll ot he r s pe ci fic at io ns

Tr an sp or t a nd d is po se o f I

D W

D ru m s fo r s oi l a nd w at er g en er at ed d ur in g in st al la tio n/ de ve lo pm en t o f M

W

1;

fe et to ta l d ep th

, s cr ee ne d fe et to fe et

Ve nd or N am e:

Q ua nt ity

D es cr ip tio n Er w in

R em ed ia tio n

W ha te ve r W as te , L

LC

C

ES

C on ta ct N am e:

R ob er t D on ad o Jo hn R us se ll M ik e

An de rs on

C on ta ct

N um be r:

0-

2-

7-

5-

3-

3-

W rit te n

Q uo te (y es /n o)

Ye s

Ye s

Ye s

Te le ph on e Q uo te

(y es

/n o)

N o N o N o

D O

T

-g al lo n dr um pe r d ru m

0.

Se rv ic e/

G oo d C os t:

Ta xe s (7

.5

Sh ip pi ng

H an dl in g/ D ro p

Fe es

TO

TA

L

C O

ST

0.

VE

D O

R S

EL

EC

TE

D

Er w in

R em ed ia tio n

B as is o f S el ec tio n:

Lo w es t b id ot e:

A ll ite m s co st in g

$1 ,0 o r m or e w ill be

-b id

M or e th an th re e bi ds w ill be n ec es sa ry if a ny v en do r n o-bi ds a re qu es t.

If ad eq ua te b id s ca nn ot b e ob ta in ed

, a fu ll ex pl an at io n m us t b e in cl ud ed w ith th is b id fo

408 Ditmar Street Pensacola, FL 32503

To: Ms. Rachael Greller Terracon 1675 Lee Road Winter Park, FL 32789

March 24, 2023

Re: Non-Hazardous Drum Disposal of Dry-Cleaning Solvents Impacted Materials

Ms. Greller:

The price for the transportation and disposal (T&D) of 55-gallon drum of non-hazardous soil and water impacted with dry-cleaning solvents is $110.00 per drum.

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

A single False Mobilization fee will apply if our driver is not able to locate a drum on site.

There is no charge for manifesting onsite, subject to change. Prior notice will be sent to Terracon for any pricing change and will only be applied upon agreement between both parties.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@erwinremediation.com p y, Robert Donado

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, FL 32223 United States 904.881.1957

Rachael Greller Staff Scientist Terracon 1675 Lee Road Winter Park 32789 United States

Proposal Number 033023.1

Overview RE: Drycleaner Waste Drum Cleanup Program Non-haz IDW Drum Transport & Disposal LOC: Statewide including Florida Keys

Good day Ms. Greller, Whatever Waste is pleased to provide non-haz IDW soil and water drum transport & disposal services to you and Terracon in regions throughout Florida including the Keys

Pricing

Notes

Proposal Date 03/30/2023

Description Rate Qty Line Total

North Region: NH IDW Soil & Water 55-gallon drums - each (No Stop Fee)

$140.00 1 $140.00

Central Region:NH IDW Soil & Water 55-gallon drums - each (South of Ocala; North of Sarasota/Port St. Lucie) (Stop fee $150; 2 drums or less)

$140.00 1 $140.00

South Region: NH IDW Soil & Water 55-gal drums - each (South of Sarasota/Port St. Lucie) (Stop fee $200; 2 drums or less)

$225.00 1 $225.00

Florida Keys: NH IDW Soil & Water 55-gal drums - each (Stop Fee - $250)

$275.00 1 $275.00

Subtotal

Tax

780.00

0.00

Proposal Total (USD) $780.00

Whatever Waste will assist with IDW profiling and require VOCs, and RCRA 4 metals for IDW drycleaner site soils; and VOCs only for IDW drycleaner site water.

DOT shippable drums at each location must be accessible in one area and on a hard surface.

No-load run charges to locations if called off in transit or upon arrival would be the stop fee in Central, South Regions and the Keys. In the North Region the no-load charge would be $100.

Terms

Actual amounts will be invoiced unless minimum quantities and associated fees apply Rates under contract are valid for 6 months Payment terms are 30 days after receiving emailed invoice with associated documents

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss or liability arising out of the party's breach of this agreement except for gross negligence, willful misconduct or bad faith.

Capitol 200 Biddle Ave, Suite 205

Environmental Newark, DE 19702

Services, Inc. 302-380-3737 www.capitolenv.com

EXPERTISE SUSTAINABILITY SOLUTIONS

Rachael Greller Terracon 3-28-2023 1675 Lee RD Winter Park FL 32789

Scope of Work: Provide transportation and disposal of Non Hazardous drill cuttings, and Purged waters. Drums to be located on a hard surface for loading, or additional charges could apply. Quote good for sites in Central FL North areas. With approved profile and analytical.

DESCRIPTION

Estimated Quantity

UM Price $ Total $

Drill cuttings from drilling operation solids 30 drums Per Drum $140.00

Drums Purge waters ( 55 GL drum ) 30 drums Per Drum $135.00

Additional loading time after 1-hour site. Per Hour $155.00

Actual time

Rachael, I appreciate the opportunity to submit this proposal and hope that Capitol Environmental Services, Inc. can be of service to Terracon. Should you require additional information, or have any questions at all, please do not hesitate to contact me at 813-613-0452 Manderson@capitolenv.com

Sincerely Yours, Mike Anderson www.capitolenv.com

From: Cline, Donna L To: Cox, Dean Subject: RE: NDO-Plume B TA and Dadeland TA Proposal + Concord TA Proposal and Yard Systems Request Date: Thursday, February 8, 2024 4:59:35 PM Attachments: image006.png image007.png image008.png image009.png image010.png

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Hi Dean, Mike and I are reviewing the available systems and will get with you shortly.

On Concord, I have the proposal ready from Sid, but we also included 3 bids for the installation of replacement well MW-1. This is an original source well and was recommended for reinstallation at our last annual review meeting.

Did something change I was not aware of?

I’ll revise to include sampling of the two wells recommended by you, and the newly installed well, if that’s ok?

Respectfully, Donna Cline, P.E.

Senior Associate | Remediation Engineer

5463 West Waters Ave I Tampa, Florida 33634 D (813) 321-0340 I F (813) 221-0051 I M (813) 898-6399 donna.cline@terracon.com I Terracon.com

From: Cox, Dean <Dean.Cox@floridadep.gov> Sent: Thursday, February 8, 2024 2:05 PM To: Cline, Donna L <Donna.Cline@terracon.com> Subject: RE: NDO-Plume B TA and Dadeland TA Proposal + Concord TA Proposal and Yard Systems Request

Donna, I do need to get the NDO sampling completed and will be sending you that TA. I will also send comments on the Dadeland ISR implementation proposal. This end of year/beginning of year period has been full of extra duties that have set me back. And I have a few CERCLA items to resolve.

While I try to catch up, please provide the following as soon as you can.

Concord groundwater monitoring (VOHs) TA proposal (2 wells: MW003, MW009) I will call the owner (I missed her call earlier this week) – I will inform you regarding the result of this call (site access is not in question)

Quick desktop evaluation of the following systems for use (@ Majik, Concord, etc.) – these were in the yard as of last week (related docs attached)

142026 (stored 8/25/23; purchase date unknown?)

141038 (stored 11/21/22; purchased 9/2/10) 135073 (stored 10/27/22; purchased 4/7/08) 123877 (purchased 4/7/05; reserved by Mike in 2022 – I think this was related to our work but we bought new instead) 133377 (purchased 8/17/07) 134142 (purchased 12/13/07; would need blower and maybe poly tank) 140849 (purchased 6/20/10)

Ballpark cost for a yard visit/eval if desktop evaluation suggests there may be a system we can use (and if you can estimate this cost quickly) Very rough cost for used system repairs (if this can be done quickly) – this would help determine if a yard visit is worth it (would any existing telemetry be of any use?)

TA for yard system visit/eval if desktop eval suggests there may be a system we can use and if a rough cost can be estimated and is reasonable

I understand the yard-related request is not completely direct. If you have thoughts or ideas, I am open. (I may not currently recall what we may have learned last time we started down this road.) If we need to extend the time on the Majik ISR TA, we will. If we find a system in the yard that we can use at Majik (with necessary repairs/mods/upgrades), I will compensate you via WCD for Mike’s time spent back and forth with Robert regarding blower size and associated operating scenarios & costs.

From: O"Neal, Sid L To: Cox, Dean Cc: Cline, Donna L; Lewis, Tom E Subject: FW: Estimate 18022 from Walker-Hill Environmental, Inc.

Date: Friday, February 9, 2024 10:38:24 AM Attachments: image002.png image003.png image004.png image005.png image006.png image007.png

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good morning Dean, Given the Task Assignment is approved prior, I secured the driller’s earliest availability of March 4th for drilling the replacement well at the Concord Custom Cleaners #715 site in Tallahassee, FL.

Thanks and have a great weekend!

Sid O’Neal Senior Scientist I Environmental

3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com

From: Frank Harrington <frank@whenv.com> Sent: Friday, February 9, 2024 10:13 AM To: O'Neal, Sid L <Sid.O'neal@terracon.com> Cc: Terry Orso <terry@whenv.com> Subject: Estimate 18022 from Walker-Hill Environmental, Inc.

Hi Sid We got you down for March 4th, I can look for other dates if you like, we do appreciate it, have a great weekend Thank You

Frank Harrington, CWD

Walker-Hill Environmental, Inc.

5983 Commerce Road Milton, FL 32583