This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW687 to Terracon Consultants, Inc. for environmental remediation services at the Wildwood Quality Cleaners and Draperies site located at 200 South Main Street, Wildwood, Florida (ERIC_5503). The task assignment was executed on May 4, 2022, with a completion date of September 30, 2022. Dean Cox serves as the FDEP Department Project Manager, while Donna Cline of Terracon Consultants, Inc. serves as the Contractor Project Manager.
The scope of work authorizes Terracon Consultants, Inc. to conduct groundwater sampling and monitoring of five deep wells, perform associated waste disposal, conduct laboratory analysis of samples, and prepare a comprehensive groundwater monitoring report. The total contract value for this task assignment is $7,488.06 on a fixed unit rate basis, covering 49.50 hours of labor. The deliverable, a Groundwater Monitoring Report, was due by June 30, 2022, with invoice payment due upon FDEP approval of the report and submittal of waste manifests. Labor cost reductions of 3.44 hours resulted in a task assignment cost reduction of $489.18 from the original contractor proposal. Waste disposal services were subcontracted to Erwin Remediation, Inc. at $100.00 per drum for non-hazardous waste transport and disposal, selected as the most cost-effective vendor among multiple qualified IDW contractors.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC006A Completion September 30, 2022
This Task Assignment (TA) authorizes costs for groundwater sampling & associated waste disposal, sample analysis, and results reporting. The total cost for this TA is $7,488.06 with 49.50 hours of labor. The entire cost is fixed unit rate.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_5503
200 S. Main Street, Wildwood
Wildwood Quality Cleaners and Draperies
✔ $ 7,488.06
$ 7,488.06
Scope of Work
William E. Burns
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.05.03 15:55:05 -04'00'
N/A dlcline Typewriter Donna Cline dlcline Typewriter Senior Remediation Engineer
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 06/30/2022
FDEP approval of Groundwater Monitoring Report and submittal of waste manifest(s) (Subtask 1 Project Management and Subtask 2 Groundwater Monitoring and Subtask 3 Reporting)
$ 7,488.06
$ 7,488.06
HW687
DC006A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC006A TA – Wildwood Quality Cleaners and Draperies
DATE: 5/2/2022
This Task Assignment (TA) authorizes costs for groundwater sampling & associated waste disposal, sample analysis, and results reporting. The total cost for this TA is $7,488.06 with 49.50 hours of labor. The entire cost is fixed unit rate.
The labor costs in this TA have been reduced from the costs in the original contractor proposal as follows. Subtask 2 labor for Senior Scientist/Geologist pre-task planning was reduced by half an hour. Subtask 2 Initial Site Visit labor for site evaluation was reduced by half an hour. Subtask 3 Report Deliverable labor to review and summarize geochemisty results was reduced by one hour. Subtask 3 Report Deliverable labor for the CADD Specialist was reduced by one hour. These three hours of labor reductions reduced Project Management costs by 0.44 hour. The total labor reduction of 3.44 hours resulted in a TA cost reduction of $489.18.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 5/1/2022 Task #: DC006A SubTask 1 Project Management SubTask 6
Site: Wildwood Quality Cleaners ERIC_5503 SubTask 2 Groundwater Monitoring SubTask 7 Activity/Phase: GW Sampling and Monitoring Report SubTask 3 Reporting SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$64.50 Project Manager Donna Cline 3.50 3.50 $0.00 Administrative Julie Brown 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$22.25 CADD Specialist Andy Schifano 3.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$24.75 Environmental Technician Pete Christianson 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$37.31 Project Scientist Igor Karimov 7.50 2.50 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$49.69 Senior Scientist Lydia Wing 20.50 6.50 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 49.50 3.50 24.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,962.22 $225.74 $787.52 $948.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $2,276.17 $261.86 $913.52 $1,100.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $1,103.94 $127.00 $443.06 $533.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $5,342.33 $614.60 $2,144.10 $2,583.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 5/1/2022
Task #: DC006A SubTask 1 Project Management SubTask 6 Site: Wildwood Quality Cleaners ERIC_5503 SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: GW Sampling and Monitoring Report SubTask 3 Reporting SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $220.00 220.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 100.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $438.00 438.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $58.50 58.50$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $496.50 $496.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 40.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $610.00 610.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 100.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $35.00 35.00$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $785.00 $785.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $6,953.83 $614.60 $3,755.60 $2,583.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $534.23 $61.46 $214.41 $258.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $7,488.06 $676.06 $3,970.01 $2,841.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Wildwood Quality Cleaners ERIC_5503 SUBTASK 2: Groundwater Monitoring
PROPOSAL NO. PH1227140
DATE: 5/1/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Groundwater Sampling
Senior Scientist/Geologist LW 0.50 Senior Scientist/Geologist LW 1.00 Senior Scientist/Geologist LW 1.00
Env Technician PC Load/unload 1.00 Env Technician PC Mobilization/Demobilization (from Winter Park) 2.00 Env Technician PC Access deep wells and replace locks ( 5 wells) 1.00 Env Technician PC Collect groundwater levels (20 wells,10 minutes per well) 3.00 Env Technician PC Collect groundwater samples (5 wells, 1.5 hours each) 7.50 Env Technician PC Containerize IDW 0.50
Initial Site Visit to Evaluate Site Conditions
Senior Scientist/Geologist LW Mobilization/Demobilization (from Winter Park) 2.00 Senior Scientist/Geologist LW Site walk-around, evaluate site and off-site access 1.50
Coordinate IDW T&D
Senior Scientist/Geologist LW 0.50 Project Scientist IK 2.50
TOTAL LABOR 24.0
VEHICLE TYPE RATE UNIT USEAGE
Truck (groundwater sampling) 120.00$ day 1 120.00$ Car (Senior Scientist) 80.00$ day 0.5 40.00$ Truck (IDW) 120.00$ day 0.5 60.00$
TOTAL VEHICLE 220.00$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation IDW Disposal 100.00$ each 1 100.00$
Subcontractor Handling Fee 10% 0 10.00$
TOTAL 110.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
Halocarbons EPA 8260 73.00$ 5 0 1 438.00$ Sample Shipping Small Cooler (2 day) 52.00$ 1 52.00$ Sample Shipping Ice 6.50$ 1 6.50$
TOTAL LAB 496.50$
* No charge for trip blanks
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Deep groundwater sampling kit 415.00$ day 1 415.00$ Tubing, HDPE 0.30$ ft 600 180.00$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 5 15.00$ Expendables 40.00$ day 1 40.00$ Lock, key operated 7.00$ ea 5 35.00$ 55-gallon drum, new 100.00$ drum 1 100.00$
TOTAL EQUIPMENT 785.00$
Request sample kit Prepare Health and Safety Plan PreTask Planning, prepare field sampling SOW/coordinate site access
Prepare waste characterization/Generator Profile Coordinate IDW T&D: Mobilize to site, meet transporter to unlock secure area for pickup
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Wildwood Quality Cleaners ERIC_5503 SUBTASK 3: Reporting
PROPOSAL NO. PH1227140
DATE: 5/1/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Report Deliverable
Project Scientist IK Prepare report tables, draft groundwater elevation and analytical isoconcentration figures 4.00
Senior Scientist/Geologist LW Prepare report 8.00 Senior Scientist/Geologist LW QA/QC field and laboratory data 1.00 Senior Scientist/Geologist LW Review and summarize groundwater analytical results 2.00 Senior Scientist/Geologist LW Review and summarize groundwater geochemistry field results 1.00 Senior Scientist/Geologist LW Conclusions/Recommendations 2.00
Project Scientist IK Complete FDEP GIS / ADaPT tables 1.00
GIS Technician AS Prepare and update TetraTech base Figures and Exhibits 3.00 (3 groundwater flow and 1 concentration map)
TOTAL LABOR 22.0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE -$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL -$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
TOTAL LAB -$
* No charge for trip blanks
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT -$
5463 West Waters Avenue, Suite 830
Tampa, FL 33584
P (813) 221-0050
F (813) 221-0051
Terracon.com
May 1, 2022
Florida Department of Environmental Protection
Waste Cleanup Program
Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Mr. Dean Cox, Environmental Consultant
E: Dean.Cox@FloridaDep.gov
W: 850-245-8969
M: 727-686-6502
Re: Proposal for Deep Well Sampling and Reporting
Wildwood Quality Cleaners & Draperies
200 South Main Street
Wildwood, Marion County, Florida
ERIC_5503
Task Assignment HW687 DC006A
Terracon Proposal No. PH1227140
Dear Mr. Cox:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida
Department of Environmental Program (FDEP) Waste Cleanup Program to perform groundwater sampling of the deep monitoring wells. This data will be used to evaluate the location and depth of the proposed permanent deep monitoring wells.
Scope of Services
◼ Conduct a full round of depth to water readings, and conduct groundwater sampling and laboratory analysis of five deep monitoring wells (MW-9D-110, MW-10D-100, MW-11-80, MW-11-
110, MW-12-80); and
◼ Prepare a Deep Well Groundwater Sampling Report.
See attached LOE for details
Schedule Deliverable report within 20 business days following receipt of laboratory results.
Compensation
See attached CEF for details.
Ranking by fee
Sub Solids non-haz 55-gal drum
Liquids non-haz
55-gal drum Additional pricing conditions
Minority Y/N
Regions* Contact Name Contact # email
1 Erwin Remediation 100.00$ 100.00$ all inclusive No All Johnathan Erwin 850-292-6511 erwinremediation@gmail.com
2 Clean Earth $63+$45=$108 $65+$45 =$110 15% EEI on total disposal, stop fee $100, 55% FSC of total transportation
No All Ryan Penfield 843-562-7481 rpenfield@harsco.com
3A Whatever Waste 150.00$ 150.00$ all included No North and
Central Florida
John 904-881-1957 John@whateverwaste.com
3B Whatever Waste 200.00$ 200.00$ all included No South Florida
John 904-881-1957 John@whateverwaste.com
* Regions that are specified with "All" of Florida, are not inclusive of the Keys
Erwin Remediation is the selected IDW Contractor
IDW Contractors, All of Florida (Except the Keys)
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Sid O’Neal
Terracon
3559 Timberlane School Road
Tallahassee, FL 32312
March 4, 2022
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. O’Neal:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water located in the State of Florida is listed below.
Non-Hazardous Chlorinated VOHs, Petroleum and Metals:
Description Rate Unit
T&D - Non-Haz Soil $ 100.00 Per Drum
T&D - Non-Haz Mud/Water $ 100.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida
Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
Cline, Donna L
From: O'Neal, Sid L Sent: Wednesday, March 9, 2022 12:12 PM To: Cline, Donna L; Wing, Lydia; Lewis, Tom E Subject: FW: :EXTERNAL: RFQ - Non-Haz T&D
Here’s an email quote from Clean Earth. Should be the final one needed
Thanks, Sid O’Neal Senior Scientist I Environmental
3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com
From: Penfield, Ryan L <rpenfield@harsco.com> Sent: Wednesday, March 9, 2022 12:09 PM To: O'Neal, Sid L <Sid.O'neal@terracon.com> Subject: RE: :EXTERNAL: RFQ - Non-Haz T&D
Hello Sid, Non haz liquids (NH-L-20) $65 per drum Non haz solids (NH-S-10) $63 per drum 15% EEI on total disposal
Transportation (excluding the KEYS) Stop fee $100 Per Drum Trans $45 FSC based upon DOE currently 55% of total trans
This will be good for all of Florida except the keys.
Ryan Penfield
Environmental Specialist
M 843.562.7841 O 1.800.739.9156 rpenfield@harsco.com www.cleanearthinc.com
402 Webster Chapel Road, Glencoe , AL 35905
From: O'Neal, Sid L <Sid.O'neal@terracon.com> Sent: Wednesday, March 9, 2022 11:59 AM To: Penfield, Ryan L <rpenfield@harsco.com> Subject: :EXTERNAL: RFQ - Non-Haz T&D
Hi Larry, Was just following up from yesterday’s phone call in case you have my email wrong.
Need quote for Non-Haz Drum T&D – soil and gw waste for all Florida regions covering north, central, and south regions
Thanks, Sid O’Neal Senior Scientist I Environmental
3559 Timberlane School Road I Tallahassee, Florida 32312 D (850) 692-7189 I F (850) 692-7186 I M (229) 400-5108 sid.oneal@terracon.com I Terracon.com
Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability.
Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access the hyperlink, please e-mail sender.
CAUTION : This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
You don't often get email from sid.o'neal@terracon.com. Learn why this is important
Whatever Waste, LLC 904.881.1957
3834 Mandarin Woods Dr. No.
Jacksonville, Florida
32223 United States
Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: North Florida (Jacksonville >< Pensacola) Central Florida (Greater Orlando >< Greater Tampa)
Good day Sid and Tom:
Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout the North and Central Florida regions.
Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums
Pricing
Prepared For Sid O'Neal Sr. Scientist
Terracon 3559 Timberlane School Road
Tallahassee, FL 32312
Proposal Number 030822.1
Proposal Date 03/08/2022
Description Rate Qty Line Total
Solids or Liquids Drums (each)
$150.00 1 $150.00
$0.00 1 $0.00
Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.
Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.
Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal
Terms
Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $125.00 Payment is due in 30 days from email receipt of invoice
Sid O'Neal Sr. Scientist, Terracon
Subtotal
Tax
150.00
0.00
Proposal Total (USD) $150.00
Whatever Waste, LLC 904.881.1957
3834 Mandarin Woods Dr. No.
Jacksonville, Florida
32223 United States
Overview RE: Non-hazardous Waste Drum Transport & Disposal LOC: South Florida (south of Lake Okeechobee north end) Florida Keys
Good day Sid and Tom:
Whatever Waste appreciates the opportunity to price non-hazardous waste drums at facilities or sites throughout South Florida and the Florida Keys.
Overview Manifest, transport and dispose of non-hazardous petroleum contaminated soil, solids or liquids (including but not limited to PCW, IDW, groundwater, well drilling, and tank cleaning) in 55-gallon DOT shippable drums
Pricing
Prepared For Sid O'Neal Sr. Scientist
Terracon 3559 Timberlane School Road
Tallahassee, FL 32312
Proposal Number 030822.2
Proposal Date 03/08/2022
Description Rate Qty Line Total
Solids or Liquids Drums (each) (South Florida)
$200.00 1 $200.00
Solids or Liquid Drums (each) (Florida Keys)
$275.00 1 $275.00
Notes Pricing includes assisting with waste profiling and analytical testing advisement unless the waste stream falls under a blanket profile.
Pricing and non-hazardous disposal acceptance of the drums is based on the waste being on-specification and RCRA non-hazardous. Required analytical testing data TBD based on disposal facility requirements DOT shippable drums must be on a hard surface and accessible location.
Drum pickup time frame can range from one week to several weeks based on location Whatever Waste also quotes hazardous waste drum transport and disposal
Terms
Whatever Waste will invoice actual amounts or volumes unless minimum quantities apply Due to pricing volatility in national and international energy sectors the non-hazardous waste drum transport and disposal rate will increase by $15.00 per drum for every $0.50 per gallon over $5.00 per gallon No-load stop fee if called off in transit or on-site $175.00 Payment is due in 30 days from email receipt of invoice
Sid O'Neal Sr. Scientist, Terracon
Subtotal
Tax
475.00
0.00
Proposal Total (USD) $475.00
| DC006A.pdf |
| DC006A memo.pdf |
| DC006A proposal noSigPage.pdf |
| DC006A sigPage.pdf |
| IDWbids.pdf |
| ErwinRemediation Quote - Terracon - Drum - All Regions - 03.04.2022 |
| Clean Earth |
| Whatever Waste - Drum Quote Proposal 030822.1 |
| Whatever Waste Proposal 030822.2 - South Region |
File details come from the government source that posted it. Updated .