This is a Task Assignment (TA) document executed between the State of Florida Department of Environmental Protection (FDEP) and Golder Associates USA Inc. under Contract Number HW685. The task assignment authorizes work at the Lakeshore Plaza-Dixie Cleaners site located at 1931 Blanding Boulevard, Jacksonville, Duval County, Florida (ERIC_4531). The project is managed by Ginger Shirah for FDEP and Matt Crews for Golder Associates USA Inc. The task assignment became effective upon the last signature date of November 1, 2022, with a completion date of January 31, 2023.
The scope of work consists of two subtasks: (1) Project Management and (2) preparation of an Interim Source Removal (ISR) Work Plan. Golder will develop a comprehensive ISR Work Plan for excavating soil contaminated with chlorinated volatile organic compounds (cis-1,2-Dichloroethene) above soil cleanup target levels. The work plan will include pre-excavation activities (coordination with property owner, utility location, well abandonment planning, erosion control, site security, permitting, and site condition documentation), soil excavation and waste management procedures, bio/chemical amendment specifications including Underground Injection Control provisions, backfill and site restoration activities, and health and safety requirements. The total task assignment value is $7,419.51 on a fixed unit rate basis, comprising $844.37 for Project Management and $6,575.14 for the ISR Work Plan. The work involves 40 total labor hours with a deliverable due date of November 22, 2022, for the ISR Work Plan submission and FDEP approval.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC027B Completion January 31, 2023
This Task Assignment authorizes Golder to prepare an Interim Source Removal Work Plan in accordance with the October 4, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Ginger Shirah 850-245-8899 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews 904-363-3430
ERIC_4531
1931 Blanding Boulevard, Jacksonville, Duval County
Lakeshore Plaza-Dixie Cleaners
✔ $ 7,419.51
$ 7,419.51
Scope of Work
Brown, Jesse (USJB701177) Digitally signed by Brown, Jesse (USJB701177) Date: 2022.11.01 13:51:07 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.11.01 12:19:55 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1 & 2: ISR Work Plan; Project Management 11/22/2022
Subtasks 1 & 2: Submittal and FDEP approval of the ISR Work Plan; Project Management $ 7,419.51
$ 7,419.51
HW685
DC027B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW685 Contract Negotiation File Lakeshore Plaza - Dixie Cleaners Jacksonville, Duval County
ERIC_4531
Ginger Shirah, Project Manager October 10, 2022
Subject: Negotiation Summary
HW685 DC027B
This Task Assignment authorizes Golder to prepare an Interim Source Removal Work Plan in accordance with the October 4, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Interim Source Removal Work Plan This subtask includes labor hours for Golder to contact and meet with property owner and develop/prepare a draft Interim Source Removal Work Plan for soil excavation and enhanced bioremediation application. Golder will submit the ISR Work Plan as the deliverable to FDEP.
The Work Plan will include a summary of the previous site assessment activities completed at the site; the horizontal and vertical extent of the proposed ISR activities; The proposed pre-excavation activities, including coordination with the property owner, utility location services, a well abandonment or protection plan, erosion control measures, a site security plan, permitting, and documentation of pre-excavation site conditions; the proposed soil excavation and waste management procedures; the proposed bio and/or chemical amendment and dosage to be added to the base of the excavation area prior to backfill, including an Underground Injection Control (UIC) Notice and a UIC Monitoring Plan; the proposed backfill and site restoration activities; and health and safety considerations, including recommended personal protective equipment and dust/vapor control measures.
Golder and the FDEP confirmed on October 10, 2022, that an Access Agreement with the current real property owner of the Dixie Cleaners (ERIC_4531) site has been executed.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $7,419.51 with 40 labor hours.
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 10/4/2022
Task #: DC027B SubTask 1 Project Management SubTask 6
Site: SubTask 2 Interim Source Removal Work Plan SubTask 7
Activity/Phase: Interim Source Removal SubTask 3 SubTask 8
Project Manager: Ginger Shirah SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$63.65 Project Manager (JB) 4 4.4 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 29 29 0 0 0 0 0 0 0 0 $59.62 Senior Consultant - X-12 (MC) 2 2 0 0 0 0 0 0 0 0
$0.00 Senior Sci/Eng - X-11 0 0 0 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 3 3 0 0 0 0 0 0 0 0
$0.00 Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Sci/Eng - P-8 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Sci/Eng - P-8 0 0.0 0 0 0 0 0 0 0 0
$32.75 Staff Sci/Eng - P-8 (AS) 2 2.0 0 0 0 0 0 0 0 0 $0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 40 4.4 36.0 0.0 0.0 0 0 0 0 0 0
Direct Labor $2,448.54 $281.69 $2,166.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $4,223.74 $485.92 $3,737.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,672.28 $767.61 $5,904.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Lakeshore Plaza - Dixie Cleaners
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 10/4/2022
Task #: DC027B SubTask 1 Project Management SubTask 6
Site: SubTask 2 Interim Source Removal Work Plan SubTask 7
Activity/Phase: Interim Source Removal SubTask 3 SubTask 8
Project Manager: Ginger Shirah SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Lakeshore Plaza - Dixie Cleaners
Travel Vehicle Rental $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $6,752.28 $767.61 $5,984.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $667.23 $76.76 $590.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $7,419.51 $844.37 $6,575.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Lakeshore Plaza - Dixie Cleaners SUBTASK 2: Interim Source Removal Work Plan
DATE: 10/4/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 29
Senior Consultant (M. Crews) 2
Senior Project Sci/Eng (B. Lucero) 3
Staff Sci/Eng (A.Shportun) 2
TOTAL LABOR 36
VEHICLE TYPE RATE UNIT USEAGE
Car (J. Brown) $80.00 Per Day 1 $80.00
TOTAL VEHICLE $80.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Develop excavation cut-lines; prepare and submit final ISR Work Plan (2 hours).
Verification of property ownership; obtain a new signed site access agreement, if needed, prior to ISR; meet with owner onsite to discuss ISR (5 hours). Prepare draft Interim Source Removal Work Plan for soil excavation and enhanced bioremediation application (24 hours).
Reporting-document production (2 hours).
Contact property owner and DEP, get a new site access agreement if it has changed, meet the owner on site to discuss ISR, develop a 3 foot deep ISR with application of a carbon source during backfill.
Develop figures for ISR Work Plan.
FINAL --7/24/96
Golder Associates USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445 golder.com
October 4, 2022 Proposal No. 202208346
Ms. Ginger Shirah Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR LAKESHORE PLAZA – DIXIE CLEANERS
INTERIM SOURCE REMOVAL WORK PLAN
1931 BLANDING BOULEVARD
JACKSONVILLE, DUVAL COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4531
PROPOSED TASK ASSIGNMENT: HW685_DC027B
Dear Ms. Shirah:
Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal to develop an Interim Source Removal (ISR) Work Plan for the above-referenced site.
This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The scope of work is based on the recommendations accepted by the DEP in the September 29, 2022, e-mail correspondence to Golder. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – INTERIM SOURCE REMOVAL WORK PLAN
Golder performed soil sampling activities in July and August 2022 to complete the delineation of chlorinated volatile organic compound (VOC) contamination in onsite soils. During the soil sampling activities, Golder identified cis-1,2-Dichloroethene (cis-1,2-DCE) in soil at concentrations above the Soil Cleanup Target Level (SCTL) for
Ms. Ginger Shirah Proposal No. 202208346
Florida Department of Environmental Protection October 4, 2022 leachability, based on groundwater criteria, at multiple locations. Subsequent VOC analysis using the Synthetic Precipitation Leaching Procedure reported cis-1,2-DCE concentrations above the Groundwater Cleanup Target Level. The September 2022 analytical results indicated that the horizontal extent of chlorinated VOC contamination at the site has been delineated. Golder recommended developing an ISR Work Plan to excavate the soil with chlorinated VOC concentrations present above the SCTL for leachability, and the DEP agreed. The proposed excavation layout, based on the soil sampling results, is shown on the attached Figure 2.
The ISR Work Plan will include the following:
▪ A summary of the previous site assessment activities completed at the site.
▪ The horizontal and vertical extent of the proposed ISR activities.
▪ The proposed pre-excavation activities, including coordination with the property owner, utility location services, a well abandonment or protection plan, erosion control measures, a site security plan, permitting, and documentation of pre-excavation site conditions.
▪ The proposed soil excavation and waste management procedures.
▪ The proposed bio and/or chemical amendment and dosage to be added to the base of the excavation area prior to backfill, including an Underground Injection Control (UIC) Notice and a UIC Monitoring Plan.
▪ The proposed backfill and site restoration activities.
▪ Health and safety considerations, including recommended personal protective equipment and dust/vapor control measures.
▪ A Remedial Action Plan Checklist.
▪ An estimated cost and schedule to implement the ISR Work Plan.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $7,419.51. The LOE/CEF sheets are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 844.37 December 21, 2022
Subtask 2 – ISR Work Plan $ 6,575.14 November 22, 2022 (ISR Work Plan)
Total/Completion Date $ 7,419.51 January 31, 2023
Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.
Ms. Ginger Shirah Proposal No. 202208346
Florida Department of Environmental Protection October 4, 2022
Golder appreciates the opportunity to provide services under the Waste Site Cleanup Section. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, Golder Associates USA Inc.
Jesse C. Brown, PE Matthew C. Crews, PE Director, Environmental Engineer Senior Lead Consultant, Environmental Engineer
JCB/MCC/as
Attachments: Figure 2 – Soil Analytical Results
Attachment A – Level of Effort Sheets and Cost Estimate Form
G:\Projects\DEP-Drycleaning\Projects\Jax\Dixie - HW685\DC027B - ISR Work Plan\Proposal\DC027B - Dixie Cleaners ISR Work Plan Pposal - ERIC_4531.docx
RESTROOM
MW-005
MW-036
CS01
CS02
CS03
CS04
CS05
CS06
CS07
GW-W
GW-E
SB-10
SB013
SB015
SB012
SB014
SB011
SB019
SB016
SB017
SB-18
SB007
SB006
SB005
SB001
SB002
SB003 SB004
MW-040
MW-038
MW-002
MW-034
MW-041
MW-039
MW-035
IW001
IW008
IW002
IW007
IW003
IW006
IW005
IW004
DPT-1
DPT-2
DPT-3
DPT-4
SB-31
SB-32
SB-33
SB-34
SB-35
SB-36
SB-37
SB-38
SB-40
SB-39
SB-41
SB-42
SB-43
SB-44
SB-45
SB-47
SB-20
SB-21
SB-22
SB-23
SB-24
SB-25SB-26
SB-27
SB-28
SB-29
SB-30
SB-46
SB-48
SB-50SB-49
1.) U - UNDER DETECTION LEVELS.
2.) BOLD INDICATES RESULTS EXCEEDING FLORIDA SCTL AND GCTL VALUES.
3.) I - REPORTED VALUE IS BETWEEN THE LABORATORY METHOD DETECTION LIMIT
AND LABORATORY PRACTICAL QUANTITATION LIMIT.
4.) GROUNDWATER RESULTS µg/L - MICROGRAMS PER LITER (SPLP RESULTS).
5.) SOIL RESULTS µg/kg - MICROGRAMS PER KILOGRAMS.
6.) FT-BGS - FEET BELOW GROUND SURFACE.
7.) SPLP - SYNTHETIC PRECIPITATION LEACHING PROCEDURE.
SOIL SAMPLE LOCATION (1' BGS)
VC (GROUNDWATER), MCL= 1µg/L (JUNE 2021)
PCE (GROUNDWATER), MCL= 3µg/L (JUNE 2021) TCE (GROUNDWATER), MCL= 3µg/L (JUNE 2021) CIS DCE (GROUNDWATER), MCL= 70µg/L (JUNE 2021) in
31404452.4531 Control No.
4531-DC027A-A009
FIGURE
2022-08-10
BCL
JCB
RFM
JCB
(FORMER) DIXIE CLEANERS
1931 BLANDING BOULEVARD, JACKSONVILLE, FL
FL. DEPT. OF ENVIRONMENTAL PROTECTION
SOIL ANALYTICAL RESULTS
(JULY & AUGUST 2022)
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\
FD
EP
\F D
EP
-D
C \3
2\
_4
1_ (F or m er )D ix ie
_C le an er s\ D
C
7A \A ct iv e D ra w in gs
Fi le
N am e:
1-
D C
7A
-A
9.
dw g
1. SITE MAP BY HARDING ESE, MACTEC COMPANY DATED DECEMBER 2002.
2. APPROXIMATE PROPERTY LINE TAKEN FROM THE CITY OF JACKSONVILLE GIS
WEBSITE.
LEGEND
NOTE(S)
REFERENCE(S)
SCALE
0 10 20
FEET
SOIL CLEANUP TARGET
LEVELS (SCTLs) (µg/Kg)
SHALLOW MONITORING WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
DEEP MONITORING WELL LOCATION
SOIL BORING LOCATION
SOIL BORING LOCATION
(INSTALLED BY GOLDER ASSOCIATES)
(INSTALLED BY HARDING ESE)
INJECTION WELL LOCATION
EXTENT OF EXCAVATION
(18) LDA FEB. 2016 EXCAVATION
(531 TONS, 20'-30' DEEP)
SB-40
JULY 2022
0.5' ft-bgs < SCTLs
SB-38
JULY 2022
0.5' ft-bgs
15 0.75 U 28 2.9 I
1,300 63 70 6
0.68 U 0.75 U
GROUNDWATER SAMPLE LOCATION (3' BGS)
SB-25
JULY 2022
0.5' ft-bgs
31 U 0.62 I 31 U 0.25 U 31 U 0.50 U 31 U 0.50 U 31 U 0.25 U
SB-41
JULY 2022
0.5' ft-bgs
0.70 U 0.75 U
0.70 U 0.75 U
2,500 90
28 4.6 I 36 1.3 I
SB-42
JULY 2022
0.5' ft-bgs < SCTLs
SB-43
JULY 2022
0.5' ft-bgs < SCTLs
SB-44
JULY 2022
0.5' ft-bgs < SCTLs
SB-45
JULY 2022
0.5' ft-bgs < SCTLs
SB-46
JULY 2022
0.5' ft-bgs < SCTLs
SB-47
JULY 2022
0.5' ft-bgs < SCTLs
SB-30
JULY 2022
0.5' ft-bgs < SCTLs
SB-31
JULY 2022
0.5' ft-bgs < SCTLs
SB-32
JULY 2022
0.5' ft-bgs < SCTLs
SB-33
JULY 2022
0.5' ft-bgs < SCTLs
SB-34
JULY 2022
0.5' ft-bgs < SCTLs
SB-35
JULY 2022
0.5' ft-bgs < SCTLs
SB-36
JULY 2022
0.5' ft-bgs < SCTLs
SB-37
JULY 2022
0.5' ft-bgs < SCTLs
SB-20
JULY 2022
0.5' ft-bgs < SCTLs
SB-21
JULY 2022
0.5' ft-bgs < SCTLs
SB-22
JULY 2022
0.5' ft-bgs < SCTLs
SB-23
JULY 2022
0.5' ft-bgs < SCTLs
SB-24
JULY 2022
0.5' ft-bgs < SCTLs
SB-26
JULY 2022
0.5' ft-bgs < SCTLs
SB-27
JULY 2022
0.5' ft-bgs < SCTLs
SB-28
JULY 2022
0.5' ft-bgs < SCTLs
SB-39
JULY 2022
0.5' ft-bgs < SCTLs
SB-29
JULY 2022
0.5' ft-bgs < SCTLs
GSB-1 Sample ID 0.5' ft-bgs Sample Depth (feet-bgs)
1/1/2012 Date Sampled
30 3 Tetrachloroethene (PCE)
30 3 Trichloroethene (TCE)
400 70 Cis-1,2-Dichloroethene (DCE)
700 100 Trans-1,2-Dichloroethene (DCE)
7 1 Vinyl Chloride (VC)
GROUNDWATER CLEANUP
TARGET LEVELS (GCTLs) (µg/L)SPLP
SB-49
AUGUST 2022
0.5' ft-bgs < SCTLs
SB-50
AUGUST 2022
0.5' ft-bgs < SCTLs
SB-48
AUGUST 2022
0.5' ft-bgs < SCTLs
PROPOSED ISR (0 - 3' BGS), APPROX. AREA = 425 ft2, VOLUME = 1,275 ft3
LESS THAN SOIL CLEANUP TARGET LEVELS< SCTLs
| DC010B Annual GW Monitoring proposal - ERIC_4553.pdf |
| Figures 4-8.pdf |
| Sheets and Views |
| 1 SITE LOCATION MAP |
| 2 POTENTIOMETRIC MAP OF THE INTERMEDIATE ZONE |
| 3 POT MAP OF THE DEEP ZONE OF THE SURFICIAL AQUIFER |
| 4 GW CHARACTERIZATION SHALLOW ZONE SURFICIAL AQUIFER |
| 5 GW CHARACTERIZATION INTERMEDIATE ZONE SURFICIAL AQUIFER |
| 6 GW CHARACTERIZATION DEEP ZONE SURFICIAL AQUIFER |
| 7 GW CHARACTERIZATION ROCK ZONE SURFICIAL AQUIFER |
| 8 GROUNDWATER CHARACTERIZATION TPOC WELLS |
| PLOT |
| DC023B Former Sages Cleaners GW Monitoring proposal - ERIC_4596.pdf |
| Table 1 - 2023 Performance Monitoring Plan.pdf |
| Table 5 |
| Figures 6-8.pdf |
| Sheets and Views |
| 1 SITE LOCATION MAP |
| 2 SITE LAYOUT |
| 3 POTENTIONMETRIC MAP OF THE SHALLOW SURFICIAL AQUIFER |
| 4 POT MAP OF THE INTERMEDIATE SURFICIAL AQUIFER |
| 5 POTENTIOMETRIC MAP OF THE DEEP SURFICIAL AQUIFER |
| 6 GW CHARAC IN THE SHALLOW ZONE OF THE SURFICIAL AQUIFER |
| 7 GW CHARAC IN THE INTERMEDIATE ZONE OF THE SURFICIAL AQUIFER |
| 8 GW CHARACTERIZATION IN THE DEEP ZONE OF THE SURFICIAL AQUIFER |
File details come from the government source that posted it. Updated .