This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to WSP USA Inc. for well abandonment services at the Dawn Laundry site located at 6890 Miramar Parkway in Miramar, Broward County, Florida. The task assignment is identified as DC013C under Contract HW685 and is effective from the date of signature (June 26, 2025) through April 3, 2026. Patrick McGrane serves as the FDEP project manager, while Matt Crews represents WSP USA Inc. as the contractor's project manager.
The contract authorizes WSP to abandon 22 existing monitoring wells at the site in accordance with the June 13, 2025 Scope of Work, Cost Estimate, and Bid Documentation. The total task assignment value is $21,561.80 on a fixed unit rate basis. Work is organized into three subtasks: Subtask 1 (Project Management and Reporting), Subtask 2 (Well Abandonment Activities), and Subtask 3 (Reporting). Deliverables include completion of well abandonment activities by December 5, 2025, and submission of project management and reporting documentation by January 30, 2026. Invoice payments are contingent upon FDEP approval of specific deliverables: $18,383.79 upon approval of the field documentation and well completion reports, and $3,178.01 upon approval of the Well Abandonment Completion Report. The cost estimate includes 53 total labor hours, subcontractor drilling costs of $12,347.00 with a 10 percent handling fee, travel expenses of $768.00, and field expendables of $80.00.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW685
DC013C Completion April 3, 2026
This Task Assignment authorizes WSP to abandon the 22 existing monitoring wells at Dawn Laundry in accordance with the June 13, 2025 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor
Contractor Matt Crews Contractor 904-363-3430
ERIC_4188
6890 Miramar Parkway, Miramar, Broward County
Dawn Laundry
Contractor Contractor
✔ $ 21,561.80
$ 21,561.80
Scope of Work
WSP USA Inc.
Contractor Matthew Crews
Environmental Engineer
6/26/2025
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.06.26 14:12:03 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.06.26 13:51:17 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM
HW685
DC013C
Subtasks 1 & 3 - Project Management; Reporting
Subtask 2 - Well Abandonment Activities 12/05/2025
01/30/2026
Subtask 2 - Submittal and FDEP approval of email summary containing field documentation and well completion reports
Subtasks 1 & 3 - Submittal and FDEP approval of the Well Abandonment Completion Report
$ 18,383.79
$ 21,561.80
$ 3,178.01
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert
Secretary
Memorandum
TO: Negotiation File
Dawn Laundry Miramar, Broward County
ERIC_4188
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC013C (HW685)
DATE: June 25, 2025
This Task Assignment authorizes WSP USA Inc. (WSP) to abandon the 22 monitoring wells located at the
Dawn Laundry site.
A Site Rehabilitation Completion Report was issued for Dawn Cleaners on June 25, 2025. No continued monitoring is to be conducted, so all monitoring wells associated with the site will be abandoned by a
Florida Licensed driller. All costs for permitting are included in the drilling subcontractors’ bid.
The total cost for this project is $21,561.80 with 53 total labor hours. All work is to be completed in accordance with the June 13, 2025, Scope of Work, Cost Estimate, and Bid Documentation.
WSP may invoice according to the included schedule.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
In c.
D at e:
6/
/2
Ta sk
D C
3C
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
S ub Ta sk
W el l A ba nd on m en t A ct iv iti es S ub Ta sk
A ct iv ity
/P ha se
W el l A ba nd on m en t
Ta sk
R ep or tin g
S ub
Ta sk
P ro je ct
M an ag er
P at ric k M cG ra ne
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
La bo r R at e
C at eg or y $5
8.
PP
ro je ct
M an ag er
(S S
4.
$0
.0
P ro gr am
L ea de r -
X -1
$7
2.
P ra ct ic e Le ad er
X
-1
(M C
$0
.0
S en io r C on su lta nt
X
-1
$5 8.
S en io r S ci
/E ng
X
-1
(S S
$5
4.
S en io r S ci /E ng
X -1
(B
L)
$0
.0
S en io r S ci /E ng
X -1
$0
.0
S en io r P ro je ct S ci /E ng
P -1
$0
.0
S en io r P ro je ct S ci /E ng
P -1
$3
8.
P ro je ct
S ci
/E ng
P
-9 (M
T)
$3
6.
S ta ff S ci /E ng
P -8
(A S
$0
.0
S ci
/E ng
/A dm in
P -7
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
H ou rs
4.
.0
.0
D ire ct L ab or
$2
,3
.3
$2
.7
$1 ,3
.1
$7
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
2.
$4
,1
.3
$4
.1
$2 ,2
.5
$1
,3
.7
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or
$6
,4
.7
$7
.9
$3 ,5
.6
$2
,1
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D aw n La un dr y
RE
V:
2/
CE
F
GO
LD
ER
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
In c.
at e:
6/
/2
Ta sk
D C
3C
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
S ub Ta sk
W el l A ba nd on m en t A ct iv iti es S ub Ta sk
A ct iv ity
/P ha se
W el l A ba nd on m t
Ta sk
R ep or tin g
S ub
Ta sk
P ro je ct
M an ag er
P at ric k M cG ra ne
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
D aw n La un dr y
TT
ra ve l
V eh ic le
R en ta l
$3
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$4
.0
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$$7
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m t) ril lin g
(C on ve nt io na
l) $1
2, 7.
$1 2, 7.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til ity L oc at io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$1 2, 7.
$1
2, 7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $1
,2
.7
$1 ,2
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$1 3, 1.
$1
3, 1.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P er so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $8
0.
$8 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g R el at ed
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
F ie ld E xp en se s
$8 0.
$8
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $2
0, 3.
$7
.9
$1 8, 4.
$2
,1
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e $6
.3
$7
4.
$3
.4
$2
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t $2
1, 1.
$8
.5
$1 8, 3.
$2
,3
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
GO
LD
ER
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dawn Laundry SUBTASK 2: Well Abandonment Activities
DATE: 6/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (S. Sider) 1
Project Sci/Eng (M. Triano) 33
TOTAL LABOR 34.0
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem M. Triano $36.00 Per Day 3 $108.00 Hotel M. Triano $150.00 Per Day 2 $300.00
TOTAL PER DIEM $408.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection Well Abandonment $12,347.00 1 $12,347.00
TOTAL $12,347.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00
TOTAL EQUIPMENT $80.00
Verification of property ownership prior to mobilization (1 hour).
Round Trip from Jacksonville to Miramar (12 hours). Field event preparation (1 hour). Oversee abandonment of 22 monitoring wells, including manhole and pad removal, and surface restoration (20 hours)
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dawn Laundry SUBTASK 3: Reporting
DATE: 6/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (M. Crews) 1
Senior Sci/Eng (S. Sider) 10
Senior Sci/Eng (B. Lucero) 1
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 14.0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Prepare final Well Abandonment Completion Report (1 hour).
Prepare draft Well Abandonment Completion Report with field documentation, photographic log, and well completion reports (10 hours).
Reporting: Document production. Create pdf for OCULUS.
Prepare well abandonment completion figure (1 hour).
FINAL --7/24/96
WSP USA Inc.
9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256
T: +1 904-363-3430 wsp.com
June 13, 2025 Proposal No. 2025US422712
Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR WELL ABANDONMENT
DAWN LAUNDRY
6890 MIRAMAR PARKWAY
MIRAMAR, BROWARD COUNTY, FLORIDA
FACILITY IDENTIFICATION NUMBER: ERIC_4188
PROPOSED TASK ASSIGNMENT: HW685_DC013C
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for well abandonment activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – WELL ABANDONMENT ACTIVITIES
WSP will abandon the 22 existing monitoring wells (MW001, MW002R, MW003, MW004, MW005, MW008, MW009, MW010R, MW011R, MW013R, MW014, MW015, MW016R, MW017, MW018R, MW019R, MW020R, MW021R, MW022R, MW023, MW025, and MW026) in accordance with DEP and South Florida Water Management District (SFWMD) regulations. WSP will use a Florida-licensed driller to abandon the monitoring wells. Monitoring well construction details are shown in the attached Table 1. The approximate well locations are shown on the attached Figure 2 and Figure 4.
Mr. Patrick McGrane Proposal No. 2025US422712
Florida Department of Environmental Protection June 13, 2025
Attachments: Table 1 – Groundwater Elevation Summary Figure 2 – Site Layout Figure 4 – Groundwater Characterization in the Intermediate Zone of the Surficial Aquifer
Attachment A – Level of Effort Sheets / Cost Estimate Form Attachment B – Subcontractor Quotes
G:\Projects\DEP-WSCS\Projects\Miami\Dawn Laundry\4 - DC013C - Well Abandonment\Proposal\DC013C - Dawn Laundry Well Abandonment Proposal.docx
November 2024 US-WSP-31404452.4188.DC01
Well Number Diameter (in) Well Depth (ft) Screen Interval TOC Elevation
DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW ELEV DTW
11/15/1997 0.31 3.50 NA NM 0.49 3.50 -0.01 3.70 -0.04 3.70
8/15/2002 0.82 2.99 NA NM 0.76 3.23 0.85 2.84 0.76 2.90
9/4/2003 1.08 2.73 NA NM 0.84 3.15 1.10 2.59 1.11 2.55
6/10/2004 -0.09 3.90 NA NM 0.08 3.91 -0.41 4.10 -0.46 4.12
12/21/2004 -0.14 3.95 NA NM 0.02 3.97 -0.44 4.13 -0.51 4.17
6/30/2005 1.29 2.52 NA NM 1.51 2.48 -0.72 4.41 1.56 2.10
9/8/2006 1.42 2.39 NA NM 1.73 2.26 NA NM NA NM
1/19/2007 0.48 3.33 NA NM 0.33 3.66 0.39 3.30 0.41 3.25
3/4/2009 NA NM NA NM NA NM NA NM NA NM
3/7/2009 NA NM NA NM NA NM NA NM NA NM
1/25/2013 0.56 3.25 NA NM 0.52 3.47 0.74 2.95 0.51 3.15
7/31/2013 1.57 2.24 1.66 1.69 1.63 2.36 1.66 2.03 1.69 1.97
7/6/2015 0.07 3.74 -0.38 3.73 0.69 3.30 NA NM NA NM
7/9/2015 0.15 3.66 -0.34 3.69 0.80 3.19 0.31 3.38 0.33 3.33 8/16/2016 0.67 3.14 0.22 3.13 0.65 3.34 0.66 3.03 0.70 2.96 7/31/2017 0.50 3.31 0.57 2.78 0.71 3.28 0.74 2.95 0.71 2.95 7/30/2018 0.61 3.20 0.57 2.78 0.81 3.18 NA under water 0.66 3.00 1/6/2021 0.51 3.30 0.55 2.80 0.48 3.51 1.49 2.20 1.49 2.17 6/6/2022 2.01 1.80 2.17 1.18 2.34 1.65 2.44 1.25 2.40 1.26
11/30/2022 NA NM NA NM NA NM NA NM 2.40 1.26
Well Number Diameter (in) Well Depth (ft) Screen Interval TOC Elevation
DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW ELEV DTW
11/15/1997 0.89 2.30 1.01 2.25 0.94 2.95 0.90 2.95 NA NA
8/15/2002 0.78 2.41 0.86 2.40 0.80 3.09 0.77 3.08 NA NA
9/4/2003 1.09 2.10 1.07 2.19 1.07 2.82 1.08 2.77 NA NA
6/10/2004 0.45 2.74 0.59 2.67 0.53 3.36 0.45 3.40 NA NA
12/21/2004 0.40 2.79 0.52 2.74 0.48 3.41 0.42 3.43 NA NA
6/30/2005 1.46 1.73 -1.09 4.35 1.46 2.43 1.51 2.34 NA NA
9/8/2006 1.02 2.17 1.07 2.19 1.36 2.53 1.42 2.43 NA NA
1/19/2007 0.62 3.27 0.47 3.38 NA NA
3/4/2009 NA NM NA NM NA NA
3/7/2009 NA NM NA NM NA NA
1/25/2013 0.72 3.17 0.68 3.17 NA NA
7/31/2013 1.54 2.35 1.61 2.24 1.63 1.83
7/6/2015 NM NM NA NM 0.22 3.24
7/9/2015 0.31 3.58 0.31 3.54 0.14 3.32
8/16/2016 0.64 3.25 0.63 3.22 0.66 2.80 7/31/2017 0.69 3.20 0.67 3.18 0.55 2.91 7/30/2018 0.64 3.25 0.67 3.18 0.58 2.88 1/6/2021 0.52 3.37 0.50 3.35 0.50 2.96 6/6/2022 2.19 1.70 2.35 1.50 2.17 1.29
11/30/2022 NA NM 2.35 1.50 1.30 2.16
destroyed destroyed
3.19 3.26 3.89 3.85 3.46
46.00 11.00 11.00 46.00 50.00 40 to 46 5 to 11
3.99 3.69 3.66
0.5" 0.5" 1"
5 to 11 40 to 46 44 to 50
MW006 MW007 MW008 MW009 MW010R
0.5" 0.5"
3.81 3.35
MW001 MW002R MW003 MW004 MW005
2" 1" 0.5" 0.5" 0.5"
13.00 13.00 11.00 20.00 46.00
TABLE 1
GROUNDWATER ELEVATION SUMMARY
Dawn Laundry 6890 Miramar Parkway, Miramar, Broward County, Florida
DEP Facility Identification Number: ERIC_4188
3 to 13 3 to 13 5 to 11 11 to 20 40 to 46
DC013B - Dawn Laundry Ann GW Tables.xlsx Page 1 of 3 11/15/2024
TABLE 1
GROUNDWATER ELEVATION SUMMARY
Dawn Laundry 6890 Miramar Parkway, Miramar, Broward County, Florida
DEP Facility Identification Number: ERIC_4188
Well Number Diameter (in) Well Depth (ft) Screen Interval TOC Elevation
DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW ELEV DTW
11/15/1997 NA NM 0.79 3.70 NA NM 0.80 3.15 0.67 3.40
8/15/2002 NA NM 0.68 3.81 NA NM 0.68 3.27 0.71 3.36
9/4/2003 NA NM 1.07 3.42 NA NM 1.06 2.89 1.00 3.07
6/10/2004 NA NM NA NM 0.38 3.57 0.24 3.83
12/21/2004 NA NM NA NM 0.32 3.63 0.19 3.88
6/30/2005 NA NM NA NM 1.43 2.52 1.32 2.75
9/8/2006 NA NM NA NM NA NM NA NM
1/19/2007 NA NM 0.37 3.64 NA NM 0.39 3.68
3/4/2009 NA NM -4.89 8.90 NA NM NA NM
3/7/2009 NA NM NA NM -5.17 9.12 NA NM
1/25/2013 NA NM 0.49 3.52 0.59 3.36 0.52 3.55
7/31/2013 1.66 1.63 1.60 2.41 NA NM 1.61 2.46
7/6/2015 0.04 3.25 -0.06 4.07 NA NM 0.00 4.07
7/9/2015 0.15 3.14 0.08 3.93 0.14 3.81 0.05 4.02 8/16/2016 0.68 2.61 0.60 3.41 0.70 3.25 0.57 3.50 7/31/2017 0.58 2.71 0.46 3.55 0.58 3.37 0.47 3.60 7/30/2018 0.61 2.68 0.50 3.51 0.57 3.38 0.46 3.61 1/6/2021 0.58 2.71 0.49 3.52 0.51 3.44 0.42 3.65 6/6/2022 2.15 1.14 2.16 1.85 2.18 1.77 2.10 1.97
11/30/2022 0.96 2.33 1.07 2.94 NA NM NA NM
Well Number Diameter (in) Well Depth (ft) Screen Interval TOC Elevation
DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW ELEV DTW
11/15/1997 NA NM NA NM NA NM NA NM NA NM
8/15/2002 NA NM 0.83 2.79 NA NM NA NM NA NM
9/4/2003 NA NM 1.08 2.54 NA NM NA NM NA NM
6/10/2004 NA NM 0.46 3.16 NA NM NA NM NA NM
12/21/2004 NA NM 0.42 3.20 NA NM NA NM NA NM
6/30/2005 NA NM NA NM NA NM NA NM NA NM
9/8/2006 NA NM 1.28 2.34 NA NM NA NM NA NM
1/19/2007 NA NM NA NM NA NM NA NM NA NM
3/4/2009 NA NM NA NM NA NM NA NM NA NM
3/7/2009 NA NM NA NM NA NM NA NM NA NM
1/25/2013 NA NM NA NM NA NM NA NM NA NM
7/31/2013 1.36 2.20 1.26 2.36 1.67 2.14 1.62 2.33 1.63 2.35 7/6/2015 0.11 3.45 -0.13 3.75 0.11 3.70 0.10 3.85 0.09 3.89 7/9/2015 0.19 3.37 0.00 3.62 0.12 3.69 0.11 3.84 0.13 3.85
8/16/2016 0.69 2.87 0.47 3.15 0.68 3.13 0.67 3.28 0.67 3.31
7/31/2017 0.56 3.00 NA NM 0.53 3.28 0.53 3.42 0.50 3.48
7/30/2018 0.58 2.98 0.47 3.15 0.63 3.18 0.54 3.41 0.57 3.41 1/6/2021 0.54 3.02 0.21 3.41 0.34 3.47 0.50 3.45 0.70 3.28 6/6/2022 2.23 1.33 1.79 1.83 2.19 1.62 2.19 1.76 2.18 1.80
11/30/2022 NA NM NA NM NA NM 1.11 2.84 1.11 2.87
3.56 3.62 3.81 3.95 3.98
74.50 13.00 13.00 46.00 36.00
69.5 to 74.5 4 to 13 3 to 13 41 to 46 31 to 36
MW016R MW017 MW018R MW019R MW020R
1" 0.75" 1" 1" 1"
3.29 4.49 4.01 3.95 4.07 destroyed
26.00 52.00 49.00 51.00 85.00 20 to 26 46 to 52 43 to 49 45 to 51 80 to 85
1" 0.5" 0.5" 0.5" 2"
MW011R MW012 MW013R MW014 MW015
DC013B - Dawn Laundry Ann GW Tables.xlsx Page 2 of 3 11/15/2024
TABLE 1
GROUNDWATER ELEVATION SUMMARY
Dawn Laundry 6890 Miramar Parkway, Miramar, Broward County, Florida
DEP Facility Identification Number: ERIC_4188
Well Number Diameter (in) Well Depth (ft) Screen Interval TOC Elevation
DATE ELEV DTW ELEV DTW ELEV DTW ELEV DTW ELEV DTW
11/15/1997 NA NM NA NM NA NM NA NM NA NM
8/15/2002 NA NM NA NM NA NM NA NM NA NM
9/4/2003 NA NM NA NM NA NM NA NM NA NM
6/10/2004 NA NM NA NM NA NM NA NM NA NM
12/21/2004 NA NM NA NM NA NM NA NM NA NM
6/30/2005 NA NM NA NM NA NM NA NM NA NM
9/8/2006 NA NM NA NM NA NM NA NM NA NM
1/19/2007 NA NM NA NM NA NM NA NM NA NM
3/4/2009 NA NM NA NM NA NM NA NM NA NM
3/7/2009 NA NM NA NM NA NM NA NM NA NM
1/25/2013 NA NM NA NM NA 4.14 NA NM NA NM
7/31/2013 1.62 1.87 1.50 2.29 NA NM NA NM NA NM
7/6/2015 0.09 3.40 0.07 3.72 NA 4.47 NA NM NA NM
7/9/2015 NA NM 0.15 3.64 NA 4.53 NA NM NA NM
8/16/2016 0.68 2.81 0.69 3.10 NA NM NA NM NA NM
7/31/2017 -0.39 3.88 0.55 3.24 NA NM NA NM NA NM
7/30/2018 0.55 2.94 0.54 3.25 NA NM NA NM NA NM
1/6/2021 0.55 2.94 0.52 3.27 NA NM 0.64 4.30 0.65 3.47
6/6/2022 2.20 1.29 2.21 1.58 NA NM 2.35 2.59 NA NM
11/30/2022 1.13 2.36 1.14 2.65 NA NM 1.25 3.69 NA NM
8/23/2023 NA NM NA NM NA NM 1.00 3.94 NA NM
12/6/2023 NA NM NA NM NA NM 1.04 3.90 NA NM
3/12/2024 NA NM NA NM NA NM 0.60 4.34 NA NM
6/18/2024 NA NM NA NM NA NM 1.97 2.97 NA NM
Well Number Diameter (in) Well Depth (ft) Screen Interval TOC Elevation
DATE ELEV DTW
11/15/1997 NA NM
8/15/2002 NA NM
9/4/2003 NA NM
6/10/2004 NA NM
12/21/2004 NA NM
6/30/2005 NA NM
9/8/2006 NA NM
1/19/2007 NA NM
3/4/2009 NA NM
3/7/2009 NA NM
1/25/2013 NA NM
7/31/2013 NA NM
7/6/2015 NA NM
7/9/2015 NA NM
8/16/2016 NA NM
7/31/2017 NA NM
7/30/2018 NA NM
1/6/2021 NA NM
6/6/2022 NA 1.33
Notes:
in. - inches NM - Not Measured ft - feet NA - Not Available DTW - Depth to Water (feet) NAVD 88 - North American Vertical Datum of 1988.
NA
45.00 unknown
MW026
1"
31 to 36 43 to 48 1 to 11 43 to 48 43 to 48
3.49 3.79 NA 4.94 4.12
1" 1" 1" 0.75" 0.75"
36.00 48.00 11.00 48.00 48.00
MW021R MW022R MW023 MW024 MW025
DC013B - Dawn Laundry Ann GW Tables.xlsx Page 3 of 3 11/15/2024
M W
M W
M W
M W
M W
6R
PU
BL
IX
PE
R
R Y
PA
R
K- W
EL
LM
AN
F
IE
LD
G
AS
S
TA
TI
O
N
M W
M W
2R
M W
M W
M W
M W
M W
M W
0R
M W
1R
M W
3R
M W
M W
M W
8R
M W
9R
M W
0R
M W
1R
M W
2R
M W
M W
M W
D
AW
N
LA
U N
D R
Y (fo rm er
U N
KN
O
W N
U N
KN
O
W N
01 in
.4
C on tro l N o.
-D C
3A
-2 a
FI
G U
R E 4
-0 4-
BC
L
SJ
R
S
SJ
R
S
M C
C
D
AW
N L
AU
N
D R
Y
M
IR
AM
AR
P
KW
Y, M
IR
AM
AR
BR
O
W
AR
D C
O U
N
TY
, F L
FL
. D
EP
T.
O F
EN
VI
R O
N M
EN
TA
L
PR
O
TE
C
TI
O N
G R
O U
N D
W A
TE
R
C H
A R
A C
TE
R
IZ
A
TI
O
N
IN
T H
E
IN
TE
R
M
ED
IA
TE
ZO
N
E O
F
TH
E
SU
R
FI
C
IA
L A
Q U
IF
ER
TI
TL
E
PR
O
JE
C
T N
O
R
EV
PR
O
JE
C
T C
LI
EN
T
C O
N
SU
LT
AN
T
PR
EP
AR
ED
D
ES
IG
N
ED
R
EV
IE
W
ED
AP
PR
O
VE
D
YY
YY
-M M
-D D
IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI B
Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4188_DawnLaundry\DC013A2\Active Drawings\ | File Name: 4188-DC013A-204a.dwg
SC
AL
E
FE
ET
SH
AL
LO
W
M O
N
IT
O R
IN
G
W
EL
L
LE
G
EN
D
D
EE
P M
O N
IT
O
R
IN
G W
EL
L
D
ES
TR
O
YE
D
/A
BA
N D
O N
ED
M
O N
IT
O
R
IN
G W
EL
L
1.
AE
R
IA
L
IM
AG
ER
Y C
O U
R
TE
SY
O
F U
SG
S, M
IC
R O
SO
FT
C O
R
PO
R
AT
IO
N
AN
D b in g©
2.
W
EL
L
LO
C
AT
IO
N S
SO
U
R C
E:
A
EC
O
M , D
AT
ED
A U
G U
ST
, 2
8.
N O
TE
(S
R
EF
ER
EN
C
E( S)
IN
TE
R M
ED
IA
TE
M
O N
IT
O
R
IN
G W
EL
L
N
AD
C s
G C
TL
s
1.
AL
L R
ES
U
LT
S
AR
E
R
EP
O R
TE
D
IN
M
IC
R
O G
R
AM
S
PE
R L
IT
ER
(μ g/
L)
2.
U
IN
D
IC
AT
ES
T H
AT
T
H E
C O
M
PO
U N
D W
AS
AN
AL
YZ
ED
F
O R
B U
T N
O T
D
ET
EC
TE
D 3.
I- R
EP
O
R
TE
D V
AL
U
E
IS
B
ET
W
EE
N T
H E
LA
BO
R
AT
O R
Y M
ET
H
O D
D
ET
EC
TI
O N
L
IM
IT
A
N D
LA
BO
R
AT
O R
Y
PR
AC
TI
C
AL
Q U
AN
TI
TA
TI
O N
LI
M
IT
4.
BO
LD
F O
N T
AN
D
Y
EL
LO
W
S H
AD
ED
C
EL
L
IN
D
IC
AT
ES
A N
E
XC
EE
D
AN
C
E O
F
TH
E
AP
PL
IC
AB
LE
G C
TL
5.
BO
LD
F
O N
T
AN
D B
LU
E
SH
AD
ED
C
EL
L
IN
D
IC
AT
ES
A
N E
XC
EE
D
AN
C E
O F
TH
E
AP
PL
IC
AB
LE
N
AD
C
6.
G
C
TL
G
R O
U N
D W
AT
ER
C
LE
AN
U
P
TA
R G
ET
LE
VE
L
PE
R
C H
AP
TE
R
2-
7, T
AB
LE
I O
F
TH
E
FL
O R
ID
A
AD
M
IN
IS
TR
AT
IV
E
C O
D E
(F
AC
7.
N
AD
C
N
AT
U
R
AL
A
TT
EN
U
AT
IO
N D
EF
AU
LT
C
O N
C
EN
TR
AT
IO
N
P
ER
C H
AP
TE
R
2-
7, TA
BL
E
V O
F
TH
E
FL
O R
ID
A
AD
M
IN
IS
TR
AT
IV
E
C O
D E
(F
AC
M W ft
-b gs
/1
8/
/1
0/
2U 2U
2U 2U
2U 2U
1U 1U
M W ft
-b gs
/1
8/
/1
0/
/0
8/
/1
9/
2U 2U
2U 3U
2U 2U
2U 2U
2U 2U
2U 2U
1U 1U
1U 1U
M W ft
-b gs
/1
8/
/1
0/
/0
8/
/1
9/
2U 2U
2U 3U
2U 2U
2U 2U
2U 2U
2U 2U
1U 1U
1.
1U
M W ft
-b gs
/1
8/
/1
0/
1U 2U
1U 2U
3.
2U 1U
1U
M W
3R ft
-b gs
/3
0/
/2
7/
/0
4/
/0
6/
2U 1U
1U 0.
U
2U 2U
1U 0.
U
.4
0.
I 0.
U
1U 7.
0.
I
0.
U
M W ft
-b gs
/3
1/
/3
0/
/0
6/
/0
6/
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
I 0.
I
0.
U 0.
U
1.
0.
U 0.
I
0.
I 0.
U
0.
U
M W
9R ft
-b gs
/3
1/
/3
0/
/0
6/
/0
6/
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
I
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
M W
0R ft
-b gs
/2
1/
/0
6/
1U 0.
U
1U 0.
U
1U 0.
U
1U 0.
U
M W
1R ft
-b gs
/3
1/
/3
0/
/0
6/
/0
6/
/3
0/
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
I 0.
U
0.
I 0.
U
1.
0.
U 0.
U
0.
I 1.
0.
U 0.
U
M W
0R ft
-b gs
/1
6/
/3
1/
/3
0/
/0
6/
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
M W
2R ft
-b gs
/3
1/
/3
0/
/0
6/
/0
6/
0.
U 0.
U
0.
U 0.
U
0.
U 0.
I
0.
U 0.
U
2.
0.
U
0.
U 6.
0.
I
0.
U
M W ft
-b gs
/0
6/
0.
U 0.
U
0.
U 0.
U
M W
- 4 ft-bg s
/0
6/
0.
U 0.
U
0.
U 0.
U
M W
Sa m pl e
ID
ft -b gs Sc re en
In te rv al
(f ee t b el ow g ro un d su rfa ce
8/
/1
D at e
Sa m pl ed
Te tra ch lo ro et he ne (P
C E)
Tr ic hl or oe th en e (T
C E)
C is -1
,2 -D ic hl or oe th en e (D
C E)
Vi ny l C hl or id e
(V C
M W ft
-b gs
/0
6/
/0
6/
/3
0/
/2
3/
/0
6/
/1
2/
/1
8/
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
U 0.
U
0.
I 1.
I
0.
U 0.
U
0.
U 3.
0.
U 3.
6.
5.
0.
U 0.
U
Sonic Auger DPT Injection Well Abandonment
DATE: 5/5/2025
ESTIMATE #: 625005
ID QTY Unit Rate TOTAL
1 1 each 1,500.00$ 1,500.00$ 2 2 night 300.00$ 600.00$ 3 792 foot 6.00$ 4,752.00$
4 20 each 200.00$ 4,000.00$ 5 2 each 100.00$ 200.00$ 6 1 each 500.00$ 500.00$ 7 1 each 220.00$ 220.00$ 8 Drums (Soil) (As Needed) each 75.00$ -$ 9 Drums (Water) (As Needed) each 75.00$ -$
10 Permit: (Broward County - $50 First, 25 Each Additional) 1 each 575.00$ 575.00$
11 Permit: (Broward County - Abandonment Report Filling Fee) 22 each 10.00$ 220.00$
Completion: 2 days Subtotal 12,347.00$
Todd Hodgson TOTAL 12,347.00$ Partner
Mobilization
THANK YOU FOR YOUR BUSINESS!
Actual quantities used and days on site will be invoiced
2' x 2' Pad Removal w/8" BD Completion, Concrete Patch (Asphalt)
Up to 2" PVC Well Abandonment (Total 906')
2' x 2' Pad Removal w/8" BD Completion, Rake Level (Grass) Equipment to Remove Concrete Pads
***Utility Locates on Private Property are the responsibility of the client*** Borehole Clearance to 5’ bgs beyond 20 minutes will require a change order for additional time and cost.
Well Locations must be accessible by track mounted DPT Rig
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.
Per Diem - 2 Man Crew Est. (Min. Hotel Cost + $50/per man)
DESCRIPTION
***Damage to utilities on private property are the responsibility of the client***
Offsite Disposal of Manhole/Concrete Disposal
PROJECT
Dawn Laundry 6890 Miramar Parkway
CUSTOMER
Justin Spengler
WSP
Project Description:
(22) Up to 2" PVC Monitoring Well Abandonment (Total 792' ) w/Removal of 2' x 2' Pad w/8" BD Manhole 20 Locations in Asphalt and 2 Locations in Grass
(904) 738-9729
Miramar, Broward County, Florida
Well Abandonments
9428 Baymeadows Road, Ste. 400 Jacksonville, Florida 32223
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.9742423
Date: 6/27/2024
FAC ID#:
PROPOSED SCOPE OF WORK:
Unit Unit Rate Number of Units Extended Price per foot $11.00 791.5 $8,706.50 per foot $0.00 per foot $0.00 per foot $0.00 each $135.00 22 $2,970.00 roundtrip $550.00 2 $1,100.00 per crew / per night $0.00 each $80.00 0 $0.00 each $60.00 1 $60.00 each $30.00 21 $630.00 each $50.00 0 $0.00 each $250.00 1 $250.00
$0.00 per hour $495.00 $0.00
TOTAL QUOTE PRICE $13,716.50
Date: 6/27/2024
Standby/Delay/Difficult Access Time
5"- 6" Well Abandonment (includes grouting)
Contractor Name: WSP - Justin Spengler - 904 738-9729
Days to Complete Scope of Work: 2 Days
Mobilization
3"- 4" Well Abandonment (includes grouting)
1/2"- 2" Well Abandonment (includes grouting)
Remove Pad/Manhole & Patch
Grout Abandon (2) 3/4" MW's = 61' Total - Remove pads/manholes
Subcontract Company Name: EARTH TECH DRILLING 954.974.2424
DOT Approved 55-gal Drum
Traffic Safety Cones (Left onsite)
Permits & Well Completion Reports (1st well)
Debris Disposal
Permits & Well Completion Reports (Additional Wells)
DRILLING
MISCELLANEOUS
Grout Abandon (7) 1/2" MW's = 234' Total - Remove pads/manholes
Subcontract Mailing Address: 2703 NW 19th St., Pompano Bch. FL 33069
Signature and Title of Person Submitting Quote: Charles Bucher / Sr. Project Manager
8" - 10" Well Abandonment (includes grouting)
Grout Abandon (11) 1" MW's = 398.5' Total - Remove pads/manholes
Site Name : Dawn Laundry - 6890 Miramar Pkwy - Miramar, FL
Per Diem
Rig Type: Well Abandonment
Grout Abandon (2) 2" MW's = 98' Total - Remove pads/manholes
Monitoring Wells Sparge Wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Date: 5/30/25 FAC ID#:
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____
HSA Drilling & Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Double Cased Well $0.00
6" Surface Casing per foot $0.00 per well $0.00
0.5"- 2" Well Abandonment (includes grouting) per foot $14.00 792.0 $11,088.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $120.00 22 $2,640.00
Mobilization roundtrip $650.00 1 $650.00
Per Diem per crew / per night $575.00 2 $1,150.00 DOT Approved 55-gal Drum each $0.00 lump sum $100.00 5 $500.00
$0.00
$0.00
$0.00 Standby/Delay/Difficult Access Time per hour $0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00
TOTAL QUOTE PRICE $16,028.00
Project No.:
Signature and Title of Person Submitting Quote: _____________________________________ Rose Hood, Estimating & Scheduling Mgr Date: 5/30/25
Days to Complete Scope of Work: 2
6890 Miramar Pkwy, Miramar, Broward County, FL
Well Completion (includes MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Permits/Well Completion or Abandonment Reports
Consultant Name: WSP
Site Name & Location: Dawn Laundry
PROPOSED SCOPE OF WORK:
Abandon (22) 0.5" - 2" MWs, depths 11' - 85', total footage: 792', remove pads and manholes, restore grade.
WSP, Dawn Laundry, Miramar, FL.xlsx