Task Assignment Summary

This Task Assignment (TA) is a work authorization document executed between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. under Contract HW685 for environmental assessment services at the Former Lake Lucina Drycleaners site located at 6054 Merrill Road, Jacksonville, Duval County, Florida (ERIC_4610). The TA was executed on March 3, 2023, with a completion date of October 31, 2023. The project is managed by Opeyemi Kehinde for FDEP and Matt Crews for WSP USA Inc.

The Task Assignment authorizes WSP to complete supplemental assessment activities consisting of four subtasks: project management, soil vapor sampling from 14 SVE wells, membrane interface probe (MiHPT) investigation with groundwater screening and soil sampling at nine locations, and preparation of a supplemental assessment report. The total contract value is $100,127.14 on a fixed unit rate basis. Invoice payments are scheduled upon completion and FDEP approval of specific deliverables: Subtask 1 & 3 ($79,611.73) by May 30, 2023; Subtask 2 ($11,564.04) by June 30, 2023; and Subtask 4 ($8,951.37) by August 18, 2023. The scope of work and cost estimate were dated February 24, 2023, and the work is authorized under the FDEP Drycleaning Solvent Cleanup Program. Field activities are anticipated to occur in May 2023, contingent on subcontractor availability for utility location, MiHPT drilling, and investigation-derived waste disposal services.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01C.pdf PDF
CN-370000-HW685-BF05ACO2.pdf PDF
CN-370000-HW685-BF05ACO3.pdf PDF
CN-370000-HW685-BF06A.pdf PDF
CN-370000-HW685-BF1ACO1.pdf PDF
CN-370000-HW685-BF6ACO1.pdf PDF
CN-370000-HW685-BIL01C.pdf PDF
CN-370000-HW685-BIL01CO1.pdf PDF
CN-370000-HW685-BIL03A.pdf PDF
CN-370000-HW685-BIL2ACO1.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf.crdownload CRDOWNLOAD file
CN-370000-HW685-DC001A.pdf PDF
CN-370000-HW685-DC002G.pdf PDF
CN-370000-HW685-DC003A.pdf PDF
CN-370000-HW685-DC005C.pdf PDF
CN-370000-HW685-DC006B.pdf PDF
CN-370000-HW685-DC006C.pdf PDF
CN-370000-HW685-DC007C.pdf PDF
CN-370000-HW685-DC008A.pdf PDF
CN-370000-HW685-DC010A.pdf PDF
CN-370000-HW685-DC011A.pdf PDF
CN-370000-HW685-DC012C.pdf PDF
CN-370000-HW685-DC013A.pdf PDF
CN-370000-HW685-DC013C.pdf PDF
CN-370000-HW685-DC015B.pdf PDF
CN-370000-HW685-DC015C.pdf PDF
CN-370000-HW685-DC016A.pdf PDF
CN-370000-HW685-DC018A.pdf PDF
CN-370000-HW685-DC019B.pdf PDF
CN-370000-HW685-DC01ACO6.pdf PDF
CN-370000-HW685-DC01ACO8.pdf PDF
CN-370000-HW685-DC01ACO9.pdf PDF
CN-370000-HW685-DC020B.pdf PDF
CN-370000-HW685-DC022A.pdf PDF
CN-370000-HW685-DC022B.pdf PDF
CN-370000-HW685-DC022D.pdf PDF
CN-370000-HW685-DC023B.pdf PDF
CN-370000-HW685-DC023C.pdf PDF
CN-370000-HW685-DC027B.pdf PDF
CN-370000-HW685-DC027C.pdf PDF
CN-370000-HW685-DC029B.pdf PDF
CN-370000-HW685-DC029C.pdf PDF
CN-370000-HW685-DC02CCO1.pdf PDF
CN-370000-HW685-DC02FCO1.pdf PDF
CN-370000-HW685-DC031A.pdf PDF
CN-370000-HW685-DC031C.pdf PDF
CN-370000-HW685-DC032B.pdf PDF
CN-370000-HW685-DC035A.pdf PDF
CN-370000-HW685-DC037A.pdf PDF
CN-370000-HW685-DC038C.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC009B Completion October 31, 2023

This Task Assignment authorizes WSP to complete a supplemental Assessment activities in accordance with the February 24, 2023 Scope of Work, Cost Estimate, and Bid Documentation.

Opeyemi Kehinde 850-245-8887 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

WSP USA Inc.

WSP USA Inc.

Matt Crews 904-363-3430

ERIC_4610

6054 Merrill Road, Jacksonville, Duval County

Former Lake Lucina Drycleaners

✔ $ 100,127.14

$ 100,127.14

Scope of Work

Brown, Jesse (USJB701177) Digitally signed by Brown, Jesse (USJB701177) Date: 2023.03.06 14:45:51 -05'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.03.03 15:31:11 -05'00'

3/3/2023

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2 – Soil Vapor Sampling 06/30/2023

Subtask 1 & 3 – Project Management; Membrane Interface Probe, Groundwater Screening, and Soil Sampling 05/30/2023

Subtask 4 – Reporting 08/18/2023

Subtask 2 – Submittal and FDEP approval of the Soil Vapor Sampling $ 11,564.04

Subtask 1 & 3 – Submittal and FDEP approval of the Membrane Interface Probe, Groundwater Screening, and Soil Sampling; Project Management $ 79,611.73

Subtask 4 – Submittal and FDEP approval of the Reports $ 8,951.37

$ 100,127.14

HW685

DC009B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

From:

To: HW685 Contract Negotiation File Former Lake Lucina Drycleaners, Jacksonville, Duval County ERIC_4610 Opeyemi Kehinde, Project Manager February 27, 2023

Date:

Subject: Negotiation Summary

HW685 DC009B

This Task Assignment authorizes WSP to conduct groundwater monitoring activities in accordance with the February 24, 2023, Scope of Work, Cost Estimate, and Bid Documentation.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Soil Vapor Sampling WSP will assess the condition of the SVE system by collecting soil vapor samples from each of the 14 individual SVE wells (SVE-7 through SVE-20). Each SVE well will be connected to Modified Active Gas Sampling (MAGS) equipment to extract and monitor soil vapor from vadose zone soil. The samples will be submitted to a laboratory for VOC analysis via EPA Method TO-15.

Subtask 3: Membrane Interface Probe, Groundwater Screening, and Soil Sampling WSP will use a membrane interface probe – hydraulic profiling tool (MiHPT) instrument at the five proposed locations presented on Figure 9. After MiHPT data is analyzed, WSP will collect deep groundwater screening samples at the proposed locations adjacent to the five MIP locations. WSP will continue to collect groundwater screening samples to a deeper zone of the surficial aquifer for laboratory analysis at 4-foot vertical continuous intervals to a total depth of 66 feet bgs, or refusal, whichever is encountered first. Fourteen grab groundwater screening samples will be collected from each location for analysis at a fixed laboratory for chlorinated VOCs using EPA Method 8260B. WSP will also collect four shallow groundwater screening grab for analysis at a fixed laboratory for chlorinated VOCs using EPA Method 8260B. WSP solicited quotes from subcontractors for the utility locate, IDW disposal, MIP, and drilling. GeoTek, Erwin, Cascade and GWP were chosen respectively, with the lowest responsive/ responsible bids.

Subtask 4: Reporting

WSP will submit a supplemental assessment report to include a description of the sampling procedures, evaluation of the soil, soil vapor, and groundwater screening analytical results, tabulated soil data summary of the current and historical analytical data, a site map showing the groundwater screening and soil analytical results, laboratory analytical data, conclusions, and recommendations.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $ 100,127.14 with 299 labor hours. WSP and FDEP confirmed on February 28, 2023 that a site access agreement has been signed by the property owner.

Printed on recycled paper.

FDEP COST ESTI MATEContractor: WSP USA Inc.

Date: 2/24/2023

Task #: DC009B SubTask 1 Project Management SubTask 6

Site: SubTask 2 Soil Vapor Sampling SubTask 7

Activity/Phase: Assessment SubTask 3 MIP and GW Screening SubTask 8

Project Manager: Ginger Shirah SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$53.28 Project Manager (RFM) 28 28.0 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$68.75 Practice Leader - X-13 (JB) 6 0 0 6 0 0 0 0 0 0 $64.39 Senior Consultant - X-12 (MCC) 8 0 0 8 0 0 0 0 0 0 $53.28 Senior Sci/Eng - X-11 (RFM) 58 8 18 32 0 0 0 0 0 0 $42.00 Project Sci/Eng - P-9 (BL) 6 0 0 6 0 0 0 0 0 0 $40.73 Project Sci/Eng - P-9 (DM) 23 23 0.0 0 0 0 0 0 0 0 $36.66 Staff Sci/Eng - P-8 (JS) 55 0 55 0 0 0 0 0 0 0 $39.00 Staff Sci/Eng - P-8 (LS) 90 0 90 0 0 0 0 0 0 0 $33.90 Staff Sci/Eng - P-8 (AS) 3 0 0 3 0 0 0 0 0 0 $30.00 Sci/Eng/Admin - P-7 (TT) 22 22 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 299 28.0 53.0 163.0 55 0 0 0 0 0 0

Direct Labor $12,988.95 $1,494.30 $2,023.03 $6,485.34 $2,986.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $22,405.94 $2,577.67 $3,489.73 $11,187.21 $5,151.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $35,394.89 $4,071.97 $5,512.76 $17,672.55 $8,137.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Former Lake Lucina Drycleaners

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTI MATEContractor: WSP USA Inc.

Date: 2/24/2023

Task #: DC009B SubTask 1 Project Management SubTask 6

Site: SubTask 2 Soil Vapor Sampling SubTask 7

Activity/Phase: Assessment SubTask 3 MIP and GW Screening SubTask 8

Project Manager: Ginger Shirah SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Former Lake Lucina Drycleaners

Travel Vehicle Rental $1,280.00 $360.00 $920.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,280.00 $360.00 $920.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $14,360.00 $0.00 $14,360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $550.00 $0.00 $550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $750.00 $0.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MIP Subcontractor $21,312.50 $0.00 $21,312.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $36,972.50 $0.00 $36,972.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $3,697.25 $0.00 $3,697.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $40,669.75 $0.00 $40,669.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $13,148.00 $2,800.00 $10,348.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $1,040.00 $300.00 $740.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $14,188.00 $3,100.00 $11,088.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $400.00 $80.00 $320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $4,655.00 $1,960.00 $2,695.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $5,055.00 $2,040.00 $3,015.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $96,587.64 $4,071.97 $11,012.76 $73,365.30 $8,137.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $3,539.50 $407.20 $551.28 $1,767.26 $813.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $100,127.14 $4,479.17 $11,564.04 $75,132.56 $8,951.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

SITE : Dry Cleaning Depot SUBTASK 2: Soil Vapor Sampling

DATE: 2/24/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R Mongillo) 8

Project Sci/Eng (D. McDaniels) 23

Sci/Eng/Admin (T. Tassimbedo) 22

TOTAL LABOR 53.0

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOC Soil Vapor-Full Scan TO-15 $200.00 14 $2,800.00 Sample Shipping Large $150.00 2 $300.00

TOTAL LAB $3,100.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 2 $80.00 Construction/O&M/Pilot Test $360.00 Per Day 2 $720.00

MAGS Investigation Kit $500.00 Per Day 2 $1,000.00 Tedlar Bag $20.00 Per Bag 12 $240.00

TOTAL EQUIPMENT $2,040.00

Verification of property ownership for site and tenants in the strip plaza (4 hours). Prepare and submit field documentation, laboratory report and non-hazardous waste manifest in an email deliverable to the DEP (4 hours).

Field event preparation (1 hour). Collect soil vapor samples from 14 SVE wells (SVE-7 through SVE-20). Some field modifications will need to be made to isolate each well prior to collecting the sample. (10 hours per day x 2 days = 20 hours), Two round trip travels (2 hours).

Collect soil vapor samples from 14 SVE wells (SVE-7 through SVE-20). Some field modifications will need to be made to isolate each well prior to collecting the sample. (10 hours per day x 2 days = 20 hours), Two round trip travels (2 hours).

SITE : Former Lake Lucina Drycleaners SUBTASK 3: MIP and GW Screening

DATE: 2/24/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R Mongillo) 18

Staff Sci/Eng (L. Swindle) 34

Staff Sci/Eng (L. Swindle) 56

Staff Sci/Eng (J. Spengler) 55

TOTAL LABOR 163

VEHICLE TYPE RATE UNIT USEAGE

Truck (GW & soil sampling) $480.00 Per Week 1 $480.00

Truck (MIP work) $120.00 Per Day 3 $360.00

Car (RFM Site Visit) $80.00 Per Day 1 $80.00

TOTAL VEHICLE $920.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW T&D - Liquids (Non hazardous) $110.00 Per Drum 4 $440.00

Erwin IDW T&D - Soil (Non hazardous) $110.00 Per Drum 1 $110.00

Geotek Utility locate Subcontractor $750.00 One Day Site Visit 1 $750.00

Cascade MIP Subcontractor $21,312.50 Three Day Site Visit 1 $21,312.50

GWP Drilling Subcontractor $14,360.00 Five Day Site Visit 1 $14,360.00

TOTAL $36,972.50

Development of Health and safety plan (3 hours), site visit during MIP activities (5 hours), prepare and submit field notes, sample forms, soil, groundwater laboratory reports and MIP data, in an email deliverable to the DEP (6 hours), and characterization and waste profile for transportation and disposal of IDW drum(s) (4 hours).

Groundwater screening and soil sampling field work. Collect soil samples at the 5 deep MIP boring and four shallow DPT boring locations with 5 soil samples collected at each location for chlorinated VOC analysis and a split sample collected for SPLP analysis, if necessary, install MIP007 thru MIP011 collecting groundwater screening samples through a 4-long stainless steel screen point from 10 to 66 feet bgs (total of 14 groundwater samples per borehole), install DPT001 thru DPT004 collecting groundwater screening samples from 10 to 26 feet bgs (total of 4 groundwater samples per borehole), complete notes, and management of IDW for transportation and disposal. (5 days x 10 hours per day = 50 hours). Five round trip travel (5 hours) and Field event preparation (1 hour).

Groundwater screening and soil sampling field work. Collect soil samples at the 5 deep MIP boring and four shallow DPT boring locations with 5 soil samples collected at each location for chlorinated VOC analysis and a split sample collected for SPLP analysis, if necessary, install deep borings MIP007 thru MIP011 collecting groundwater screening samples through a 4-long stainless steel screen point from 10 to 66 feet bgs (total of 14 groundwater samples per borehole), install shallow borings DPT001 thru DPT004 collecting groundwater screening samples from 10 to 26 feet bgs (total of 4 groundwater samples per borehole), complete notes, and management of IDW for transportation and disposal. (5 days x 10 hours per day = 50 hours).

Five round trip travel (5 hours).

Mobilize and complete a membrane interface probe using a hydraulic profiling tool (MiHPT) instrument to be pushed to a depth of 65 feet below ground surface (bgs) or to refusal at the five proposed locations, utility clearance, and borehole abandonment for each boring location. (10 hours per day x 3 days = 30 hours). Field event preparation (1 hour). Three round trip travel (3 hours).

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B

Total VOHs Five Deep Groundwater

EPA Method 8260B $73.00 70 $5,110.00

Total VOHs Four Shallow Groundwater

EPA Method 8260B $73.00 16 $1,168.00

Total VOHs Nine Soil Sample Locations

EPA Method 8260B $73.00 45 $3,285.00

SPLP Extraction EPA Method 1311/1312 $55.00 0 $0.00

Total VOHs EPA Method 8260B $73.00 0 $0.00

Total VOCs (IDW) Aqueous IDW EPA Method 8260 $110.00 4 $440.00

TCLP Metals (IDW) Non-aqueous

IDW

Method 1311/6010/6020/7470 $135 1 $135.00

TCLP VOCs (IDW) Non-aqueous IDW Method 8260 $210 1 $210.00

Sample Shipping Small soil+IDW $110.00 4 $440.00

Sample Shipping Large gw $150.00 2 $300.00

TOTAL LAB $11,088.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 8 $320.00

Shallow Groundwater Sampling Kit $290.00 Per Day 5 $1,450.00

Tubing, Poly HDPE $0.30 Per Foot 0 $0.00

Tubing, Silicon 3/16 x 3/8 $3.00 Per foot 0 $0.00

Drum, 55-gallon $100.00 Per Drum 0 $0.00

Soil Sampling Kit $175.00 Per Day 3 $525.00

25 gram Encore (SPLP Samples) $16.00 sampler 45 $720.00

TOTAL EQUIPMENT $3,015.00

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Lake Lucina Drycleaners SUBTASK 4: Reporting

DATE: 2/24/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Vice President (J. Brown) 6

Senior Consultant (M. Crews) 8

Senior Sci/Eng (R Mongillo) 32

Senior Project Sci/Eng (B. Lucero) 6

Staff Sci/Eng (A. Strayer) 3

TOTAL LABOR 55

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Reporting: generating tables, document production, binding and shipping. Create pdf for

OCULUS.

Develop conclusions and recommendations and prepare final report.

Data entry, prepare tables and figures, and draft report

CADD generate Figures (MIP, GW Screening and soil detections) for the report.

Soil vapor gas evaluation and report document

FINAL --7/24/96

one drum of soil and four drums of water CVOC prices

Cascade US Ecology* HEPACO T&D Non Haz Soil - VOCs per drum 1 $110.00 $110.00 T&D Non Haz Mud/water - VOCs per drum 4 $110.00 $440.00 False Mobilization (no drum found) 0 $85.00 $0.00 PFAS Profile Fee (1 per site) 0 $350.00 $0.00 T&D Non Haz Soil - PFAS/PFOS per drum 0 $130.00 $0.00 T&D Non Haz Mud/water -PFAS/PFOS per drum 0 $140.00 $0.00 Disposal Non Haz Soil - VOCs per drum 1 $150.00 $150.00 Disposal Non Haz Mud/water - VOCs per drum 4 $150.00 $600.00 PFAS Profile Fee (1 per site) 0 $95.00 $0.00 Disposal Non Haz Soil - PFAS/PFOS 0 $650.00 $0.00 Disposal Non Haz Mud/water -PFAS/PFOS 0 $650.00 $0.00 Approval Fee (per site) 0 $750.00 $0.00 Disposal Non Haz Mud/water - VOCs per drum 4 $141.75 $567.00 Disposal Non Haz Soil - VOCs per drum 1 $185.00 $185.00 Waste Profile Fee (1 per media) 2 $110.00 $220.00 Technician per hr 2 $60.56 $121.12 Driver per hr 2 $69.60 $139.20 55 gallon reconditioned drum 0 $95.12 $0.00 55 gallon reconditioned drum 0 $134.63 $0.00 Flat Bed with lift gate per hr 2 $76.32 $152.64 Energy security recovery fee 15% 1 $207.74 $207.74

Total Cost $550.00 $750.00 * $1,592.70

Notes* Transportation costs will be calculated based on pickups at various sites and waste stream volume

IDW SUBCONTRACTOR COST ESTIMATES

Summary of IDW Subcontractors Costs Page 1 of 1

GWP PDS Earth tech Casscade Dakota Mobe/Demobe 1 $750.00 $750.00 1 $750.00 $750.00 1 $1,800.00 $1,800.00 1 $1,750.00 $1,750.00 1 $1,250.00 $1,250.00 Perdiem 5 $250.00 $1,250.00 4 $450.00 $1,800.00 8 $475.00 $3,800.00 8 $500.00 $4,000.00 12 $225.00 $2,700.00 DPT rig and crew 6 $1,650.00 $9,900.00 5 $2,000.00 $10,000.00 7 $1,650.00 $11,550.00 8 $2,500.00 $20,000.00 8 $2,000.00 $16,000.00 Materials Water samplin points 98 $3.00 $294.00 Materials HDPE Sampling Tubing (500 ft) 14 $100.00 $1,400.00 Borehole grouting w/ conc cap 9 25 $225.00 Macrocore liners for soil sampling 9 3 $27.00 55 gallon drums soil 3 65 $195.00 55 gallon drums gw 5 65 $325.00 25 $70.00 $1,750.00 7 $80.00 $560.00 3 $95.00 $285.00 Permits 1 $175.00 $175.00 Geoprobe consumables 5 $200.00 $1,000.00 Decon pad 1 $350.00 $350.00 1 $350.00 $350.00 Steam cleaner 5 $75.00 $375.00 water samples 86 $65.00 $5,590.00 86 $50.00 $4,300.00 Soil sampls 18 $12.00 $216.00 Borehole abandonment 429 $2.50 $1,072.50 429 $1.50 $643.50 Total Cost $14,366.00 $16,200.00 $23,300.00 $31,338.50 $21,228.50

DPT SUBCONTRACTOR COST ESTIMATES

Summary of DPT Subcontractors Costs Page 1 of 1

Cascade Dakota Technologies S2C2 Inc.

Mobe/Demobe 1 $3,500.00 $3,500.00 1 $2,000.00 $2,000.00 1 $2,500.00 $2,500.00 Perdiem 3 $500.00 $1,500.00 9 $225.00 $2,025.00 3 $250.00 $750.00 MIP rig and operator 3 $4,100.00 $12,300.00 3 $5,750.00 $17,250.00 3 $3,500.00 $10,500.00 Reporting and PM 2 $300.00 $600.00 1 $1,000.00 $1,000.00 1 $1,750.00 $1,750.00 Borehole Aandonment 325 $2.50 $812.50 325 $1.50 $487.50 0 $0.00 $0.00 Decon Pad equipment 1 $350.00 $350.00 0 $0.00 $0.00 55 gallon drum 1 $95.00 $95.00 0 $0.00 $0.00 Replacement Membrane 1 $195.00 $195.00 DPT Subcontractor GWP 1 $6,450.00 $6,450.00 work 10 hour days 6 $350.00 $2,100.00

Total 3 days W/O Vis Pack $18,712.50 $23,207.50 $24,245.00

Data Visual Package 1 $2,600.00 $2,600.00 1 $3,000.00 $3,000.00 1 $2,750.00 $2,750.00

Total 3 days with Visual Package $21,312.50 $26,207.50 $26,995.00

MIP SUBCONTRACTOR COST ESTIMATES

Summary of MIP Subcontractors Costs Page 1 of 1

GeoTek GPRS S2C2 Inc.

locate a 10' X10' area around 14 boring locations 1 $750.00 $750.00 1 $975.00 $975.00 0 $0.00 $0.00 Fuel Surcharge 0 $0.00 $0.00 0 $0.00 $0.00 1 $25.00 $25.00 Hourly locate for 14 borings 7 $200.00 $1,400.00 Total Cost $750.00 $975.00 $1,425.00

UTILITY LOCATES SUBCONTRACTOR COST ESTIMATES

Summary of Utilty Locator Subcontractors Costs Page 1 of 1

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Ralph Mongillo

WSP USA Inc.

9428 Baymeadows Road, Suite 400

Jacksonville, FL 32256 USA

January 4, 2023

Re: Non-Hazardous Drum Disposal

Mr. Mongillo:

The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water is listed below.

Non-Hazardous Chlorinated Solvents, Petroleum and Metals:

Description Rate Unit

T&D - Non-Haz Soil $ 110.00 Per Drum

T&D - Non-Haz Mud/Water $ 110.00 Per Drum

False Mobilization (No Drum Found) $ 85.00 Per Stop

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys.

Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Ralph Mongillo

9428 Baymeadows Road, Suite 400

Jacksonville, FL 32256 USA

January 9, 2023

Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials

Mr. Mongillo:

The price for the transportation and disposal (T&D) of drums of non-hazardous PFOS/PFAS soil, mud and water located in the State of Florida is listed below.

Description Rate Unit

Profile Fee (Charged once per site) $ 350.00 Per Site

T&D - Non-Haz PFOS/PFAS Impacted Soil $ 130.00 Per Drum

T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 140.00 Per Drum

False Mobilization (No Drum Found) $ 85.00 Per Stop

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

From: Jason Boltus To: Crews, Matt Cc: Mongillo, Ralph; Jon Ramsier Subject: RE: Rate Sheet for Drum Pickups Date: Wednesday, February 8, 2023 11:34:02 AM Attachments: image002.png image003.png

Good Morning Matt, US Ecology can provide disposal options (solid/liquid) based on the analytical confirming Non-Reg Disposal at $150.00/Drum. The PFAs containing material would be priced at $650/Drum to a Subtitle C Landfill. The PFAs also would carry a $750 subtitle C State Approval fee. Each Wastestream profiled would carry a $95.00 profiling fee to that designated facility. Hope that helps and if there is anything else you need don’t hesitate to reach out.

Transportation we can discussed based on location of the various job sites and wastestream volume.

Thank you, Jason Boltus

Branch Manager 7202 E. 8th Avenue Tampa, FL 33619 E: Jason.Boltus@usecology.com P: (315) 256-2688 C: (315) 802-3164 Emergency Response: 800.839.3975

From: Crews, Matt <matt.crews@wsp.com> Sent: Wednesday, February 8, 2023 8:45 AM To: Jason Boltus <Jason.Boltus@usecology.com> Cc: Mongillo, Ralph <ralph.mongillo@wsp.com> Subject: RE: Rate Sheet for Drum Pickups

This email came from an external source, please take caution when interacting with it.

Thanks, Jason. The material would be located at sites across the state of Florida. We understand that transportation costs depend on location. We have had other companies provide transportation rates based on a range of distances from the disposal facility.

Matthew Crews, P.E.

Assistant Vice President, Environmental Engineer mailto:Jason.Boltus@usecology.com mailto:matt.crews@wsp.com mailto:ralph.mongillo@wsp.com mailto:Jon.Ramsier@usecology.com https://www.wsp.com/

T+ 1 904-363-3430 M+ 1 904-327-8420

9428 Baymeadows Road, Suite 400 Jacksonville, Florida, USA 32256 wsp.com

From: Jason Boltus <Jason.Boltus@usecology.com> Sent: Wednesday, February 8, 2023 6:19 AM To: Crews, Matt <matt.crews@wsp.com> Cc: Mongillo, Ralph <ralph.mongillo@wsp.com> Subject: RE: Rate Sheet for Drum Pickups

Good Morning Matt, Yes I will work up a rate sheet for Transportation and Disposal of 55 gallon drums of Solids/Liquids based on contaminants listed below.

Where would the material be located?

Thank you, Branch Manager 7202 E. 8th Avenue Tampa, FL 33619 E: Jason.Boltus@usecology.com P: (315) 256-2688 C: (315) 802-3164 Emergency Response: 800.839.3975

From: Crews, Matt <matt.crews@wsp.com> Sent: Friday, February 3, 2023 10:03 AM To: Jason Boltus <Jason.Boltus@usecology.com> Cc: Mongillo, Ralph <ralph.mongillo@wsp.com> Subject: Rate Sheet for Drum Pickups

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

This email came from an external source, please take caution when interacting with it.

mailto:Jason.Boltus@usecology.com mailto:matt.crews@wsp.com mailto:ralph.mongillo@wsp.com mailto:Jason.Boltus@usecology.com mailto:matt.crews@wsp.com mailto:Jason.Boltus@usecology.com mailto:ralph.mongillo@wsp.com

Jason, We have a contract with the FDEP Waste Cleanup Program and would like to know if you can provide a general rate sheet to us for transportation and disposal of soils and liquids generated during our projects. For this rate sheet, please assume that the waste is non-hazardous and stored in 55-gallon steel drums. Our most common contaminants of concern are chlorinated volatile organic compounds, PFAS, and metals. Please let us know if you can help.

Thanks, Matt

Matthew Crews, P.E.

Assistant Vice President, Environmental Engineer

T+ 1 904-363-3430

M+ 1 904-327-8420

9428 Baymeadows Road, Suite 400 Jacksonville, Florida, USA 32256

NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.

-LAEmHhHzdJzBlTWfa4Hgs7pbKl

02/03/2023

Ralph Mongillo

WSO USA

9428 Baymeadows Rd Ste 400

Jacksonville,, FL, 32256 ralph.mongillo@wsp.com

19046108761

Subject: Non Hazardous Waste Drums

Quote Number: QT-2040

Dear Ralph, Thank you for the opportunity to provide this proposal for the waste management of 55 gallon drums located at Multiple Site Locations. I have created a rate quote based on your description of needs. I have also included our standard rate sheet of other needs and services.

HEPACO is the premier environmental contractor with coverage from 45 offices. We specialize in emergency response, industrial services, remediation, and waste services. HEPACO serves a multitude of customers including transportation companies, energy companies, environmental consultants, industrial facilities, terminals, environmental service companies, general contractors, property owners, and many other public and private-sector clients.

HEPACO, with its well-rounded and cross-trained staff, can effectively and efficiently complete this project and appreciates the opportunity. We stand firmly behind our work and always strives to deliver exceptional value and a high level of service at reasonable pricing.

Scope of Work

HEPACO will provide the following:

Transport 55 gallon drums of non regulated solids and liquids

Disposal of non hazardous solids and liquids

Assumptions

HEPACO assumes the following:

All work will be completed in one mobilization unless otherwise noted

If groundwater is encountered, additional costs for transportation, disposal, management, and/or containment will apply accordingly to the HEPACO Time and Materials Rate Sheet.

Costs do not include any required permitting unless otherwise noted

Costs do not include any surgical excavation around utilities, surface and/or subsurface structures

(it is assumed utilities are not present)

Client will provide any required sampling/analysis, technical reports, surveying, compaction testing and/or private utility locating services unless otherwise noted

All disposal costs are based on final profile approval and waste acceptance by the disposal facility

Client is responsible for any additional cost associated with non-conforming waste as determined by the disposal facility

Field crew will be on-site working eight (8) hours per day M-F with no weekend or holiday work unless otherwise noted

Customer is responsible for disposal costs unless otherwise noted

Quantities are speculative. With the exception of minimums, all billing will be based on actual quantities.

Price

A pricing itemization is provided in Attachment A.

HEPACO Basic Conditions:

All projects require a two (2) week notice to proceed. HEPACO will make every effort possible to meet all our client’s requests; however, HEPACO cannot guarantee a project start date with less than two (2) weeks’ notice to proceed.

This proposal is contingent upon credit approval and valid for thirty days

For any additional work beyond the original scope of work, time and material rates will apply.

Except for minimums, billing will be based on actual quantities at unit costs (see Attachment A).

A four (4)-hour minimum will apply to all unit costs quoted by the hour

Unit costs quoted by the day will be billed at the full day rate for any work on site. There will be no partial billing for partial workdays.

Unit costs quoted by the day apply up to eight hours per day. After eight hours per day, the day rate will be pro-rated for additional hours.

Unit costs are based on a non-union work force, no prevailing wages, no overtime work, and no performance bond.

Additional costs related to unexpected, concealed, or unknown conditions or any delays at the project site shall be incurred by customer.

HEPACO will not be held responsible if underground or above ground structures, cables, conduits, site features, property, materials, or equipment are destroyed, damaged, or rendered inoperable during the project.

Pricing is based on the national average for Diesel Fuel at the time of proposal submittal. The index will be reviewed during the start of the field work and additional costs will be billed if applicable. For reference, the link to current and historic fuel pricing is located at https://www.eia.gov/petroleum/gasdiesel/

Pricing includes HEPACO’s standard insurance coverage. Adding additional insured or increased coverages will be at additional cost and will be quoted on a case-by-case basis.

Again, thank you for the opportunity and we look forward to completing this project.

Sincerely, Kevin Hamilton

Kevin Hamilton

HEPACO Territory Account Manager

Subject: Non Hazardous Waste Drums

Quote Number: QT-2040

By signing below the customer acknowledges that they have received, reviewed, and agree to the HEPACO

Proposal

Owner or Owner Agent:

Signature:

Date of Acceptance:

Print Name

Owner or Owner Agent

ATTACHMENT A

PRICING ITEMIZATION TABLE

PRICING ITEMIZATION TABLE

FEES

Fee Calculated As Total Dollar Amount

Energy, Security and Recovery Fee Percentage of Total $130.95

Estimated Total Quote Cost: $1,003.93

Item Name or Description Estimated Quantity Unit Cost Units of Measure Total Line-Item Cost

NON-HAZ LIQUIDS DISPOSAL (PER

DRUM) 1 $141.75 DRUM $141.75

NON-HAZ SOLIDS DISPOSAL (PER

DRUM) 1 $185.00 DRUM $185.00

WASTE PROFILE FEE 1 $110.00 EACH $110.00

TECHNICIAN 1 $60.56 HOUR $60.56

TRUCK DRIVER 1 $69.60 HOUR $69.60

17H/E 55 GALLON - RECONDITIONED

DRUMS 1 $95.12 EACH $95.12

17H/E 55 GALLON DRUMS 1 $134.63 EACH $134.63

FLATBED W/LIFT GATE 1 $76.32 HOUR $76.32

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256

T: +1 904 363-3430 F: +1 904 363-3445

February 24, 2023 Proposal No. 202208346

Ms. Ginger Shirah Florida Department of Environmental Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR THE FORMER LAKE LUCINA DRYCLEANERS

SUPPLEMENTAL ASSESSMENT REPORT

6054 MERRILL ROAD

JACKSONVILLE, DUVAL COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_4610

PROPOSED TASK ASSIGNMENT: HW685_DC009B

Dear Ms. Shirah:

WSP USA Inc. (WSP), formerly Golder Associates USA Inc. (Golder), is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for completing additional assessment of the soil, groundwater, and soil vapor and presenting the results in a Supplemental Assessment Report at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – SOIL VAPOR SAMPLING

WSP operated a soil vapor extraction (SVE) system at the site that has been shut down since September 2018.

Based on the Operation and Maintenance data in the Remedial Action System Status Report, between December 2004 and September 2013, the SVE system removed approximately 78 pounds of volatile organic compounds

Ms. Ginger Shirah Proposal No. 202208346

Florida Department of Environmental Protection February 24, 2023

(VOCs) during operation. The system was activated for a short period of time between August 2017 and September 2018 at a reduced run time of about 100 hours a month where the system removed a total of approximately 0.18 pounds of VOCs. The SVE system is still onsite but has been dormant for about 4.5 years and vagrants have lived inside the trailer; therefore, it is unknown if the system has been damaged.

WSP proposes to assess the condition of the SVE system and collect soil vapor samples from each of the 14 individual SVE wells (SVE-7 through SVE-20). The SVE layout is presented on the attached Figure 10. Before sample collection, WSP will need to cut the manifold and use existing valves and fittings to isolate each SVE well at the system manifold. WSP will then, one at a time, connect each SVE well to Modified Active Gas Sampling (MAGS) equipment to extract and monitor soil vapor from vadose zone soil. The MAGS blower (Fuji Electric Model VFC508P-2T, 2.5 hp, single phase) will be capable of a flow rate of 154 standard cubic feet per minute at a vacuum of 80 inches of water (inches H20) under ideal conditions. A portable generator will supply power to the blower. The connection between the SVE wells and the blower will be made using 2-inch diameter vacuum-rated flexible PVC tubing and Schedule 40 PVC pipe. Vacuum gauges, a flowmeter, a filter, and sample ports will be installed in line.

WSP will run the blower at the highest achievable wellhead vacuum without entraining water for up to 30 minutes at each location. One soil vapor sample will be collected from each well using a Summa Canister (Tedlar bags if Summa Canisters are not available) and submitted to a fixed-base laboratory for VOC analysis using EPA Method

TO-15.

Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.

SUBTASK 3 – MEMBRANE INTERFACE PROBE, GROUNDWATER SCREENING, AND

SOIL SAMPLING

Membrane Interface Probe Activities A membrane interface probe – hydraulic profiling tool (MiHPT) instrument will be used to be pushed to a depth of 65 feet below ground surface (bgs) or to refusal at the five proposed locations presented on Figure 9. Review of previous soil borings indicated that there is a clayey silt approximately 40 feet bgs. The results of the MIP data will be reviewed in real time to determine if penetrating the 5-10 foot thick clayey silt layer to the total depth of 65 feet bgs is viable. If groundwater results are elevated just above the clay layer, WSP will call DEP prior to penetrating.

Each boring location in the back and front of the building will have a utility clearance completed by a private subcontractor before the work is initiated. The MIP boreholes will be abandoned immediately after the last reading is completed to prevent the vertical migration of contamination.

Groundwater Screening Sampling After completion of the five MIP borings and analysis of MiHPT data, WSP will collect deep groundwater screening samples by advancing Direct Push Technology (DPT) tooling at the proposed locations adjacent to the five MIP locations. WSP will continue to collect groundwater screening samples to a deeper zone of the surficial aquifer for laboratory analysis at 4-foot vertical continuous intervals, beginning at the 10–14-foot interval, using stainless-steel DPT screens to a total depth of 66 feet bgs, or refusal, whichever is encountered first. If the MIP was not able to penetrate the clayey silt layer previously at each location; then the groundwater sampling will be completed on top of the clayey silt layer. Grab groundwater screening samples (14 samples per location to a depth of 66 feet) will be collected from each location for analysis at a fixed laboratory for chlorinated VOCs using EPA Method 8260B. The boreholes will be abandoned immediately after the last groundwater sample is collected. Sampling equipment will be decontaminated between sampling locations/intervals to prevent cross-contamination.

Additionally, WSP will collect groundwater screening samples by advancing DPT tooling to collect shallow groundwater screening grab samples using 4-foot-long stainless-steel screens for analysis at a fixed laboratory for chlorinated VOCs using EPA Method 8260B at four locations. WSP assumes the top of the water table will be encountered at approximately 9 feet bgs; therefore, the DPT screen will be installed at four intervals: near the top of the water table (10-14 feet bgs); with the bottom of the screen on top of the hardpan layer (14-18 feet bgs), with the screen within the hardpan layer (18-22 feet bgs), and with the screen below the bottom of the hardpan layer (22-26 feet bgs) for a total of 4 samples for each location. These intervals will likely be adjusted based on actual hardpan dimensions observed during DPT activities. The DPT boreholes at the nine sample locations will be abandoned immediately after the last sample is collected to prevent the vertical migration of contamination.

Soil Sampling Soil samples will be collected from each of the nine sample locations prior to initiating DPT water sampling activities.

Soil samples will be collected at depths above the water table (0.5, 2.0, 4.0, 6.0, and 8.0 feet bgs), assuming the depth-to-water is 9 feet bgs, for analysis at a fixed laboratory for chlorinated VOCs using EPA Method 8260B. If depth-to-water measurements are different than what was assumed, adjustments will be made in the field regarding sample depths that need to be sampled for laboratory analysis. An additional soil sample will be collected at each depth in an ENCORE 25-gram sampler for possible synthetic precipitation leaching procedure analysis after review of initial soil total chlorinated VOC data. The boreholes will be advanced prior to the DPT water sampling at each location.

Upon completion of Subtask 3, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical reports, MIP data, and laboratory chain-of-custody documentation.

SUBTASK 4 – REPORTING

The supplemental assessment report will include a description of the sampling procedures, evaluation of the soil, soil vapor, and groundwater screening analytical results, tabulated soil data summary of the current and historical analytical data, a site map showing the groundwater screening and soil analytical results, laboratory analytical data, conclusions, and recommendations. WSP will forward the Automated Data Processing Tool (ADaPT) data deliverables for the groundwater sampling event provided by the laboratory.

HEALTH AND SAFETY

WSP will prepare a site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $100,393.57. WSP anticipates the field activities will take place in May 2023 or sooner depending on subcontractor availability. The LOE/CEF sheets are included in Attachment A. Subcontractor quotes including from the utility locate, MIP, drilling, and IDW waste disposal subcontractors are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 4,509.82 August 18, 2023

Subtask 2 – Soil Vapor Sampling $ 11,799.82 May 30, 2023 (Field documentation and laboratory analytical report via E-mail)

Subtask 3 – Membrane Interface Probe, Groundwater Screening, and Soil Sampling

$ 75,132.56 June 30, 2023 (Field documentation and laboratory analytical report via E-mail)

Subtask 4 – Reporting $ 8,951.37 August 18, 2023 (Supplemental Assessment Report)

Total/Completion Date $100,393.57 October 31, 2023

WSP appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, Golder Associates USA Inc.

Ralph F. Mongillo, Jr., PG Jesse C. Brown, PE Lead Consultant/Senior Geologist Vice President, Environmental Engineer

RFM/JCB/as

Attachments: Figure 10 – Existing Remediation Systems, Piping Layouts, and Well Locations Figure 9 – Proposed MIP, Shallow and Deep Groundwater Screening Sampling Locations

Attachment A Level of Effort Sheets and Cost Estimate Form Attachment B Subcontractor Quotes

G:\Projects\DEP-Drycleaning\Projects\Jax\Lake Lucina Shopping Center\HW685\DC009B - MIP\Proposal\HW685 Lake Lucina Supplemental Assessment Proposal - ERIC_4610.docx

Summary of Utilty Locator Subcontractors Costs.pdf
Sheet1
Summary of MIP Subcontractors Costs.pdf
Sheet1
Summary of DPT Subcontractors Costs.pdf
Sheet1

File details come from the government source that posted it. Updated .