This is a Task Assignment (TA) document for Contract Number HW685 between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc., a contractor providing environmental engineering services. The task assignment is numbered BF06A and establishes the terms for well abandonment activities at the AAA Chemicals site located at 163 Stockton Street, Jacksonville, Duval County, Florida (Site ID: ERIC_6087). The services are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement administered by the FDEP on behalf of the U.S. Environmental Protection Agency (EPA). The Department Project Manager is Megan Johnson (850.245.8994), and the Contractor's Project Manager is Justin W. Spengler (904.363.3430).

The scope of work consists of two subtasks: Subtask 1 involves project management at a cost of $320.91, and Subtask 2 encompasses well abandonment activities for nine monitoring wells (MW1 through MW9) at a cost of $5,857.15. The total task assignment value is $6,178.06 on a fixed unit rate basis. Deliverables include field documentation, photographic logs, and well completion reports due by July 31, 2025, with final task completion by September 12, 2025. The well abandonment subcontractor, Preferred Drilling Solutions, Inc., quoted $2,935.00 for drilling and abandonment services plus $675.00 for mobilization. Labor costs include professional services from WSP staff with overhead calculated at 172.50%, and additional expenses include vehicle rental ($120.00) and expendables ($40.00). Payment is contingent upon FDEP approval of project management and field documentation deliverables.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01A.pdf PDF
CN-370000-HW685-BF01CCO1.pdf PDF
CN-370000-HW685-BF02A.pdf PDF
CN-370000-HW685-BF05A.pdf PDF
CN-370000-HW685-BF05ACO1.pdf PDF
CN-370000-HW685-BF1BCO1.pdf PDF
CN-370000-HW685-BIL02C.pdf PDF
CN-370000-HW685-BIL1ACO4.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf PDF
CN-370000-HW685-BIL3ACO1.pdf PDF
CN-370000-HW685-CSS01.pdf PDF
CN-370000-HW685-CSS2ACO2.pdf PDF
CN-370000-HW685-DC001C.pdf PDF
CN-370000-HW685-DC001E.pdf PDF
CN-370000-HW685-DC002B.pdf PDF
CN-370000-HW685-DC002C.pdf PDF
CN-370000-HW685-DC002E.pdf PDF
CN-370000-HW685-DC003C.pdf PDF
CN-370000-HW685-DC004A.pdf PDF
CN-370000-HW685-DC007A.pdf PDF
CN-370000-HW685-DC007B.pdf PDF
CN-370000-HW685-DC008B.pdf PDF
CN-370000-HW685-DC008D.pdf PDF
CN-370000-HW685-DC009A.pdf PDF
CN-370000-HW685-DC009D.pdf PDF
CN-370000-HW685-DC009E.pdf PDF
CN-370000-HW685-DC010C.pdf PDF
CN-370000-HW685-DC012A.pdf PDF
CN-370000-HW685-DC012D.pdf PDF
CN-370000-HW685-DC014B.pdf PDF
CN-370000-HW685-DC016D.pdf PDF
CN-370000-HW685-DC017A.pdf PDF
CN-370000-HW685-DC017B.pdf PDF
CN-370000-HW685-DC018B.pdf PDF
CN-370000-HW685-DC019A.pdf PDF
CN-370000-HW685-DC019C.pdf PDF
CN-370000-HW685-DC01ACO1.pdf PDF
CN-370000-HW685-DC01ECO1.pdf PDF
CN-370000-HW685-DC021A.pdf PDF
CN-370000-HW685-DC021B.pdf PDF
CN-370000-HW685-DC021C.pdf PDF
CN-370000-HW685-DC021E.pdf PDF
CN-370000-HW685-DC022C.pdf PDF
CN-370000-HW685-DC023A.pdf PDF
CN-370000-HW685-DC023D.pdf PDF
CN-370000-HW685-DC024C.pdf PDF
CN-370000-HW685-DC025A.pdf PDF
CN-370000-HW685-DC027D.pdf PDF
CN-370000-HW685-DC028A.pdf PDF
CN-370000-HW685-DC028D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW685

BF06A Completion September 12, 2025

WSP will complete well-abandonment activities at the below referenced site in accordance with the cost proposal and Level of Effort (LOE) submitted to the Department on May 16, 2025.

Megan Johnson 850.245.8994 Contractor WSP USA Inc. Contractor

Contractor Justin W. Spengler Contractor 904.363.3430

ERIC_6087

163 Stockton Street, Jacksonville, Duval County

AAA Chemicals

Contractor Contractor

✔ $ 6,178.06

$ 6,178.06

Scope of Work

WSP USA Inc.

Contractor Matthew C. Crews

Assistant VP / Environmental Engineer

5/23/2025

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.05.23 10:20:54 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.05.22 15:01:17 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Field documentation, photographic log, and well completion reports 07/31/2025

Department approval of Project Management and field documentation, photographic log, and well completion reports (Subtasks 1 and 2) $ 6,178.06

$ 6,178.06

HW685

BF06A

FFLLORIDAA DDEEPARTMENTT OOFF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Alexiss A.. Lambert Secretary

Memorandum TO: WSP USA Inc. (WSP) HW685 Contract File

FROM: Megan Johnson, Contract Manager

DATE: May 22, 2025

SUBJECT: Negotiation Summary – SRP28, Task Assignment (TA) BF0 A AAA Chemicals - Site ID #: ERIC_6087 Well Abandonment

This TA is for abandoning (9) monitoring wells at the AAA Chemicals site, located at 163 Stockton Street, Jacksonville, Duval County. The services under this task are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement that is administered by the Department on behalf of the U.S.

Environmental Protection Agency (EPA).

Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general, administrative, and fringe costs.

The agreed upon cost of this subtask is $320.91.

Subtask 2: Well Abandonment Activities Under this subtask, WSP will oversee well-abandonment activities at the project site. The deliverable for this subtask will include field documentation, photographic log, and well completion reports. The agreed upon cost of this subtask is $5,857.15.

Summary The Department’s SRP Contract Manager and WSP’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $6,178.06. Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by WSP on May 16, 2025, and the TA Form for BF0 A prepared by the Department. The final deliverable for this TA must be received by the Department no later than July 31, 2025.

WSP USA Inc.

9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256 T: +1 904-363-3430 wsp.com

May 16, 2025 Proposal No. 2025US414644

Ms. Megan Johnson Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR WELL ABANDONMENT

AAA CHEMICALS

163 STOCKTON STREET

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FACILITY IDENTIFICATION NUMBER: ERIC_6087

PROPOSED TASK ASSIGNMENT: HW685_BF0 A

Dear Ms. Johnson:

WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for well abandonment activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Brownfields and CERCLA Site Screening Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – WELL ABANDONMENT ACTIVITIES

WSP will abandon the nine existing monitoring wells (MW1 through MW9) in accordance with DEP and St. Johns River Water Management District (SJRWMD) regulations. WSP will use a Florida-licensed driller to abandon the monitoring wells. Monitoring well construction details are shown in the attached table. The approximate well locations are shown on the attached figure.

The steel manholes and concrete well pads will be removed after abandonment activities are completed, and the ground surface will be restored to near its original condition. After the fieldwork is completed, the driller will prepare the appropriate well completion reports for submittal to the SJRWMD, updating the status of the wells at the site.

The well abandonment field activities will be completed in one day and documented with photographs.

Ms. Megan Johnson Proposal No. 2025US414644

Florida Department of Environmental Protection May 16, 2025

Following completion of the well abandonment activities, WSP will submit an e-mail deliverable to the DEP to document the well abandonment activities. The e-mail deliverable will include field documentation, a photographic log, and copies of the well completion reports.

HEALTH AND SAFETY

WSP will prepare a site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high-visibility safety vests, and steel-toed boots. A safety job briefing will be conducted before the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the scope of work is $6,178.06. WSP will tentatively schedule the well abandonment event for June 2025. The LOE and CEF are included in Attachment A. The subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 320.91 August 15, 2025

Subtask 2 – Well Abandonment Activities

$5,857.15 July 18, 2025 (Field documentation, photographic log, and well completion reports via E-mail Deliverable)

Total/Completion Date $6,178.06 September 12, 2025

WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, WSP USA Inc.

Justin W. Spengler Matthew C. Crews Senior Consultant, Environmental Engineer Assistant Vice President, Environmental Engineer

JWS/MCC/as

Attachments: Table 3-1 – Monitoring Well Construction Details Figure 2-2 – Site Details Plan

Attachment A – Level of Effort Sheets / Cost Estimate Form Attachment B – Subcontractor Quotes

G:\Projects\DEP - Brownfields\AAA Chemicals\Proposal\BF0 A - AAA Chemicals Well Abandonment Proposal.docx

Table 3-1

Figure 2-2

ATTACHMENT A

Level of Effort Sheets / Cost Estimate Form

FDEP COST ESTIMATEContractor: WSP USA Inc.

Date: 5/16/2025

Task #: BF0 A SubTask 1 Project Management SubTask 6

Site: SubTask 2 Well Abandonment Activities SubTask 7

Activity/Phase: Well Abandonment SubTask 3 SubTask 8

Project Manager: Megan Johnson SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$47.22 Project Manager (JS) 2.3 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$72.83 Practice Leader - X-13 (MC) 1 1 0 0 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Sci/Eng - X-11 0 0 0 0 0 0 0 0 0 0

$54.68 Senior Sci/Eng - P-11 (BL) 0 0 0 0 0 0 0 0 0 0 $47.22 Senior Project Sci/Eng - P-10 (JS) 7 7 0 0 0 0 0 0 0 0

$0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0

$38.20 Project Sci/Eng - P-9 (MT) 11 11 0 0 0 0 0 0 0 0 $36.84 Staff Sci/Eng - P-8 (AS) 0 0 0 0 0 0 0 0 0 0

$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 21 2.3 19.0 0.0 0 0 0 0 0 0 0

Direct Labor $930.63 $107.06 $823.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $1,605.34 $184.68 $1,420.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $2,535.97 $291.74 $2,244.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

AAA Chemicals

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTIMATEContractor: WSP USA Inc.

Date: 5/16/2025

Task #: BF0 A SubTask 1 Project Management SubTask 6

Site: SubTask 2 Well Abandonment Activities SubTask 7

Activity/Phase: Well Abandonment SubTask 3 SubTask 8

Project Manager: Megan Johnson SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

AAA Chemicals

Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $2,935.00 $2,935.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $2,935.00 $2,935.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $293.50 $293.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $3,228.50 $3,228.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $5,924.47 $291.74 $5,632.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $253.59 $29.17 $224.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $6,178.06 $320.91 $5,857.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : AAA Chemicals SUBTASK 2: Well Abandonment Activities

DATE: 5/16/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (M. Crews) 1

Senior Project Sci/Eng (J. Spengler) 7

Project Sci/Eng (M. Triano) 11

TOTAL LABOR 19.0

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Preferred Drilling Solutions Well Abandonment $2,935.00 1 $2,935.00

TOTAL $2,935.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00

TOTAL EQUIPMENT $40.00

Prepare Health and Safety Plan (2 hours). Verification of property ownership prior to mobilization (1 hour). Prepare draft E-mail Deliverable with field documentation, photographic log, and well completion reports (4 hours).

Field event preparation (1 hour). Oversee abandonment of 9 monitoring wells, including manhole and pad removal, and surface restoration (10 hours)

Prepare final E-mail Deliverable (1 hour).

FINAL --7/24/96

ATTACHMENT B

Subcontractor Quotes

Preferred Drilling Solutions, Inc.

8820 66th St, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

Date: 5/6/25 FAC ID#:

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price

Rig Type: Auger/Mud Rotary_____

HSA Drilling & Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)

<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00

Borehole Grouting

4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00

1" - 2" Well Installation (includes screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00

4" Well Installation (includes screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00

Double Cased Well $0.00

6" Surface Casing per foot $0.00 per well $0.00

1"- 2" Well Abandonment (includes grouting) per foot $16.00 140.0 $2,240.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $0.00

Mobilization roundtrip $675.00 1 $675.00

Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum each $0.00 lump sum $10.00 2 $20.00

$0.00

$0.00

$0.00 Standby/Delay/Difficult Access Time per hour $0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00

TOTAL QUOTE PRICE $2,935.00

Project No.:

Signature and Title of Person Submitting Quote: _____________________________________ Rose Hood, Estimating & Scheduling Mgr Date: 5/6/25

Consultant Name: WSP

Site Name & Location: AAA Chemicals

PROPOSED SCOPE OF WORK:

Abandon (9) 1" MWs, depths 14' - 15', total footage: 140', remove pads and manholes, restore grade

Days to Complete Scope of Work: 0.5

163 Stockton St, Jacksonville, Duval County, FL

Well Completion (includes MH w/ cover, concrete pad, locking well cap, DRILLING

MISCELLANEOUS

Permits/Well Completion or Abandonment Reports

WSP, AAA Chemicals, Jacksonville, FL.xlsx

Spengler, Justin

From: probedomain <probedomain@bellsouth.net> Sent: Thursday, May 15, 2025 11:00 AM To: Spengler, Justin Subject: RE: Quote Request - AAA Chemicals, Jacksonville, FL

The FDEP has tasked WSP with completing well abandonment activities at the former AAA Chemicals site, which is located at 163 Stockton Street in Jacksonville, Florida. The well locations are shown on the attached Figure 2-2 and the well construction table is shown on the attached Table 3-1. Please provide a quote to abandon all nine wells on site (MW-1 through MW-9).

If you have any questions, please let me know.

Justin Spengler

Senior Consultant, Environmental Engineering justin.spengler@wsp.com

T+ 1 904-363-3430

M+ 1 904-738-9729

NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.

-LAEmHhHzdJzBlTWfa4Hgs7pbKl

Sonic Auger DPT Injection Well Abandonment

DATE: 5/5/2025

ESTIMATE #: 525005

ID QTY Unit Rate TOTAL

1 1 each 900.00$ 900.00$

2 night 300.00$ -$

3 140 foot 10.00$ 1,400.00$

4 9 each 100.00$ 900.00$

5 1 each 100.00$ 100.00$

6 Drums (Soil) (As Needed) each 75.00$ -$

7 Drums (Water) (As Needed) each 75.00$ -$

8 Permit: (City of Jacksonville - Permit Required, No Fee) 1 each -$

Completion: 1 day Subtotal 3,300.00$

TTodd Hodgson Todd Hodgson TOTAL 3,300.00$ Partner

Mobilization

THANK YOU FOR YOUR BUSINESS!

Actual quantities used and days on site will be invoiced

2' x 2' Pad Removal w/8" BD Completion, Rake Level (Grass)

1" PVC Well Abandonment (Total 140')

***Utility Locates on Private Property are the responsibility of the client*** Borehole Clearance to 5’ bgs beyond 20 minutes will require a change order for additional time and cost.

Well Locations must be accessible by track mounted DPT Rig

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.

Per Diem - 2 Man Crew Est. (Min. Hotel Cost + $50/per man)

DESCRIPTION

***Damage to utilities on private property are the responsibility of the client***

Offsite Disposal of Manhole/Concrete Disposal

PROJECT

AAA Chemicals 163 Stockton Street

CUSTOMER

Justin Spengler

WSP

Project Description:

(9) 1" PVC Monitoring Well Abandonment (Total 124' )w/ Removal of 2' x 2' Pad w/8" BD Manhole (Grass)

(904) 738-9729

Jacksonville, Florida

Well Abandonments

9428 Baymeadows Road, Ste. 400 Jacksonville, Florida 32223

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586