This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Golder Associates USA Inc. for environmental services at the Classic Cleaners of Belleview site located at 10841 Southeast United States Highway 441 in Belleview, Marion County, Florida. The task assignment is designated as Contract HW685, Task Assignment DC035A, and is part of the FDEP's Drycleaning Solvent Cleanup Program. Ben Grubbs serves as the FDEP Project Manager, while Matt Crews represents Golder Associates USA Inc. as the contractor's project manager. The assignment became effective on June 1, 2022, with a completion date of January 13, 2023.
The contract authorizes Golder to conduct well installation and groundwater monitoring activities in accordance with a May 25, 2022 Scope of Work, Cost Estimate, and Bid Documentation. The work consists of four subtasks: Project Management, Monitoring Well Installation, Biennial Groundwater Monitoring, and Reporting. Golder will abandon three damaged monitoring wells and install two new replacement monitoring wells completed to 57 feet below ground surface, collect groundwater samples from ten monitoring wells for chlorinated volatile organic compounds analysis, manage investigation-derived waste, and submit a Biennial Groundwater Monitoring Report with updated Geographic Information System tables and Automated Data Processing Tool deliverables. The total contract value is $30,636.62 on a fixed unit rate basis, with invoice payments tied to deliverable submissions: $17,444.91 for well installation (due August 26, 2022), $7,929.30 for groundwater monitoring (due September 16, 2022), and $5,262.41 for reporting (due October 28, 2022). The 112 direct labor hours are distributed across project management, well installation, groundwater monitoring, and reporting activities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC035A Completion January 13, 2023
This Task Assignment authorizes Golder to conduct well installation and groundwater monitoring activities in accordance with the May 25, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Ben Grubbs 850-245-8992 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews 904-363-3430
ERIC_4906
10841 Southeast United States Highway 441, Belleview, Marion County
Classic Cleaners of Belleview
✔ $ 30,636.62
$ 30,636.62
Scope of Work
Robert M. Wojcik, PG Digitally signed by Robert M. Wojcik, PG Date: 2022.06.01 08:22:59 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.06.01 07:24:26 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Monitoring Well Permits and Installation Documentation 08/26/2022
Subtask 3: Groundwater Monitoring Field Documentation and Laboratory Report;
IDW Disposal Documentation 09/16/2022
Subtasks 1 & 4: Biennial Groundwater Monitoring Report; ADaPT/GIS Update;
Project Management 10/28/2022
Subtask 2: Submittal and FDEP approval of the Monitoring Well Permits and Installation Documentation $ 17,444.91
Subtask 3: Submittal and FDEP approval of the Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 7,929.30
Subtasks 1 & 4: Submittal and FDEP approval of the Biennial Groundwater Monitoring Report; ADaPT/GIS Update; Project Management $ 5,262.41
$ 30,636.62
HW685
DC035A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW685 Contract Negotiation File Classic Cleaners of Belleview Belleview, Marion County
ERIC_4906
From: Ben Grubbs, Project Manager Date: May 31, 2022 Subject: Negotiation Summary
HW685 DC035A
This Task Assignment authorizes Golder to conduct well installation and groundwater monitoring activities in accordance with the May 25, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Monitoring Well Installation Golder will abandon three wells that were damaged and could not be rehabilitated and oversee a utility locate and installation of two monitoring wells. Golder requested bids for the utility locate from ProCheck, GPRS, and GeoTek. GPRS was selected as the lowest responsive and responsible bidder. Golder requested bids for the monitoring well installation from Earth Tech, Preferred Drilling Solutions, and Groundwater Protection. Groundwater Protection was selected as the lowest responsive and responsible bidder. Investigation-derived waste (IDW) will be temporarily stored in 55-gallon drums. IDW costs are covered in Subtask 3.
Subtask 3: Biennial Groundwater Monitoring Golder will collect groundwater samples from ten monitoring wells (MW001 – MW003, MW004R, MW005R, MW007, MW008, MW010, MW013, and MW015). Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). IDW will be temporarily stored in 55-gallon drums. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste, and M & D Industrial Services. Erwin was selected as the lowest responsive and responsible bidder.
Subtask 4: Reporting Golder will submit the Biennial Groundwater Monitoring Report and ADaPT and GIS deliverables to FDEP.
MEMORANDUM
Classic Cleaners of Belleview May 31, 2022 Page Two
Golder will obtain an Access Agreement from the current real property owner of the Classic Cleaners of Belleview (ERIC_4906) site prior to the start of field activities.
This groundwater sampling event is a part of long-term monitoring to determine when the site will be eligible for closure.
The original Task Assignment totaled $30,291.62 with 112 labor hours but after negotiations and corrections with contractor costs are reflected as below:
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $30,636.62 with 112 labor hours.
Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 5/25/2022
Task #: DC035A SubTask 1 Project Management SubTask 6
Site: SubTask 2 MW Installation SubTask 7
Activity/Phase: Assessment SubTask 3 Bieannial GW Monitoring SubTask 8
Project Manager: Ben Grubbs SubTask 4 Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.23 Project Manager (RFM) 10 10.4 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 3 0 0 3 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0
$51.23 Senior Sci/Eng - X-11 (RFM) 26 8 5 13 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 4 0 0 4 0 0 0 0 0 0 $44.15 Project Sci/Eng - P-10 (JT) 2 0 0.0 2.0 0 0 0 0 0 0 $34.55 Staff Sci/Eng - P-8 (SN) 46 27 19.0 0 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 18 0 18 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 3 0 0 3 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 112 10.4 35.0 42.0 25.0 0 0 0 0 0 0
Direct Labor $4,610.65 $530.43 $1,342.69 $1,512.36 $1,225.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $7,953.37 $914.99 $2,316.14 $2,608.82 $2,113.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $12,564.02 $1,445.42 $3,658.83 $4,121.18 $3,338.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
Task #: DC035A SubTask 1 Project Management SubTask 6
Site: SubTask 2 MW Installation SubTask 7
Activity/Phase: Assessment SubTask 3 Bieannial GW Monitoring SubTask 8
Project Manager: Ben Grubbs SubTask 4 Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Classic Cleaners of Belleview
Travel Vehicle Rental $600.00 $360.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $500.00 $250.00 $250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,100.00 $610.00 $490.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $10,282.00 $10,282.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $330.00 $0.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $700.00 $700.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $11,312.00 $10,982.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,131.20 $1,098.20 $33.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $12,443.20 $12,080.20 $363.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,185.00 $0.00 $1,185.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $0.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,405.00 $0.00 $1,405.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $650.00 $650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,058.00 $0.00 $1,058.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,868.00 $730.00 $1,138.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $29,380.22 $1,445.42 $17,079.03 $7,517.18 $3,338.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,256.40 $144.54 $365.88 $412.12 $333.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $30,636.62 $1,589.96 $17,444.91 $7,929.30 $3,672.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
SITE : Classic Cleaners of Belleview SUBTASK 2: MW Installation
DATE: 5/25/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R Mongillo) 8
Staff Sci/Eng (S Neal) 27
TOTAL LABOR 35
VEHICLE TYPE RATE UNIT USEAGE
Truck (Well installation) $120.00 Per Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem Project Sci/Eng (S. Neal) $36.00 Per Day 2 $72.00 Hotel Project Sci/Eng (S. Neal) $89.00 Per Day 2 $178.00
TOTAL PER DIEM $250.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
GPRS Utility locator $700.00 Per Visit 1 $700.00 GWP Drilling Subcontractor $10,282.00 Lump Sum 1 $10,282.00
TOTAL $10,982.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00 MW Installation kit $325.00 Per Day 2 $650.00
TOTAL EQUIPMENT $730.00
Contact property owners, get signed access agreement, and DEP scheduling field work, install and develop two monitoring wells completed to 57 feet bgs, abandon three damaged wells and management of IDW (soil and development water) at site.
Communication with RPO and verification of property ownership prior to site access and get a current site Access form signed (3 hours), Develop Health and Safety Plan (3 hours), prepare and submit field notes and well construction forms in an email deliverable to the DEP. (2 hours).
Round trip travel (5 hours). Field event preparation (1 hr) Mobilize to the site meet with the utility locator and identify buried utilities at proposed well locations (1 hour), meet with drilling subcontractor and install MW004R and MW005R, abandon MW004, MW005, MW006, and manage the IDW (2 days at 10 hours a day)
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 3: Bieannial GW Monitoring
DATE: 5/25/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R Mongillo) 5
Project Sci/Eng (S. Neal) 19
Staff Sci/Eng (J. Spengler) 18
TOTAL LABOR 42
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling S. Neal) $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem Staff Sci/Eng (S. Neal) $36.00 Per Day 1 $36.00 Per Diem Project Sci/Eng $36.00 Per Day 1 $36.00
Hotel Staff Sci/Eng (S. Neal) $89.00 Per Day 1 $89.00 Hotel Project Sci/Eng $89.00 Per Day 1 $89.00
TOTAL PER DIEM $250.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW soil, devel, and sampling water $110.00 Per Drum 3 $330.00
TOTAL $330.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B Total VOHs EPA Method 8260B $73.00 10 $730.00 Total VOCs EPA Method 8260B - IDW Drums $110.00 1 $110.00
TCLP Metals - non aqueous IDW Method 1311/6010/6020/7470 $135 1 $135.00
TCLP VOCs - non aqueous IDW Method 8260 $210 1 $210.00 Sample Shipping Small $110.00 2 $220.00
TOTAL LAB $1,405.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Deep Groundwater Sampling Kit $415.00 Per Day 2 $830.00 Tubing, Poly HDPE $0.30 Per Foot 660 $198.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 10 $30.00
TOTAL EQUIPMENT $1,138.00
Conduct groundwater sampling event. Field event preparation (1 hr), Mobe/demobe from Jacksonville to Apopka (5 hours), locate wells at new site, instrument calibration, groundwater measure water levels (3 wells), and sample 10 wells MW001, MW002, MW003, MW004R, MW005R, MW007, MW008, MW010, MW013, and MW015 and measure field parameters and securing the IDW drum(s) (13 hours).
Communication with RPO to schedule site visit (1 hours), prepare and submit field notes, sample forms, laboratory report in an email deliverable to the DEP (2 hrs), and characterization and waste profile for transportation and disposal of purge water IDW drum(s) (2 hours). .
Conduct groundwater sampling event. Mobe/demobe from Jacksonville to Apopka (5 hours), locate wells at new site, instrument calibration, groundwater measure water levels (3 wells), and sample 10 wells MW001, MW002, MW003, MW004R, MW005R, MW007, MW008, MW010, MW013, and MW015 and measure field parameters and securing the IDW drum(s) (13 hours).
Contact property owner and DEP scheduling field work, locate wells at the new site, collect depth to water measurements from three monitoring wells and groundwater samples from ten monitoring wells for chlorinated VOC analysis, and management of IDW for transportation and disposal.
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 4: Reporting
DATE: 5/25/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 3
Senior Sci/Eng (R Mongillo) 13
Senior Project Sci/Eng (J. Thomas) 2.0
Senior Project Sci/Eng (B. Lucero) 4
Staff Sci/Eng (A. Strayer) 3
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Reporting: Updating tables from other consultant, document production, binding and shipping.
Create pdf for OCULUS.
Develop conclusions and recommendations and prepare final Biennial Monitoring Report.
Data entry, prepare tables and figures, and draft Biennial Monitoring Report
Update FDEP GIS Tables, run data checker, create and edit error report, and annotate error report (10 data points x 8 min/point = 80 minutes). Submit DEP GIS tables; submit ADaPT deliverable (0.5) CADD Update Figures from other consultant (one groundwater shallow zone and shallow and intermediate CVOC detections) for the report.
FINAL --7/24/96
FDEP COST ESTIMATE
Contractor: Golder Associates USA Inc.
Date: 5/25/2022
Task #: DC035A SubTask 1 Project Management SubTask 6
Site: SubTask 2 MW Installation SubTask 7
Activity/Phase: Assessment SubTask 3 Bieannial GW Monitoring SubTask 8
Project Manager: Ben Grubbs SubTask 4 Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$51.23 Project Manager (RFM) 10 10.4
$0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 3 0 0 3 0 0 0 0 0 0
$0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0
$51.23 Senior Sci/Eng - X-11 (RFM) 26 8 5 13 0 0 0 0 0 0
$45.42 Senior Project Sci/Eng - P-10 (BL) 4 0 0 4 0 0 0 0 0 0
$44.15 Project Sci/Eng - P-10 (JT) 2 0 0.0 2.0 0 0 0 0 0 0
$34.55 Staff Sci/Eng - P-8 (SN) 46 27 19.0 0 0 0 0 0 0 0
$33.32 Staff Sci/Eng - P-8 (JS) 18 0 18 0 0 0 0 0 0 0
$32.75 Staff Sci/Eng - P-8 (AS) 3 0 0 3 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 112 10.4 35.0 42.0 25.0 0 0 0 0 0 0
Direct Labor $4,610.65 $530.43 $1,342.69 $1,512.36 $1,225.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $7,953.37 $914.99 $2,316.14 $2,608.82 $2,113.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $12,564.02 $1,445.42 $3,658.83 $4,121.18 $3,338.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
Task #: DC035A SubTask 1 Project Management SubTask 6
Site: SubTask 2 MW Installation SubTask 7
Activity/Phase: Assessment SubTask 3 Bieannial GW Monitoring SubTask 8
Project Manager: Ben Grubbs SubTask 4 Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Classic Cleaners of Belleview
Travel
Vehicle Rental $600.00 $360.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $500.00 $250.00 $250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $1,100.00 $610.00 $490.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $10,282.00 $10,282.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $330.00 $0.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utility Location $700.00 $700.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $11,312.00 $10,982.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $1,131.20 $1,098.20 $33.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $12,443.20 $12,080.20 $363.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $840.00 $0.00 $840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $220.00 $0.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $1,060.00 $0.00 $1,060.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $160.00 $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $650.00 $650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $1,058.00 $0.00 $1,058.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $1,868.00 $730.00 $1,138.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $29,035.22 $1,445.42 $17,079.03 $7,172.18 $3,338.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $1,256.40 $144.54 $365.88 $412.12 $333.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $30,291.62 $1,589.96 $17,444.91 $7,584.30 $3,672.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
Golder Associates USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445 golder.com
May 25, 2022 Proposal No. 202208346
Mr. Ben Grubbs Florida Department of Environment Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: PROPOSAL FOR WELL INSTALLATION AND BIENNIAL GROUNDWATER MONITORING
CLASSIC CLEANERS OF BELLEVIEW
10841 SE HIGHWAY 441, BELLEVIEW, MARION RIVER COUNTY, FLORIDA
FACILITY ID NUMBER: ERIC_4906
PROPOSED TASK ASSIGNMENT: HW685_DC035A
Dear Mr. Grubbs:
Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this proposal for conducting well installation and the biennial groundwater monitoring activities at the Classic Cleaners of Belleview site, located at the above referenced address. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The scope of work is based on the recommendations accepted by the DEP in the August 5, 2020, Memorandum submitted to E&E. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submission of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will be responsible seeing that the work is conducted in a manner that is consistent with the requirements of the DEP approved task assignment.
SUBTASK 2 – MONITORING WELL INSTALLATION
Three monitoring wells MW004, MW005, and MW006 were observed to be “destroyed” during the June 2020 site visit where no depth-to-water could be measured. The DEP recommended that MW004 and MW005 be replaced if they could not be rehabilitated prior to the next sampling event. Golder will install two replacement monitoring
Mr. Ben Grubbs Proposal No. 202208346
Florida Department of Environment Protection May 25, 2022 wells near the MW004 and MW005 locations. The attached Figure 3 shows the approximate monitoring well locations.
Golder will oversee use of a drill rig to install two shallow zone surficial aquifer wells. The proposed monitoring wells installed at the site will be constructed of 2-inch diameter, Schedule 40 PVC casing with 0.01-inch diameter slot size Schedule 40 PVC screen. The two shallow zone wells will be constructed with 10-feet of screen installed at approximately 47 to 57 feet bgs. The well casings and screens will be connected using flush-threaded joints.
The annular space between the borehole wall and each well screen will be completed with a 20/30 grade silica sand filter pack from the bottom of the borehole to approximately 2 feet above the top of the well screen. A minimum 2-foot thick, fine (30/65) grade silica sand seal will be placed above the sand filter pack and the remainder of the annular space will be completed with a Portland Cement Type II bentonite grout seal.
The wells will be installed with flush-mounted surface completion, a 2-foot by 2-foot sloped concrete pad and an 8-inch diameter bolt-down steel cover. Each of the well’s risers will be cut just below final grade and capped with water-tight expandable locking plugs.
To reduce sample turbidity and establish a good hydraulic connection with the aquifer, Golder will develop both wells the following day until purged water remains visibly clear and free of suspended particulate matter. Golder estimates two days to complete utility locates and well installation activities.
Golder will temporarily store the investigation derived waste (IDW) soil cuttings and purge water generated from well development in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total volatile organic compounds (VOCs) using EPA Method 8260 during Subtask 3 (groundwater monitoring). If the waste characterization sample is nonhazardous and acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.
Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field well installation forms, field notes, and well permits.
SUBTASK 3 – BIENNIAL GROUNDWATER MONITORING
Golder will collect groundwater samples from 10 shallow zone monitoring wells included in the groundwater monitoring program, MW001, MW002, MW003, MW004R, MW005R, MW007, MW008, MW010, MW0013, and MW015 for chlorinated VOCs. The potentiometric map of the shallow surficial aquifer (Figure 2) and chlorinated VOC detection map (Figure 3) from the previous groundwater monitoring report are attached for reference.
Prior to groundwater sampling, depth-to-water measurements will be collected using an electronic water level indicator to determine groundwater depth. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.
Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B. Upon receipt of the laboratory analytical results, Golder will evaluate the constituent concentrations to determine if off-site notification is required.
Golder will temporarily store the IDW purge water generated from the groundwater sampling event in a 55-gallon steel drum(s) and sample the IDW for waste characterization and follow the same procedures as described in Subtask 2 for storage, characterization, and disposal.
Upon completion of Subtask 3, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, nonhazardous waste disposal, and laboratory chain-of-custody documentation.
SUBTASK 4 – REPORTING
The biennial groundwater monitoring report will include a description of the sampling procedures, evaluation of the analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will also update the DEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the DEP data checker on the completed tables; and submit the updated tables and error reports under this subtask. Additionally, Golder will forward the Automated Data Processing Tool (ADaPT) data deliverables for the groundwater sampling event provided by the laboratory.
HEALTH AND SAFETY
Golder will prepare a site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $30,291.62. Golder anticipates the well installation will be completed late July/early August 2022 and the groundwater monitoring event will take place approximately 2 weeks later. The LOE/CEF sheets and the subcontractor bids are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule and Deliverables
Subtask 1 – Project Management $ 1,589.96 November 25, 2022
Subtask 2 – Monitoring Well Installation
$17,444.91 August 26, 2022 (Field notes, well installation logs, and laboratory report submittal)
Subtask 3 – Biennial Groundwater Monitoring
$ 7,584.30 September 16, 2022 (Field notes, sampling logs, IDW disposal, and laboratory report submittal)
Subtask 4 – Reporting $ 3,672.45 October 28, 2022 (Groundwater Monitoring Report, GIS Tables, ADaPT Deliverables)
Total/Completion Date $30,291.62 December 30, 2022
Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.
Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at 904 363-3430.
Sincerely, Golder Associates USA Inc.
Ralph F. Mongillo, Jr. PG Robert M. Wojcik, PG Lead Consultant / Senior Geologist Director, Hydrogeologist
RFM/BMW/as
Attachments: Figure 2 Groundwater Elevation Map (June 4, 2020)
Figure 4 Groundwater Contaminant Concentration Map (June 26, 2020)
Attachment A Level of Effort Sheets / Cost Estimate Form and Subcontractor Bids
G:\Projects\DEP-Drycleaning\Projects\Tampa-Ocala\Classic Cleaners of Belleview - HW685\Proposal\HW685 Well installation and Biennial Groundwater Monitoring Proposal ERIC_4906.docx
From: Mongillo, Ralph To: Mongillo, Ralph Subject: RE: IDW soil and groundwater drum pick up at the Capitol Cleaners at 3813 North Monroe Street in Tallahassee, FL
Date: Tuesday, May 24, 2022 9:10:22 AM
From: Erwin Remediation <erwinremediation@gmail.com> Sent: Monday, May 23, 2022 4:14 PM To: Mongillo, Ralph <ralph.mongillo@wsp.com> Subject: Re: IDW soil and groundwater drum pick up at the Capitol Cleaners at 3813 North Monroe Street in Tallahassee, FL
EXTERNAL EMAIL
EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.
Ralph, I have this on schedule, but we recently had to increase our drum rate by $10.00.
Unfortunately the cost of fuel and disposal has forced our hand on this.
Thank you, Jonathan Erwin Erwin Remediation, Inc.
Office: (850) 292-6511|Email: ErwinRemediation@Gmail.com Erwin Remediation, Inc.|408 Ditmar Street Pensacola, FL 32503 lTWfa4Hgs7pbKl-BT-P365-c108p227-DayTwo-Disclaimer mailto:ralph.mongillo@wsp.com mailto:ralph.mongillo@wsp.com tel:%28850%29%20292-6511 mailto:ErwinRemediation@gmail.com
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Ralph Mongillo
WSP Golder
9428 Baymeadows Road, Suite 400
Jacksonville, FL 32256
May 24, 2022
Re: Non-Hazardous Drum Disposal
Mr. Mongillo:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water is listed below.
Non-Hazardous Chlorinated Solvents:
Description Rate Unit
T&D - Non-Haz Soil $ 110.00 Per Drum
T&D - Non-Haz Mud/Water $ 110.00 Per Drum
Non-Hazardous PFAS Impacted:
Description Rate Unit
Profile Fee $ 350.00 Per Site
T&D - Non-Haz PFAS Impacted Soil $ 120.00 Per Drum
T&D - Non-Haz PFAS Impacted Mud/Water $ 130.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
From: Craig Burns To: Crews, Matt; Morelli, Gene; Neal, Scott; Mongillo, Ralph Subject: Golder Drum Rates update from CLARK Date: Tuesday, May 10, 2022 12:56:33 PM Attachments: image001.png
Golder Drum Rates - 2022.pdf
EXTERNAL EMAIL
EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.
Gents- See the new line item reflecting a 10% FSC to the drum total invoice. CLARK started to implement April 15.
Call with questions, also always…thank you for your business.
Craig
Please note: a 10% “cost of services surcharge” will be added to the bottom line of all invoices effective April 15, 2022.
Think CLARK!
Craig Burns | Sales / Project Manager | Clark Environmental Inc.
cburns@clarkenv.com | È:863.327.6289 mailto:cburns@clarkenvironmental.com mailto:matt.crews@wsp.com mailto:gene.morelli@wsp.com mailto:scott.neal@wsp.com mailto:ralph.mongillo@wsp.com https://urldefense.proofpoint.com/v2/url?u=https-3A__eur03.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.clarkenvironmental.com-252F-26data-3D04-257C01-257C-257Ccbc1f417ff8c4337355508d9512e2412-257Cef8a53ea1a1c4189b792c832dcaea568-257C0-257C0-257C637630080879080169-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Do50wIW3MIyw-252FGoKyrlvbxMIbbP-252BO9gB5TtQqcXHi-252BR0-253D-26reserved-3D0&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=Nk5c7G1FQ88ZgxtZwQzwAlNlpfGMEJLPerLkIs92lL0&s=IkqjklDtDzZYWA58IMoE8gCdmyvcKTVe3L1scUIICLc&e= mailto:cburns@clarkenv.com
5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2
Quote Number: 19536
QUOTE
QUOTED TO:
QUOTE DATE: 1/1/2022
COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns
863.327.6289 - cburns@clarkenv.com
Name (print) Title quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2
Quote Number: 19536
QUOTE
QUOTED TO:
QUOTE DATE: 1/1/2022
COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns
863.327.6289 - cburns@clarkenv.com
Name (print) Title quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png
AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png
EXTERNAL EMAIL
EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.
Ralph
We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.
Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790
Sent from Mail for Windows
From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com
GPRS is the nation’s premier company specializing in the detection of underground utilities and underground storage tanks, video pipe inspection, leak detection, drone inspection and the imaging of concrete structures.
Our services enable your projects to stay safe, on time and on budget.
WHAT'S UNDERNEATH
MATTERS.
UTILITY LOCATING n LEAK DETECTION n VIDEO PIPE INSPECTION n CONCRETE IMAGING
GPRSINC.COM
In Pursuit of Subsurface Damage Prevention
TM
SIM-CERTIFIED FIELD STAFF
Our SIM-Certified Project Managers are equipped with the latest technology, industry leading training and a methodology that has produced over 99.8% accuracy on over 300,000 projects.
NATIONWIDE FOOTPRINT
GPRS is the largest company of our kind. With over 350+ highly trained Project Managers across America we can provide Rapid Response to your job site — wherever it may be located.
CONSULTATIVE APPROACH
GPRS Project Managers are trained to help you remove barriers that could impact your project being safe, on time and on budget. They provide industry-leading deliverables such as CAD, 3D drawings, NASSCO reports, and a complimentary .KMZ and .PDF map which accelerates planning, and organizes operations and increases communication.
PROPOSAL Golder
GPRSQUOTE-19107 Page 2 of 4
May 23, 2022
Client: Golder
Attn: Ralph F. Mongillo Jr., PG
904 610 8761 | Ralph_Mongillo@golder.com
Project: Classic Cleaners of Belleview at 10841 SE US HWY 441 in Belleview, Florida
Submitted By:
Megan Meyers
419-767-2456 megan.meyers@gprsinc.com
GPRS appreciates the opportunity to provide this proposal. I encourage you to visit our website (www.gprsinc.com) and contact any of the numerous references listed. Our insurance certificate and W-9 can also be downloaded here. Please feel free to contact me if you have any questions, or if you need additional information.
SCOPE OF WORK
Soil Borings We understand the scope to be to search for underground utilities within a radius of approximately 10’ around (2) monitoring wells, MW004R and MW005R. We will attempt to trace any utilities for which there are structures visible from the work area. Utilities will be marked on the surface using paint, flags, or other appropriate means. The client will be responsible to provide drawings or notify GPRS of any utilities known to be entering the work area for which there are no apparent surface features or structures that are visible from the work area. The areas should be laid out, marked, and cleared of obstructions prior to our arrival in order to avoid additional charges. Please visit www.simspec.org for an overview of our industry-leading best practices that will be applied to this project.
EQUIPMENT
Underground Scanning GPR Antenna. The antenna frequencies range from 250 MHz-450 MHz is mounted in a stroller frame which rolls over the surface. The surface needs to be reasonably smooth and unobstructed in order to obtain readable scans. Obstructions such as curbs, landscaping, and vegetation will limit the feasibility of GPR. The data is displayed on a screen and marked in the field in real time.
The total depth achieved can be as much as 8’ or more with this antenna but can vary widely depending on the types of materials being scanned through. Some soil types such as clay may limit maximum depths to 3’ or less. As depth increases, targets must be larger in order to be detected and non-metallic targets can be especially difficult to locate. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
Electromagnetic Pipe Locator. The EM locator can passively detect the signals from live AC power or radio signals travelling along some conductive utilities. It can also be used in conjunction with a transmitter to connect directly to accessible, metallic pipes, risers, or tracer wires. A current is sent through the pipe or tracer wire at a specific frequency and the resulting signal can then be detected by the receiver. A utility’s ability to be located depends on a variety of factors including access to the utility, conductivity, grounding, interference from other utilities, and many others. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
Traceable Rodder. The rodder has a copper wire encased in fiberglass. The line is pushed through accessible pipes before placing a current on the wire and the signal is then traced from the surface. The maximum traceable depth is 10’ depending on the soil conditions and the maximum distance is 200’. The line can be pushed through a pipe with direct access such as a sewer line at a cleanout or a storm drain catch basin. It may not be able to be pushed through deeper pipes within manholes. Electrical conduits will not be accessed by GPRS. The signal cannot be located through metallic pipes. For more information, please visit: Link
GPS. This handheld GPS unit offers accuracy down to 4 inches, however, the accuracy achieved will depend on the satellite environment at the time of collection and should not be considered to be survey-grade. Features can be collected as points, lines, or areas and then exported as a KML/KMZ or overlaid on a CAD drawing. For more information, please visit: Link www.gprsinc.com https://www.gp-radar.com/resources/downloadable http://www.simspec.org/ https://www.gp-radar.com/equipment/350-400-mhz-gpr-antenna https://www.gp-radar.com/equipment/electromagnetic-pipe-locators https://www.gp-radar.com/Duct-Hunter-Traceable-Rodders.html https://www.gp-radar.com/equipment/gprs-data-sheets
GPRSQUOTE-19107 Page 3 of 4
PROJECT COSTS
SERVICE DESCRIPTION PRICE
SCANNING/FIELD MARKINGS Described on Page 2 Included
MOBILIZATION Included
GPS MAP For exterior locations only. Findings will be collected with GPS and displayed with an aerial image background. Results are not survey-grade accuracy See example: Link
Included
TOTAL $700.00
ACCEPTED AND AGREED:
Billing Company Name: Golder
Billing Address: , Company Phone/Email:___________________________ PO #:___________ Job #:______________
Print Name:_____________________ Signature:_____________________ Date:________________
Standard full-day rates are based on an 8-hour workday. Time-on-site in excess of 8-hours will be billed at overtime rates.• This price assumes that we will be given access to perform the work during normal, weekday business hours. Work performed outside of 7am-5pm Monday-Friday will be billed at overtime rates.
As-builts and any other…