Summary of Task Assignment DC015B
This document is a Task Assignment (TA) executed between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. for quarterly groundwater sampling activities at the Classic French Dry Cleaners site located at 5539 W. Oakland Park Boulevard in Lauderhill, Broward County, Florida (DEP Facility ID: ERIC_4050). The task assignment is issued pursuant to Contract Number HW685 and includes a Scope of Work dated April 25, 2023, with a completion date of April 30, 2024. Key personnel include Opeyemi Kehinde as the FDEP Project Manager and Matt Crews as WSP's Project Manager.
WSP will conduct quarterly groundwater sampling activities across two quarters (September and December 2023) targeting five monitoring wells at varying depths to evaluate the attenuation of chlorinated volatile organic compounds (VOCs) below Groundwater Cleanup Target Levels. The total task assignment value is $16,992.73 on a fixed unit rate basis, distributed across four subtasks: Project Management ($1,402.31), Groundwater Sampling First Quarter ($6,123.92), Groundwater Sampling Second Quarter with Investigation Derived Waste (IDW) Management ($6,865.54), and Reporting ($4,003.27). Deliverables include email summaries with field documentation and certified laboratory analytical reports due October 30, 2023, and January 22, 2024, respectively, with a final Quarterly Sampling Letter Report due February 28, 2024. Erwin Remediation was selected as the lowest responsive bidder for IDW transportation and disposal at $195.00 per drum.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC015B Completion April 30, 2024
This Task Assignment authorizes WSP to conduct Quarterly Groundwater sampling activities in accordance with the April 25, 2023 Scope of Work, Cost Estimate, and Bid Documentation.
Opeyemi Kehinde 850-245-8887 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
WSP USA Inc.
WSP USA Inc.
Matt Crews 904-363-3430
ERIC_4050
5539 W. Oakland and Park Boulevard Lauderhill, Broward County, Classic French Dry Cleaners
✔ $ 16,992.73
$ 16,992.73
Scope of Work
Matthew Crews
Environmental Engineer
9/8/2023
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2023.09.08 09:25:40 -04'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.09.06 08:42:43 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2 – Groundwater Sampling - First Quarter September 2023 10/30/2023
Subtask 3 – Groundwater Sampling - Second Quarter December 2023 and IDW Management 01/22/2024
Subtask 1 & 4 – Project Management; Reporting 02/28/2024
Subtask 2: Submittal and FDEP approval of Email summary with the Field documentation and certified laboratory analytical report $ 6,123.92
Subtask 3: Submittal and FDEP approval of Email summary with the field documentation, certified laboratory analytical reports, and IDW manifest $ 6,865.54
Subtask 1 & 4: Submittal and FDEP approval of Email summary with the Quaterly Sampling Letter Report $ 4,003.27
$ 16,992.73
HW685
DC015B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW685 Contract Negotiation File Classic French Dry Cleaners, Lauderhill, Broward County
ERIC_4050
Kehinde Opeyemi, Project Manager August 25, 2023
Subject: Negotiation Summary
HW685_DC015B
This Task Assignment authorizes WSP to conduct Quarterly Groundwater sampling activities in accordance with the August 25, 2023, Scope of Work, Cost Estimate, and Bid Documentation.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Groundwater Sampling and IDW Management In order to recommend No Further Action with or without Controls using Risk Management Option II (RMO II) or (RMO I) in accordance with Chapter 62-780 (2) of the Florida Administrative Code, WSP recommended annual groundwater sampling report, to sample shallow zone monitoring wells MW001 and MW016, intermediate zone well MW034, and deep zone monitoring wells MW036R and MW039R for two quarters, September and December 2023, to achieve two consecutive periods where chlorinated volatile organic compounds (VOCs) in the shallow, intermediate, and deep zones, have attenuated to concentrations below the Groundwater Cleanup Target Levels. Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). Investigation derived waste (IDW) will be temporarily stored in a 55-gallon drum. WSP requested bids for IDW drum treatment and disposal from Erwin, US Ecology, and HEPACO. Erwin was selected as the lowest responsive and responsible bidder.
Subtask 3: Reporting WSP will submit a Quarterly Groundwater Sampling letter report upon completing the December 2023 sampling event summarizing the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.
WSP and the FDEP confirmed on August 25, 2023, that an Access Agreement with the current real property owner of the Touch of Class (ERIC_4050) site has been executed. The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $16,992.73 with 109 labor hours.
recommendations. Additionally, WSP will forward Automated Data Processing Tool (ADaPT) data deliverables provided by the laboratory for each groundwater sampling event.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment.
The final cost for this Task Assignment is $15,678.65 with 86 labor hours.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $22,926.25 with 150 labor hours.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $23,386.91 with 115 labor hours. Printed on recycled paper.
FDEP COST ESTIMATEContractor: WSP USA Inc.
Date: 8/25/2023
Task #: DC015B SubTask 1 Project Management SubTask 6
Site: Classic French SubTask 2 Qtr Sampling Sept 2023 SubTask 7
Activity/Phase: Monitoring SubTask 2 Qtr Sampling Dec 2023 SubTask 8
Project Manager: Ginger Shirah SubTask 3 Reporting SubTask 9
SubTask 4 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.23 Project Manager (RFM) 10 10.0 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 2 0 0 2 0 0 0 0 0 0 $59.62 Senior Consultant - X-12 (MCC) 0 0 0 0 0 0 0 0 0 0 $51.23 Senior Sci/Eng - X-11 (RFM) 22 5 7 10 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 0 0 0 0 0 0 0 0 0 0
$0.00 Project Sci/Eng - P-9 (LC) 0 0 0 0 0 0 0 0 0 0 $38.61 Staff Sci/Eng - P-8 (LS) 39 18 18 3 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 34 17 17 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 2 0 0 2 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 109 10.0 40.0 42.0 17 0 0 0 0 0 0
Direct Labor $4,473.14 $514.61 $1,517.57 $1,620.03 $820.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $7,716.16 $887.70 $2,617.81 $2,794.55 $1,416.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $12,189.30 $1,402.31 $4,135.38 $4,414.58 $2,237.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: WSP USA Inc.
Date: 8/25/2023
Task #: DC015B SubTask 1 Project Management SubTask 6
Site: Classic French SubTask 2 Qtr Sampling Sept 2023 SubTask 7
Activity/Phase: Monitoring SubTask 2 Qtr Sampling Dec 2023 SubTask 8
Project Manager: Ginger Shirah SubTask 3 Reporting SubTask 9
SubTask 4 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $480.00 $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $644.00 $322.00 $322.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,124.00 $562.00 $562.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $195.00 $0.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $195.00 $0.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $19.50 $0.00 $19.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $214.50 $0.00 $214.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $840.00 $365.00 $475.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $330.00 $110.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,170.00 $475.00 $695.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $796.00 $398.00 $398.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,076.00 $538.00 $538.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $15,773.80 $1,402.31 $5,710.38 $6,424.08 $2,237.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,218.93 $140.23 $413.54 $441.46 $223.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $16,992.73 $1,542.54 $6,123.92 $6,865.54 $2,460.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Classic French SUBTASK 2: Qtr Sampling Sept 2023
DATE: 8/25/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R. Mongillo) 5
Staff Sci/Eng (L. Swindle) 18
Staff Sci/Eng (J. Spengler) 17
TOTAL LABOR 40
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem Project Sci/Eng (L. Swindle) $36.00 Per Day 2 $72.00 Per Diem Project Sci/Eng (J. Spengler) $36.00 Per Day 2 $72.00
Hotel Project Sci/Eng (L. Swindle) $89.00 Per Day 1 $89.00 Hotel Project Sci/Eng (J. Spengler) $89.00 Per Day 1 $89.00
TOTAL PER DIEM $322.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Halocarbons EPA Method 8260 $73.00 5 0 $365.00
Sample Shipping Small CVOC/Waste Profile $110.00 1 $110.00
TOTAL LAB $475.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 310 $93.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 5 $15.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $538.00
Field event preparation (1 hour). Round trip travel (9 hours). Gauge water levels and calibrate instrumentation, collect groundwater samples from monitoring wells MW001, MW016, MW034, MW036R and MW039R, mange IDW, and complete field notes (8 hours).
Verification of property ownership with property access forms prior to groundwater sampling (1 hour). . Prepare and submit email summary with analytical figure, field documentation, and certified laboratory report (4 hours).
Round trip travel (9 hours). Gauge water levels and calibrate instrumentation, collect groundwater samples from monitoring wells MW001, MW016, MW034, MW036R and MW039R, mange IDW, and complete field notes (8 hours).
FINAL --7/24/96
SUBTASK 3: Qtr Sampling Dec 2023
DATE: 8/25/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R. Mongillo) 7
Staff Sci/Eng (L. Swindle) 18
Staff Sci/Eng (J. Spengler) 17
TOTAL LABOR 42
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem Project Sci/Eng (L. Swindle) $36.00 Per Day 2 $72.00 Per Diem Project Sci/Eng (J. Spengler) $36.00 Per Day 2 $72.00
Hotel Project Sci/Eng (L. Swindle) $89.00 Per Day 1 $89.00 Hotel Project Sci/Eng (J. Spengler) $89.00 Per Day 1 $89.00
TOTAL PER DIEM $322.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Profile Fee - Previously obtained $0.00 LS 0 $0.00 Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Halocarbons EPA Method 8260 $73.00 5 0 $365.00 PID/Hall Series EPA Method 8021 (Total VOCs) $110.00 1 0 $110.00
Sample Shipping Small CVOC/Waste Profile $110.00 2 $220.00
TOTAL LAB $695.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 310 $93.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 5 $15.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $538.00
Verification of property ownership with property access forms prior to groundwater sampling (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit email summary with analytical figure, field documentation, and certified laboratory report (4 hours).
Field event preparation (1 hour). Round trip travel (9 hours). Gauge water levels and calibrate instrumentation, collect groundwater samples from monitoring wells MW001, MW016, MW034, MW036R and MW039R, mange IDW, and complete field notes (8 hours).
Round trip travel (9 hours). Gauge water levels and calibrate instrumentation, collect groundwater samples from monitoring wells MW001, MW016, MW034, MW036R and MW039R, mange IDW, and complete field notes (8 hours).
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 4: Reporting
DATE: 8/25/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 2
Senior Sci/Eng (R. Mongillo) 10
Senior Project Sci/Eng (B. Lucero) 3
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 17
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Develop conclusions and recommendations for Annual Monitoring Report
Prepare report tables and draft Annual Monitoring Report
CADD; update figures for Annual Monitoring Report
Reporting; document production. Prepare PDF for OCULUS.
FINAL --7/24/96
US Ecology* HEPACO T&D Non Haz Soil - VOCs per drum 0 $110.00 $0.00 T&D Non Haz Mud/water - VOCs per drum 0 $110.00 $0.00 False Mobilization (no drum found) 0 $85.00 $0.00 PFAS Profile Fee (1 per site) 1 $350.00 $350.00 T&D Non Haz Soil - PFAS/PFOS per drum 0 $195.00 $0.00 T&D Non Haz Mud/water -PFAS/PFOS per drum 1 $195.00 $195.00 Disposal Non Haz Soil - VOCs per drum 0 $150.00 $0.00 Disposal Non Haz Mud/water - VOCs per drum 0 $150.00 $0.00 PFAS Profile Fee (1 per site) 1 $95.00 $95.00 Disposal Non Haz Soil - PFAS/PFOS 0 $650.00 $0.00 Disposal Non Haz Mud/water -PFAS/PFOS 1 $650.00 $650.00 Approval Fee (per site) 1 $750.00 $750.00 Non Haz Solification Waste Profile fee 0 $50.00 $0.00 Non Haz Solids Disposal (per drum) 0 $185.00 $0.00 Non Haz Sludge Disposal 0 $185.00 $0.00 PFAS Waste 55 gal drum emelle AL 1 $810.00 $810.00 Truck with lift gate and driver 4 $145.00 $580.00 non haz liquids disposal (per drum) 0 $141.75 $0.00 55 gallon reconditioned drum 0 $134.63 $0.00 LTL fees (less than 15 drums 1 $150.00 $150.00 Energy security recovery fee 15% 1 $231.00 $231.00
Total Cost $545.00 $1,495.00 * $1,771.00
Notes* Transportation costs will be calculated based on pickups at various sites and waste stream volume
IDW SUBCONTRACTOR COST ESTIMATES FOR PFAS MATERIAL
Erwin
Summary of IDW Subcontractors Costs 2023_4_11 PFAS Page 1 of 1
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363 3430 F: +1 904 363-3445 wsp.com
August 25, 2023 Proposal No. 202208346
Ms. Ginger Shirah Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR QUARTERLY GROUNDWATER SAMPLING
CLASSIC FRENCH DRY CLEANERS
5539 W. OAKLAND PARK BOULEVARD
LAUDERHILL, BROWARD COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4050
PROPOSED TASK ASSIGNMENT: DC015B
Dear Ms. Shirah:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual groundwater monitoring activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with the DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – GROUNDWATER SAMPLING AND IDW MANAGEMENT
WSP recommended, in the July 31, 2023, annual groundwater sampling report, to sample shallow zone monitoring wells MW001 and MW016, intermediate zone well MW034, and deep zone monitoring wells MW036R and MW039R for two quarters, September and December 2023, to achieve two consecutive periods where chlorinated volatile organic compounds (VOCs) in the shallow, intermediate, and deep zones, have attenuated to concentrations below the Groundwater Cleanup Target Levels. The objective is to recommend No Further Action with or without Controls
Ms. Ginger Shirah Proposal No. 202208346
Florida Department of Environmental Protection August 25, 2023 at this site using Risk Management Option II (RMO II) or (RMO I) in accordance with Chapter 62-780 (2) of the Florida Administrative Code. The well locations and previous analytical results are shown on the attached Figures 5, 6, and 7.
In April 2016, AECOM collected two soil samples near previous sample locations SB001 and SB016, where PCE concentrations were above the leachability-based Soil Cleanup Target Level (SCTL) during initial assessment activities. The PCE concentrations in the soil confirmation samples were below the leachability based SCTL. The soil confirmation sampling results were documented in AECOM’s May 2016 Annual Natural Attenuation Monitoring Report and the SVE system trailer was removed from the site on May 1, 2018.
Prior to groundwater sampling, depth-to-water measurements will be measured using an electronic water level indicator. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary. Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
The groundwater samples to be analyzed for chlorinated VOCs will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified, fixed-base laboratory. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if off-site notification is required.
Investigation Derived Waste WSP will containerize the investigation derived waste (IDW) purge water and decontamination water in a 55-gallon drum for both quarterly sampling events. WSP will collect a waste characterization sample from the drum after the second quarterly sampling event for analysis of total VOCs using EPA Method 8260. The drum will be temporarily staged onsite, pending waste characterization. For cost estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility.
WSP estimates one drum of IDW purge water will be generated during groundwater sampling activities.
Interim Deliverable WSP will submit an e-mail deliverable after completion of the September and December 2023 sampling event and receipt of the certified laboratory analytical report. The deliverable will consist of an e-mail summary and will include field documentation, field forms, and the certified laboratory analytical report.
SUBTASK 3 – REPORTING
WSP will prepare a Quarterly Groundwater Sampling letter report upon completing the December 2023 sampling event that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data;
and conclusions and recommendations.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $16,586.63. WSP anticipates the monitoring event will take place in September and December 2023. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 1,495.81 March 31, 2024
Subtask 2 – Groundwater Sampling - First Quarter September 2023
$ 6,123.92 October 30, 2023 (E-mail summary including field documentation and certified laboratory analytical report)
Subtask 3 – Groundwater Sampling - Second Quarter December 2023 and IDW Management
$ 6,506.17 January 22, 2024 (E-mail summary including field documentation, certified laboratory analytical reports, and IDW manifest)
Subtask 4 – Reporting $ 2,460.73 February 28, 2024 (Quarterly Sampling Letter Report)
Total/Completion Date $ 16,586.63 April 30, 2024
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, Golder Associates USA Inc.
Ralph F. Mongillo Jr., PG Jesse C. Brown, PE Senior Geologist/Lead Consultant Vice President, Environmental Engineer
RFM/JCB/as
Attachments: Figure 4 – Groundwater Characterization in the Shallow Zone of the Surficial Aquifer Figure 5 – Groundwater Characterization in the Intermediate Zone of the Surficial Aquifer Figure 6 – Groundwater Characterization in the Deep Zone of the Surficial Aquifer
Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes
G:\Projects\DEP-Drycleaning\Projects\Fort Lauderdale\Classic French Dry Cleaners - HW685\3 - DC015B - Quarterly GW Sampling\Proposal\DC015B - Classic French Quarterly GW Mon Proposal_ERIC_4050.docx
APPROXIMATE EXTENT OF
GROUNDWATER ABOVE GCTL
C
LA
SS
IC
F R
EN
C
H C
LE
AN
ER
S
MW032
MW038
MW039R
MW040
MW041
MW042
MW043
MW046
MW045
MW002
MW003
MW003R
MW004
MW004R
MW005
MW006
MW007
MW007R
MW008
MW011
MW012
MW013
MW014
MW014R
MW015
MW016 MW017
MW018
MW019
MW020
MW021
MW022
MW023
MW024
MW025
MW026
MW027
MW028
MW029
MW030
MW031
MW033
MW035
MW037
MW044
MW047
MW014RR
MW036
MW001MW034
in
31404452.4050 Control No.
4050-HW014A-005
FIGURE
2023-07-24
BCL
RFM
RFM
JCB
CLASSIC FRENCH DRY CLEANERS
5539 WEST OAKLAND PARK BOULEVARD
LAUDERHILL, BROWARD COUNTY, FL
FL. DEPT. OF ENVIRONMENTAL PROTECTION
GROUNDWATER CHARACTERIZATION IN THE SHALLOW ZONE
OF THE SURFICIAL AQUIFER
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\
FD
EP
\F D
EP
-D
C \3
2\
_4
0_ C la ss ic _F re nc hD C
\H W
4A
\A ct iv e
D ra w in gs
Fi le N am e:
0- H
W
4A -0
.d w g
SCALE
0 20 40
FEET
SHALLOW MONITORING WELL
LEGEND
DEEP MONITORING WELL
1. AERIAL IMAGE TAKEN FROM FLORIDA DEPARTMENT OF TRANSPORTATION
- APLUS, PUBLISHED MARCH 4, 2021.
2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.
3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF
REVENUE.
REFERENCE(S)
INTERMEDIATE MONITORING WELL
NOTE(S)
MW001 Sample ID 2 - 12 ft-bgs Screeening Interval (feet below ground surface)
8/12/19 Date Sampled
3 300 Tetrachloroethene (PCE)
3 300 Trichloroethene (TCE)
70 700 Cis-1,2-Dichloroethene (DCE)
1 100 Vinyl Chloride (VC)
NADCsGCTLs
1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT
NOT DETECTED
3. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION
LIMIT
4. BOLD FONT AND YELLOW SHADED CELL INDICATES AN
EXCEEDANCE OF THE APPLICABLE GCTL.
5. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE
OF THE APPLICABLE NADC.
6. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER
62-777, TABLE I OF THE FLORIDA ADMINISTRATIVE CODE (FAC).
7. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER
CHAPTER 62-777, TABLE V OF THE FLORIDA ADMINISTRATIVE
CODE (FAC)
8. NS - NOT SAMPLED.
GCTL EXCEEDANCE CONTOUR
DESTROYED/ABANDONED/NOT LOCATED MONITORING WELL
PARCEL BOUNDARY
MW016
5 - 15 ft-bgs
05/12/20 04/01/21 06/08/22 06/28/23
8.9 3.4 6.3 3.4
0.89 U 0.2 U 0.36 U 0.25 U
0.53 U 0.2 U 0.83 U 0.50 U
0.71 U 0.2 U 0.88 U 0.25 U
MW017
14 - 20 ft-bgs
08/22/97 09/18/01
NS NS
<1 <1 <1 <1
NS NS
MW018
9 - 15 ft-bgs
08/22/97 12/06/97
NS NS
8.2 <1 <1 <1
NS NS
MW019
1 - 11 ft-bgs
08/22/97 09/17/01
NS NS
1.3 <1 <1 11.8
NS NS
MW020
9 - 15 ft-bgs
08/22/97 09/18/01
NS NS
2.4 <1 <1 <1
NS NS
MW020
9 - 15 ft-bgs
08/22/97 09/18/01
NS NS
2.4 <1 <1 <1
NS NS
MW023
14 - 20 ft-bgs
08/22/97 12/06/97
NS NS
10.0 <1 <1 <1
NS NS
MW024
14 - 20 ft-bgs
08/22/97 09/18/01
NS NS
1.2 <1 <1 2
NS NS
MW033
5 - 11 ft-bgs
09/25/01 <1 <1 <1 <1
MW001
5 - 15 ft-bgs
05/12/20 04/01/21 06/08/22 6/38/2023
4.0 2.9 4.5 3.6
0.89 U 0.2 U 2.0 0.25 U
1.3 0.2 U 4.9 0.50 U
0.71 U 0.2 U 1.5 0.25 U
MW002
2 - 12 ft-bgs
07/09/97 <1 <1 <1 <1
MW004
2 - 12 ft-bgs
07/07/97 5.6 <1
58.5 1.6
MW005
2 - 12 ft-bgs
09/17/01 01/21/05 06/05/17 08/14/18 <1 <2 0.76 U 0.76 U <1 <2 0.89 U 0.89 U
19.0 <2 0.53 U 0.53 U <1 <1 0.71 U 0.71 U
MW012
2 - 12 ft-bgs
07/09/97 <1 <1 <1 <1
MW013
2 - 12 ft-bgs
07/09/97 <1 <1 <1 <1
MW014 / MW014R
5 - 11 ft-bgs
07/07/97 12/06/97 06/05/17 <1 <1 0.76 U
21.7 <1 0.89 U <1 <1 4.0 <1 <1 3.0
MW014RR
2 - 12 ft-bgs
05/12/20 04/01/21 06/08/22 06/28/23
0.76 U 0.2 U 0.38 U 0.25 U
0.89 U 0.2 U 0.36 U 0.25 U
1.9 0.2 U 0.83 U 0.50 U
0.71 U 0.2 U 0.88 U 0.25 U
MW015
12 - 18 ft-bgs
08/22/97 09/17/01 <1 1.23
7.2 <1 <1 <1 <1 <1
MW040
MW045
APPROXIMATE EXTENT OF
GROUNDWATER ABOVE GCTL
C
LA
SS
IC
F R
EN
C
H C
LE
AN
ER
S
MW032
MW038
MW039R
MW041
MW042
MW043
MW046
MW001
MW002
MW003
MW003R
MW004
MW004R
MW005
MW006
MW007
MW007R
MW008
MW011
MW012
MW013
MW014
MW014R
MW015
MW016 MW017
MW018
MW019
MW020
MW021
MW022
MW023
MW024
MW025
MW026
MW027
MW028
MW029
MW030
MW031
MW033
MW034
MW035
MW037
MW044
MW047
MW014RR
MW036
in
31404452.4050 Control No.
4050-HW014A-006
FIGURE
2023-07-24
BCL
JWS
RFM
JCB
CLASSIC FRENCH DRY CLEANERS
5539 WEST OAKLAND PARK BOULEVARD
GROUNDWATER CHARACTERIZATION IN THE INTERMEDIATE
ZONE OF THE SURFICIAL AQUIFER
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\
FD
EP
\F D
EP
-D
C \3
2\
_4
0_ C la ss ic _F re nc hD C
\H W
4A
\A ct iv e
D ra w in gs
Fi le N am e:
0- H
W
4A -0
.d
FEET
SHALLOW MONITORING WELL
LEGEND
DEEP MONITORING WELL
1. AERIAL IMAGE TAKEN FROM FLORIDA DEPARTMENT OF TRANSPORTATION
- APLUS, PUBLISHED MARCH 4, 2021.
2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.
3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF
REVENUE.
REFERENCE(S)
INTERMEDIATE MONITORING WELL
NOTE(S)
1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT
NOT DETECTED
3. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION
LIMIT
4. BOLD FONT AND YELLOW SHADED CELL INDICATES AN
EXCEEDANCE OF THE APPLICABLE GCTL.
5. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE
OF THE APPLICABLE NADC.
6. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER
62-777, TABLE I OF THE FLORIDA ADMINISTRATIVE CODE (FAC).
7. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER
CHAPTER 62-777, TABLE V OF THE FLORIDA ADMINISTRATIVE
CODE (FAC)
8. NS - NOT SAMPLED.
MW001 Sample ID 63 - 68 ft-bgs Screeening Interval (feet below ground surface)
8/12/19 Date Sampled
3 300 Tetrachloroethene (PCE)
3 300 Trichloroethene (TCE)
70 700 Cis-1,2-Dichloroethene (DCE)
1 100 Vinyl Chloride (VC)
NADCsGCTLs
GCTL EXCEEDANCE CONTOUR
DESTROYED/ABANDONED/NOT LOCATED MONITORING WELL
PARCEL BOUNDARY
MW025
50 - 60 ft-bgs
01/09/07 04/18/07 07/12/07 10/10/07 <1 <2 <1 <1 <1 <2 <1 <1 <1 <2 <1 0.27 I <1 <1 <1 <1
TDC MW014
50 - 56 ft-bgs
04/10/12 08/19/13 02/27/15 04/07/16
0.20 U 0.19 U 0.74 U 0.76 U
0.26 U 0.16 U 0.48 U 0.89 U
0.22 U 0.14 U 0.41 U 0.53 U
0.81 I 0.22 U 0.50 U 0.71 U
MW026
63 - 68 ft-bgs
10/14/97 09/17/01
NS NS
NS NS
8.55 5.77 <1 <1
MW047
51 - 52 ft-bgs
01/15/03
NS
NS
<1 <1
MW027
63 - 68 ft-bgs
01/20/06 03/29/06 07/11/06 10/07/06
NS NS NS NS
NS NS NS NS
<1 <1 <2 <1
3.28 76.8 1.13 0.83
MW034
26 - 30 ft-bgs
05/12/20 04/01/21 06/08/22 06/28/23
0.76 U 0.2 U 0.38 U 0.25 U
0.89 U 0.2 U 0.36 U 0.25 U
0.60 I 0.2 U 0.83 U 0.50 U
9.4 3.6 2.1 0.25 U
MW028
63 - 68 ft-bgs
10/14/97 09/18/01
NS NS
NS NS
<1 <1 <1 <1
MW035
50 - 56 ft-bgs
07/12/07 10/10/07 06/05/17 08/14/18
NS NS 0.76 U 0.76 U
NS NS 0.89 U 0.89 U
<1 <1 0.53 U 0.53 U
0.44 I <1 0.71 U 0.71 U
MW029
63 - 68 ft-bgs
10/14/97 09/17/01 08/19/04
NS NS NS
NS NS NS
<1 <1 <1 <1 <1 <1
MW037
63 - 68 ft-bgs
12/12/08 02/24/09 06/24/09 10/22/09 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1 <1
MW030
55 - 60 ft-bgs
10/14/97 09/18/01 <1 <1 <1 <1 <1 <1 <1 <1
MW044
51 - 56 ft-bgs
01/15/03
NS
NS
NS
<1
MW021
24 - 30 ft-bgs
08/22/97 09/18/01
NS NS
<1 <1 <1 <1
NS NS
MW031
62 - 67 ft-bgs
05/12/20 04/01/21 06/08/22 06/28/23
0.76 U 0.2 U 0.38 U 0.25 U
0.89 U 0.2 U 0.36 U 0.25 U
0.53 U 0.2 U 0.83 U 0.50 U
0.71 U 11.0 0.88 U 0.25 U
C
LA
SS
IC
F R
EN
C
H C
LE
AN
ER
S
MW032
MW038
MW039R
MW040
MW041
MW042
MW043
MW046
MW045
MW001
MW002
MW003
MW003R
MW004
MW004R
MW005
MW006
MW007
MW007R
MW008
MW011
MW012
MW013
MW014
MW014R
MW015
MW016 MW017
MW018
MW019
MW020
MW021
MW022
MW023
MW024
MW025
MW026
MW027
MW028
MW029
MW030
MW031
MW033
MW034
MW035
MW037
MW044
MW047
MW014RR
MW036
in
31404452.4050 Control No.
4050-HW014A-007
FIGURE
2023-07-24
BCL
JWS
RFM
JCB
CLASSIC FRENCH DRY CLEANERS
5539 WEST OAKLAND PARK BOULEVARD
GROUNDWATER CHARACTERIZATION IN THE DEEP ZONE OF
THE SURFICIAL AQUIFER
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\
FD
EP
\F D
EP
-D
C \3
2\
_4
0_ C la ss ic _F re nc hD C
\H W
4A
\A ct iv e
D ra w in gs
Fi le N am e:
0- H
W
4A -0
.d
FEET
SHALLOW MONITORING WELL
LEGEND
DEEP MONITORING WELL
1. AERIAL IMAGE TAKEN FROM FLORIDA DEPARTMENT OF TRANSPORTATION
- APLUS, PUBLISHED MARCH 4, 2021.
2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.
3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF
REVENUE.
REFERENCE(S)
INTERMEDIATE MONITORING WELL
NOTE(S)
1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT
NOT DETECTED
3. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION
LIMIT
4. BOLD FONT AND YELLOW SHADED CELL INDICATES AN
EXCEEDANCE OF THE APPLICABLE GCTL.
5. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE
OF THE APPLICABLE NADC.
6. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER
62-777, TABLE I OF THE FLORIDA ADMINISTRATIVE CODE (FAC).
7. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER
CHAPTER 62-777, TABLE V OF THE FLORIDA ADMINISTRATIVE
CODE (FAC)
8. NS - NOT SAMPLED.
MW001 Sample ID 75 - 80 ft-bgs Screeening Interval (feet below ground surface)
8/12/19 Date Sampled
3 300 Tetrachloroethene (PCE)
3 300 Trichloroethene (TCE)
70 700 Cis-1,2-Dichloroethene (DCE)
1 100 Vinyl Chloride (VC)
NADCsGCTLs
NADC EXCEEDANCE CONTOUR
DESTROYED/ABANDONED/NOT LOCATED MONITORING WELL
GCTL EXCEEDANCE CONTOUR
PARCEL BOUNDARY
MW032
84 - 89 ft-bgs
12/06/97 09/18/01 10/28/03 <1 <1 <2 <1 <1 <2
14.5 <1 24 <1 52.2 <1
MW046
75 - 80 ft-bgs
05/05/08 08/07/08 12/12/08 02/24/09 <1 <1 <1 <1
NS NS NS NS
<1 <1 <1 <1 <1 <1 <1 <1
MW036 MW036R
105 - 110 ft-bgs
12/19/01 10/28/03 08/19/04 6/28/2023 <1 <1 <1 0.25 U
NS NS NS 0.25 U
<1 4.5 69 0.50 U <1 <2 144 0.25 U
MW038
85 - 90 ft-bgs
01/09/07 04/17/07 07/12/07 10/10/07 <1 <2 0.70 I <1
NS NS NS NS
<1 <2 <1 <1
MW039 MW039R
85 - 90 ft-bgs
12/19/01 10/28/03 10/17/05 6/27/2023 <1 <2 <1 0.25 U <1 <2 <1 0.25 U
2.97 46.8 <1 0.50 U
27.7 <1 25.6 0.25 U
MW040
85 - 90 ft-bgs
10/28/03 08/19/04 01/21/05 04/01/21
591.0 <1 <2 0.2 U
541.0 <1 <2 0.2 U
466.0 188.0 <2 0.2 U
<1 37.0 <1 0.2 U
MW041
75 - 80 ft-bgs
01/09/07 04/18/07 07/12/07 10/10/07 <1 <2 <1 <1 <1 <2 <1 <1 <1 <2 <1 <1 <1 <1 <1 <1
MW042
75 - 80 ft-bgs
01/09/07 04/17/07 07/12/07 10/08/07 <1 <2 <1 <1 <1 <2 <1 <1 <1 <2 <1 <1 <1 <1 <1 1.3
MW043
75 - 80 ft-bgs
01/15/03
NS
NS
NS
<1
MW045
75 - 80 ft-bgs
03/29/06 07/11/06 10/07/06 01/09/07
NS NS NS NS
NS NS NS NS
NS NS NS NS
<1 <1 <0.5 <1
Untitled
File details come from the government source that posted it. Updated .