This document comprises a Task Assignment Change Order (TACO #2) executed between the State of Florida Department of Environmental Protection (FDEP) and WSP Environment & Infrastructure, Inc. under Contract Number HW685. The change order amends the original task assignment (BF05A) for supplemental site assessment activities at the Former Colt's Station site located at 1022 SE State Road 26, Trenton, Gilchrist County, Florida (FDEP Facility ID: ERIC_5564). The parties are represented by Justin Cross (FDEP Project Manager) and Geoff Schaefer, P.E. (WSP Project Manager).
The change order revises costs associated with a second sampling event required due to field conditions that made obtaining necessary samples infeasible during the initial site visit. The amended total task value is $15,303.55, an increase of $3,753.14 from the prior cost of $11,550.41. Cost increases are allocated as follows: Subtask 1 (Project Management) increases by $373.46 to $1,454.00; Subtask 2 (SSA Work Plan/QAPP and Health and Safety Plan) increases by $3,379.68 to $9,955.70; and Subtask 3 (SSA Report) remains unchanged at $3,893.85. The task completion date remains August 29, 2025. Invoice requirements include FDEP approval of the QAPP Workplan/HASP and field documentation ($9,955.70) and approval of the Supplemental Site Assessment Report ($5,347.85). All other terms and conditions of the original task assignment remain in effect.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
BF05A 2 HW685
Justin Cross 850.245.8968 WSP Environment & Infrastructure, Inc.
Geoff Schaefer, P.E. 850.298.7707
ERIC_5564
Former Colt's Station
$ 15,303.55 $ 11,550.41
$ 15,303.55 $ 11,550.41
08/29/2025 08/29/2025 0
1 1
Ron White
Project Manager
White, Ron (USRW720051) Digitally signed by White, Ron (USRW720051) Date: 2025.08.11 14:36:08 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.08.11 12:44:10 -04'00'
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum
TO: WSP Environmental & Infrastructure, Inc., HW685 Contract File
FROM: Justin Cross, Contract Manager
DATE: August 11, 2025
SUBJECT: Negotiation Summary – SRP28 Task Assignment (TA) Change Order #1 BF05AC2 Former Colt’s Station, Gilchrist County – Site ID # ERIC_5564 Supplemental Site Assessment activities
This Task Assignment Change Order (TACO) revises the costs for the original task (BF05A) due to field conditions that made acquiring the necessary samples unfeasible, therefore requiring a second field work trip. Specific changes are detailed below:
Subtask 1 Project Management The additional hours required for the second field work visit calculate into an increase of $373.46.
The revised cost of this subtask is $1,454.00.
Subtask 2: SSA Work Plan/QAPP, and Health and Safety Plan Additional mobilization charges as well as the additional hours and equipment required for the second sampling attempt translate into a cost increase of $3,379.68. The revised cost of this subtask is $9,955.70.
Subtask 3 SSA Report There are no changes to the cost of this subtask.
Summary DEP’s SRP Contract Manager and WSP’s Contract Manager have both agreed to the scope of work and associated costs related to this Task Assignment Change Order (TACO). The final cost associated with this TACO is $15,303.55. Documentation of these cost revisions is included in the Level of Effort/Cost Proposal (LOE-CP) Forms and LOE-CP email provided by WSP on August 8, 2025, as well as the Task Assignment Change Order Form for BF05AC2 prepared by DEP. The final deliverable must be received by FDEP no later than September 19, 2025.
F D
E P
C
O S
T
T I
M A
T E
C o nt ra ct or
W
P U
S A
I n c.
D a te
8/
T as k
B
A S ub T as k
P ro je ct M an ag em en t S ub T as k
S ite ub
T as k
A nn ua l G ro un dw at e r
M o ni to rin g
S ub
T as k
A ct iv ity
/P ha se
T a sk
R e po rt in g S ub T as k
P ro je ct
M a na ge r:
Ju st in C ro ss
S ub
T as k
S ub
T as k
S ub
T as k
S ub
T as k
T o ta ls
L ab o r
R at e C at e g o ry
$7 7.
P ro je ct M an ag er
G S
6.
$0 .0
P ro gr am L ea d er
X -1
$7 7.
P ra ct ic e
Le ad er
X -1
(G
S
$0 .0
S en io r C on su lta nt
X
-1
$5 5.
S en io r S ci /E ng
X -1
(R
W
$4 6.
S en io r P ro je ct S ci /E ng
P -1
(A
H
$0 .0
P ro je ct S ci /E n g
-9
$3 8.
P ro je ct S ci /E n g
P
-9
JW
$3 8.
P ro je ct S ci /E n g
P
-9
M T
$3 6.
S ta ff
S ci
/E n g
P -8
G
B
$3 6.
S ta ff
S ci
/E n g
P -8
A
S
$0 .0
S ta ff
S ci
/E n g
-8
$0 .0
S ci /E ng /A dm in
P
-7
$0 .0
$0 .0
$0 .0
$0 .0
$0 .0
$0 .0
$0 .0
$0 .0
$0 .0
$0 .0
$0 .0
$0 .0
$0 .0
T o ta l
H o u rs
6.
.0
5.
D ire ct L ab
$4
,2
.3
$4
.0
$2 ,4
.2
1, .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
O ve rh e ad
2.
0% $7
,2
.2
$8
.7
$4 ,1
.6
2, .8
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
G en
A dm in
0.
0% $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
F rin ge 0.
0%
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
T o ta l
L ab o r
$1
,4
.5
$1 ,3
.8
$6
,6
.9
3, 9.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
0.
$0
.0
F or m er
C ol t's S ta tio n
M on ito rin g
R E V
C E F
G O L D E R
P a g e
O
T I
M A
T E
C o nt ra ct
P U
S A
I n c.
D a as k
A S ub T as k
P ro je ct M an ag em en t S ub T as k
S
T as k
A nn ua l G ro un dw at e r
M o ni to rin g
S ub
T as k
A ct iv ity
/P ha
T a sk
R e po rt in g S ub T as k
P ro je ct
M a na ge in C ro ss
S ub
T as k
S ub
T as k
S ub
T as k
S ub
T as k
T o ta ls
F or m er
C ol t's S ta tio n
M on ito rin g
T ra ve l
V eh ic le
R e nt al
$2
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
A ir
F ar e $0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
T ot al T ra ve l $2
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b co n tr ac to r (E q u ip m en t
P ro cu re m en t)
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l
S u b co n tr ac to r C o st
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
S u b co n tr ac to r (S er vi ce s
P ro cu re m en t)
D ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
D ril lin g
(N on
-c o nv en tio na
l) $0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
M ob ile L a bo ra to ry $0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
S ur ve yi ng $0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
ID
W
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
U til ity L oc at io n
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
$0
.0
H a nd lin g F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l
S u b co n tr ac to r C o st
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
L ab o ra to ry
A na ly tic al C os ts
$1 ,5
.0
$1
,5
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
F as t T ur n ar ou nd C ha rg es $0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
S am pl e
S hi pp in g $1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l
L ab o ra to ry
$1 ,6
.0
$1
,6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
F ie ld E xp en se s
P er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
E xp e nd ab le s $8
0.
$8 0.
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t
(D ril lin g r el at ed
$0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
$0
.0
$0 .0
E qu ip m en t
(A na ly tic al r el at e d)
$6
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t
(I D
W r el at ed
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
E qu ip m en t
(O th er
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
T o ta l
F ie ld E xp en se s
$7
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
S u b to ta l
$1 4, 4.
$1
,3
.8
9, .9
$3 ,5
.8
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
C o m p le ti o n
F ee
$1 ,1
.9
$1
.1
$6
.7
$3
.9
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0 .0
$0
.0
T o ta l
E st im at ed C o st
$1
,3
.5
$1 ,4
.0
$9
,9
.7
3, .8
$0 .0
$0
.0
0.
$0
.0
$0 .0
0.
$0 .0
C os t fr om P rio r
C E
F
$1 1, 0.
C os t fr om
D el ta C
E F
$3
,7
.1
C os t (P rio r
D el ta
$1
5, 3.
R ou nd in g E rr or
$0
.0
F in al T o ta l C o st
$1
5, 3.
R E V
C E F
G O L D E R
P a g
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Colt's Station SUBTASK 2: Annual Groundwater Monitoring
DATE: 8/8/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R. White) 8
Project Sci/Eng (M. Triano) 13
Project Sci/Eng (M. Triano) 13
Staff Sci/Eng (G. Burton) 2
Project Sci/Eng (J. Whipple) 12
Project Sci/Eng (J. Whipple) 12
TOTAL LABOR 60
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 1 $120.00
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE COSTING UNIT USAGE TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Soil
Aromatics Method 8021/8260 Groundwater $73.00 4 3 DUP, EQB, TB $511.00
PAHs Method 8270C Groundwater $110.00 4 1 $550.00
TRPH FL-PRO method Groundwater $88.00 4 1 $440.00
Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $1,651.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00
Miscellaneous Expendables $40.00 Per Day 1 $40.00
$290.00 Per Day 1 $290.00
$290.00 Per Day 1 $290.00
Tubing, Poly HDPE $0.30 Per Foot 150 $45.00
Tubing, Poly HDPE $0.30 Per Foot 150 $45.00
Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 4 $12.00
Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 4 $12.00
TOTAL EQUIPMENT $774.00
Shallow GW Sampling Kit
Shallow GW Sampling Kit
Prepare Supplemental Site Assessment Work Plan/Quality Assurance Project Plan and HASP (5 hours). Verification of property ownership and notification (1 hour). Prepare and submit field documentation and laboratory analytical reports in an email deliverable (1 hour). Technical oversight (1 hour).
Round trip travel (6 hours). Field event preparation (1 hour). Groundwater Sampling: Collect water levels from 7 MWs and groundwater samples from 4 MWs (MW-4, MW-5, MW-6, MW-7) (6 hours).
Round trip travel (6 hours). Groundwater Sampling: Collect water levels from 7 MWs and groundwater samples from 4 MWs (MW-4, MW-5, MW-6, MW-7) (6 hours).
Prepare figures for Supplemental Site Assessment Work Plan/Quality Assurance Project Plan.
Round trip travel (6 hours). Field event preparation (1 hour). Groundwater Sampling: Collect water levels from 7 MWs and groundwater samples from 4 MWs (MW-4, MW-5, MW-6, MW-7) (6 hours).
Round trip travel (6 hours). Groundwater Sampling: Collect water levels from 7 MWs and groundwater samples from 4 MWs (MW-4, MW-5, MW-6, MW-7) (6 hours).
FINAL --7/24/96
SUBTASK 3: Reporting
DATE: 8/8/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (G. Schaefer) 2
Senior Sci/Eng (R. White) 14
Project Sci/Eng (A. Horne) 4
Staff Sci/Eng (G. Burton) 3
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
TOTAL EQUIPMENT $0.00
Review and develop conclusions and recommendations for final Natural Attenuation Monitoring Report.
Prepare CADD figures for report.
Reporting: Document production, create pdf for OCULUS.
Data entry; prepare GW logs, prepare tables and figures.
Prepare draft Natural Attenuation Monitoring Report.
E P
C O
S T
E S
T
IM
A T
E C o n tr a ct o
P U
S A
I n c.
D a
/8 /2
T a sk
A S u b
T a sk
P ro je ct
M a n a g e m e n t
S u b T a sk
S u b T a sk
A n n u a l G ro u n d w a te r M o n ito ri n g
S u b T a sk
A ct iv ity
/P h a b T a sk
R e p o rt in g
S u b T a sk
P ro je ct
M a n a g in C ro ss
S u b T a sk
S u b
T a sk
S u b T a sk
S u b
T a sk
T o ta ls
L a b o r R a te
C a te g o ry
.2
P ro je c t
M a n a g e r (G
S
.6
.0
P ro g ra m L e a d e r
X -1
.2
P ra ct ic e
L e a d e r
X
-1
G
S
.0
S e n io r C o n su lta n t
X
-1
.4
S e n io r
S ci
/E n g
X -1
R W
.6
S e n io r
P ro je ct
S ci
/E n g
P -1
A H
.0
P ro je ct
S ci
/E n g
.4
P ro je ct S ci /E n g
P
-9
JW
.2
P ro je ct S ci /E n g
P
-9
M T
.0
S ta ff
S ci
/E n g
P -8
G
B
.8
S ta ff
S ci
/E n g
P -8
A
S
.0
S ta ff S ci /E n g
-8
.0
S ci
/E n g /A d m in
P -7
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
H o u rs
.6
.0
.0
D ir e ct
L a b o r
,0
.9
.5
.3
.0
.0
.0
.0
.0
.0
.0
.0
O ve rh e a d
.5
,8
.0
.9
,6
.1
.0
.0
.0
.0
.0
.0
.0
.0
G e n
A d m in
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
F ri n g e
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
L a b o r
,9
.0
.5
,6
.5
.0
.0
.0
.0
.0
.0
.0
.0
F o rm e r C o lt' s S ta tio n
M o n ito ri n g
R E V
C E F
G O L D E R
P a g
E P
C O
S T
E S
T
IM
A T
E C o n tr a ct
P U
S A
I n c.
D a
/8 /2
T a sk
A S u b
T a sk
P ro je ct
M a n a g e m e n t
S u b T a sk
S b T a sk
A n n u a l G ro u n d w a te r M o n ito ri n g
S u b T a sk
A ct iv ity
/P h a b T a sk
R e p o rt in g
S u b T a sk
P ro je ct
M a n a g in C ro ss
S u b T a sk
S u b
T a sk
S u b T a sk
S u b
T a sk
T o ta ls
F o rm e r C o lt' s S ta tio n
M o n ito ri n g
T ra ve l
V e h ic le R e n ta l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
M ile a g e C o st s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
A ir
F a re
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
P e r d ie m
H o te l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l T ra ve l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b c o n tr a c to r (E q u ip m e n t P ro c u re m e n t)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b co n tr a ct o r
S u b to ta l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
P ro cu re m e n t
F e e
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
S u b c o n tr a c to r C o s t
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b c o n tr a c to r (S e rv ic e s P ro c u re m e n t)
D ri lli n g
C o n ve n tio n a l)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
D ri lli n g
N o n -c o n ve n tio n a l)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
M o b ile
L a b o ra to ry
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u rv e yi n g
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
ID
W
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
U til iti e s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
U til ity L o ca tio n
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b co n tr a ct o r
S u b to ta l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
H a n d lin g
F e e
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
S u b c o n tr a c to r C o s t
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
L a b o ra to ry
A n a ly tic a l C o st s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
F a st T u rn a ro u n d C h a rg e s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S a m p le S h ip p in g
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
L a b o ra to ry
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
F ie ld E x p e n s e s
P e rs o n a l P ro te ct io n
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E xp e n d a b le s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(D ri lli n g r e la te d
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(A n a ly tic a l r e la te d
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(I D
W r e la te d
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(O th e r)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
F ie ld E x p e n s e s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b to ta l
,4
.0
.5
,1
.5
.0
.0
.0
.0
.0
.0
.0
.0
C o m p le ti o n
F e e
.1
.9
.1
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
E s ti m a te d C o s t
,7
.1
.4
,3
.6
.0
.0
.0
.0
.0
.0
.0
.0
R E V
C E F
G O L D E R
P a g
SUBTASK 2: Annual Groundwater Monitoring
DATE: 8/8/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Sci/Eng (M. Triano) 13
Project Sci/Eng (J. Whipple) 12
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE COSTING UNIT USAGE TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Soil
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00
$290.00 Per Day 1 $290.00
Tubing, Poly HDPE $0.30 Per Foot 150 $45.00
Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 4 $12.00
TOTAL EQUIPMENT $387.00
Shallow GW Sampling Kit
Round trip travel (6 hours). Field event preparation (1 hour). Groundwater Sampling: Collect water levels from 7 MWs and groundwater samples from 4 MWs (MW-4, MW-5, MW-6, MW-7) (6 hours).
Round trip travel (6 hours). Groundwater Sampling: Collect water levels from 7 MWs and groundwater samples from 4 MWs (MW-4, MW-5, MW-6, MW-7) (6 hours).
E P
C O
S T
E S
T
IM
A T
E C o n tr a ct
P U
S A
I n c.
D a
/2
/2
T a sk
H
B
IL
C S u b
T a sk
P ro je ct
M a n a g e m e n t
S u b T a sk
S b T a sk
A n n u a l G ro u n d w a te r M o n ito ri n g
S u b T a sk
A ct iv ity
/P h a b T a sk
R e p o rt in g
S u b T a sk
P ro je ct
M a n a g in C ro ss
S u b T a sk
S u b
T a sk
S u b T a sk
S u b
T a sk
T o ta ls
L a b o r R a te
C a te g o ry
.2
P ro je c t
M a n a g e r (G
S
.7
.0
P ro g ra m L e a d e r
X -1
.0
P ra ct ic e L e a d e r
X -1
.2
S e n io r
C o n su lta n t
X -1
G S
.4
S e n io r
S ci
/E n g
X -1
R W
.0
S e n io r P ro je ct S ci /E n g
P
-1
.0
P ro je ct
S ci
/E n g
.6
P ro je ct S ci /E n g
P
-9
A H
.2
S ta ff
S ci
/E n g
P -9
M
T
.0
S ta ff
S ci
/E n g
P -8
G
B
.8
S ta ff
S ci
/E n g
P -8
A
S
.4
S ta ff
S ci
/E n g
P -8
JW
.0
S ci
/E n g /A d m in
P -7
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
H o u rs
.7
.0
.0
D ir e ct
L a b o r
,1
.4
.4
,4
.9
,2
.0
.0
.0
.0
.0
.0
.0
.0
O ve rh e a d
.5
,4
.1
.8
,5
.4
,2
.8
.0
.0
.0
.0
.0
.0
.0
G e n
A d m in
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
F ri n g e
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
L a b o r
,5
.5
.3
,0
.3
,5
.8
.0
.0
.0
.0
.0
.0
.0
C o lt' s
S ta tio n
G ilc h ri st
C o u n ty
N a tu ra l A tt e n u a tio n
M o n ito ri n g
R E V
C E F
G O L D E R
P a g
E P
C O
S T
E S
T
IM
A T
E C o n tr a ct
P U
S A
I n c.
D a
/2
/2
T a sk
H
B
IL
b T a sk
P ro je ct M a n a g e m e n t S u b
T a sk
S b T a sk
A n n u a l G ro u n d w a te r M o n ito ri n g
S u b T a sk
A ct iv ity
/P h a b T a sk
R e p o rt in g
S u b T a sk
P ro je ct
M a n a g in C ro ss b
T a sk
S u b T a sk
S u b T a sk
S u b
T a sk
T o ta ls
C o lt' s
S ta tio n
G ilc h ri st
C o u n ty
N a tu ra l A tt e n u a tio n
M o n ito ri n g
T ra ve l
V e h ic le R e n ta l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
M ile a g e C o st s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
A ir
F a re
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
P e r d ie m
H o te l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l T ra ve l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b c o n tr a c to r (E q u ip m e n t P ro c u re m e n t)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b co n tr a ct o r
S u b to ta l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
P ro cu re m e n t
F e e
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
S u b c o n tr a c to r C o s t
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b c o n tr a c to r (S e rv ic e s P ro c u re m e t) ri lli n g
C o n ve n tio n a l)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
D ri lli n g
N o n -c o n ve n tio n a l)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
M o b ile
L a b o ra to ry
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u rv e yi n g
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
ID
W
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
U til iti e s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
U til ity L o ca tio n
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b co n tr a ct o r
S u b to ta l
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
H a n d lin g
F e e
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
S u b c o n tr a c to r C o s t
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
L a b o ra to ry
A a ly tic a l C o st s
,5
.0
,5
.0
.0
.0
.0
.0
.0
.0
.0
.0
F a st T u rn a ro u n d C h a rg e s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S a m p le S h ip p in g
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
L a b o ra to ry
,6
.0
,6
.0
.0
.0
.0
.0
.0
.0
.0
.0
F ie ld E x p e n s s rs o n a l P ro te ct io n
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E xp e n d a b le s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(D ri lli n g r e la te d
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(A n a ly tic a l r e la te d
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(I D
W r e la te d
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
E q u ip m e n t
(O th e r)
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
T o ta l
F ie ld E x p e n s e s
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
S u b to ta l
,6
.5
.3
,1
.3
,5
.8
.0
.0
.0
.0
.0
.0
.0
C o m p le ti o n
F e e
.8
.2
.6
.9
.0
.0
.0
.0
.0
.0
.0
T o ta l
E s ti m a te d C o s t
,5
.4
,0
.5
,5
.0
,8
.8
.0
.0
.0
.0
.0
.0
.0
R E V
C E F
G O L D E R
P a g
SITE : Colt's Station (Gilchrist County) SUBTASK 2: Annual Groundwater Monitoring
DATE: 4/25/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R. White) 8
Staff Sci/Eng (M. Triano) 13
Drafter/GIS (G. Burton) 2
Staff Sci/Eng (J. Whipple) 12
TOTAL LABOR 35
VEHICLE TYPE RATE UNIT USAGE
Equipment Van $120.00 Per Day $0.00
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE COSTING UNIT USAGE TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Soil
PID/Hall Series Method 8021 Groundwater $73.00 4 3 DUP, EQB, TB $511.00
PAHs Method 8270C Groundwater $110.00 4 1 $550.00
TRPH FL-PRO method Groundwater $88.00 4 1 $440.00
Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $1,651.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00
$290.00 Per Day 1 $290.00
Tubing, Poly HDPE $0.30 Per Foot 150 $45.00
Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 4 $12.00
TOTAL EQUIPMENT $387.00
Shallow GW Sampling Kit
Prepare Supplemental Site Assessment Work Plan/Quality Assurance Project Plan and HASP (5 hours). Verification of property ownership and notification (1 hour). Prepare and submit field documentation and laboratory analytical reports in an email deliverable (1 hour). Technical oversight (1 hour).
Round trip travel (6 hours). Field event preparation (1 hour). Groundwater Sampling: Collect water levels from 7 MWs and groundwater samples from 4 MWs (MW-4, MW-5, MW-6, MW-7) (6 hours).
Round trip travel (6 hours). Groundwater Sampling: Collect water levels from 7 MWs and groundwater samples from 4 MWs (MW-4, MW-5, MW-6, MW-7) (6 hours).
Prepare figures for Supplemental Site Assessment Work Plan/Quality Assurance Project Plan
SITE : Colt's Station (Gilchrist County) SUBTASK 3: Reporting
DATE: 4/25/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Consultant (G. Schaefer) 2
Senior Sci/Eng (R. White) 14
Project Sci/Eng (A. Horne) 4
Staff Sci/Eng (G. Burton) 3
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 25
Review and develop conclusions and recommendations for final Natural Attenuation Monitoring Report.
Prepare CADD figures for report. (Draft & Final)
Reporting: Document production, create pdf for OCULUS.
Data entry; prepare GW logs, prepare tables and figures.
Prepare draft Natural Attenuation Monitoring Report.
From: White, Ronald To: Cross, Justin L.
Subject: RE: For Signature: HW685 BF05A-2 Date: Friday, August 8, 2025 4:21:38 PM Attachments: Colts Station NAM LOECEF 4.25.25.xlsx
BF05A (TACO #2) - Colt"s Station LOECEF.xlsx BF05A (Delta #2) - Colt"s Station LOECEF.xlsx
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Hey Matt
Please find attached the LOE sheets for TACO#2 providing the LOE to return to Colt’s Station to attempt to collect GW samples again. We plan on going back on 8/11.
Have a great weekend Ron
Ron White, P.G.
Lead Consulting Geologist, Senior Project Manager
Licensed - FL
From: Cross, Justin L. <Justin.L.Cross@FloridaDEP.gov> Sent: Monday, July 28, 2025 1:57 PM To: White, Ronald <ron.white@wsp.com> Cc: Schaefer, Geoffrey <geoff.schaefer@wsp.com> Subject: FW: For Signature: HW685 BF05A-1 (ERGrubbs, Benjamin <Benjamin.Grubbs@FloridaDEP.gov>IC_5564)
Hey Ron, Here is the TACO for WSP’s signature.
Thanks, Justin 850.245.8968
From: Farrell, Jennifer A. <Jennifer.A.Farrell@FloridaDEP.gov> Sent: Monday, July 28, 2025 1:55 PM To: Cross, Justin L. <Justin.L.Cross@FloridaDEP.gov> Cc: Sweeney, Scott L <Scott.L.Sweeney@FloridaDEP.gov>; Grubbs, Benjamin
Please find attached the LOE sheets for TACO#2 providing the LOE to return to Colt’s Station to attempt to collect GW samples again. We plan on going back on 8/11.
<Benjamin.Grubbs@FloridaDEP.gov> Subject: RE: For Signature: HW685 BF05A-1 (ERGrubbs, Benjamin <Benjamin.Grubbs@FloridaDEP.gov>IC_5564)
For signature
From: Grubbs, Benjamin <Benjamin.Grubbs@FloridaDEP.gov> Sent: Monday, July 28, 2025 1:35 PM To: Farrell, Jennifer A. <Jennifer.A.Farrell@FloridaDEP.gov> Cc: Cross, Justin L. <Justin.L.Cross@FloridaDEP.gov>; Sweeney, Scott L <Scott.L.Sweeney@FloridaDEP.gov> Subject: For Signature: HW685 BF05A-1 (ERIC_5564)
For review/approval. Change is for a time extension. Approx. cost is $11K.
Ben Grubbs, FCCM General Contract Coordinator Waste Cleanup Program Florida Department of Environmental Protection Benjamin.Grubbs@FloridaDEP.gov Office: 850-245-8992
NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.
-LAEmHhHzdJzBlTWfa4Hgs7pbKl
File details come from the government source that posted it. Updated .