This is a Task Assignment (TA) document issued under Contract Number HW685 between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. The assignment, numbered DC020B, was executed on June 28, 2024, with authorization for work at the Holiday Plaza French Cleaners facility located at 9147 Taft Street, Pembroke Pines, Broward County, Florida (ERIC_4247). The project manager for FDEP is Patrick McGrane, and the contractor's project manager is Matt Crews of WSP USA Inc. The task assignment completion date is March 28, 2025.

The scope of work encompasses three subtasks: (1) Project Management, (2) Annual Groundwater Monitoring Activities, and (3) Reporting. Subtask 2 includes redevelopment of monitoring wells MW017 and MW018, groundwater sampling from shallow wells MW002 and MW004R and deep well MW017 for analysis of chlorinated volatile organic compounds via EPA Method 8260B, and investigative derived waste (IDW) characterization and disposal. The total task assignment value is $16,024.12 on a fixed unit rate basis, with 98 total labor hours allocated. Payment is structured by invoice milestone: Subtask 2 invoicing of $11,160.59 is due upon FDEP approval of field documentation and certified laboratory reports (due 11/08/2024), and Subtasks 1 and 3 invoicing of $4,863.53 is due upon FDEP approval of the 2024 Annual Groundwater Monitoring Report (due 01/31/2025). IDW disposal costs are subcontracted through Erwin Remediation at $195.00 for non-hazardous PFOS/PFAS water transportation and disposal per drum.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01A.pdf PDF
CN-370000-HW685-BF01CCO1.pdf PDF
CN-370000-HW685-BF02A.pdf PDF
CN-370000-HW685-BF05A.pdf PDF
CN-370000-HW685-BF05ACO1.pdf PDF
CN-370000-HW685-BF1BCO1.pdf PDF
CN-370000-HW685-BIL02C.pdf PDF
CN-370000-HW685-BIL1ACO4.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf PDF
CN-370000-HW685-BIL3ACO1.pdf PDF
CN-370000-HW685-CSS01.pdf PDF
CN-370000-HW685-CSS2ACO2.pdf PDF
CN-370000-HW685-DC001C.pdf PDF
CN-370000-HW685-DC001E.pdf PDF
CN-370000-HW685-DC002B.pdf PDF
CN-370000-HW685-DC002C.pdf PDF
CN-370000-HW685-DC002E.pdf PDF
CN-370000-HW685-DC003C.pdf PDF
CN-370000-HW685-DC004A.pdf PDF
CN-370000-HW685-DC007A.pdf PDF
CN-370000-HW685-DC007B.pdf PDF
CN-370000-HW685-DC008B.pdf PDF
CN-370000-HW685-DC008D.pdf PDF
CN-370000-HW685-DC009A.pdf PDF
CN-370000-HW685-DC009D.pdf PDF
CN-370000-HW685-DC009E.pdf PDF
CN-370000-HW685-DC010C.pdf PDF
CN-370000-HW685-DC012A.pdf PDF
CN-370000-HW685-DC012D.pdf PDF
CN-370000-HW685-DC014B.pdf PDF
CN-370000-HW685-DC016D.pdf PDF
CN-370000-HW685-DC017A.pdf PDF
CN-370000-HW685-DC017B.pdf PDF
CN-370000-HW685-DC018B.pdf PDF
CN-370000-HW685-DC019A.pdf PDF
CN-370000-HW685-DC019C.pdf PDF
CN-370000-HW685-DC01ACO1.pdf PDF
CN-370000-HW685-DC01ECO1.pdf PDF
CN-370000-HW685-DC021A.pdf PDF
CN-370000-HW685-DC021B.pdf PDF
CN-370000-HW685-DC021C.pdf PDF
CN-370000-HW685-DC021E.pdf PDF
CN-370000-HW685-DC022C.pdf PDF
CN-370000-HW685-DC023A.pdf PDF
CN-370000-HW685-DC023D.pdf PDF
CN-370000-HW685-DC024C.pdf PDF
CN-370000-HW685-DC025A.pdf PDF
CN-370000-HW685-DC027D.pdf PDF
CN-370000-HW685-DC028A.pdf PDF
CN-370000-HW685-DC028D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC020B Completion March 28, 2025

This Task Assignment authorizes WSP to conduct Annual Groundwater Monitoring at Holiday Plaza French Cleaners in accordance with the June 11, 2024 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

WSP USA Inc.

WSP USA Inc.

Matt Crews 904-363-3430

ERIC_4247

9147 Taft Street, Pembroke Pines, Broward County

Holiday Plaza French Cleaners

✔ $ 16,024.12

$ 16,024.12

Scope of Work

Matthew Crews

Environmental Engineer

6/28/2024

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.06.28 08:46:12 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.06.25 17:03:57 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW685

DC020B

Subtask 2 - Annual Groundwater Monitoring 11/08/2024

Subtask 1 & 3 - Project Management; 2024 Annual Groundwater Report 01/31/2025

Subtask 2 - Submittal and FDEP approval of e-mail summary with field documentation and certified laboratory analytical report for chlorinated VOCs for both both soil and groundwater

$ 11,160.59

Subtask 1 & 3 - Project Management; Submittal and FDEP approval of the 2024 Annual Groundwater Monitoring Report $ 4,863.53

$ 16,024.12

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Holiday Plaza French Cleaners Pembroke Pines, Broward County

ERIC_4247

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment DC020B (HW685)

DATE: June 13, 2024

This Task Assignment authorizes WSP USA Inc. (WSP) to conduct Annual Groundwater Monitoring and redevelop two deep monitoring wells at the Holiday Plaza French Cleaners site.

The total cost for this project is $16,024.12 with 98 total labor hours. All work is to be completed in accordance with the June 11, 2024, Scope of Work.

WSP may invoice according to the included schedule.

Subtask 1:

Project Management is automatically calculated as a percentage of total labor in accordance with Contract HW685.

Subtask 2:

Following the confirmation of accurate access agreements with the necessary property owners, WSP will mobilize to the site for groundwater sampling and well development activities. MW017 and MW018 were both observed to have foreign material partially obscuring the screen interval during the 2023 monitoring event. These wells are to be redeveloped and completed at the surface with 8-inch diameter bolt-down steel covers inside a flush-mounted 2-foot by 2-foot concrete pad.

WSP will collect groundwater samples from shallow wells MW002 and MW004R as well as deep well MW017. These samples will be analyzed for chlorinated volatile organic compounds via EPA Method 8260B.

Subtask 3:

Following the groundwater sampling event, WSP will submit an Annual Groundwater Report summarizing their findings with updated analytical results and tables as well as conclusions and recommendations based on the most recent data.

FDEP COST ESTIMATEContractor: WSP USA Inc.

Date: 6/24/2024

Task #: DC020B SubTask 1 Project Management SubTask 6

Site: SubTask 2 Annual Groundwater Monitoring Activities SubTask 7

Activity/Phase: Monitoring SubTask 3 Reporting SubTask 8

Project Manager: Patrick McGrane SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$43.69 Project Manager (SS) 11 10.6 $0.00 Program Leader - X-13 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0

$67.94 Senior Consultant - X-12 (MC) 3 0 3 0 0 0 0 0 0 0 $43.69 Senior Project Sci/Eng - P-10 (SS) 18 4 14 0 0 0 0 0 0 0 $48.00 Senior Project Sci/Eng - P-10 (BL) 5 0 5 0 0 0 0 0 0 0 $42.77 Senior Project Sci/Eng - P-10 (DM) 30 30 0 0 0 0 0 0 0 0

$0.00 Project Sci/Eng - P-9 0 0 0 0 0 0 0 0 0 0 $38.77 Staff Sci/Eng - P-8 (HB) 0 0 0 0 0 0 0 0 0 0 $34.92 Staff Sci/Eng - P-8 (AS) 3 0 3 0 0 0 0 0 0 $33.50 Staff Sci/Eng - P-8 (JW) 28 28 0 0 0 0 0 0 0 0

$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 98 10.6 62.0 25.0 0.0 0 0 0 0 0 0

Direct Labor $4,018.39 $462.29 $2,395.86 $1,160.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $6,931.72 $797.45 $4,132.86 $2,001.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $10,950.11 $1,259.74 $6,528.72 $3,161.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Holiday Plaza French Cleaners

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTIMATEContractor: WSP USA Inc.

Date: 6/24/2024

Task #: DC020B SubTask 1 Project Management SubTask 6

Site: SubTask 2 Annual Groundwater Monitoring Activities SubTask 7

Activity/Phase: Monitoring SubTask 3 Reporting SubTask 8

Project Manager: Patrick McGrane SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Holiday Plaza French Cleaners

Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $816.00 $816.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,176.00 $1,176.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $780.00 $780.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $780.00 $780.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $78.00 $78.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $858.00 $858.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $329.00 $329.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $479.00 $479.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $652.00 $652.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $400.00 $400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $294.00 $294.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,466.00 $1,466.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $14,929.11 $1,259.74 $10,507.72 $3,161.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,095.01 $125.97 $652.87 $316.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $16,024.12 $1,385.71 $11,160.59 $3,477.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

SITE : Holiday Plaza French Cleaners SUBTASK 2: Annual Groundwater Monitoring Activities

DATE: 6/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Project Sci/Eng (S. Sider) 4

Senior Project Sci/Eng (D. McDaniels) 30

Staff Sci/Eng (J. Whipple) 28

TOTAL LABOR 62

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem D. McDaniels $36.00 Per Day 3 $108.00 Per Diem J. Whipple $36.00 Per Day 3 $108.00

Hotel D. McDaniels $150.00 Per Day 2 $300.00 Hotel J. Whipple $150.00 Per Day 2 $300.00

TOTAL PER DIEM $816.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 4 $780.00

TOTAL $780.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Total VOHs EPA Method 8260B $73.00 3 $219.00 Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00

Sample Shipping Large $150.00 1 $150.00

TOTAL LAB $479.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 3 $120.00 Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00 Tubing, Poly HDPE $0.30 Per Foot 200 $60.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 4 $12.00 Portable Generator 5 kW $70.00 Per Day 1 $70.00 Pump - Centrifugal (1.5") $40.00 Per Day 1 $40.00 Construction/O&M Supplies $75.00 Per Day 2 $150.00 Well Cap, 2" $17.00 Per Each 2 $34.00 Drum, 55-gallon $100.00 Per Each 4 $400.00

TOTAL EQUIPMENT $1,466.00

Verification of property ownership with property access forms prior to mobilization (1 hour). Prepare and submit email summary with field documentation, well redevelopment log, laboratory chain-of-custody, certified laboratory report, and IDW disposal manifest (3 hours).

Round Trip from Jacksonville to Pembroke Pines (12 hours). Field event preparation (2 hours).

Redevelop and surface completion of MW017 and MW018 (8 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from 3 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (8 hours).

Round Trip from Jacksonville to Pembroke Pines (12 hours). Redevelop and surface completion of MW017 and MW018 (8 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from 3 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (8 hours).

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Holiday Plaza French Cleaners SUBTASK 3: Reporting

DATE: 6/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 3

Senior Project Sci/Eng (S. Sider) 14

Senior Project Sci/Eng (B. Lucero) 5

Staff Sci/Eng (A. Strayer) 3

TOTAL LABOR 25

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Data entry, prepare tables and figures, and draft Annual Groundwater Monitoring Report

Update figures for Annual Groundwater Monitoring Report using CADD

Develop conclusions and recommendations for Annual Groundwater Monitoring Report.

Reporting: Updating tables, document production. Create pdf for OCULUS.

FINAL --7/24/96

WSP USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA

T: +1 904 363-3430 F: +1 904 363-3445 wsp.com

June 24, 2024 Proposal No. 2024US274489

Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR ANNUAL GROUNDWATER MONITORING

HOLIDAY PLAZA FRENCH CLEANERS

9147 TAFT STREET

PEMBROKE PINES, BROWARD COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_4247

PROPOSED TASK ASSIGNMENT: DC020B

Dear Mr. McGrane:

WSP USA Inc. (WSP), is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual chlorinated volatile organic compound (VOC) groundwater monitoring activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – ANNUAL GROUNDWATER MONITORING ACTIVITIES

Following authorization to proceed, WSP will use the Broward County Property Appraiser’s website to verify that the current property owner and relevant offsite property owners have an executed Permission to Enter Property agreement with the DEP. WSP will then coordinate with the real property owner, tenant, and offsite property owners

Mr. Patrick McGrane Proposal No. 2024US274489

Florida Department of Environmental Protection June 24, 2024 for access to complete the scope of work. WSP or the DEP will attempt to obtain updated Permission to Enter Property forms from relevant property owners prior to and/or during mobilization to the site, as needed.

As referenced in the previous Annual Groundwater Monitoring Report, due to past interior improvements (carpet installation) made by the tenant, monitoring well MW002 cannot be accessed. WSP will evaluate the current conditions within the building to determine if the well may be accessible. If located, WSP will collect a groundwater sample from the monitoring well.

Monitoring Well Redevelopment During the June 2023 monitoring event, the top-of-casing at monitoring well location MW017 was located approximately 6 inches below ground surface (bgs) and was not observed to be installed inside a manhole or concrete pad. Additionally, the top-of-casing at adjacent monitoring well MW018 was located flush with ground surface and was not observed to be installed inside a manhole, or concrete pad. The total depth of MW017 was measured at 68.5 feet bgs, indicating that approximately 6.5 feet of foreign material is present at the bottom of the water column from 68.5-75.0 feet bgs, which obscured the well screen interval of 70.0-75.0 feet bgs. The total depth of MW018 was measured at 87.5 feet bgs, indicating that approximately 2.5 feet of foreign material is present at the bottom of the water column from 87.5-90.0 feet bgs, which is partially obscuring the well screen interval of 85.0-90.0 feet bgs.

WSP will redevelop monitoring wells MW017 and MW018 using a trash pump until the development water remains visibly clear and free of suspended particulate matter. Following redevelopment, monitoring wells MW017 and MW018 will be completed at the surface with 8-inch diameter bolt-down steel cover inside a flush-mounted 2-foot by 2-foot concrete pad which will be sloped away from the well to prevent surface water infiltration. The well risers will be capped with water-tight expandable locking plugs.

Groundwater Monitoring WSP will collect groundwater samples from three monitoring wells. The attached Figures 3 through 7 from the June 2023 sampling event show the monitoring well locations, groundwater flow direction, and chlorinated VOC results for each zone.

Prior to groundwater sampling, the depth-to-groundwater will be measured at accessible monitoring wells using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.

Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

The groundwater samples to be analyzed for chlorinated VOCs will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified, fixed-base laboratory along with the completed chain-of-custody documentation. Florida.

The samples will be analyzed as follows:

Sample ID Chlorinated VOCs (EPA Method 8260B)

Shallow Zone Surficial Aquifer Well

MW002 X

MW004R X

Deep Zone Surficial Aquifer Wells

MW017 X

Investigative Derived Waste

(IDW)

Total VOCs

IDW Transportation and Disposal WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum(s). WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260, as shown in the above table. The drum(s) will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates four drums of IDW water will be generated during the field activities.

Interim Deliverable Upon completion of Subtask 2, an e-mail deliverable will be submitted which will include copies of the field data sheets, equipment calibration forms, field notes, monitoring well redevelopment logs, laboratory analytical report, laboratory chain-of-custody documentation, and IDW disposal manifest.

SUBTASK 3 – REPORTING

WSP will prepare an Annual Groundwater Monitoring Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.

HEALTH AND SAFETY

WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $16,024.12. WSP anticipates the monitoring event will take place in August or September 2024. The level of effort sheets and cost estimate form are included in Attachment A. The subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 1,385.71 January 31, 2025

Subtask 2 – Annual Groundwater Monitoring Activities

$ 11,160.59 October 25, 2024 (E-mail deliverable with field documentation; laboratory COC, IDW disposal manifest)

Subtask 3 – Reporting $ 3,477.82 January 31, 2025 (Annual Groundwater Monitoring Report)

Total/Completion Date $16,024.12 February 28, 2025

WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, WSP USA Inc.

Stephen J.R. Sider, GISP, PG Matthew C. Crews, PE Senior Consultant, Geology Assistant Vice President, Environmental Engineering

SJRS/MCC/as

Attachments: Figure 3 – Potentiometric Map of the Shallow Zone of the Surficial Aquifer (June 7, 2023) Figure 4 – Potentiometric Map of the Lower Shallow Zone of the Surficial Aquifer (June 7, 2023) Figure 5 – VOC Analytical Summary of the Shallow Zone of the Surficial Aquifer (June 8, 2023) Figure 6 – VOC Analytical Summary of the Intermediate Zone of the Surficial Aquifer (June 8, 2023) Figure 7 – VOC Analytical Summary of the Deep Zones of the Surficial Aquifer (June 8, 2023)

Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes

G:\Projects\DEP-Drycleaning\Projects\Miami\Holiday Plaza French Cleaners\3 - DC020B - 2024 Annual Groundwater Monitoring\Proposal\DC020B - Holiday Plaza French Cleaners - Ann GW Mon Proposal.docx

FIGURES

HOLIDAY PLAZA FRENCH CLEANERS

N W

2n d

AV

E.

NW 18th STREET

TAFT STREET

MW008

MW011

MW004R

1.33

MW014

MW019

MW020

MW021

MW023

MW001

MW002

MW003

MW004MW005

MW006

1.56 MW007

1.52

MW009

MW010

MW003R

1.67

MW022

MW005R

1.22

1.50

1.25 1.25 1.50 1.75

1.75 in

31404452.4247 Control No.

4247-HW023A-003

FIGURE

2023-07-23

BCL

SJRS

FL. DEPT. OF ENVIRONMENTAL PROTECTION

PROJECT NO. REV.

PROJECT

HOLIDAY PLAZA FRENCH CLEANERS

9147 TAFT STREET

PEMBROKE PINES, BROWARD COUNTY, FL

TITLE

POTENTIOMETRIC MAP OF THE SHALLOW ZONE OF THE

SURFICIAL AQUIFER

(JUNE 7, 2023)

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

7_ H ol id ay Pl az aF rC le an er s\ H

W

3A \A ct iv e D ra w in gs

Fi le

N am e:

7-

H W

3A

-0

.d w g

SCALE

0 25 50

FEET

SHALLOW MONITORING WELL

LEGEND

DEEP MONITORING WELL

DESTROYED/ABANDONED MONITORING WELL

1. AERIAL IMAGERY COURTESY OF USGS, MICROSOFT CORPORATION,

AND bing©

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF

REVENUE.

REFERENCE(S)

INTERMEDIATE MONITORING WELL

PROPERTY BOUNDARY

1.80 GROUNDWATER ELEVATION

GROUNDWATER CONTOUR INTERVAL

(DASHED WHERE INFERRED)

ESTIMATED GROUNDWATER FLOW DIRECTION

1.75

LOWER DEEP MONITORING WELL

LOWER SHALLOW MONITORING WELL

SJRS

JCB

HOLIDAY PLAZA FRENCH CLEANERS

N W

2n d

AV

E.

NW 18th STREET

TAFT STREET

1.25

1.35

1.

35MW003

MW004

MW005

MW006 MW007

MW003R

MW005R

MW008

1.34

MW011

MW004R

MW014

1.17

MW019

MW020

MW021

MW023

MW009

MW010

MW022

1.16

1.

1.15

MW001

MW002

1.

in

31404452.4247 Control No.

4247-HW023A-004

FIGURE

2023-07-23

BCL

SJRS

FL. DEPT. OF ENVIRONMENTAL PROTECTION

PROJECT NO. REV.

PROJECT

HOLIDAY PLAZA FRENCH CLEANERS

9147 TAFT STREET

PEMBROKE PINES, BROWARD COUNTY, FL

TITLE

POTENTIOMETRIC MAP OF THE LOWER SHALLOW ZONE OF

THE SURFICIAL AQUIFER

(JUNE 7, 2023)

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

7_ H ol id ay Pl az aF rC le an er s\ H

W

3A \A ct iv e D ra w in gs

Fi le

N am e:

7-

H W

3A

-0

.d w g

SCALE

0 25 50

FEET

SHALLOW MONITORING WELL

LEGEND

DEEP MONITORING WELL

DESTROYED MONITORING WELL

1. AERIAL IMAGERY COURTESY OF USGS, MICROSOFT CORPORATION,

AND bing©

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF

REVENUE.

REFERENCE(S)

INTERMEDIATE MONITORING WELL

PROPERTY BOUNDARY

1.21 GROUNDWATER ELEVATION

GROUNDWATER CONTOUR INTERVAL

(DASHED WHERE INFERRED)

ESTIMATED GROUNDWATER FLOW DIRECTION

1.25

LOWER DEEP MONITORING WELL

LOWER SHALLOW MONITORING WELL

MW001

MW003

MW004

MW005

MW006 MW007

MW008

MW009

MW010

MW011

MW003R

MW004R

MW014

MW019MW020

MW022

MW005R

MW023

HOLIDAY PLAZA FRENCH CLEANERS

N W

2n d

AV

E.

NW 18th STREET

TAFT STREET

MW002

MW021

in

31404452.4247 Control No.

4247-HW023A-005

FIGURE

2023-07-23

BCL

SJRS

HOLIDAY PLAZA FRENCH CLEANERS

9147 TAFT STREET

PEMBROKE PINES, BROWARD COUNTY, FL

FL. DEPT. OF ENVIRONMENTAL PROTECTION

VOC ANALYTICAL SUMMARY OF THE SHALLOW ZONES OF THE

SURFICIAL AQUIFER

(JUNE 8, 2023)

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

7_ H ol id ay Pl az aF rC le an er s\ H

W

3A \A ct iv e D ra w in gs

Fi le

N am e:

7-

H W

3A

-0

.d w g

SCALE

0 25 50

FEET

1. AERIAL IMAGERY COURTESY OF USGS, MICROSOFT CORPORATION,

AND bing©

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF

REVENUE.

REFERENCE(S)

PROPERTY BOUNDARY

MW016

10/10/22

GCTLs

MONITORING WELL I.D.

SAMPLE DATE

TETRACHLOROETHENE (PCE)

TRICHLOROETHENE (TCE)

cis-1,2-DICHLOROETHENE

VINYL CHLORIDE

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (ug/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER

62-777, TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.

3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF THE

APPLICABLE GCTL.

4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT

DETECTED. THE VALUE SHOWN IS THE METHOD DETECTION LIMIT.

5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND THE LABORATORY PRACTICAL QUANTITATION

LIMIT.

NOTE(S)

MW003R

1/7/14 4/6/15 10/13/22 6/8/23

0.29 I 0.50 U 0.38 U 0.38 U

0.22 I 0.61 U 0.36 U 0.36 U

0.48 I 0.65 U 0.27 U 0.27 U

0.22 U 0.71 U 0.39 U 0.39 U

MW005R

1/24/12 4/19/12 10/13/22 6/8/23

0.20 U 0.20 U 0.38 U 0.38 U

0.26 U 0.26 U 0.36 U 0.36 U

38 0.22 U 0.27 U 0.27 U

6.9 0.29 U 0.39 U 0.39 U

MW006

9/23/05 7/6/10 7/18/11 10/13/22

99.8 0.20 U 0.20 U 0.38 U

30.5 0.26 U 0.26 U 0.36 U 301 0.22 U 0.22 U 0.27 U

69.1 0.79 I 0.29 U 0.39 U

SHALLOW MONITORING WELL

LEGEND

DEEP MONITORING WELL

INTERMEDIATE MONITORING WELL

DESTROYED MONITORING WELL

LOWER DEEP MONITORING WELL

LOWER SHALLOW MONITORING WELL

MW004R

6/25/20 3/10/21 10/13/22 6/8/23 18 85 8.9 39.9

6.7 34 3.2 11.4 39 140 27.2 50.4 20 35 8.5 20.8

MW001

1/11/13 4/9/13

0.19 U 0.19 U

0.45 I 0.16 U

0.21 U 0.21 U

0.22 U 0.22 U

MW002

1/15/16 4/27/17

0.40 U 0.40 U

0.60 I 0.96 I

4.0 9.5

14.7 45

MW007

03/01/04

2 U 2 U 2 U 1 U

MW014

1/24/12 4/19/12

0.20 U 0.20 U

0.26 U 0.26 U

0.54 I 0.47 I

0.95 I 0.60 I

GCTL EXCEEDANCE CONTOUR

MW008

4/6/15 5/21/19 6/8/23

0.50 U 0.76 U 0.38 U

0.61 U 0.89 U 0.36 U

0.65 U 0.53 U 0.27 U

0.71 U 0.71 U 0.39 U

MW004

MW005

MW006 MW007

MW008

MW009

MW010

MW011

MW003R

MW004R

MW014

MW019MW020

MW022

MW005R

MW023

HOLIDAY PLAZA FRENCH CLEANERS

N W

2n d

AV

E.

NW 18th STREET

TAFT STREET

MW002

MW021

in

31404452.4247 Control No.

4247-HW023A-005

FIGURE

2023-07-23

BCL

SJRS

FL. DEPT. OF ENVIRONMENTAL PROTECTION

PROJECT NO. REV.

PROJECT

HOLIDAY PLAZA FRENCH CLEANERS

9147 TAFT STREET

PEMBROKE PINES, BROWARD COUNTY, FL

TITLE

VOC ANALYTICAL SUMMARY OF THE INTERMEDIATE ZONE OF

THE SURFICIAL AQUIFER

(JUNE 8, 2023)

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

7_ H ol id ay Pl az aF rC le an er s\ H

W

3A \A ct iv e D ra w in gs

Fi le

N am e:

7-

H W

3A

-0

.d w g

SCALE

0 25 50

FEET

1. AERIAL IMAGERY COURTESY OF USGS, MICROSOFT CORPORATION,

AND bing©

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF

REVENUE.

REFERENCE(S)

PROPERTY BOUNDARY

MW016

10/10/22

GCTLs

MONITORING WELL I.D.

SAMPLE DATE

TETRACHLOROETHENE (PCE)

TRICHLOROETHENE (TCE)

cis-1,2-DICHLOROETHENE

VINYL CHLORIDE

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (ug/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,

TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.

3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF THE

APPLICABLE GCTL.

4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT

DETECTED. THE VALUE SHOWN IS THE METHOD DETECTION LIMIT.

5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND THE LABORATORY PRACTICAL QUANTITATION LIMIT.

6.) ISOCONCENTRATION CONTOURS DASHED WHERE INFERRED.

NOTE(S)

GCTL EXCEEDANCE CONTOUR

SHALLOW MONITORING WELL

LEGEND

DEEP MONITORING WELL

INTERMEDIATE MONITORING WELL

DESTROYED MONITORING WELL

LOWER DEEP MONITORING WELL

LOWER SHALLOW MONITORING WELL

MW009

7/7/10 6/19/18

0.20 U 0.50 U

0.26 U 0.61 U

0.22 U 0.32 U

0.29 U 0.26 U

MW010

7/18/11 6/19/18

0.20 U 0.50 U

0.26 U 0.61 U

0.22 U 0.32 U

0.29 U 0.26 U

MW022

1/7/14 4/6/15

0.19 U 0.50 U

0.16 U 0.61 U

0.15 U 0.65 U

0.22 U 0.71 U

MW023

4/19/12 6/19/18

0.20 U 0.50 U

0.26 U 0.61 U

0.22 U 0.32 U

0.29 U 0.26 U

MW004

MW005

MW006 MW007

MW008

MW009

MW010

MW011

MW003R

MW004R

MW014

MW017

MW018

MW019MW020

MW022

MW005R

MW023

HOLIDAY PLAZA FRENCH CLEANERS

N W

2n d

AV

E.

NW 18th STREET

TAFT STREET

MW002

MW021

in

31404452.4247 Control No.

4247-HW023A-005

FIGURE

2023-07-23

BCL

SJRS

FL. DEPT. OF ENVIRONMENTAL PROTECTION

PROJECT NO. REV.

PROJECT

HOLIDAY PLAZA FRENCH CLEANERS

9147 TAFT STREET

PEMBROKE PINES, BROWARD COUNTY, FL

TITLE

VOC ANALYTICAL SUMMARY OF THE DEEP ZONES OF THE

SURFICIAL AQUIFER

(JUNE 8, 2023)

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

7_ H ol id ay Pl az aF rC le an er s\ H

W

3A \A ct iv e D ra w in gs

Fi le

N am e:

7-

H W

3A

-0

.d w g

SCALE

0 25 50

FEET

SHALLOW MONITORING WELL

LEGEND

DEEP MONITORING WELL

1. AERIAL IMAGERY COURTESY OF USGS, MICROSOFT CORPORATION,

AND bing©

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF

REVENUE.

REFERENCE(S)

INTERMEDIATE MONITORING WELL

PROPERTY BOUNDARY

DESTROYED MONITORING WELL

MW016

10/10/22

GCTLs

MONITORING WELL I.D.

SAMPLE DATE

TETRACHLOROETHENE (PCE)

TRICHLOROETHENE (TCE)

cis-1,2-DICHLOROETHENE

VINYL CHLORIDE

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (ug/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,

TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.

3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF THE

APPLICABLE GCTL.

4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT

DETECTED. THE VALUE SHOWN IS THE METHOD DETECTION LIMIT.

5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND THE LABORATORY PRACTICAL QUANTITATION LIMIT.

6.) ISOCONCENTRATION CONTOURS DASHED WHERE INFERRED.

NOTE(S)MW019

7/6/10 7/18/11 4/6/15 10/13/22

0.20 U 0.20 U 0.50 U 0.38 U

0.26 U 0.26 U 0.61 U 0.36 U

0.59 I 0.22 U 0.65 U 0.27 U

0.71 I 0.29 U 0.71 U 0.39 U

GCTL EXCEEDANCE CONTOUR

LOWER DEEP MONITORING WELL

LOWER SHALLOW MONITORING WELL

MW011

10/13/06 6/19/18

2 U 0.50 U 2 U 0.61 U 2 U 0.32 U 1 U 0.26 U

MW017

11/12/04 10/11/06

2 U 2 U 2 U 2 U 2 U 12.3 1 U 3.51

MW018

11/12/04 10/11/06

2 U 2 U 2 U 2 U 2 U 2 U 1 U 1 U

MW020

10/13/06 6/8/23

2 U 0.38 U 2 U 0.36 U 2 U 0.27 U 1 U 0.39 U

MW021

10/13/06 6/8/23

2 U 0.38 U 2 U 0.36 U 2 U 0.27 U 1 U 0.39 U

ATTACHMENT B

Subcontractor Quotes

US Ecology* HEPACO T&D Non Haz Soil - VOCs per drum 0 $125.00 $0.00 T&D Non Haz Mud/water - VOCs per drum 0 $125.00 $0.00 False Mobilization (no drum found) 0 $85.00 $0.00 PFAS Profile Fee (1 per site) 0 $350.00 $0.00 T&D Non Haz Soil - PFAS/PFOS per drum 0 $195.00 $0.00 T&D Non Haz Mud/water -PFAS/PFOS per drum 1 $195.00 $195.00 Disposal Non Haz Soil - VOCs per drum 0 $150.00 $0.00 Disposal Non Haz Mud/water - VOCs per drum 0 $150.00 $0.00 PFAS Profile Fee (1 per site) 1 $95.00 $95.00 Disposal Non Haz Soil - PFAS/PFOS 0 $650.00 $0.00 Disposal Non Haz Mud/water -PFAS/PFOS 1 $650.00 $650.00 Approval Fee (per site) 1 $750.00 $750.00 Non Haz Solification Waste Profile fee 0 $50.00 $0.00 Non Haz Solids Disposal (per drum) 0 $185.00 $0.00 Non Haz Sludge Disposal 0 $185.00 $0.00 PFAS Waste 55 gal drum emelle AL 1 $810.00 $810.00 Truck with lift gate and driver 4 $145.00 $580.00 non haz liquids disposal (per drum) 0 $141.75 $0.00 55 gallon reconditioned drum 0 $134.63 $0.00 LTL fees (less than 15 drums 1 $150.00 $150.00 Energy security recovery fee 15% 1 $231.00 $231.00

Total Cost $195.00 $1,400.00 * $1,586.00

Notes* Transportation costs will be calculated based on pickups at various sites and waste stream volume

IDW SUBCONTRACTOR COST ESTIMATES FOR PFAS MATERIAL

Erwin

Summary of IDW Subcontractors Costs 2023_6_16 PFAS no profile Page 1 of 1

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Ralph Mongillo

WSP

9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256

June 16, 2023

Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials

Mr. Mongillo:

The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:

For Non-Hazardous Chlorinated Solvent Impacted Materials:

Description Rate Unit

T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum

T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum

T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket

For Non-Hazardous PFAS/PFOS Impacted Materials:

Description Rate Unit

Profile Fee (Charged once per site) $ 350.00 Per Site

T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket

T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum

T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: robert@erwinremediation.com

COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf
Table 1 for SAWP
Monitoring Well Locations
Utility Locate Bids_Compiled.pdf
Geosyntec Utility-272_Geotek_1500
Geoview Utility Quote_2000_COT FTF SIS
Tallahassee Fire Training Division_V1_Bloodhound_3700
Drilling Bids_Compiled.pdf
PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic)
Direct Push
City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email
Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844
GW Protection_Geosyntec (T) 1022060 S.pdf
Invoice
Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf
Sheet1
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf
Table 1 for SAWP
Monitoring Well Locations