CN-370000-HW685-BIL2CCO1.pdf.crdownload

CRDOWNLOAD file 36 MB Posted

Attached to
Master Agreement FL|HW685|184b9800bda47b032a54413957b4b38d
Contract number
HW685
Issued by
Florida

About this file

This document is a Task Assignment Change Order (TACO #1) issued by the State of Florida Department of Environmental Protection (FDEP) to WSP USA Inc. The change order amends the original Task Assignment (TA BIL02C) executed under Contract Number HW685 for environmental remediation activities at the Port of Fort Pierce, located at 101 Port Avenue, Fort Pierce, St. Lucie County. The work is funded by federal grants from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) cooperative agreement administered by FDEP on behalf of the U.S. Environmental Protection Agency (EPA). The change order was authorized by Megan Johnson (FDEP Contract Manager) and Justin Spengler (WSP USA Inc. Project Manager) and became effective on May 21, 2025.

The TACO reduces the overall Task Assignment value from $68,123.37 to $59,609.76, representing a total cost decrease of $8,513.61. This reduction results from adjustments across multiple subtasks: Project Management ($405.29 decrease), Soil Sampling and Monitoring Well Installation ($6,392.92 decrease), Groundwater Sampling Activities ($1,775.71 decrease), and IDW Transportation and Disposal ($726.00 decrease), partially offset by increased costs in Supplemental Site Assessment Report preparation ($786.31 increase). The change order also extends the Task Assignment completion date from May 30, 2025, to September 1, 2025 (94 additional days) and the final deliverable due date to August 1, 2025. Deliverables include field documentation and analytical reports for soil and groundwater sampling, non-hazardous waste manifests, and a Supplemental Site Assessment Report with an updated Interim Notice of Completion (INOC) package, with invoicing tied to Department approval of each deliverable phase.

Text of this file

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

BIL02C 1 HW685

This Task Assignment Change Order authorizes a reduction in overall costs. This TACO also authorizes time extensions for the task assignment completion date and final deliverable due date per the request submitted by WSP USA Inc. on April 30, 2025.

Megan Johnson 850.245.8994 WSP USA Inc.

Justin Spengler 904.363.3430

ERIC_15269

Port of Fort Pierce

$ 59,609.76 $ 68,123.37

$ 59,609.76 $ 68,123.37

05/30/2025 09/01/2025 94

1 1 1

WSP USA Inc.

Matt Crews, P.E.

Environmental Engineer

5/21/2025

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.05.21 08:19:38 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.05.20 13:55:24 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum

TO: WSP USA Inc., HW685 Contract File

FROM: Megan Johnson, Contract Manager

DATE: May 16, 2025

SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) Change Order #1 – TA BIL02C C1 Port of Fort Pierce – Site ID # ERIC_15269 Supplemental Site Assessment activities

This Task Assignment Change Order (TACO) is for changes in field staff, changes in laboratory costs and subcontractor costs, and additional staff hours needed to update the INOC package. This TACO also authorizes an extension to the overall TA Completion Date, as well as final deliverable due date. This work is being conducted at the Port of Fort Pierce site, located at 101 Port Avenue A, Fort Pierce, St. Lucie County. The services under this task are being conducted using federal funds from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency

(EPA).

Subtask 1: Project Management The reduction of overall task labor hours produced a change associated with Project Management. This change resulted in a cost actual decrease of ($405.29).

Subtask 2: Soil Sampling and Monitoring Well Installation Under this subtask, this TACO authorizes changes in field staff, reduction in laboratory costs, and reduction in subcontractor costs. These changes resulted in a cost actual decrease of ($6,392.92).

Subtask 3: Groundwater Sampling Activities Under this subtask, this TACO authorizes changes in field staff, a reduction in the number of arsenic samples and equipment needs. This change resulted in a cost actual decrease of ($1,775.71).

Subtask 4: IDW Transportation and Disposal Under this subtask there was a reduction in costs associated with IDW disposal. This change resulted in a cost actual decrease of ($726.00).

Negotiation Summary – Task Assignment Change Order #1 TA BIL02C C1 Port of Fort Pierce – Site ID # ERIC_15269 May 16, 2025

Subtask 5: Supplemental Site Assessment Report Under this subtask, this TACO authorizes additional staff hours for WSP to update the INOC package. This change resulted in a cost actual increase of $786.31.

Summary The Department’s BIL Contract Manager and WSP USA Inc’s Contract Manager have both agreed to the above changes. All changes noted above represent a total overall cost decrease of ($8,513.61) as shown in the Cost Actual LOE. Due to a rounding error in Excel, the Delta LOE states an overall cost decrease of ($8,513.62), however this was addressed in the Cost Actual LOE. The changes were noted in the TACO Request received from WSP USA Inc. on April 30, 2025. The final cost associated with this TA decreased from $68,123.37 to $59,609.76. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Cost Actual LOE spreadsheet, and the TACO Form for BIL02C C1 prepared by the Department. The final deliverable for this TA must be received by the Department no later than August 1, 2025.

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Port of Fort Pierce SUBTASK 2: Soil Sampling and MW Installation

DATE: 4/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 12

Senior Consultant (M. Crews) -12

Senior Project Sci/Eng (J. Spengler) 12

Staff Sci/Eng (J. Whipple) 59

Staff Sci/Eng (J. Whipple) -59

Project Sci/Eng (M. Triano) 54

Staff Sci/Eng (L. Kamikazi) 57

Staff Sci/Eng (L. Kamikazi) -57

Staff Sci/Eng (K. Straight) 52

TOTAL LABOR 118

VEHICLE TYPE RATE UNIT USEAGE

Truck $480.00 Per Week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem L. Kamikazi $36.00 Per Day 6 $216.00 Per Diem J. Whipple $36.00 Per Day 6 $216.00 Per Diem L. Kamikazi $36.00 Per Day -6 ($216.00) Per Diem J. Whipple $36.00 Per Day -6 ($216.00) Per Diem M. Triano $36.00 Per Day 6 $216.00 Per Diem K. Straight $36.00 Per Day 6 $216.00

Hotel L. Kamikazi $150.00 Per Day 5 $750.00 Hotel J. Whipple $150.00 Per Day 5 $750.00 Hotel L. Kamikazi $150.00 Per Day -5 ($750.00) Hotel J. Whipple $150.00 Per Day -5 ($750.00) Hotel M. Triano $150.00 Per Day 5 $750.00 Hotel K. Straight $150.00 Per Day 5 $750.00

TOTAL PER DIEM $1,932.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Pace TRPH - Fractionation 9 250.00$ $2,250.00 Pace TRPH - Fractionation -9 250.00$ ($2,250.00) Eurofins TRPH - Fractionation 2 227.27$ $454.54 Geotek Utility Location 1 1,500.00$ $1,500.00 GWP MW Installation 1 15,955.00$ $15,955.00 GWP MW Installation -1 15,955.00$ ($15,955.00) GWP MW Installation 1 14,308.00$ $14,308.00

TOTAL $16,262.54

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Area B Arsenic - Method 6010 $13.00 21 3 $312.00

TRPH - FLPRO $88.00 3 3 $528.00

Area C Arsenic - Method 6010 $13.00 21 3 $312.00 Arsenic - Method 6010 $13.00 -21 -3 ($312.00) Arsenic - Method 6010 $13.00 20 3 $299.00

Area F&G Arsenic - Method 6010 $13.00 15 0 $195.00 Arsenic - Method 6010 $13.00 -15 0 ($195.00) Arsenic - Method 6010 $13.00 9 2 $143.00

Area H Arsenic - Method 6010 $13.00 15 3 $234.00

TRPH - FLPRO $88.00 6 0 $528.00

Arsenic - Method 6010 $13.00 -15 -3 ($234.00) Arsenic - Method 6010 $13.00 13 2 $195.00

Area I Arsenic - Method 6010 $13.00 33 3 $468.00 Arsenic - Method 6010 $13.00 -33 -3 ($468.00) Arsenic - Method 6010 $13.00 24 0 $312.00

TRPH - Equipment Blanks $88.00 0 1 $88.00 Arsenic - Equipment Blanks $13.00 0 5 $65.00

TCLP Metals - IDW Soil $135.00 1 0 $135.00 Arsenic - IDW Water $13.00 1 0 $13.00

Shipping (large) $150.00 4 0 $600.00

TOTAL LAB $3,218.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 5 $200.00 Monitor Well Installation Kit $325.00 Per Day 2 $650.00 Soil Assessment Kit $700.00 Per Week 1 $700.00

TOTAL EQUIPMENT $1,550.00

Verify existing site access agreements and obtain offsite access agreements for offsite well installation activities and soil sampling activities (8 hours). Submit e-mail deliverable with field documentation and laboratory analytical reports (4 hours).

Round trip travel (7 hours). Update Health and Safety Plan (1 hour). Field event preparation (1 hour). Soil sampling and MW install (10 hours per day x 5 days = 50 hours).

Round trip travel (7 hours). Soil sampling and MW install (10 hours per day x 5 days = 50 hours).

Round trip travel (7 hours). Update Health and Safety Plan (1 hour). Field event preparation (1 hour). Soil sampling and MW install (45 hours).

Round trip travel (7 hours). Soil sampling and MW install (45 hours).

Verify existing site access agreements and obtain offsite access agreements for offsite well installation activities and soil sampling activities (8 hours). Submit e-mail deliverable with field documentation and laboratory analytical reports (4 hours).

Verify existing site access agreements and obtain offsite access agreements for offsite well installation activities and soil sampling activities (8 hours). Submit e-mail deliverable with field documentation and laboratory analytical reports (4 hours).

Round trip travel (7 hours). Update Health and Safety Plan (1 hour). Field event preparation (1 hour). Soil sampling and MW install (10 hours per day x 5 days = 50 hours).

Round trip travel (7 hours). Soil sampling and MW install (10 hours per day x 5 days = 50 hours).

FINAL --7/24/96

SUBTASK 3: GW Sampling Activities

DATE: 4/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 3

Senior Consultant (M. Crews) -3

Senior Project Sci/Eng (J. Spengler) 3

Staff Sci/Eng (J. Whipple) 43

Staff Sci/Eng (J. Whipple) -43

Staff Sci/Eng (K. Straight) 43

Staff Sci/Eng (L. Kamikazi) 42

Staff Sci/Eng (L. Kamikazi) -42

Sci/Eng (S. Svendsen) 42

TOTAL LABOR 88

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 4 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem L. Kamikazi $36.00 Per Day 4 $144.00 Per Diem J. Whipple $36.00 Per Day 4 $144.00 Per Diem L. Kamikazi $36.00 Per Day -4 ($144.00) Per Diem J. Whipple $36.00 Per Day -4 ($144.00) Per Diem S. Svendsen $36.00 Per Day 4 $144.00 Per Diem K. Straight $36.00 Per Day 4 $144.00

Hotel L. Kamikazi $150.00 Per Day 3 $450.00 Hotel J. Whipple $150.00 Per Day 3 $450.00 Hotel L. Kamikazi $150.00 Per Day -3 ($450.00) Hotel J. Whipple $150.00 Per Day -3 ($450.00) Hotel S. Svendsen $150.00 Per Day 3 $450.00 Hotel K. Straight $150.00 Per Day 3 $450.00

TOTAL PER DIEM $1,188.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Arsenic - Method 6010 $13.00 28 3 $403.00 Arsenic - Method 6010 $13.00 -28 -3 ($403.00) Arsenic - Method 6010 $13.00 25 6 $403.00

Arsenic - IDW Water $13.00 1 0 $13.00

Shipping (large) $150.00 1 0 $150.00

TOTAL LAB $566.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 4 $160.00 Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00 Tubing, Poly HDPE $0.30 Per Foot 750 $225.00 Tubing, Poly HDPE $0.30 Per Foot -60 ($18.00) Tubing, Silicon 3/16 x 3/8 $3.00 Per foot 22 $66.00 Total Survey Station $50.00 Per Day 1 $50.00 Drum, 55-gallon $100.00 Per Drum 2 $200.00 Drum, 55-gallon $100.00 Per Drum -2 ($200.00)

TOTAL EQUIPMENT $1,063.00

Submit e-mail deliverable for groundwater sampling activities (3 hours).

Round trip travel (7 hours). Field event preparation (1 hour). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

Round trip travel (7 hours). Field event preparation (1 hour). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

Round trip travel (7 hours). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

Round trip travel (7 hours). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

Submit e-mail deliverable for groundwater sampling activities (3 hours).

Submit e-mail deliverable for groundwater sampling activities (3 hours).

Round trip travel (7 hours). Field event preparation (1 hour). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

Round trip travel (7 hours). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

SUBTASK 4: IDW Transportation & Disposal

DATE: 4/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 1

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW Disposal (Subtask 2) 8 110.00$ $880.00 Erwin IDW Disposal (Subtask 3) 2 110.00$ $220.00 Erwin IDW Disposal (Subtask 2) -8 110.00$ ($880.00) Erwin IDW Disposal (Subtask 3) -2 110.00$ ($220.00) Erwin IDW Disposal (Subtask 2 & 3) 4 110.00$ $440.00

TOTAL $440.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Characterization and waste profile for transportation and disposal of IDW drum (1 hour).

SUBTASK 5: Reporting

DATE: 4/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 3

Senior Project Sci/Eng (J. Spengler) 30 Senior Project Sci/Eng (J. Spengler) 6

Senior Project Sci/Eng (B. Lucero) 8

Staff Sci/Eng (A.Strayer) 2

TOTAL LABOR 49

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Prepare final SSA Report (3 hours).

Update data tables and prepare draft SSA Report (30 hours).

Prepare CAD figures for SSA Report.

Reporting-document production (1 hour).

Prepare INOC package update (6 hours).

SUBTASK 2: Soil Sampling and MW Installation

DATE: 4/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) -12

Senior Project Sci/Eng (J. Spengler) 12

Staff Sci/Eng (J. Whipple) -59

Project Sci/Eng (M. Triano) 54

Staff Sci/Eng (L. Kamikazi) -57

Staff Sci/Eng (K. Straight) 52

TOTAL LABOR -10

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem L. Kamikazi $36.00 Per Day -6 ($216.00) Per Diem J. Whipple $36.00 Per Day -6 ($216.00) Per Diem M. Triano $36.00 Per Day 6 $216.00 Per Diem K. Straight $36.00 Per Day 6 $216.00

Hotel L. Kamikazi $150.00 Per Day -5 ($750.00) Hotel J. Whipple $150.00 Per Day -5 ($750.00) Hotel M. Triano $150.00 Per Day 5 $750.00 Hotel K. Straight $150.00 Per Day 5 $750.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Pace TRPH - Fractionation -9 250.00$ ($2,250.00) Eurofins TRPH - Fractionation 2 227.27$ $454.54

GWP MW Installation -1 15,955.00$ ($15,955.00) GWP MW Installation 1 14,308.00$ $14,308.00

TOTAL ($3,442.46)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Area B

Area C

Arsenic - Method 6010 $13.00 -21 -3 ($312.00) Arsenic - Method 6010 $13.00 20 3 $299.00

Area F&G

Arsenic - Method 6010 $13.00 -15 0 ($195.00) Arsenic - Method 6010 $13.00 9 2 $143.00

Area H

Arsenic - Method 6010 $13.00 -15 -3 ($234.00) Arsenic - Method 6010 $13.00 13 2 $195.00

Area I

Arsenic - Method 6010 $13.00 -33 -3 ($468.00) Arsenic - Method 6010 $13.00 24 0 $312.00

TOTAL LAB ($260.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Round trip travel (7 hours). Update Health and Safety Plan (1 hour). Field event preparation (1 hour). Soil sampling and MW install (45 hours).

Round trip travel (7 hours). Soil sampling and MW install (45 hours).

Verify existing site access agreements and obtain offsite access agreements for offsite well installation activities and soil sampling activities (8 hours). Submit e-mail deliverable with field documentation and laboratory analytical reports (4 hours).

Verify existing site access agreements and obtain offsite access agreements for offsite well installation activities and soil sampling activities (8 hours). Submit e-mail deliverable with field documentation and laboratory analytical reports (4 hours).

Round trip travel (7 hours). Update Health and Safety Plan (1 hour). Field event preparation (1 hour). Soil sampling and MW install (10 hours per day x 5 days = 50 hours).

Round trip travel (7 hours). Soil sampling and MW install (10 hours per day x 5 days = 50 hours).

SUBTASK 3: GW Sampling Activities

DATE: 4/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) -3

Senior Project Sci/Eng (J. Spengler) 3

Staff Sci/Eng (J. Whipple) -43

Staff Sci/Eng (K. Straight) 43

Staff Sci/Eng (L. Kamikazi) -42

Sci/Eng (S. Svendsen) 42

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem L. Kamikazi $36.00 Per Day -4 ($144.00) Per Diem J. Whipple $36.00 Per Day -4 ($144.00) Per Diem S. Svendsen $36.00 Per Day 4 $144.00 Per Diem K. Straight $36.00 Per Day 4 $144.00

Hotel L. Kamikazi $150.00 Per Day -3 ($450.00) Hotel J. Whipple $150.00 Per Day -3 ($450.00) Hotel S. Svendsen $150.00 Per Day 3 $450.00 Hotel K. Straight $150.00 Per Day 3 $450.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Arsenic - Method 6010 $13.00 -28 -3 ($403.00) Arsenic - Method 6010 $13.00 25 6 $403.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Tubing, Poly HDPE $0.30 Per Foot -60 ($18.00)

Drum, 55-gallon $100.00 Per Drum -2 ($200.00)

TOTAL EQUIPMENT ($218.00)

Round trip travel (7 hours). Field event preparation (1 hour). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

Round trip travel (7 hours). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

Submit e-mail deliverable for groundwater sampling activities (3 hours).

Submit e-mail deliverable for groundwater sampling activities (3 hours).

Round trip travel (7 hours). Field event preparation (1 hour). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

Round trip travel (7 hours). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

SUBTASK 4: IDW Transportation & Disposal

DATE: 4/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW Disposal (Subtask 2) -8 110.00$ ($880.00) Erwin IDW Disposal (Subtask 3) -2 110.00$ ($220.00) Erwin IDW Disposal (Subtask 2 & 3) 4 110.00$ $440.00

TOTAL ($660.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 5: Reporting

DATE: 4/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Project Sci/Eng (J. Spengler) 6

TOTAL LABOR 6

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Prepare INOC package update (6 hours).

SUBTASK 2: Soil Sampling and MW Installation

DATE: 10/3/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 12

Staff Sci/Eng (J. Whipple) 59

Staff Sci/Eng (L. Kamikazi) 57

TOTAL LABOR 128

VEHICLE TYPE RATE UNIT USEAGE

Truck $480.00 Per Week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem L. Kamikazi $36.00 Per Day 6 $216.00

Per Diem J. Whipple $36.00 Per Day 6 $216.00

Hotel L. Kamikazi $150.00 Per Day 5 $750.00

Hotel J. Whipple $150.00 Per Day 5 $750.00

TOTAL PER DIEM $1,932.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Pace TRPH - Fractionation 9 250.00$ $2,250.00

Geotek Utility Location 1 1,500.00$ $1,500.00

GWP MW Installation 1 15,955.00$ $15,955.00

TOTAL $19,705.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Area B Arsenic - Method 6010 $13.00 21 3 $312.00

TRPH - FLPRO $88.00 3 3 $528.00

Area C

Arsenic - Method 6010 $13.00 21 3 $312.00

Area F&G

Arsenic - Method 6010 $13.00 15 0 $195.00

Area H

Arsenic - Method 6010 $13.00 15 3 $234.00

TRPH - FLPRO $88.00 6 0 $528.00

Area I Arsenic - Method 6010 $13.00 33 3 $468.00

TRPH - Equipment Blanks $88.00 0 1 $88.00

Arsenic - Equipment Blanks $13.00 0 5 $65.00

TCLP Metals - IDW Soil $135.00 1 0 $135.00

Arsenic - IDW Water $13.00 1 0 $13.00

Shipping (large) $150.00 4 0 $600.00

TOTAL LAB $3,478.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 5 $200.00 Monitor Well Installation Kit $325.00 Per Day 2 $650.00

Soil Assessment Kit $700.00 Per Week 1 $700.00

TOTAL EQUIPMENT $1,550.00

Verify existing site access agreements and obtain offsite access agreements for offsite well installation activities and soil sampling activities (8 hours). Submit e-mail deliverable with field documentation and laboratory analytical reports (4 hours).

Round trip travel (7 hours). Update Health and Safety Plan (1 hour). Field event preparation (1 hour).

Soil sampling and MW install (10 hours per day x 5 days = 50 hours).

Round trip travel (7 hours). Soil sampling and MW install (10 hours per day x 5 days = 50 hours).

SUBTASK 3: GW Sampling Activities

DATE: 10/3/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 3

Staff Sci/Eng (J. Whipple) 43

Staff Sci/Eng (L. Kamikazi) 42

TOTAL LABOR 88

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 4 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem L. Kamikazi $36.00 Per Day 4 $144.00 Per Diem J. Whipple $36.00 Per Day 4 $144.00

Hotel L. Kamikazi $150.00 Per Day 3 $450.00 Hotel J. Whipple $150.00 Per Day 3 $450.00

TOTAL PER DIEM $1,188.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Arsenic - Method 6010 $13.00 28 3 $403.00

Arsenic - IDW Water $13.00 1 0 $13.00

Shipping (large) $150.00 1 0 $150.00

TOTAL LAB $566.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 4 $160.00 Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00 Tubing, Poly HDPE $0.30 Per Foot 750 $225.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per foot 22 $66.00 Total Survey Station $50.00 Per Day 1 $50.00 Drum, 55-gallon $100.00 Per Drum 2 $200.00

TOTAL EQUIPMENT $1,281.00

Submit e-mail deliverable for groundwater sampling activities (3 hours).

Round trip travel (7 hours). Field event preparation (1 hour). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

Round trip travel (7 hours). Groundwater sampling activities (10 hours per day x 3.5 days = 35 hours).

SUBTASK 4: IDW Transportation & Disposal

DATE: 10/3/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 1

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW Disposal (Subtask 2) 8 110.00$ $880.00 Erwin IDW Disposal (Subtask 3) 2 110.00$ $220.00

TOTAL $1,100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Characterization and waste profile for transportation and disposal of IDW drum (1 hour).

SUBTASK 5: Reporting

DATE: 10/3/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 3

Senior Project Sci/Eng (J. Spengler) 30

Senior Project Sci/Eng (B. Lucero) 8

Staff Sci/Eng (A.Strayer) 2

TOTAL LABOR 43

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Prepare final SSA Report (3 hours).

Update data tables and prepare draft SSA Report (30 hours).

Prepare CAD figures for SSA Report.

Reporting-document production (1 hour).

Area C - 8 soil As, 3 QA/QC As Area F&G - 9 soil As, 2 QA/QC As EQB - 2 As IDW - 1 soil TCLP, 1 water As

Area B - 21 soil As, 3 QA/QC As Area B - 3 soil TRPH, 3 QA/QC TRPH Area C - 6 soil As Area H - 13 soil As, 2 QA/QC As Area I - 24 soil As EQB - 3 As, 1 TRPH

Area C - 6 soil As GW Samples - 25 wells As, 6 QA/QC As

IDW - 1 water As

From: Spengler, Justin To: Johnson, Megan R Cc: Crews, Matt; Mccarthy Jr, Arthur Subject: BIL02C (TACO #1) - Port of Fort Pierce Task Assignment Change Order Date: Wednesday, April 30, 2025 4:29:18 PM Attachments: image001.png

BIL02C (TACO #1) - Port of Fort Pierce TBA Activities LOECEF.xlsx BIL02C (Delta #1) - Port of Fort Pierce TBA Activities LOECEF.xlsx BIL02C - Port of Fort Pierce Signed TA.pdf BIL02C - Port of Fort Pierce TBA Activities LOECEF rev1.xlsx Combined Subcontractor Invoices.pdf

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Megan, WSP has attached the files necessary to complete TACO #1 for TA BIL02C. TACO #1 rectifies the final Subtask 2, 3, and 4 related costs. TACO #1 also includes additional hours for WSP to update the INOC package. WSP submitted the subtask 2, 3, and 4 deliverable on April 28, 2025.

The following files are attached for your review:

• The Excel TACO #1 LOE and CEF

• The Excel Delta #1 LOE and CEF

• The original signed TA BIL02C (PDF)

• The rev1 Excel LOE and CEF for TA BIL02C

• Relevant subcontractor invoices for Subtask 2, 3, and 4

Please review and let us know if you have any questions or comments.

Thanks, Justin

Justin Spengler Senior Consultant, Environmental Engineering justin.spengler@wsp.com

T+ 1 904-363-3430 M+ 1 904-738-9729

NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW685

BIL02C Completion May 30, 2025

The Department approves this Task Assignment (TA), based upon the Cost Proposal and Level of Effort (CP/LOE), for Supplemental Site Assessment evaluation activities at the below project site, submitted to the Department on September 27, 2024, revised October 3, 2024, by WSP USA Inc.

Megan Johnson 850.245.8994 Contractor WSP USA Inc. Contractor

Contractor Justin Spengler Contractor 904.363.3430

ERIC_15269

101 Port Avenue, Fort Pierce, St. Lucie County

Port of Fort Pierce

Contractor Contractor

$ 68,123.37

$ 68,123.37

Scope of Work

WSP USA Inc.

Contractor

Matt Crews, P.E.

Assistant Vice President

10/7/2024

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.10.07 09:35:43 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.10.04 13:17:31 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Field documentation and laboratory analytical report for soil sampling activities.

02/21/2025

Field documentation and laboratory analytical report for groundwater sampling activities. 03/14/2025

Non-hazardous waste manifest.

04/11/2025

Supplemental Site Assessment Report.

04/25/2025

Department approval of field documentation and laboratory analytical report for soil sampling activities.(Subtask 2) $ 43,713.99

Department approval of field documentation and laboratory analytical report for groundwater sampling activities.(Subtask 3) $ 13,021.37

Department approval of non-hazardous waste manifest. (Subtask 4) $ 1,415.00

Department approval of Project Management and Supplemental Site Assessment Report. (Subtasks 1 and 5) $ 9,973.01

$ 68,123.37

HW685

BIL02C

Other files

File Type Posted
CN-370000-HW685-BF01C.pdf PDF
CN-370000-HW685-BF05ACO2.pdf PDF
CN-370000-HW685-BF05ACO3.pdf PDF
CN-370000-HW685-BF06A.pdf PDF
CN-370000-HW685-BF1ACO1.pdf PDF
CN-370000-HW685-BF6ACO1.pdf PDF
CN-370000-HW685-BIL01C.pdf PDF
CN-370000-HW685-BIL01CO1.pdf PDF
CN-370000-HW685-BIL03A.pdf PDF
CN-370000-HW685-BIL2ACO1.pdf PDF
CN-370000-HW685-DC001A.pdf PDF
CN-370000-HW685-DC002G.pdf PDF
CN-370000-HW685-DC003A.pdf PDF
CN-370000-HW685-DC005C.pdf PDF
CN-370000-HW685-DC006B.pdf PDF
CN-370000-HW685-DC006C.pdf PDF
CN-370000-HW685-DC007C.pdf PDF
CN-370000-HW685-DC008A.pdf PDF
CN-370000-HW685-DC009B.pdf PDF
CN-370000-HW685-DC010A.pdf PDF
CN-370000-HW685-DC011A.pdf PDF
CN-370000-HW685-DC012C.pdf PDF
CN-370000-HW685-DC013A.pdf PDF
CN-370000-HW685-DC013C.pdf PDF
CN-370000-HW685-DC015B.pdf PDF
CN-370000-HW685-DC015C.pdf PDF
CN-370000-HW685-DC016A.pdf PDF
CN-370000-HW685-DC018A.pdf PDF
CN-370000-HW685-DC019B.pdf PDF
CN-370000-HW685-DC01ACO6.pdf PDF
CN-370000-HW685-DC01ACO8.pdf PDF
CN-370000-HW685-DC01ACO9.pdf PDF
CN-370000-HW685-DC020B.pdf PDF
CN-370000-HW685-DC022A.pdf PDF
CN-370000-HW685-DC022B.pdf PDF
CN-370000-HW685-DC022D.pdf PDF
CN-370000-HW685-DC023B.pdf PDF
CN-370000-HW685-DC023C.pdf PDF
CN-370000-HW685-DC027B.pdf PDF
CN-370000-HW685-DC027C.pdf PDF
CN-370000-HW685-DC029B.pdf PDF
CN-370000-HW685-DC029C.pdf PDF
CN-370000-HW685-DC02CCO1.pdf PDF
CN-370000-HW685-DC02FCO1.pdf PDF
CN-370000-HW685-DC031A.pdf PDF
CN-370000-HW685-DC031C.pdf PDF
CN-370000-HW685-DC032B.pdf PDF
CN-370000-HW685-DC035A.pdf PDF
CN-370000-HW685-DC037A.pdf PDF
CN-370000-HW685-DC038C.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .