CN-370000-HW685-DC029C.pdf
PDF 1 MB Posted
- Contract number
- HW685
- Issued by
- Florida
About this file
This is a Task Assignment (TA) entered into between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. under Contract Number HW685. The TA is designated DC029C with an effective date of June 14, 2024, and a completion date of January 31, 2025. The project involves preparing an Interim Source Removal (ISR) Work Plan for the Swift Cleaners Inc. site located at 1029 North 3rd Street, Jacksonville Beach, Duval County, Florida (Facility ID: ERIC_4583). Patrick McGrane serves as the Department's Project Manager, while Matt Crews represents WSP USA Inc. as the Contractor's Project Manager.
The scope of work authorizes WSP to develop a comprehensive ISR Work Plan addressing chlorinated volatile organic compounds in impacted vadose zone soils using Soil Vapor Extraction (SVE), a presumptive remedy approved by FDEP in October 2023. The total contract value is $10,635.58, based on 54 total labor hours and payable on a fixed unit rate basis. The work is divided into two subtasks: Subtask 1 covers Project Management (automatically calculated as a percentage of total labor), and Subtask 2 encompasses development of the ISR Work Plan with a deliverable due date of September 20, 2024. The ISR Work Plan must include site location and description, summary of previous activities, site visit recommendations, site preparation activities, well and monitoring point locations, SVE system design criteria and components, control panel and telemetry requirements, effluent treatment design, system construction details, operation and maintenance procedures, cleanup goals and shutdown requirements, health and safety considerations, and estimated cost and schedule for implementation. Payment of the full $10,635.58 is invoiced upon submittal and FDEP approval of the ISR Work Plan.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW685
DC029C January 31, 2025
This Task Assignment authorizes WSP to prepare an Interim Source Removal Work
Plan for the Swift Cleaners Inc. site in accordance with the May 14, 2024 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 WSP USA Inc.
Matt Crews 904-363-3430
ERIC_4583
1029 North 3rd Street, Jacksonville Beach, Duval County
Swift Cleaners Inc.
$ 10,635.58
$ 10,635.58
Scope of Work
WSP USA Inc.
Matthew Crews
Environmental Engineer
6/14/2024
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.06.14 10:01:41 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.05.28 11:39:01 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton
Secretary
Memorandum
TO: Negotiation File Swift Cleaners Inc.
Jacksonville Beach, Duval County
ERIC_4583
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC029C (HW685)
DATE: May 21, 2024
This Task Assignment authorizes WSP USA Inc. (WSP) to prepare an Interim Source Removal Work Plan for the Swift cleaners Inc site. Soil Vapor Extraction was approved as a Presumptive Remedy by the FDEP in October 2023.
The total cost for this project is $10,635.58 with 54 total labor hours. All work is to be completed in accordance with the May 14, 2024, Scope of Work, Cost Estimate, and Bid Documentation.
WSP may invoice according to the included schedule.
Subtask 1:
Project Management is automatically calculated as a percentage of total labor in accordance with
Contract HW685.
Subtask 2:
WSP will develop an ISR Work Plan to address chlorinated VOCs in impacted vadose zone soils. The ISR
Work Plan is to include all the details as laid out in the bulleted section of Subtask 2 in the included Scope of Work.
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Swift Cleaners Inc. (Swift Beaches) SUBTASK 2: ISR Work Plan
DATE: 5/14/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 6
Senior Consultant (M. Crews) 34
Senior Project Sci/Eng (B. Lucero) CADD - Develop figures for ISR Work Plan 6
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 48.0
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00
TOTAL EQUIPMENT $40.00
Site visit (4 hours). Prepare draft ISR Work Plan (30 hours).
Site visit (4 hours). Reporting: Review Draft ISR Work Plan; incorporate design comments and edits into final report (2 hours).
Reporting: report formatting, document production. Create pdf for OCULUS.
FINAL --7/24/96
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA
T: +1 904 363-3430 F: +1 904 363-3445 wsp.com
May 14, 2024 Proposal No. 2024US213936
Mr. Patrick McGrane
Florida Department of Environmental Protection
Division of Waste Management
Waste Site Cleanup Section
2600 Blair Stone Road, MS 4520
Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR ISR WORK PLAN
SWIFT CLEANERS INC.
1029 N. 3RD STREET
JACKSONVILLE BEACH, DUVAL COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4583
PROPOSED TASK ASSIGNMENT: DC029C
Dear Mr. McGrane, WSP USA Inc. (WSP), is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal to develop an Interim Source Removal (ISR) Work Plan for the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the
DEP-approved task assignment.
SUBTASK 2 ISR WORK PLAN
Based on the results of recent assessment activities, the DEP approved Soil Vapor Extraction (SVE) as the presumptive remedy for the site in an approval memorandum, dated October 13, 2023. Therefore, WSP will develop an ISR Work Plan to use SVE to address the chlorinated volatile organic compound impacts identified in the vadose zone soils during the October 2021 Modified Active Gas Sampling investigation. The ISR Work Plan will include the following:
Mr. Patrick McGrane Proposal No. 2024US213936
Florida Department of Environmental Protection May 14, 2024
Site location and description.
A summary of previous site assessment and remediation activities completed at the site.
A recommendation for a site visit to identify a location for the SVE system; identify potential electrical power drop locations; and discuss the proposed site activities with the property owner and tenants.
The proposed site preparation activities, including verification of the existing site access agreement, utility location services, and documentation of existing site conditions.
Proposed vacuum extraction well and vacuum monitoring point locations and construction details.
Proposed SVE conveyance piping layout and trenching details, where applicable.
SVE system design criteria, including system operating vacuum, wellhead vacuum and flow rates, ROI, and a piping and instrumentation diagram.
SVE system components, including the manifold, vapor-liquid separator, dilution air valve, vacuum blower, gauges (temperature, pressure, and flow), valves, and sample port locations.
Control panel and telemetry requirements.
Effluent treatment design and water entrainment management.
Review of available and compatible DEP-owned SVE systems and recommendation for reuse/repair or procurement of new system.
SVE system construction details.
System startup and operation and maintenance procedures.
SVE cleanup goals and system shutdown requirements, including groundwater monitoring requirements.
Health and safety considerations, including recommended personal protective equipment.
An estimated cost and schedule to implement the ISR Work Plan.
COST AND SCHEDULE
The estimated cost to complete the ISR Work Plan is $10,635.58. The LOE/CEF cost sheets are included in
Attachment A. The following table summarizes the proposed costs and deliverable schedule. WSP will discuss any modifications to the proposed schedule with the DEP.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 Project Management $ 1,205.15 September 27, 2024
Subtask 2 ISR Work Plan $ 9,430.43 August 2, 2024 (ISR Work Plan)
Total/Completion Date $10,635.58 November 30, 2024
Mr. Patrick McGrane Proposal No. 2024US213936
Florida Department of Environmental Protection May 14, 2024
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, WSP USA Inc.
Richard D. "Rick" McCann, PG Matthew C. Crews, PE
Vice President, Geology Assistant Vice President, Environmental Engineering
RDM/MCC/as
Attachments: Attachment A Level of Effort Sheets and Cost Estimate Form
G:\Projects\DEP-Drycleaning\Projects\Jax\Swift Cleaners Inc - Beaches\HW685\DC029C - ISR Work Plan (SVE)\Proposal\DC029C - Swift Cleaners Inc (Beaches) - Cost Proposal for ISRP.docx
Site Name:
Facility ID #:
Street Address:
City:
County:
Facility Type: Active Drycleaner
Dry Drop Off
Other
Description:
YES NO
Is Vapor Treatment required?
Is there groundwater contamination associated with the site?
Is the groundwater contamination off site?
Is there a potentially sensitive receptor within 150 feet of the site?
What is the estimated cost for SVE Construction?
What is the estimated annual cost for O&M?
PM Comments:
Project Manager:
Waste Site Cleanup Section
Soil Vapor Extraction (SVE) Presumptive Remedy Approval
Facility Information:
date
Based on current site assessment data, the Department concurs with the selection of Soil Vapor Extraction as a presumptive remedy for soil contamination. Additional remediation of soil and/or groundwater may be implemented based upon subsequent assessment/monitoring data.
Will annual groundwater monitoring be performed to evaluate NAM/remediation?
date
Has Modified Active Gas Sampling (MAGS) shown SVE to be an effective soil remedial option for the site?
date
Technical Advisor:
Supervisor:
Swift Cleaners
ERIC 4583
1029 3rd Street N
Jacksonville Beach
Duval County
$75,000
$10,500
There is a restaurant opposite this site, across the street.
Opeyemi Kehinde Digitally signed by Opeyemi Kehinde Date: 2023.10.05 12:27:40 -04'00'
13-Oct-2023
13-Oct-2023
Mubeen Darji Digitally signed by Mubeen Darji Date: 2023.10.13 15:03:36 -04'00'
Aaron Cohen Digitally signed by Aaron Cohen Date: 2023.10.13 15:59:16 -04'00'
File details come from the government source that posted it. Updated .