This Task Assignment (TA) is a contract vehicle executed between the State of Florida Department of Environmental Protection (DEP) and WSP USA Inc. for environmental consulting services at The Music Man site in Jacksonville, Duval County, Florida. The contract is identified as TA Number DC028D under Contract Number HW685, with a completion date of February 13, 2026. The work is authorized under an existing indefinite delivery contract between DEP and WSP, enabling the state to issue task assignments for specific projects without requiring new procurement processes.
WSP will conduct annual groundwater sampling and expanded per- and polyfluoroalkyl substances (PFAS) monitoring activities across four subtasks: project management, annual groundwater monitoring, PFAS-related costs and investigative derived waste (IDW) transportation and disposal, and reporting. The total contract value is $18,731.91, structured as a fixed unit rate with invoicing tied to deliverable completion. Subtask costs are allocated as follows: Subtask 1 (Project Management) $1,866.30; Subtask 2 (Annual Groundwater Monitoring) $6,402.95; Subtask 3 (PFAS-Related Costs and IDW T&D) $4,632.85; and Subtask 4 (Reporting) $5,829.81. The scope includes sampling from 12 monitoring wells for chlorinated volatile organic compounds and PFAS analysis, waste characterization, equipment blank sampling, IDW containerization in 55-gallon drums, and preparation of an Annual Groundwater Monitoring Report. Subcontractor quotes for IDW disposal were obtained from Erwin Remediation, Inc., with estimated costs of $195.00 for transportation and $1,495.00 for disposal of PFAS-impacted materials, totaling approximately $1,690.00. Deliverables are due on staggered dates between September 2025 and December 2025, with final project completion by February 13, 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW685
DC028D Completion February 13, 2026
This Task Assignment authorizes WSP to conduct groundwater sampling at The Music Man in accordance with the May 21, 2025 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor
Contractor Matt Crews Contractor 904-363-3430
ERIC_4619
799 Lane Avenue South, Jacksonville, Duval County
The Music Man
Contractor Contractor
✔ $ 18,731.91
$ 18,731.91
Scope of Work
WSP USA Inc.
Contractor Matthew Crews
Environmental Engineer
5/30/2025
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.05.30 13:49:05 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.05.28 15:11:58 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
HW685
DC028D
Subtask 3 - PFAS Related Costs and IDW Management
Subtasks 1 & 4 - Project Management; Reporting
Subtask 2 - Annual Groundwater Monitoring 09/05/2025
10/17/2025
12/05/2025
Subtask 2 - Submittal and FDEP approval of email summary containing field documentation and certified laboratory reports for VOCs
Subtask 3 - Submittal and FDEP approval of email summary containing field documentation, certified laboratory reports for PFAS, and signed waste manifests
Subtasks 1 & 4 - Submittal and FDEP approval of the Annual Groundwater Monitoring Report
$ 6,402.95
$ 18,731.91
$ 4,632.85
$ 7,696.11
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum TO: Negotiation File
The Music Man Jacksonville, Duval County
ERIC_4619
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC028D (HW685)
DATE: May 27, 2025
This Task Assignment authorizes WSP USA Inc. (WSP) to conduct annual groundwater sampling at The
Music Man site.
PFAS monitoring continue on the four wells sampled during the initial screening event. SW-17 was sampled as part of PFAS monitoring completed last year, where exceedances of the
PGCTL were detected. and IW-17 as part of this Task Assignment, with continued monitoring dependent on this year’s results. IDW transport and disposal will be handled in Subtask 3 due to disposal costs associated with PFAS impacted waste.
The total cost for this project is $18, . with 10 total labor hours. All work is to be completed in accordance with the May 21, 2025, Scope of Work, Cost Estimate, and Bid Documentation.
WSP may invoice according to the included schedule.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
In c.
D at e:
5/
/2
Ta sk
D C
8D
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
M us ic
M an
S ub
Ta sk
A nn ua l G W
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
M on ito rin g S ub Ta sk
P
FA
S R el at ed C os ts a nd
ID
W
T
D S ub Ta sk
P ro je ct
M an ag er
P at ric k M cG ra ne S ub Ta sk
R ep or tin g S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $7
1.
PP
ro je ct
M an ag er
(r dm
8.
$7 2.
P ra ct ic e
Le ad er
X -1
(M
C C
0.
0.
3.
$7 1.
P ra ct ic e
Le ad er
X -1
(r dm
4.
.0
.0
$0
.0
S en io r C on su lta nt
X
-1
0.
0.
0.
$5
4.
S en io r S ci /E ng
X -1
(B
L)
0.
3.
4.
$0 .0
S en io r P ro je ct
S ci
/E ng
P
-1
0.
0.
0.
$3
8.
P ro je ct
S ci
/E ng
P
-9 (J
W
.0 7.
0.
$0
.0
S ta ff S ci /E ng
P -8
0.
0.
0.
$3 4.
S ta ff
S ci
/E ng
P
-8 (L
K
.0 4.
0.
$3
6.
S ta ff S ci /E ng
P -8
(A S
0.
0.
2.
$0 .0
S ci /E ng /A dm in
P
-7
0.
0.
0.
$0
.0
0.
0.
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
H ou rs
8.
.0
.0
.0
D ire ct L ab or
$5
,4
.9
$6
.6
$1 ,5
.9
$1
,2
.5
$1 ,9
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
2.
$9
,3
.6
$1 ,0
.0
$2
,6
.4
$2 ,2
.2
$3
,3
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or
$1 4, 7.
$1
,6
.6
$4 ,2
.4
$3
,5
.7
$5 ,2
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
GO
LD
ER
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
In c.
D at e:
5/
/2
Ta sk
D C
8D
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
M us ic
M an
S ub
Ta sk
A nn ua l G W
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
M on ito rin g S ub Ta sk
P
FA
S R el at ed C os ts a nd
ID
W
T
D S ub Ta sk
P ro je ct
M an ag er
P at ric k M cG ra ne S ub Ta sk
R ep or tin g S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
T ra ve l
V eh ic le
R en ta l
$2
.0
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $2
.0
$1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en
t) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en
t) D ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til ity
L oc at io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$1 9.
$0
.0
$1 9.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $2
.5
$0
.0
$2
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al C os ts
$9
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$1 ,1
.0
$1
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$8 0.
$4
0.
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $7
.0
$4
.0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$1
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $9
.0
$4
.0
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $1
7, 7.
$1 ,6
.6
$5
,9
.4
$4 ,2
.2
$5
,2
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$1 ,4
.7
$1
.6
$4
.5
$3
.5
$5
.9
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t $1
8, 1.
$1 ,8
.3
$6
,4
.9
$4 ,6
.8
$5
,8
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
GO
LD
ER
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Music Man SUBTASK 2: Annual GW Monitoring
DATE: 5/27/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTION HOURS
Practice Leader (R. McCann) 4.0
Project Sci/Eng (J. Whipple) 18.0
Staff Sci/Eng (L. Kamikazi) 17.0
TOTAL LABOR 39.0
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL SUBS $0.00
LABORATORY COSTS
PARAMETERS RATES # SAMPLES #QAQC
Total VOHs EPA Method 8260B $73.00 12 $876.00 Total VOCs EPA Method 8260B - IDW $110.00 1 $110.00
Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $1,136.00
EQUIPMENT ITEMS RATES COSTING UNITS USAGES TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 360 $108.00 Tubing, Silicon 1/4 x 7/16" $3.00 Per Foot 13 $39.00
TOTAL EQUIPMENT $477.00
Verification of property ownership for site access (1 hour). Prepare and submit email summary with field documentation and certified lab report with chlorinated VOC results (3 hours).
Field event preparation (1 hour). Round trip travel (1 hour per day x 2 days = 2 hours). Instrument calibration, groundwater measure water levels, measure field parameters, sampling for 12 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (15 hours).
Round trip travel (1 hour per day x 2 days = 2 hours). Instrument calibration, groundwater measure water levels, measure field parameters, sampling for 12 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (15 hours).
SUBTASK 3: PFAS Related Costs and IDW T&D
DATE: 5/27/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTION HOURS
Practice Leader (R. McCann) 10.0
Project Sci/Eng (J. Whipple) 7.0
Staff Sci/Eng (L. Kamikazi) 4.0
Senior Sci/Eng (B. Lucero) 3.0
TOTAL LABOR 24.0
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00
TOTAL SUBS $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $110.00
EQUIPMENT ITEMS RATES COSTING UNITS USAGES TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 20 $6.00 Tubing, Silicon 1/4 x 7/16" $3.00 Per Foot 2 $6.00 Drum (55-gallon) $100.00 Each 1 $100.00
TOTAL EQUIPMENT $442.00
Complete forms to arrange for PFAS sample bottle order delivery and shipment from DEP Central Laboratory (2 hours). Characterize IDW and prepare waste profile for transportation and disposal of IDW (3 hours). Prepare and submit email summary with field documentation and certified laboratory report with PFAS results (2 hours). Prepare PFAS section for the draft annual report (3 hours).
Collect samples from 6 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (2 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours). Prepare data tables with PFAS analytical results (3 hours).
Collect samples from 4 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (2 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours).
Prepare CADD Figures (shallow and intermediate zones) with PFAS data for Annual Groundwater Monitoring Report.
FINAL --7/24/96
SUBTASK 4: Reporting
DATE: 5/27/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLES WORK DESCRIPTION HOURS
Practice Leader (M. Crews) 3.0
Practice Leader (R. McCann) 20.0
Senior Sci/Eng (B. Lucero) 4.0
Staff Sci/Eng (A. Strayer) 2.0
TOTAL LABOR 29.0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL SUBS $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Develop conclusions and recommendations and prepare final Annual Groundwater Monitoring Report.
Data entry, prepare tables and figures, and draft Annual Groundwater Monitoring Report
Prepare figures for report using CAD.
Reporting: Updating tables, document production. Create pdf for OCULUS.
FINAL --7/24/96
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA T: +1 904 363-3430 F: +1 904 363-3445 wsp.com
May 21, 2025 Proposal No. 2025US414639
Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR ANNUAL GROUNDWATER MONITORING
THE MUSIC MAN
799 LANE AVENUE
JACKSONVILLE, DUVAL COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4619
PROPOSED TASK ASSIGNMENT: DC028D
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual groundwater monitoring and expanded per- and polyfluoroalkyl Substances (PFAS) monitoring at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services.
The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – ANNUAL GROUNDWATER MONITORING
Groundwater Monitoring Following authorization to proceed, WSP will coordinate with the real property owner for access to complete the scope of work. WSP will collect groundwater samples from 12 monitoring wells. The attached Figures 3 through 6 from the April/May 2024 sampling event show the monitoring well locations, groundwater flow direction, and chlorinated volatile organic compound (VOC) results for each zone. The attached Figures 7 and 8 show the 2024 PFAS results for each zone.
Mr. Patrick McGrane Proposal No. 2025US414639
Florida Department of Environmental Protection May 21, 2025
Prior to groundwater sampling, the depth-to-groundwater will be measured at the wells sampled using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.
Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018) and DEP SOPs for Sampling with and Analysis of PFAS, dated August 2020. Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
The groundwater samples to be analyzed for chlorinated VOCs will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified, fixed-base laboratory along with the completed chain-of-custody documentation. The selected groundwater samples to be analyzed for PFAS will be shipped to the DEP Central Laboratory in Tallahassee, Florida. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if off-site notification is required.
The samples will be analyzed as follows:
Sample ID Chlorinated VOCs (EPA Method 8260B)
PFAS
(DEP SOP: LC001-3 or
Similar)
SW-4 X
SW-10 X X
SW-13 X
SW-15 X X
SW-17 X X
IW-1 X X
IW-4 X
IW-9 X
IW-10 X
IW-13 X
IW-15 X X
IW-17 X X
Equipment Blank --- X
Investigative Derived Waste (IDW) Total VOCs X
Interim Deliverable Upon completion of Subtask 2, an e-mail deliverable will be submitted for the chlorinated VOC samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.
SUBTASK 3 – PFAS-RELATED COSTS AND IDW TRANSPORTATION AND DISPOSAL
WSP will include costs associated with the expanded PFAS monitoring activities in this subtask. These activities include completing bottle order requests with the DEP Central Laboratory; waste characterization and waste profiling; packaging and shipping PFAS samples to the DEP Central Laboratory; labor involved in sampling wells associated with PFAS analysis only; and investigation-derived waste (IDW) transportation and disposal.
Quality Assurance/Quality Control WSP will collect one equipment blank sample during the groundwater sampling event. The equipment blank will be collected by pumping (peristaltic pump) PFAS-free water through silicon and/or HDPE tubing and into laboratory-supplied containers. The equipment blank will be analyzed for PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table.
IDW Transportation and Disposal WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum(s). WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260 and PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table. The drum(s) will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates one drum of IDW purge water will be generated during the field activities.
Interim Deliverable Upon completion of Subtask 3, an e-mail deliverable will be submitted for the PFAS samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated data tables and figures.
SUBTASK 4 – REPORTING
WSP will prepare an Annual Groundwater Monitoring Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $18, . WSP anticipates the groundwater monitoring event will take place in July 2025. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 1,8 . October 17, 2025
Subtask 2 – Annual Groundwater Monitoring
$ 6, . August 22, 2025 (E-mail summary with field documentation and certified laboratory analytical report for chlorinated VOCs)
Subtask 3 – PFAS Related Costs and IDW Transportation and Disposal
$ 4,632.85 September 19, 2025 (E-mail summary with field documentation and certified laboratory analytical report for PFAS and non-hazardous waste manifest for IDW)
Subtask 4 – Reporting $ 5,829.81 September 26, 2025 (Annual Groundwater Monitoring Report)
Total/Completion Date $ 18, . November 14, 2025
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, WSP USA Inc.
Richard D. "Rick" McCann, PG Matthew C. Crews, PE Vice President, Geologist Assistant Vice President, Environmental Engineer
RDM/MCC/as
Attachments: Figure 3 – Potentiometric Map - Shallow Zone of the Surficial Aquifer (April 29, 2024) Figure 4 – Potentiometric Map – Intermediate Zone of the Surficial Aquifer (April 29, 2024) Figure 5 – Chlorinated VOC Concentrations in the Shallow Zone of the Surficial Aquifer Figure 6 – Chlorinated VOC Concentrations in the Intermediate Zone of the Surficial Aquifer Figure 7 – PFOA and PFOS Concentrations in the Shallow Surficial Aquifer Figure 8 – PFOA and PFOS Concentrations in the Intermediate Surficial Aquifer
Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes
R A M O N A B O U L E V A R D
L A
N E
A
V E
N U
E
HOME DEPOT ENTRANCE
SW-9
SW-21
SW-18
UES TMW-1
IW-7
IW-18
PICCADILLY
CAFETERIA
IW-16
IW-8
UES TMW-2
MUSIC
DEPOT
BONO'S
BAR B QUE
O F F I C E D E P O T
IW-21
IW-9
IW-11
IW-12
IW-2
IW-1
DW-1
IW-3
IW-6
IW-10
IW-4
IW-5
IW-13
IW-14 IW-15
IW-20
IW-19
SW-20
SW-19
SW-14
SW-5
SW-16
SW-15
SW-13
SW-4
SW-10
SW-7
SW-8
SW-2
SW-1
SW-3
SW-6
IW-17
SW-17
MW-24
MW-27
MW-25
MW-15
MW-17R
MW-8R
MW-18 MW-7
MW-23
MW-6R
MW-21MW-19
MW-5R
MW-26
MW-12R
MW-22
9.81
10.20
10.30
10.25
10.29
10.32
10.48
10.67 10.55
10.74
10.75 10.63
10.75
11.15
FORMER
BUILDING
FOOTPRINT
10.15
10.15
10.3510.35
10.55 10.55
10.75
.75
GROUNDWATER ELEVATION CONTOUR
INFERRED DIRECTION OF GROUNDWATER FLOW
(DASHED WHERE INFERRED)
GROUNDWATER ELEVATION IN FEET ABOVE MEAN
SEA LEVEL
10.63
DICK ENVIRONMENTAL SERVICES WELL
SHALLOW MONITORING WELL LOCATION
TEMPORARY MONITORING WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
DEEP MONITORING WELL LOCATION
in
31404452.4619 Control No.
4619-DC028C-003
FIGURE
2024-07-25
BCL
RDM
RDM
MCC
GRACE PROPERTY (THE MUSIC MAN)
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMENTAL PROTECTION
POTENTIOMETRIC MAP - SHALLOW ZONE OF THE SURFICIAL
AQUIFER (APPROXIMATELY 2 TO 14 FT. BGS)
(APRIL 29, 2024)
TITLE
PROJECT NO. REV.
PROJECTCLIENT
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-003.dwg
LEGEND
SCALE
0 1000 2000
FEET
1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE
DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA
FEBRUARY 2005", DATED 3/21/05.
2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON
F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD
SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL
GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).
3. GROUNDWATER ELEVATION FROM SW-15 WAS NOT USED
BECAUSE OF ERRONEOUS DEPTH TO WATER MEASUREMENT.
REFERENCE(S)
10.75
E
N U
E
HOME DEPOT ENTRANCE
R A M O N A B O U L E V A R D
PICCADILLY
CAFETERIA
MUSIC
DEPOT
BONO'S
BAR B QUE
O F F I C E D E P O T
UES TMW-2UES TMW-1
IW-7IW-9
IW-8
IW-11
IW-12
IW-2
IW-1DW-1
IW-3
IW-6
IW-10
IW-4
IW-5
IW-13
IW-14 IW-15
IW-16
IW-20
IW-19
IW-18
IW-21
SW-18
SW-21
SW-19 SW-20
SW-14
SW-15
SW-16
SW-5
SW-13
SW-4
SW-10
SW-7
SW-9
SW-8
SW-2
SW-1
SW-3
SW-6
IW-17
SW-17
MW-15
MW-25
MW-23
MW-17R
MW-24
MW-7MW-21
MW-18
MW-19
MW-5R
MW-6R
MW-12R
MW-8R
MW-22
MW-26
MW-27
9.82
10.32
10.28
10.33
10.32
10.48
10.52 10.50
10.67
10.66
10.63
10.86
10.74
10.89
FORMER
BUILDING
FOOTPRINT
10.85
10.65
10.45
10.25 10.25
10.45
10.65
10.85
GROUNDWATER ELEVATION CONTOUR
INFERRED DIRECTION OF GROUNDWATER FLOW
(DASHED WHERE INFERRED)
GROUNDWATER ELEVATION IN FEET ABOVE MEAN
SEA LEVEL
10.63
DICK ENVIRONMENTAL SERVICES WELL
SHALLOW MONITORING WELL LOCATION
TEMPORARY MONITORING WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
DEEP MONITORING WELL LOCATION
in
31404452.4619 Control No.
4619-DC028C-004
FIGURE
2024-07-25
BCL
RDM
RDM
MCC
GRACE PROPERTY (THE MUSIC MAN)
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMENTAL PROTECTION
POTENTIOMETRIC MAP - INTERMEDIATE ZONE OF THE SURFICIAL
AQUIFER (APPROXIMATELY 14 TO 31 FT. BGS)
(APRIL 29, 2024)
TITLE
PROJECT NO. REV.
PROJECTCLIENT
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-004.dwg
LEGEND
SCALE
0 40 80
FEET
1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE
DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA
FEBRUARY 2005", DATED 3/21/05.
2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON
F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD
SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL
GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).
REFERENCE(S)
NOTE(S)
10.85
E
N U
E
HOME DEPOT ENTRANCE
CONCRETE
POWER POLE
POWER POLE
CONCRETE
FIRE HYDRANT
BACK OF WALK
GRASS ISLAND
TELEPHONE
WIRE
AREA OF
EXCAVATION
CONCRETE
POWER POLE
R A M O N A B O U L E V A R D
PICCADILLY
CAFETERIA
MUSIC
DEPOT
BONO'S
BAR B QUE
O F F I C E D E P O T
UES TMW-2
UES TMW-1
IW-7
IW-9
IW-8
IW-11
IW-12
IW-2
DW-1
IW-3
IW-6
IW-10
IW-4
IW-13
IW-14 IW-15
IW-16
IW-20
IW-19
IW-18
IW-21
SW-18
SW-21
SW-19
SW-20
SW-14 SW-15
SW-16
SW-5
SW-13
SW-4
SW-10
SW-7
SW-9
SW-8
SW-2
SW-1
SW-3
SW-6
IW-17
SW-17
MW-25
MW-15
MW-23
MW-17R
MW-24
MW-7MW-21MW-18MW-19
MW-5R
MW-6R
MW-12R
MW-8R
MW-22
MW-26
MW-27
IW-1
FORMER
BUILDING
FOOTPRINT
INFERRED EXTENT OF CHLORINATED
HYDROCARBONS (EXCEEDING THE
FDEP GROUNDWATER CLEANUP
TARGET LEVELS)
IW-5
INFERRED EXTENT OF
CHLORINATED
HYDROCARBONS
EXCEEDING THE FDEP
NADCs
DICK ENVIRONMENTAL SERVICES WELL
SHALLOW MONITORING WELL LOCATION
TEMPORARY MONITORING WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
DEEP MONITORING WELL LOCATION
CHITIN COLUMNS
in
31404452.4619 Control No.
4619-DC028C-005
FIGURE
2024-07-25
BCL
RDM
RDM
MCC
GRACE PROPERTY (THE MUSIC MAN)
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMENTAL PROTECTION
CHLORINATED VOC CONCENTRATIONS IN THE SHALLOW
ZONE OF THE SURFICIAL AQUIFER
(APRIL/MAY 2024)
TITLE
PROJECT NO. REV.
PROJECTCLIENT
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-005.dwg
LEGEND
1. ALL UNITS REPORTED IN MICROGRAMS PER LITER (μg/L).
2. < = BELOW THE LABORATORY REPORTED METHOD
DETECTION LIMIT.
3. I - REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND LABORATORY PRACTICAL
QUANTITATION LIMIT.
4. BOLD/YELLOW HIGHLIGHTED VALUE INDICATES
CONCENTRATION IS ABOVE THE FDEP GROUNDWATER
CLEANUP TARGET LEVEL (GCTL).
5. BOLD/BLUE HIGHLIGHTED VALUE INDICATES CONCENTRATION
IS ABOVE THE FDEP NATURAL ATTENUATION DEFAULT
CONCENTRATION (NADC).
6. FT-BGS = FEET BELOW GROUND SURFACE
SCALE
0 40 80
FEET
NOTE(S)
1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE
DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA
FEBRUARY 2005", DATED 3/21/05.
2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON
F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD
SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL
GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).
REFERENCE(S)
WELL ID (SCREEN INTERVAL DEPTH IN FT-BGS)
DATE SAMPLED
TETRACHLOROETHYLENE CONCENTRATION (PCE)
TRICHLOROETHYLENE CONCENTRATION (TCE)
VINYL CHLORIDE CONCENTRATION
SW-00 (3.6-13.6)
APR 2024
3 300
3 300
70 700
1 100
FDEP NATURAL ATTENUATION
DEFAULT CONCENTRATION (NADC)
FDEP GROUNDWATER CLEANUP
TARGET LEVEL (GCTL)
SW-1 (3.6-13.6)
Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50
SW-3 (3.8-13.8)
Feb 2016 < 0.50 < 0.50 14.2
< 0.50
SW-6 (3.7-13.7)
Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50
SW-14 (3.5-13.5)
Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50
SW-21 (3.6-13.6)
Feb 2016
<0.50 <0.50 <0.50 <0.50
SW-9 (3.8-13.8)
Feb 2016 Jun 2023 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50
SW-16 (3.6-13.6)
Feb 2016 Jun 2018 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50
SW-19 (3.5-13.5)
Feb 2016 Apr 2017 Jun 2018 < 0.50 < 0.22 < 0.50 < 0.50 < 0.36 < 0.50 < 0.50 < 0.36 < 0.50 < 0.50 < 0.36 < 0.50
SW-4 (4.1-14.1)
Apr 2024
0.25 U
0.25 U
SW-10 (3.8-13.8)
Apr 2024
0.25 U
0.60 I
SW-13 (4-14)
Apr 2024
0.25 U
1.3
SW-15 (3.4-13.4)
Apr 2024
0.25 U
0.25 U
SW-17 (3.6-13.6)
Apr 2024
0.25 U
0.25 U
0.50 U
0.25 U
CIS-1,2-DICHLOROETHYLENE
CONCENTRATION (cis-1,2-DCE)
SW-7 (3.8-13.8)
Apr 2010
<0.82 <0.36 <0.28 <0.40
SW-5 (3.9-13.9)
Apr 2010 <0.82 <0.36 <0.28 <0.40
SW-2 (3.6-13.6)
Mar 2007
<0.22 <0.22 1.5
<0.47
E
N U
E
HOME DEPOT ENTRANCE
CONCRETE
POWER POLE
POWER POLE
CONCRETE
FIRE HYDRANT
BACK OF WALK
GRASS ISLAND
TELEPHONE
WIRE
AREA OF
EXCAVATION
CONCRETE
POWER POLE
R A M O N A B O U L E V A R D
PICCADILLY
CAFETERIA
MUSIC
DEPOT
BONO'S
BAR B QUE
O F F I C E D E P O T
UES TMW-2UES TMW-1
IW-7
IW-9
IW-8
IW-11
IW-12
IW-2
IW-1
DW-1
IW-3
IW-6IW-10
IW-4
IW-5
IW-13
IW-14 IW-15
IW-16
IW-20
IW-19
IW-18
IW-21
SW-18
SW-21
SW-19
SW-20
SW-14
SW-15
SW-16
SW-5
SW-13
SW-4
SW-10
SW-7
SW-9
SW-8
SW-2
SW-1
SW-3
SW-6
IW-17
SW-17
MW-25
MW-15
MW-23
MW-17R
MW-24
MW-7MW-21MW-18MW-19
MW-5R
MW-6R
MW-12R
MW-8R
MW-22
MW-26
MW-27
FORMER
BUILDING
FOOTPRINT
INFERRED EXTENT OF
CHLORINATED HYDROCARBONS
(EXCEEDING THE FDEP
GROUNDWATER CLEANUP
TARGET LEVELS)
INFERRED EXTENT OF
CHLORINATED
HYDROCARBONS
EXCEEDING THE FDEP
NADCs
DICK ENVIRONMENTAL SERVICES WELL
SHALLOW MONITORING WELL LOCATION
TEMPORARY MONITORING WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
DEEP MONITORING WELL LOCATION
CHITIN COLUMNS
in
31404452.4619 Control No.
4619-DC028C-006
FIGURE
2024-07-25
BCL
RDM
RDM
MCC
GRACE PROPERTY (THE MUSIC MAN)
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMENTAL PROTECTION
CHLORINATED VOC CONCENTRATIONS IN THE INTERMEDIATE
ZONE OF THE SURFICIAL AQUIFER
(APRIL/MAY 2024)
TITLE
PROJECT NO. REV.
PROJECTCLIENT
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-006.dwg
LEGEND
SCALE
0 40 80
FEET
1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE
DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA
FEBRUARY 2005", DATED 3/21/05.
2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON
F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD
SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL
GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).
REFERENCE(S)
1. ALL UNITS REPORTED IN MICROGRAMS PER LITER (μg/L).
2. < = BELOW THE LABORATORY REPORTED METHOD
DETECTION LIMIT.
3. I - REPORTED VALUE IS BETWEEN THE LABORATORY
METHOD DETECTION LIMIT AND LABORATORY PRACTICAL
QUANTITATION LIMIT.
4. BOLD/YELLOW HIGHLIGHTED VALUE INDICATES
CONCENTRATION IS ABOVE THE FDEP GROUNDWATER
CLEANUP TARGET LEVEL (GCTL).
5. BOLD/BLUE HIGHLIGHTED VALUE INDICATES
CONCENTRATION IS ABOVE THE FDEP NATURAL
ATTENUATION DEFAULT CONCENTRATION (NADC).
6. * = RESULT DETERMINED NOT TO EXCEED THE GCTL BASED
ON THE FDEP MEMORANDUM "ROUNDING ANALYTICAL DATA
FOR THE SITE REHABILITATION COMPLETION", DATED
NOVEMBER 17, 2011.
7. FT-BGS = FEET BELOW GROUND SURFACE
NOTE(S)
DATE SAMPLED
TETRACHLOROETHYLENE CONCENTRATION
TRICHLOROETHYLENE CONCENTRATION
CIS-1,2-DICHLOROETHYLENE CONCENTRATION
VINYL CHLORIDE CONCENTRATION
IW-1 (15.2-20.2)
APR 2024
3 300 3 300
70 700
1 100
FDEP NATURAL ATTENUATION
DEFAULT CONCENTRATION (NADC)
FDEP GROUNDWATER CLEANUP
TARGET LEVEL (GCTL)
WELL ID (SCREEN INTERVAL DEPTH IN FT-BGS)IW-3 (25.8-30.8)
Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50
IW-6 (16.5-21.5)
Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50
IW-14 (15.5-20.5)
Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50
IW-16 (14.4-19.4)
Feb 2016 Jun 2018 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50
IW-19 (15.5-20.5)
Feb 2016 Apr 2017 Jun 2018 < 0.50 < 0.22 < 0.50 < 0.50 < 0.36 < 0.50
50.1 38 37.2
3.9 1.1* 0.72 I
IW-21 (15.5-20.5)
Feb 2016 Jun 2018 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50
IW-1 (14.3-19.3)
Jul 2021 May 2024
0.38 U 0.25 U
0.36 U 0.25 U
669 950 231 150
IW-9 (16-21)
May 2024
0.25 U
0.25 U
IW-15 (15.6-20.6)
Jul 2021 Apr 2024
0.38 U 0.25 U
0.36 U 0.25 U
154 19 109 45
IW-17 (14.6-19.6)
Apr 2024
0.25 U
0.25 U
0.64 I
0.25 U
IW-10 (15.2-20.2)
Apr 2024
0.25 U
0.25 U
IW-4 (16.7-21.7)
Apr 2024
0.25 U
0.25 U
0.76 I
IW-13 (17-22)
Apr 2024
0.25 U
0.25 U
7.5
IW-2 (17.4-22.4)
Mar 2007 < 0.22 < 0.22 < 0.21 < 0.47
IW-5 (16.5-21.5)
Apr 2010 < 0.82 < 0.36 < 0.28 < 0.40
IW-7 (15.8-20.8)
Apr 2010 < 0.82 < 0.36 < 0.28 < 0.40
IW-12(16.7-21.7)
Mar 2007 < 0.22 < 0.22 < 0.21 < 0.47
E
N U
E
HOME DEPOT ENTRANCE
CONCRETE
POWER POLE
POWER POLE
CONCRETE
FIRE HYDRANT
BACK OF WALK
GRASS ISLAND
TELEPHONE
WIRE
AREA OF
EXCAVATION
CONCRETE
POWER POLE
R A M O N A B O U L E V A R D
PICCADILLY
CAFETERIA
MUSIC
DEPOT
BONO'S
BAR B QUE
O F F I C E D E P O T
IW-7
IW-9
IW-8
IW-11
IW-12
IW-2
IW-1
IW-3
IW-6IW-10
IW-4
IW-5
IW-13
IW-14 IW-15
IW-16
IW-20
IW-19
IW-18
IW-21
SW-18
SW-21
SW-19
SW-20
SW-14
SW-15
SW-16
SW-5
SW-13
SW-4
SW-10
SW-7
SW-9
SW-8
SW-2
SW-1
SW-3
SW-6
IW-17
SW-17
FORMER
BUILDING
FOOTPRINT
INFERRED EXTENT OF SUM OF
PFOA + PFOS > PGCTL OF 70 ng/L
INFERRED EXTENT OF SUM OF
PFOA + PFOS > PGCTL OF 70 ng/L
SHALLOW MONITORING WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
in
31404452.4619 Control No.
4619-DC028C-007a
FIGURE
7----
2024-07-25
BCL
RDM
RDM
MCC
GRACE PROPERTY (THE MUSIC MAN)
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMENTAL PROTECTION
PFOA AND PFOS CONCENTRATIONS IN THE SHALLOW
SURFICIAL AQUIFER
APR/MAY 2024
TITLE
PROJECT NO. REV.
PROJECTCLIENT
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-007a.dwg
LEGEND
SCALE
0 40 80
FEET
1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE
DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA
FEBRUARY 2005", DATED 3/21/05.
2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON
F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD
SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL
GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).
REFERENCE(S)
NOTE(S)
1. PROVISIONAL GCTL - FDEP PROVISIONAL GROUNDWATER CLEANUP
TARGET LEVEL.
2. ALL RESULTS ARE REPORTED IN NANOGRAMS PER LITER (ng/L).
3. BOLD FONTS INDICATES CONSTITUENT CONCENTRATION WAS
REPORTED ABOVE THE LABORATORY METHOD DETECTION LIMIT.
4. HIGHLIGHTED FONT INDICATES CONSTITUENT CONCENTRATION WAS
REPORTED ABOVE THE PROVISIONAL GROUNDWATER CLEANUP LEVEL.
5. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT.
6. U - THE COMPOUND WAS ANALYZED FOR, BUT NOT DETECTED. THE
REPORTED VALUE IS THE METHOD DETECTION LIMIT FOR THE SAMPLE
ANALYZED.
7. PFOA - PERFLUORO-N-OCTANOIC ACID.
8. PFOS - PERFLUOROOCTANESULFONIC ACID.
9. Y - THE LABORATORY ANALYSIS WAS FROM AN UNPRESERVED OR
IMPROPERLY PRESERVED SAMPLE. THE DATA MAY NOT BE ACCURATE.
PROVISIONAL GROUND
WATER CLEANUP TARGET
LEVEL (GCTL)
PFOA IN
ng/L
PFOS IN
ng/L
SUM OF PFOA
+ PFOS IN ng/L
GCTL 70 70 70
SCREEN INTERVAL (FEET BELOW GROUND SURFACE)(3.63 - 13.63)
SW-17
(3.66 - 13.66)
DATE PFOA PFOS PFOA+PFOS
4/29/2024 15 Y 66 Y 81
SW-15
(3.42 - 13.42)
DATE PFOA PFOS PFOA+PFOS
7/15/2021 14 99 113 4/30/2024 25 140 165
SW-13
(4 - 14)
DATE PFOA PFOS PFOA+PFOS
4/30/2024 5.3 I 1.9 U 5.3
SW-16
(3.57 - 13.57)
DATE PFOA PFOS PFOA+PFOS
4/29/2024 8.0 1.9 U 8.0
SW-5
(3.87 - 13.87)
DATE PFOA PFOS PFOA+PFOS
4/29/2024 8.4 1.9 U 8.4
SW-10
(3.80 - 13.80)
DATE PFOA PFOS PFOA+PFOS
7/15/2021 11 54 65 4/30/2024 11 35 46
SW-6
(3.70 - 13.70)
DATE PFOA PFOS PFOA+PFOS
5/1/2024 3.9 I 31 34.9
SW-7
(3.81 - 13.81)
DATE PFOA PFOS PFOA+PFOS
5/1/2024 21 1.9 U 21
SW-9
(3.80 - 13.80)
DATE PFOA PFOS PFOA+PFOS
5/1/2024 2.4 I 32 34.4
SW-1
(3.63 - 13.63)
DATE PFOA PFOS PFOA+PFOS
5/1/2024 12 76 88
SW-2
(3.55 - 13.55)
DATE PFOA PFOS PFOA+PFOS
5/2/2024 4.0 I 12 16.0
SW-3
(3.80 - 13.80)
DATE PFOA PFOS PFOA+PFOS
5/2/2024 12 33 45
SW-4
(4.10 - 14.10)
DATE PFOA PFOS PFOA+PFOS
4/30/2024 5.8 I 4.7 I 10.5
SW-14
(3.49 - 13.49)
DATE PFOA PFOS PFOA+PFOS
4/30/2024 3.4 I 2.0 U 3.4
E
N U
E
HOME DEPOT ENTRANCE
CONCRETE
POWER POLE
POWER POLE
CONCRETE
FIRE HYDRANT
BACK OF WALK
GRASS ISLAND
TELEPHONE
WIRE
AREA OF
EXCAVATION
CONCRETE
POWER POLE
R A M O N A B O U L E V A R D
PICCADILLY
CAFETERIA
MUSIC
DEPOT
BONO'S
BAR B QUE
O F F I C E D E P O T
IW-7
IW-9
IW-8
IW-11
IW-12
IW-2
IW-1
IW-3
IW-6IW-10
IW-4
IW-5
IW-13
IW-14 IW-15 IW-16
IW-20
IW-19
IW-18
IW-21
SW-18
SW-21
SW-19
SW-20
SW-14
SW-15
SW-16
SW-5
SW-13
SW-4
SW-10
SW-7
SW-9
SW-8
SW-2
SW-1
SW-3
SW-6
IW-17
SW-17
FORMER
BUILDING
FOOTPRINT
INFERRED EXTENT OF SUM OF
PFOA + PFOS > PGCTL OF 70 ng/L
INFERRED EXTENT OF SUM OF
PFOA + PFOS > PGCTL OF 70 ng/L
W
SHALLOW MONITORING WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
in
31404452.4619 Control No.
4619-DC028C-008
FIGURE
8----
2024-07-25
BCL
RDM
RDM
MCC
GRACE PROPERTY (THE MUSIC MAN)
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMENTAL PROTECTION
PFOA AND PFOS CONCENTRATIONS IN THE INTERMEDIATE
SURFICIAL AQUIFER
APR/MAY 2024
TITLE
PROJECT NO. REV.
PROJECTCLIENT
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-008.dwg
LEGEND
SCALE
0 40 80
FEET
1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE
DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA
FEBRUARY 2005", DATED 3/21/05.
2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON
F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD
SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL
GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).
REFERENCE(S)
NOTE(S)
1. PROVISIONAL GCTL - FDEP PROVISIONAL GROUNDWATER CLEANUP
TARGET LEVEL.
2. ALL RESULTS ARE REPORTED IN NANOGRAMS PER LITER (ng/L).
3. BOLD FONTS INDICATES CONSTITUENT CONCENTRATION WAS
REPORTED ABOVE THE LABORATORY METHOD DETECTION LIMIT.
4. HIGHLIGHTED FONT INDICATES CONSTITUENT CONCENTRATION WAS
REPORTED ABOVE THE PROVISIONAL GROUNDWATER CLEANUP LEVEL.
5. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT.
6. U - THE COMPOUND WAS ANALYZED FOR, BUT NOT DETECTED. THE
REPORTED VALUE IS THE METHOD DETECTION LIMIT FOR THE SAMPLE
ANALYZED.
7. PFOA - PERFLUORO-N-OCTANOIC ACID.
8. PFOS - PERFLUOROOCTANESULFONIC ACID.
9. Y - THE LABORATORY ANALYSIS WAS FROM AN UNPRESERVED OR
IMPROPERLY PRESERVED SAMPLE. THE DATA MAY NOT BE ACCURATE.
PROVISIONAL GROUND
WATER CLEANUP TARGET
LEVEL (GCTL)
PFOA IN
ng/L
PFOS IN
ng/L
SUM OF PFOA
+ PFOS IN ng/L
GCTL 70 70 70
IW-1
(14.30 - 19.30)
DATE PFOA PFOS PFOA+PFOS
7/15/2021 12 130 142 5/1/2024 13 Y 130 Y 143
IW-12
(16.65 - 21.65)
DATE PFOA PFOS PFOA+PFOS
5/1/2024 1.8 U Y 4.5 I Y 4.5
IW-2
(17.40 - 22.40)
DATE PFOA PFOS PFOA+PFOS
5/2/2024 1.8 U Y 3.8 I Y 3.8
IW-3
(25.80 - 30.80)
DATE PFOA PFOS PFOA+PFOS
5/2/2024 5.1 I Y 5. 3 I Y 10.4
IW-4
(16.73 - 21.73)
DATE PFOA PFOS PFOA+PFOS
4/30/2024 3.0 I Y 3.3 I Y 6.3
IW-13
(17 - 22)
DATE PFOA PFOS PFOA+PFOS
4/30/2024 1.9 U Y 1.9 U Y 3.8 U
IW-15
(15.61 - 20.61)
DATE PFOA PFOS PFOA+PFOS
7/15/2021 6.0 I 36 42.0 4/30/2024 4.6 I Y 19 Y 23.6
IW-17
(14.56 - 19.56)
DATE PFOA PFOS PFOA+PFOS
4/29/2024 17 Y 56 Y 73
IW-16
(14.41 - 19.41)
DATE PFOA PFOS PFOA+PFOS
4/29/2024 1.8 U Y 1.8 U Y 3.6 U
IW-5
(16.54 - 21.54)
DATE PFOA PFOS PFOA+PFOS
4/29/2024 28 Y 40 Y 68
IW-10
(15.20 - 20.20)
DATE PFOA PFOS PFOA+PFOS
4/30/2024 10Y 47 Y 57
IW-6
(16.50 - 21.50)
DATE PFOA PFOS PFOA+PFOS
5/1/2024 3.7 I Y 1.9 U Y 3.7
IW-9
(16.00 - 21.00)
DATE PFOA PFOS PFOA+PFOS
5/1/2024 10 Y 75 Y 85
IW-7
(15.80 - 20.80)
DATE PFOA PFOS PFOA+PFOS
5/1/2024 16 Y 1.9 U Y 16
SCREEN INTERVAL (FEET BELOW GROUND SURFACE)(14.30 - 19.30)
U S
Ec ol og y*
H
EP
AC
O
T& D
N on
H az
S oi l - V
O C s pe r d ru m
$1
.0
$0 .0
T&
D N on H az M ud /w at er
VO
C s pe r d ru m
$1
.0
$0
.0
Fa ls e M ob iliz at io n (n o dr um fo un d)
$8
5.
$0 .0
PF
AS
P ro fil e Fe e (1 p er s ite
$3
.0
$0 .0
T&
D N on H az S oi l -
P
FA
S/
PF
O S pe r d ru m
$1
.0
$0
.0
T& D
N on
H az
M ud
/w at er -P
FA
S/
PF
O
S pe r d ru m
$1
.0
$1
.0
D is po sa l N on
H az
S oi l - V
O C s pe r d ru m
$1
.0
$0 .0
D is po sa l N on H az M ud /w at er
VO
C s pe r d ru m
$1
.0
$0
.0
PF
AS
P ro fil e
Fe e
(1 p er s ite
$9
5.
$9 5.
D is po sa l N on H az S oi l -
P
FA
S/
PF
O S
$6
.0
$0
.0
D is po sa l N on H az M ud /w at er
-P
FA
S/
PF
O S
$6
.0
$6
.0
Ap pr ov al F ee (p er s ite
$7
.0
$7
.0
N on H az S ol ifi ca tio n W as te
P ro fil e fe e
$5
0.
$0 .0
N on H az S ol id s D is po sa l
(p er d ru m
$1
.0
$0
.0
N on
H az
S lu dg e
D is po sa l
$1
.0
$0 .0
PF
AS
W as te ga l d ru m e m el le
A L
$8
.0
$8
.0
Tr uc k w ith li ft ga te a nd d riv er
$1
.0
$5
.0 no n ha z liq ui ds d is po sa l ( pe r d ru m
$1
.7
$0 .0 g al lo n re co nd iti on ed d ru m
$1
.6
$0
.0
LT
L fe es
(l es s th an dr um s
$1
.0
$1
.0
En er gy s ec ur ity re co ve ry fe e
$2
.0
$2
.0
To ta l C os t $1
.0
$1
,4
.0
$1
,7
.0
N ot es
* T ra ns po rta tio n co st s w ill be c al cu la te d ba se d on p ic ku ps a t v ar io us s ite s an d w as te s tre am v ol um e
ID
W
S U
B C
O N
TR
AC
TO
R
C O
ST
E
ST
IM
AT
ES
F O
R P
FA
S
M
AT
ER
IA
L
Er w in
Su m m ar y of
ID
W
S ub co nt ra ct or s
C os ts
3_
6_
P
FA
S no p ro fil e
Pa ge o f 1
408 Ditmar Street Pensacola, FL 32503
To: Mr. Ralph Mongillo
WSP
9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256
June 16, 2023
Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials
Mr. Mongillo:
The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:
For Non-Hazardous Chlorinated Solvent Impacted Materials:
Description Rate Unit T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket
For Non-Hazardous PFAS/PFOS Impacted Materials:
Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com p y