About this file

This Task Assignment (TA) is a contract vehicle executed between the State of Florida Department of Environmental Protection (DEP) and WSP USA Inc. for environmental consulting services at The Music Man site in Jacksonville, Duval County, Florida. The contract is identified as TA Number DC028D under Contract Number HW685, with a completion date of February 13, 2026. The work is authorized under an existing indefinite delivery contract between DEP and WSP, enabling the state to issue task assignments for specific projects without requiring new procurement processes.

WSP will conduct annual groundwater sampling and expanded per- and polyfluoroalkyl substances (PFAS) monitoring activities across four subtasks: project management, annual groundwater monitoring, PFAS-related costs and investigative derived waste (IDW) transportation and disposal, and reporting. The total contract value is $18,731.91, structured as a fixed unit rate with invoicing tied to deliverable completion. Subtask costs are allocated as follows: Subtask 1 (Project Management) $1,866.30; Subtask 2 (Annual Groundwater Monitoring) $6,402.95; Subtask 3 (PFAS-Related Costs and IDW T&D) $4,632.85; and Subtask 4 (Reporting) $5,829.81. The scope includes sampling from 12 monitoring wells for chlorinated volatile organic compounds and PFAS analysis, waste characterization, equipment blank sampling, IDW containerization in 55-gallon drums, and preparation of an Annual Groundwater Monitoring Report. Subcontractor quotes for IDW disposal were obtained from Erwin Remediation, Inc., with estimated costs of $195.00 for transportation and $1,495.00 for disposal of PFAS-impacted materials, totaling approximately $1,690.00. Deliverables are due on staggered dates between September 2025 and December 2025, with final project completion by February 13, 2026.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01C.pdf PDF
CN-370000-HW685-BF05ACO2.pdf PDF
CN-370000-HW685-BF05ACO3.pdf PDF
CN-370000-HW685-BF06A.pdf PDF
CN-370000-HW685-BF1ACO1.pdf PDF
CN-370000-HW685-BF6ACO1.pdf PDF
CN-370000-HW685-BIL01C.pdf PDF
CN-370000-HW685-BIL01CO1.pdf PDF
CN-370000-HW685-BIL03A.pdf PDF
CN-370000-HW685-BIL2ACO1.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf.crdownload CRDOWNLOAD file
CN-370000-HW685-DC001A.pdf PDF
CN-370000-HW685-DC002G.pdf PDF
CN-370000-HW685-DC003A.pdf PDF
CN-370000-HW685-DC005C.pdf PDF
CN-370000-HW685-DC006B.pdf PDF
CN-370000-HW685-DC006C.pdf PDF
CN-370000-HW685-DC007C.pdf PDF
CN-370000-HW685-DC008A.pdf PDF
CN-370000-HW685-DC009B.pdf PDF
CN-370000-HW685-DC010A.pdf PDF
CN-370000-HW685-DC011A.pdf PDF
CN-370000-HW685-DC012C.pdf PDF
CN-370000-HW685-DC013A.pdf PDF
CN-370000-HW685-DC013C.pdf PDF
CN-370000-HW685-DC015B.pdf PDF
CN-370000-HW685-DC015C.pdf PDF
CN-370000-HW685-DC016A.pdf PDF
CN-370000-HW685-DC018A.pdf PDF
CN-370000-HW685-DC019B.pdf PDF
CN-370000-HW685-DC01ACO6.pdf PDF
CN-370000-HW685-DC01ACO8.pdf PDF
CN-370000-HW685-DC01ACO9.pdf PDF
CN-370000-HW685-DC020B.pdf PDF
CN-370000-HW685-DC022A.pdf PDF
CN-370000-HW685-DC022B.pdf PDF
CN-370000-HW685-DC022D.pdf PDF
CN-370000-HW685-DC023B.pdf PDF
CN-370000-HW685-DC023C.pdf PDF
CN-370000-HW685-DC027B.pdf PDF
CN-370000-HW685-DC027C.pdf PDF
CN-370000-HW685-DC029B.pdf PDF
CN-370000-HW685-DC029C.pdf PDF
CN-370000-HW685-DC02CCO1.pdf PDF
CN-370000-HW685-DC02FCO1.pdf PDF
CN-370000-HW685-DC031A.pdf PDF
CN-370000-HW685-DC031C.pdf PDF
CN-370000-HW685-DC032B.pdf PDF
CN-370000-HW685-DC035A.pdf PDF
CN-370000-HW685-DC037A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW685

DC028D Completion February 13, 2026

This Task Assignment authorizes WSP to conduct groundwater sampling at The Music Man in accordance with the May 21, 2025 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor

Contractor Matt Crews Contractor 904-363-3430

ERIC_4619

799 Lane Avenue South, Jacksonville, Duval County

The Music Man

Contractor Contractor

✔ $ 18,731.91

$ 18,731.91

Scope of Work

WSP USA Inc.

Contractor Matthew Crews

Environmental Engineer

5/30/2025

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.05.30 13:49:05 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.05.28 15:11:58 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM 01/18

HW685

DC028D

Subtask 3 - PFAS Related Costs and IDW Management

Subtasks 1 & 4 - Project Management; Reporting

Subtask 2 - Annual Groundwater Monitoring 09/05/2025

10/17/2025

12/05/2025

Subtask 2 - Submittal and FDEP approval of email summary containing field documentation and certified laboratory reports for VOCs

Subtask 3 - Submittal and FDEP approval of email summary containing field documentation, certified laboratory reports for PFAS, and signed waste manifests

Subtasks 1 & 4 - Submittal and FDEP approval of the Annual Groundwater Monitoring Report

$ 6,402.95

$ 18,731.91

$ 4,632.85

$ 7,696.11

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum TO: Negotiation File

The Music Man Jacksonville, Duval County

ERIC_4619

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment DC028D (HW685)

DATE: May 27, 2025

This Task Assignment authorizes WSP USA Inc. (WSP) to conduct annual groundwater sampling at The

Music Man site.

PFAS monitoring continue on the four wells sampled during the initial screening event. SW-17 was sampled as part of PFAS monitoring completed last year, where exceedances of the

PGCTL were detected. and IW-17 as part of this Task Assignment, with continued monitoring dependent on this year’s results. IDW transport and disposal will be handled in Subtask 3 due to disposal costs associated with PFAS impacted waste.

The total cost for this project is $18, . with 10 total labor hours. All work is to be completed in accordance with the May 21, 2025, Scope of Work, Cost Estimate, and Bid Documentation.

WSP may invoice according to the included schedule.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

W S

P U

S A

In c.

D at e:

5/

/2

Ta sk

D C

8D

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

M us ic

M an

S ub

Ta sk

A nn ua l G W

M on ito rin g S ub Ta sk

A ct iv ity

/P ha se

M on ito rin g S ub Ta sk

P

FA

S R el at ed C os ts a nd

ID

W

T

D S ub Ta sk

P ro je ct

M an ag er

P at ric k M cG ra ne S ub Ta sk

R ep or tin g S ub Ta sk

S ub

Ta sk

S ub Ta sk

T T ot al s

La bo r R at e

C at eg or y $7

1.

PP

ro je ct

M an ag er

(r dm

8.

$7 2.

P ra ct ic e

Le ad er

X -1

(M

C C

0.

0.

3.

$7 1.

P ra ct ic e

Le ad er

X -1

(r dm

4.

.0

.0

$0

.0

S en io r C on su lta nt

X

-1

0.

0.

0.

$5

4.

S en io r S ci /E ng

X -1

(B

L)

0.

3.

4.

$0 .0

S en io r P ro je ct

S ci

/E ng

P

-1

0.

0.

0.

$3

8.

P ro je ct

S ci

/E ng

P

-9 (J

W

.0 7.

0.

$0

.0

S ta ff S ci /E ng

P -8

0.

0.

0.

$3 4.

S ta ff

S ci

/E ng

P

-8 (L

K

.0 4.

0.

$3

6.

S ta ff S ci /E ng

P -8

(A S

0.

0.

2.

$0 .0

S ci /E ng /A dm in

P

-7

0.

0.

0.

$0

.0

0.

0.

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

H ou rs

8.

.0

.0

.0

D ire ct L ab or

$5

,4

.9

$6

.6

$1 ,5

.9

$1

,2

.5

$1 ,9

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

2.

$9

,3

.6

$1 ,0

.0

$2

,6

.4

$2 ,2

.2

$3

,3

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or

$1 4, 7.

$1

,6

.6

$4 ,2

.4

$3

,5

.7

$5 ,2

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

RE

V:

2/

CE

F

GO

LD

ER

Pa ge

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

W S

P U

S A

In c.

D at e:

5/

/2

Ta sk

D C

8D

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

M us ic

M an

S ub

Ta sk

A nn ua l G W

M on ito rin g S ub Ta sk

A ct iv ity

/P ha se

M on ito rin g S ub Ta sk

P

FA

S R el at ed C os ts a nd

ID

W

T

D S ub Ta sk

P ro je ct

M an ag er

P at ric k M cG ra ne S ub Ta sk

R ep or tin g S ub Ta sk

S ub

Ta sk

S ub Ta sk

T T ot al s

T ra ve l

V eh ic le

R en ta l

$2

.0

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $2

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m en

t) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m en

t) D ril lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til ity

L oc at io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$1 9.

$0

.0

$1 9.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al S ub co nt ra ct or

C os t $2

.5

$0

.0

$2

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al C os ts

$9

.0

$9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or at or y

$1 ,1

.0

$1

,1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s

P er so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$8 0.

$4

0.

$4 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $7

.0

$4

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$1

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al F ie ld

E xp en se s $9

.0

$4

.0

$4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $1

7, 7.

$1 ,6

.6

$5

,9

.4

$4 ,2

.2

$5

,2

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$1 ,4

.7

$1

.6

$4

.5

$3

.5

$5

.9

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al E st im at ed

C os t $1

8, 1.

$1 ,8

.3

$6

,4

.9

$4 ,6

.8

$5

,8

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

GO

LD

ER

Pa ge

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Music Man SUBTASK 2: Annual GW Monitoring

DATE: 5/27/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLES WORK DESCRIPTION HOURS

Practice Leader (R. McCann) 4.0

Project Sci/Eng (J. Whipple) 18.0

Staff Sci/Eng (L. Kamikazi) 17.0

TOTAL LABOR 39.0

VEHICLE TYPE RATE UNIT USAGE

Truck $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL SUBS $0.00

LABORATORY COSTS

PARAMETERS RATES # SAMPLES #QAQC

Total VOHs EPA Method 8260B $73.00 12 $876.00 Total VOCs EPA Method 8260B - IDW $110.00 1 $110.00

Sample Shipping Large $150.00 1 $150.00

TOTAL LAB $1,136.00

EQUIPMENT ITEMS RATES COSTING UNITS USAGES TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 360 $108.00 Tubing, Silicon 1/4 x 7/16" $3.00 Per Foot 13 $39.00

TOTAL EQUIPMENT $477.00

Verification of property ownership for site access (1 hour). Prepare and submit email summary with field documentation and certified lab report with chlorinated VOC results (3 hours).

Field event preparation (1 hour). Round trip travel (1 hour per day x 2 days = 2 hours). Instrument calibration, groundwater measure water levels, measure field parameters, sampling for 12 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (15 hours).

Round trip travel (1 hour per day x 2 days = 2 hours). Instrument calibration, groundwater measure water levels, measure field parameters, sampling for 12 wells for chlorinated VOC analysis (see Table in proposal), and IDW sampling and staging (15 hours).

SUBTASK 3: PFAS Related Costs and IDW T&D

DATE: 5/27/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLES WORK DESCRIPTION HOURS

Practice Leader (R. McCann) 10.0

Project Sci/Eng (J. Whipple) 7.0

Staff Sci/Eng (L. Kamikazi) 4.0

Senior Sci/Eng (B. Lucero) 3.0

TOTAL LABOR 24.0

VEHICLE TYPE RATE UNIT USAGE

Truck $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00

TOTAL SUBS $195.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $110.00

EQUIPMENT ITEMS RATES COSTING UNITS USAGES TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 20 $6.00 Tubing, Silicon 1/4 x 7/16" $3.00 Per Foot 2 $6.00 Drum (55-gallon) $100.00 Each 1 $100.00

TOTAL EQUIPMENT $442.00

Complete forms to arrange for PFAS sample bottle order delivery and shipment from DEP Central Laboratory (2 hours). Characterize IDW and prepare waste profile for transportation and disposal of IDW (3 hours). Prepare and submit email summary with field documentation and certified laboratory report with PFAS results (2 hours). Prepare PFAS section for the draft annual report (3 hours).

Collect samples from 6 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (2 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours). Prepare data tables with PFAS analytical results (3 hours).

Collect samples from 4 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (2 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours).

Prepare CADD Figures (shallow and intermediate zones) with PFAS data for Annual Groundwater Monitoring Report.

FINAL --7/24/96

SUBTASK 4: Reporting

DATE: 5/27/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLES WORK DESCRIPTION HOURS

Practice Leader (M. Crews) 3.0

Practice Leader (R. McCann) 20.0

Senior Sci/Eng (B. Lucero) 4.0

Staff Sci/Eng (A. Strayer) 2.0

TOTAL LABOR 29.0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL SUBS $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Develop conclusions and recommendations and prepare final Annual Groundwater Monitoring Report.

Data entry, prepare tables and figures, and draft Annual Groundwater Monitoring Report

Prepare figures for report using CAD.

Reporting: Updating tables, document production. Create pdf for OCULUS.

FINAL --7/24/96

WSP USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA T: +1 904 363-3430 F: +1 904 363-3445 wsp.com

May 21, 2025 Proposal No. 2025US414639

Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR ANNUAL GROUNDWATER MONITORING

THE MUSIC MAN

799 LANE AVENUE

JACKSONVILLE, DUVAL COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_4619

PROPOSED TASK ASSIGNMENT: DC028D

Dear Mr. McGrane:

WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual groundwater monitoring and expanded per- and polyfluoroalkyl Substances (PFAS) monitoring at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services.

The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – ANNUAL GROUNDWATER MONITORING

Groundwater Monitoring Following authorization to proceed, WSP will coordinate with the real property owner for access to complete the scope of work. WSP will collect groundwater samples from 12 monitoring wells. The attached Figures 3 through 6 from the April/May 2024 sampling event show the monitoring well locations, groundwater flow direction, and chlorinated volatile organic compound (VOC) results for each zone. The attached Figures 7 and 8 show the 2024 PFAS results for each zone.

Mr. Patrick McGrane Proposal No. 2025US414639

Florida Department of Environmental Protection May 21, 2025

Prior to groundwater sampling, the depth-to-groundwater will be measured at the wells sampled using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.

Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018) and DEP SOPs for Sampling with and Analysis of PFAS, dated August 2020. Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

The groundwater samples to be analyzed for chlorinated VOCs will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified, fixed-base laboratory along with the completed chain-of-custody documentation. The selected groundwater samples to be analyzed for PFAS will be shipped to the DEP Central Laboratory in Tallahassee, Florida. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if off-site notification is required.

The samples will be analyzed as follows:

Sample ID Chlorinated VOCs (EPA Method 8260B)

PFAS

(DEP SOP: LC001-3 or

Similar)

SW-4 X

SW-10 X X

SW-13 X

SW-15 X X

SW-17 X X

IW-1 X X

IW-4 X

IW-9 X

IW-10 X

IW-13 X

IW-15 X X

IW-17 X X

Equipment Blank --- X

Investigative Derived Waste (IDW) Total VOCs X

Interim Deliverable Upon completion of Subtask 2, an e-mail deliverable will be submitted for the chlorinated VOC samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.

SUBTASK 3 – PFAS-RELATED COSTS AND IDW TRANSPORTATION AND DISPOSAL

WSP will include costs associated with the expanded PFAS monitoring activities in this subtask. These activities include completing bottle order requests with the DEP Central Laboratory; waste characterization and waste profiling; packaging and shipping PFAS samples to the DEP Central Laboratory; labor involved in sampling wells associated with PFAS analysis only; and investigation-derived waste (IDW) transportation and disposal.

Quality Assurance/Quality Control WSP will collect one equipment blank sample during the groundwater sampling event. The equipment blank will be collected by pumping (peristaltic pump) PFAS-free water through silicon and/or HDPE tubing and into laboratory-supplied containers. The equipment blank will be analyzed for PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table.

IDW Transportation and Disposal WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum(s). WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260 and PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table. The drum(s) will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates one drum of IDW purge water will be generated during the field activities.

Interim Deliverable Upon completion of Subtask 3, an e-mail deliverable will be submitted for the PFAS samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated data tables and figures.

SUBTASK 4 – REPORTING

WSP will prepare an Annual Groundwater Monitoring Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.

HEALTH AND SAFETY

WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $18, . WSP anticipates the groundwater monitoring event will take place in July 2025. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 1,8 . October 17, 2025

Subtask 2 – Annual Groundwater Monitoring

$ 6, . August 22, 2025 (E-mail summary with field documentation and certified laboratory analytical report for chlorinated VOCs)

Subtask 3 – PFAS Related Costs and IDW Transportation and Disposal

$ 4,632.85 September 19, 2025 (E-mail summary with field documentation and certified laboratory analytical report for PFAS and non-hazardous waste manifest for IDW)

Subtask 4 – Reporting $ 5,829.81 September 26, 2025 (Annual Groundwater Monitoring Report)

Total/Completion Date $ 18, . November 14, 2025

WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, WSP USA Inc.

Richard D. "Rick" McCann, PG Matthew C. Crews, PE Vice President, Geologist Assistant Vice President, Environmental Engineer

RDM/MCC/as

Attachments: Figure 3 – Potentiometric Map - Shallow Zone of the Surficial Aquifer (April 29, 2024) Figure 4 – Potentiometric Map – Intermediate Zone of the Surficial Aquifer (April 29, 2024) Figure 5 – Chlorinated VOC Concentrations in the Shallow Zone of the Surficial Aquifer Figure 6 – Chlorinated VOC Concentrations in the Intermediate Zone of the Surficial Aquifer Figure 7 – PFOA and PFOS Concentrations in the Shallow Surficial Aquifer Figure 8 – PFOA and PFOS Concentrations in the Intermediate Surficial Aquifer

Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes

R A M O N A B O U L E V A R D

L A

N E

A

V E

N U

E

HOME DEPOT ENTRANCE

SW-9

SW-21

SW-18

UES TMW-1

IW-7

IW-18

PICCADILLY

CAFETERIA

IW-16

IW-8

UES TMW-2

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

IW-21

IW-9

IW-11

IW-12

IW-2

IW-1

DW-1

IW-3

IW-6

IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-20

IW-19

SW-20

SW-19

SW-14

SW-5

SW-16

SW-15

SW-13

SW-4

SW-10

SW-7

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-24

MW-27

MW-25

MW-15

MW-17R

MW-8R

MW-18 MW-7

MW-23

MW-6R

MW-21MW-19

MW-5R

MW-26

MW-12R

MW-22

9.81

10.20

10.30

10.25

10.29

10.32

10.48

10.67 10.55

10.74

10.75 10.63

10.75

11.15

FORMER

BUILDING

FOOTPRINT

10.15

10.15

10.3510.35

10.55 10.55

10.75

.75

GROUNDWATER ELEVATION CONTOUR

INFERRED DIRECTION OF GROUNDWATER FLOW

(DASHED WHERE INFERRED)

GROUNDWATER ELEVATION IN FEET ABOVE MEAN

SEA LEVEL

10.63

DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

in

31404452.4619 Control No.

4619-DC028C-003

FIGURE

2024-07-25

BCL

RDM

RDM

MCC

GRACE PROPERTY (THE MUSIC MAN)

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

POTENTIOMETRIC MAP - SHALLOW ZONE OF THE SURFICIAL

AQUIFER (APPROXIMATELY 2 TO 14 FT. BGS)

(APRIL 29, 2024)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-003.dwg

LEGEND

SCALE

0 1000 2000

FEET

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

3. GROUNDWATER ELEVATION FROM SW-15 WAS NOT USED

BECAUSE OF ERRONEOUS DEPTH TO WATER MEASUREMENT.

REFERENCE(S)

10.75

E

N U

E

HOME DEPOT ENTRANCE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

UES TMW-2UES TMW-1

IW-7IW-9

IW-8

IW-11

IW-12

IW-2

IW-1DW-1

IW-3

IW-6

IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19 SW-20

SW-14

SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-15

MW-25

MW-23

MW-17R

MW-24

MW-7MW-21

MW-18

MW-19

MW-5R

MW-6R

MW-12R

MW-8R

MW-22

MW-26

MW-27

9.82

10.32

10.28

10.33

10.32

10.48

10.52 10.50

10.67

10.66

10.63

10.86

10.74

10.89

FORMER

BUILDING

FOOTPRINT

10.85

10.65

10.45

10.25 10.25

10.45

10.65

10.85

GROUNDWATER ELEVATION CONTOUR

INFERRED DIRECTION OF GROUNDWATER FLOW

(DASHED WHERE INFERRED)

GROUNDWATER ELEVATION IN FEET ABOVE MEAN

SEA LEVEL

10.63

DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

in

31404452.4619 Control No.

4619-DC028C-004

FIGURE

2024-07-25

BCL

RDM

RDM

MCC

GRACE PROPERTY (THE MUSIC MAN)

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

POTENTIOMETRIC MAP - INTERMEDIATE ZONE OF THE SURFICIAL

AQUIFER (APPROXIMATELY 14 TO 31 FT. BGS)

(APRIL 29, 2024)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-004.dwg

LEGEND

SCALE

0 40 80

FEET

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

NOTE(S)

10.85

E

N U

E

HOME DEPOT ENTRANCE

CONCRETE

POWER POLE

POWER POLE

CONCRETE

FIRE HYDRANT

BACK OF WALK

GRASS ISLAND

TELEPHONE

WIRE

AREA OF

EXCAVATION

CONCRETE

POWER POLE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

UES TMW-2

UES TMW-1

IW-7

IW-9

IW-8

IW-11

IW-12

IW-2

DW-1

IW-3

IW-6

IW-10

IW-4

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19

SW-20

SW-14 SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-25

MW-15

MW-23

MW-17R

MW-24

MW-7MW-21MW-18MW-19

MW-5R

MW-6R

MW-12R

MW-8R

MW-22

MW-26

MW-27

IW-1

FORMER

BUILDING

FOOTPRINT

INFERRED EXTENT OF CHLORINATED

HYDROCARBONS (EXCEEDING THE

FDEP GROUNDWATER CLEANUP

TARGET LEVELS)

IW-5

INFERRED EXTENT OF

CHLORINATED

HYDROCARBONS

EXCEEDING THE FDEP

NADCs

DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

CHITIN COLUMNS

in

31404452.4619 Control No.

4619-DC028C-005

FIGURE

2024-07-25

BCL

RDM

RDM

MCC

GRACE PROPERTY (THE MUSIC MAN)

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

CHLORINATED VOC CONCENTRATIONS IN THE SHALLOW

ZONE OF THE SURFICIAL AQUIFER

(APRIL/MAY 2024)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-005.dwg

LEGEND

1. ALL UNITS REPORTED IN MICROGRAMS PER LITER (μg/L).

2. < = BELOW THE LABORATORY REPORTED METHOD

DETECTION LIMIT.

3. I - REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND LABORATORY PRACTICAL

QUANTITATION LIMIT.

4. BOLD/YELLOW HIGHLIGHTED VALUE INDICATES

CONCENTRATION IS ABOVE THE FDEP GROUNDWATER

CLEANUP TARGET LEVEL (GCTL).

5. BOLD/BLUE HIGHLIGHTED VALUE INDICATES CONCENTRATION

IS ABOVE THE FDEP NATURAL ATTENUATION DEFAULT

CONCENTRATION (NADC).

6. FT-BGS = FEET BELOW GROUND SURFACE

SCALE

0 40 80

FEET

NOTE(S)

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

WELL ID (SCREEN INTERVAL DEPTH IN FT-BGS)

DATE SAMPLED

TETRACHLOROETHYLENE CONCENTRATION (PCE)

TRICHLOROETHYLENE CONCENTRATION (TCE)

VINYL CHLORIDE CONCENTRATION

SW-00 (3.6-13.6)

APR 2024

3 300

3 300

70 700

1 100

FDEP NATURAL ATTENUATION

DEFAULT CONCENTRATION (NADC)

FDEP GROUNDWATER CLEANUP

TARGET LEVEL (GCTL)

SW-1 (3.6-13.6)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

SW-3 (3.8-13.8)

Feb 2016 < 0.50 < 0.50 14.2

< 0.50

SW-6 (3.7-13.7)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

SW-14 (3.5-13.5)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

SW-21 (3.6-13.6)

Feb 2016

<0.50 <0.50 <0.50 <0.50

SW-9 (3.8-13.8)

Feb 2016 Jun 2023 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50

SW-16 (3.6-13.6)

Feb 2016 Jun 2018 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50

SW-19 (3.5-13.5)

Feb 2016 Apr 2017 Jun 2018 < 0.50 < 0.22 < 0.50 < 0.50 < 0.36 < 0.50 < 0.50 < 0.36 < 0.50 < 0.50 < 0.36 < 0.50

SW-4 (4.1-14.1)

Apr 2024

0.25 U

0.25 U

SW-10 (3.8-13.8)

Apr 2024

0.25 U

0.60 I

SW-13 (4-14)

Apr 2024

0.25 U

1.3

SW-15 (3.4-13.4)

Apr 2024

0.25 U

0.25 U

SW-17 (3.6-13.6)

Apr 2024

0.25 U

0.25 U

0.50 U

0.25 U

CIS-1,2-DICHLOROETHYLENE

CONCENTRATION (cis-1,2-DCE)

SW-7 (3.8-13.8)

Apr 2010

<0.82 <0.36 <0.28 <0.40

SW-5 (3.9-13.9)

Apr 2010 <0.82 <0.36 <0.28 <0.40

SW-2 (3.6-13.6)

Mar 2007

<0.22 <0.22 1.5

<0.47

E

N U

E

HOME DEPOT ENTRANCE

CONCRETE

POWER POLE

POWER POLE

CONCRETE

FIRE HYDRANT

BACK OF WALK

GRASS ISLAND

TELEPHONE

WIRE

AREA OF

EXCAVATION

CONCRETE

POWER POLE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

UES TMW-2UES TMW-1

IW-7

IW-9

IW-8

IW-11

IW-12

IW-2

IW-1

DW-1

IW-3

IW-6IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19

SW-20

SW-14

SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-25

MW-15

MW-23

MW-17R

MW-24

MW-7MW-21MW-18MW-19

MW-5R

MW-6R

MW-12R

MW-8R

MW-22

MW-26

MW-27

FORMER

BUILDING

FOOTPRINT

INFERRED EXTENT OF

CHLORINATED HYDROCARBONS

(EXCEEDING THE FDEP

GROUNDWATER CLEANUP

TARGET LEVELS)

INFERRED EXTENT OF

CHLORINATED

HYDROCARBONS

EXCEEDING THE FDEP

NADCs

DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

CHITIN COLUMNS

in

31404452.4619 Control No.

4619-DC028C-006

FIGURE

2024-07-25

BCL

RDM

RDM

MCC

GRACE PROPERTY (THE MUSIC MAN)

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

CHLORINATED VOC CONCENTRATIONS IN THE INTERMEDIATE

ZONE OF THE SURFICIAL AQUIFER

(APRIL/MAY 2024)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-006.dwg

LEGEND

SCALE

0 40 80

FEET

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

1. ALL UNITS REPORTED IN MICROGRAMS PER LITER (μg/L).

2. < = BELOW THE LABORATORY REPORTED METHOD

DETECTION LIMIT.

3. I - REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND LABORATORY PRACTICAL

QUANTITATION LIMIT.

4. BOLD/YELLOW HIGHLIGHTED VALUE INDICATES

CONCENTRATION IS ABOVE THE FDEP GROUNDWATER

CLEANUP TARGET LEVEL (GCTL).

5. BOLD/BLUE HIGHLIGHTED VALUE INDICATES

CONCENTRATION IS ABOVE THE FDEP NATURAL

ATTENUATION DEFAULT CONCENTRATION (NADC).

6. * = RESULT DETERMINED NOT TO EXCEED THE GCTL BASED

ON THE FDEP MEMORANDUM "ROUNDING ANALYTICAL DATA

FOR THE SITE REHABILITATION COMPLETION", DATED

NOVEMBER 17, 2011.

7. FT-BGS = FEET BELOW GROUND SURFACE

NOTE(S)

DATE SAMPLED

TETRACHLOROETHYLENE CONCENTRATION

TRICHLOROETHYLENE CONCENTRATION

CIS-1,2-DICHLOROETHYLENE CONCENTRATION

VINYL CHLORIDE CONCENTRATION

IW-1 (15.2-20.2)

APR 2024

3 300 3 300

70 700

1 100

FDEP NATURAL ATTENUATION

DEFAULT CONCENTRATION (NADC)

FDEP GROUNDWATER CLEANUP

TARGET LEVEL (GCTL)

WELL ID (SCREEN INTERVAL DEPTH IN FT-BGS)IW-3 (25.8-30.8)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

IW-6 (16.5-21.5)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

IW-14 (15.5-20.5)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

IW-16 (14.4-19.4)

Feb 2016 Jun 2018 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50

IW-19 (15.5-20.5)

Feb 2016 Apr 2017 Jun 2018 < 0.50 < 0.22 < 0.50 < 0.50 < 0.36 < 0.50

50.1 38 37.2

3.9 1.1* 0.72 I

IW-21 (15.5-20.5)

Feb 2016 Jun 2018 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50

IW-1 (14.3-19.3)

Jul 2021 May 2024

0.38 U 0.25 U

0.36 U 0.25 U

669 950 231 150

IW-9 (16-21)

May 2024

0.25 U

0.25 U

IW-15 (15.6-20.6)

Jul 2021 Apr 2024

0.38 U 0.25 U

0.36 U 0.25 U

154 19 109 45

IW-17 (14.6-19.6)

Apr 2024

0.25 U

0.25 U

0.64 I

0.25 U

IW-10 (15.2-20.2)

Apr 2024

0.25 U

0.25 U

IW-4 (16.7-21.7)

Apr 2024

0.25 U

0.25 U

0.76 I

IW-13 (17-22)

Apr 2024

0.25 U

0.25 U

7.5

IW-2 (17.4-22.4)

Mar 2007 < 0.22 < 0.22 < 0.21 < 0.47

IW-5 (16.5-21.5)

Apr 2010 < 0.82 < 0.36 < 0.28 < 0.40

IW-7 (15.8-20.8)

Apr 2010 < 0.82 < 0.36 < 0.28 < 0.40

IW-12(16.7-21.7)

Mar 2007 < 0.22 < 0.22 < 0.21 < 0.47

E

N U

E

HOME DEPOT ENTRANCE

CONCRETE

POWER POLE

POWER POLE

CONCRETE

FIRE HYDRANT

BACK OF WALK

GRASS ISLAND

TELEPHONE

WIRE

AREA OF

EXCAVATION

CONCRETE

POWER POLE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

IW-7

IW-9

IW-8

IW-11

IW-12

IW-2

IW-1

IW-3

IW-6IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19

SW-20

SW-14

SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

FORMER

BUILDING

FOOTPRINT

INFERRED EXTENT OF SUM OF

PFOA + PFOS > PGCTL OF 70 ng/L

INFERRED EXTENT OF SUM OF

PFOA + PFOS > PGCTL OF 70 ng/L

SHALLOW MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

in

31404452.4619 Control No.

4619-DC028C-007a

FIGURE

7----

2024-07-25

BCL

RDM

RDM

MCC

GRACE PROPERTY (THE MUSIC MAN)

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

PFOA AND PFOS CONCENTRATIONS IN THE SHALLOW

SURFICIAL AQUIFER

APR/MAY 2024

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-007a.dwg

LEGEND

SCALE

0 40 80

FEET

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

NOTE(S)

1. PROVISIONAL GCTL - FDEP PROVISIONAL GROUNDWATER CLEANUP

TARGET LEVEL.

2. ALL RESULTS ARE REPORTED IN NANOGRAMS PER LITER (ng/L).

3. BOLD FONTS INDICATES CONSTITUENT CONCENTRATION WAS

REPORTED ABOVE THE LABORATORY METHOD DETECTION LIMIT.

4. HIGHLIGHTED FONT INDICATES CONSTITUENT CONCENTRATION WAS

REPORTED ABOVE THE PROVISIONAL GROUNDWATER CLEANUP LEVEL.

5. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT.

6. U - THE COMPOUND WAS ANALYZED FOR, BUT NOT DETECTED. THE

REPORTED VALUE IS THE METHOD DETECTION LIMIT FOR THE SAMPLE

ANALYZED.

7. PFOA - PERFLUORO-N-OCTANOIC ACID.

8. PFOS - PERFLUOROOCTANESULFONIC ACID.

9. Y - THE LABORATORY ANALYSIS WAS FROM AN UNPRESERVED OR

IMPROPERLY PRESERVED SAMPLE. THE DATA MAY NOT BE ACCURATE.

PROVISIONAL GROUND

WATER CLEANUP TARGET

LEVEL (GCTL)

PFOA IN

ng/L

PFOS IN

ng/L

SUM OF PFOA

+ PFOS IN ng/L

GCTL 70 70 70

SCREEN INTERVAL (FEET BELOW GROUND SURFACE)(3.63 - 13.63)

SW-17

(3.66 - 13.66)

DATE PFOA PFOS PFOA+PFOS

4/29/2024 15 Y 66 Y 81

SW-15

(3.42 - 13.42)

DATE PFOA PFOS PFOA+PFOS

7/15/2021 14 99 113 4/30/2024 25 140 165

SW-13

(4 - 14)

DATE PFOA PFOS PFOA+PFOS

4/30/2024 5.3 I 1.9 U 5.3

SW-16

(3.57 - 13.57)

DATE PFOA PFOS PFOA+PFOS

4/29/2024 8.0 1.9 U 8.0

SW-5

(3.87 - 13.87)

DATE PFOA PFOS PFOA+PFOS

4/29/2024 8.4 1.9 U 8.4

SW-10

(3.80 - 13.80)

DATE PFOA PFOS PFOA+PFOS

7/15/2021 11 54 65 4/30/2024 11 35 46

SW-6

(3.70 - 13.70)

DATE PFOA PFOS PFOA+PFOS

5/1/2024 3.9 I 31 34.9

SW-7

(3.81 - 13.81)

DATE PFOA PFOS PFOA+PFOS

5/1/2024 21 1.9 U 21

SW-9

(3.80 - 13.80)

DATE PFOA PFOS PFOA+PFOS

5/1/2024 2.4 I 32 34.4

SW-1

(3.63 - 13.63)

DATE PFOA PFOS PFOA+PFOS

5/1/2024 12 76 88

SW-2

(3.55 - 13.55)

DATE PFOA PFOS PFOA+PFOS

5/2/2024 4.0 I 12 16.0

SW-3

(3.80 - 13.80)

DATE PFOA PFOS PFOA+PFOS

5/2/2024 12 33 45

SW-4

(4.10 - 14.10)

DATE PFOA PFOS PFOA+PFOS

4/30/2024 5.8 I 4.7 I 10.5

SW-14

(3.49 - 13.49)

DATE PFOA PFOS PFOA+PFOS

4/30/2024 3.4 I 2.0 U 3.4

E

N U

E

HOME DEPOT ENTRANCE

CONCRETE

POWER POLE

POWER POLE

CONCRETE

FIRE HYDRANT

BACK OF WALK

GRASS ISLAND

TELEPHONE

WIRE

AREA OF

EXCAVATION

CONCRETE

POWER POLE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

IW-7

IW-9

IW-8

IW-11

IW-12

IW-2

IW-1

IW-3

IW-6IW-10

IW-4

IW-5

IW-13

IW-14 IW-15 IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19

SW-20

SW-14

SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

FORMER

BUILDING

FOOTPRINT

INFERRED EXTENT OF SUM OF

PFOA + PFOS > PGCTL OF 70 ng/L

INFERRED EXTENT OF SUM OF

PFOA + PFOS > PGCTL OF 70 ng/L

W

SHALLOW MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

in

31404452.4619 Control No.

4619-DC028C-008

FIGURE

8----

2024-07-25

BCL

RDM

RDM

MCC

GRACE PROPERTY (THE MUSIC MAN)

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

PFOA AND PFOS CONCENTRATIONS IN THE INTERMEDIATE

SURFICIAL AQUIFER

APR/MAY 2024

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\corp.pbwan.net\US\CentralData\USJAX100\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028C_2024GW\Active Drawings\ | File Name: 4619-DC028C-008.dwg

LEGEND

SCALE

0 40 80

FEET

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

NOTE(S)

1. PROVISIONAL GCTL - FDEP PROVISIONAL GROUNDWATER CLEANUP

TARGET LEVEL.

2. ALL RESULTS ARE REPORTED IN NANOGRAMS PER LITER (ng/L).

3. BOLD FONTS INDICATES CONSTITUENT CONCENTRATION WAS

REPORTED ABOVE THE LABORATORY METHOD DETECTION LIMIT.

4. HIGHLIGHTED FONT INDICATES CONSTITUENT CONCENTRATION WAS

REPORTED ABOVE THE PROVISIONAL GROUNDWATER CLEANUP LEVEL.

5. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT.

6. U - THE COMPOUND WAS ANALYZED FOR, BUT NOT DETECTED. THE

REPORTED VALUE IS THE METHOD DETECTION LIMIT FOR THE SAMPLE

ANALYZED.

7. PFOA - PERFLUORO-N-OCTANOIC ACID.

8. PFOS - PERFLUOROOCTANESULFONIC ACID.

9. Y - THE LABORATORY ANALYSIS WAS FROM AN UNPRESERVED OR

IMPROPERLY PRESERVED SAMPLE. THE DATA MAY NOT BE ACCURATE.

PROVISIONAL GROUND

WATER CLEANUP TARGET

LEVEL (GCTL)

PFOA IN

ng/L

PFOS IN

ng/L

SUM OF PFOA

+ PFOS IN ng/L

GCTL 70 70 70

IW-1

(14.30 - 19.30)

DATE PFOA PFOS PFOA+PFOS

7/15/2021 12 130 142 5/1/2024 13 Y 130 Y 143

IW-12

(16.65 - 21.65)

DATE PFOA PFOS PFOA+PFOS

5/1/2024 1.8 U Y 4.5 I Y 4.5

IW-2

(17.40 - 22.40)

DATE PFOA PFOS PFOA+PFOS

5/2/2024 1.8 U Y 3.8 I Y 3.8

IW-3

(25.80 - 30.80)

DATE PFOA PFOS PFOA+PFOS

5/2/2024 5.1 I Y 5. 3 I Y 10.4

IW-4

(16.73 - 21.73)

DATE PFOA PFOS PFOA+PFOS

4/30/2024 3.0 I Y 3.3 I Y 6.3

IW-13

(17 - 22)

DATE PFOA PFOS PFOA+PFOS

4/30/2024 1.9 U Y 1.9 U Y 3.8 U

IW-15

(15.61 - 20.61)

DATE PFOA PFOS PFOA+PFOS

7/15/2021 6.0 I 36 42.0 4/30/2024 4.6 I Y 19 Y 23.6

IW-17

(14.56 - 19.56)

DATE PFOA PFOS PFOA+PFOS

4/29/2024 17 Y 56 Y 73

IW-16

(14.41 - 19.41)

DATE PFOA PFOS PFOA+PFOS

4/29/2024 1.8 U Y 1.8 U Y 3.6 U

IW-5

(16.54 - 21.54)

DATE PFOA PFOS PFOA+PFOS

4/29/2024 28 Y 40 Y 68

IW-10

(15.20 - 20.20)

DATE PFOA PFOS PFOA+PFOS

4/30/2024 10Y 47 Y 57

IW-6

(16.50 - 21.50)

DATE PFOA PFOS PFOA+PFOS

5/1/2024 3.7 I Y 1.9 U Y 3.7

IW-9

(16.00 - 21.00)

DATE PFOA PFOS PFOA+PFOS

5/1/2024 10 Y 75 Y 85

IW-7

(15.80 - 20.80)

DATE PFOA PFOS PFOA+PFOS

5/1/2024 16 Y 1.9 U Y 16

SCREEN INTERVAL (FEET BELOW GROUND SURFACE)(14.30 - 19.30)

U S

Ec ol og y*

H

EP

AC

O

T& D

N on

H az

S oi l - V

O C s pe r d ru m

$1

.0

$0 .0

T&

D N on H az M ud /w at er

VO

C s pe r d ru m

$1

.0

$0

.0

Fa ls e M ob iliz at io n (n o dr um fo un d)

$8

5.

$0 .0

PF

AS

P ro fil e Fe e (1 p er s ite

$3

.0

$0 .0

T&

D N on H az S oi l -

P

FA

S/

PF

O S pe r d ru m

$1

.0

$0

.0

T& D

N on

H az

M ud

/w at er -P

FA

S/

PF

O

S pe r d ru m

$1

.0

$1

.0

D is po sa l N on

H az

S oi l - V

O C s pe r d ru m

$1

.0

$0 .0

D is po sa l N on H az M ud /w at er

VO

C s pe r d ru m

$1

.0

$0

.0

PF

AS

P ro fil e

Fe e

(1 p er s ite

$9

5.

$9 5.

D is po sa l N on H az S oi l -

P

FA

S/

PF

O S

$6

.0

$0

.0

D is po sa l N on H az M ud /w at er

-P

FA

S/

PF

O S

$6

.0

$6

.0

Ap pr ov al F ee (p er s ite

$7

.0

$7

.0

N on H az S ol ifi ca tio n W as te

P ro fil e fe e

$5

0.

$0 .0

N on H az S ol id s D is po sa l

(p er d ru m

$1

.0

$0

.0

N on

H az

S lu dg e

D is po sa l

$1

.0

$0 .0

PF

AS

W as te ga l d ru m e m el le

A L

$8

.0

$8

.0

Tr uc k w ith li ft ga te a nd d riv er

$1

.0

$5

.0 no n ha z liq ui ds d is po sa l ( pe r d ru m

$1

.7

$0 .0 g al lo n re co nd iti on ed d ru m

$1

.6

$0

.0

LT

L fe es

(l es s th an dr um s

$1

.0

$1

.0

En er gy s ec ur ity re co ve ry fe e

$2

.0

$2

.0

To ta l C os t $1

.0

$1

,4

.0

$1

,7

.0

N ot es

* T ra ns po rta tio n co st s w ill be c al cu la te d ba se d on p ic ku ps a t v ar io us s ite s an d w as te s tre am v ol um e

ID

W

S U

B C

O N

TR

AC

TO

R

C O

ST

E

ST

IM

AT

ES

F O

R P

FA

S

M

AT

ER

IA

L

Er w in

Su m m ar y of

ID

W

S ub co nt ra ct or s

C os ts

3_

6_

P

FA

S no p ro fil e

Pa ge o f 1

408 Ditmar Street Pensacola, FL 32503

To: Mr. Ralph Mongillo

WSP

9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256

June 16, 2023

Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials

Mr. Mongillo:

The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:

For Non-Hazardous Chlorinated Solvent Impacted Materials:

Description Rate Unit T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket

For Non-Hazardous PFAS/PFOS Impacted Materials:

Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: robert@erwinremediation.com p y

File details come from the government source that posted it. Updated .