CN-370000-HW685-DC021A.pdf
PDF 2 MB Posted
- Contract number
- HW685
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document issued under Contract Number HW685 between the State of Florida Department of Environmental Protection (FDEP) and Golder Associates USA Inc. The task assignment authorizes work at the Jet Cleaners facility located at 1346 Gandy Street in Jacksonville, Duval County, Florida (FDEP Facility ID: ERIC_4540). The Department Project Manager is Ben Grubbs, and the Contractor's Project Manager is Matt Crews. The task assignment was executed in May 2022 with a completion date of August 26, 2022.
The scope of work comprises two subtasks: Project Management (Subtask 1) and preparation of an Interim Source Removal (ISR) Work Plan (Subtask 2). The work plan will address chlorinated volatile organic compounds (VOCs) detected in vadose zone soils through the design of a Soil Vapor Extraction (SVE) system. The total task assignment value is $9,215.02 on a fixed unit rate basis, with $1,041.72 allocated to project management and $8,173.30 to the ISR Work Plan development. The work encompasses 55 total labor hours distributed across multiple staff categories including senior consultants, engineers, and support personnel. Deliverables include submittal and FDEP approval of the ISR Work Plan by May 27, 2022, with invoicing contingent upon completion of these deliverables. The contractor must obtain an updated access agreement from the property owner and will incorporate previous site assessment data from 2020 soil sampling and Modified Activated Gas Sampling (MAGS) investigations into the final work plan.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC021A Completion August 26, 2022
This Task Assignment authorizes Golder to complete an ISR Work Plan in accordance with the April 27, 2022, Scope of Work and Cost Estimate.
Ben Grubbs 850-245-8992 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews 904-363-3430
ERIC_4540
1346 Gandy Street, Jacksonville, Duval County
Jet Cleaners
✔ $ 9,215.02
$ 9,215.02
Scope of Work
Donald Miller
Principal
Donald Miller Digitally signed by Donald Miller Date: 2022.05.02 12:06:56 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.05.02 11:11:00 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1 & 2: ISR Work Plan; Project Management 05/27/2022
Subtasks 1 & 2: Submittal and FDEP approval of the ISR Work Plan; Project Management $ 9,215.02
$ 9,215.02
HW685
DC021A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW685 Contract Negotiation File Jet Cleaners Jacksonville, Duval County
ERIC_4540
From: Ben Grubbs, Project Manager Date: April 28, 2022 Subject: Negotiation Summary
HW685 DC021A
This Task Assignment authorizes Golder to complete an ISR Work Plan in accordance with the April 27, 2022, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: ISR Work Plan Golder will complete an Interim Source Removal (ISR) Work Plan to use a Soil Vapor Extraction (SVE) System to address chlorinated volatile organic compounds (VOCs) impacts in vadose zone soils.
Golder will obtain an updated Access Agreement from the current real property owner of the Jet Cleaners (ERIC_4540) site.
This work plan, and the subsequent running of the SVE System, address chlorinated volatile organic compounds (VOCs) impacts in vadose zone soils to move the site towards closure.
The original Task Assignment totaled $8,653.63 with 52 labor hours but after negotiations and corrections with contractor costs are reflected as below:
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $9,215.02 with 55 labor hours.
Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATEContractor: Golder Associates USA Inc.
Date: 4/27/2022
Task #: DC021A SubTask 1 Project Management SubTask 6
Site: Jet Cleaners SubTask 2 ISR Work Plan SubTask 7
Activity/Phase: ISR SubTask 3 SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$55.25 Project Manager 6 6.3 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 6 6 0 0 0 0 0 0 0 0 $55.25 Senior Consultant - X-12 (MC) 37 37 0 0 0 0 0 0 0 0
$0.00 Senior Sci/Eng - X-11 0 0 0 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 4 4 0 0 0 0 0 0 0 0
$0.00 Project Sci/Eng - P-9 0 0 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 2 2 0 0 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 55 6.3 49.0 0 0 0 0 0 0 0 0
Direct Labor $3,020.86 $347.53 $2,673.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $5,210.98 $599.49 $4,611.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,231.84 $947.02 $7,284.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTI MATEContractor: Golder Associates USA Inc.
Date: 4/27/2022
Task #: DC021A SubTask 1 Project Management SubTask 6
Site: Jet Cleaners SubTask 2 ISR Work Plan SubTask 7
Activity/Phase: ISR SubTask 3 SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $8,391.84 $947.02 $7,444.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $823.18 $94.70 $728.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $9,215.02 $1,041.72 $8,173.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Jet Cleaners SUBTASK 2: ISR Work Plan
DATE: 4/27/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Consultant (J. Brown) 6
Senior Sci/Eng (M. Crews) 37
Senior Project Sci/Eng (B. Lucero) CADD - Develop figures for ISR Work Plan 4
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 49
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00
TOTAL EQUIPMENT $40.00
Obtain new access agreement for site (3 hours). Site visit (4 hours). Prepare draft ISR Work Plan and correspondence with FDEP and property owner (30 hours).
Site visit (4 hours). Reporting: Review Draft ISR Work Plan; incorporate design comments and edits into final report (2 hours).
Reporting: report formatting, document production, binding and shipping. Create pdf for
OCULUS.
FINAL --7/24/96
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 4/21/2022
Task #: DC021A SubTask 1 Project Management SubTask 6
Site: Jet Cleaners SubTask 2 ISR Work Plan SubTask 7
Activity/Phase: ISR SubTask 3 SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$55.25 Project Manager 6 5.9 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 6 6 0 0 0 0 0 0 0 0 $55.25 Senior Consultant - X-12 (MC) 34 34 0 0 0 0 0 0 0 0
$0.00 Senior Sci/Eng - X-11 0 0 0 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 4 4 0 0 0 0 0 0 0 0
$0.00 Project Sci/Eng - P-9 0 0 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 2 2 0 0 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 52 5.9 46.0 0 0 0 0 0 0 0 0
Direct Labor $2,833.57 $325.99 $2,507.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $4,887.91 $562.33 $4,325.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,721.48 $888.32 $6,833.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 4/21/2022
Task #: DC021A SubTask 1 Project Management SubTask 6
Site: Jet Cleaners SubTask 2 ISR Work Plan SubTask 7
Activity/Phase: ISR SubTask 3 SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $7,881.48 $888.32 $6,993.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $772.15 $88.83 $683.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $8,653.63 $977.15 $7,676.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
Golder Associates USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445
Golder and the G logo are trademarks of Golder Associates Corporation golder.com
April 27, 2022 Proposal No. 202208346
Mr. Ben Grubbs Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR ISR WORK PLAN
JET CLEANERS
1346 GANDY STREET
JACKSONVILLE, DUVAL COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4540
PROPOSED TASK ASSIGNMENT: DC021A
Dear Mr. Grubbs:
Golder Associates USA Inc. (Golder) is providing the Florida Department of Environmental Protection (FDEP) with this cost proposal to develop an Interim Source Removal (ISR) Work Plan for the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
RECENT SITE HISTORY
The highest concentrations of chlorinated volatile organic compounds (VOCs) in groundwater remain in the source area within the shallow (MW011) and intermediate (MW017) zones of the surficial aquifer. Based on the February 2014 limited interior investigation and subsequent annual groundwater sampling results, the chlorinated VOC concentrations in the shallow and intermediate zones of the surficial aquifer appear to be isolated to a relatively small area around the former dry cleaning machine locations and immediately adjacent to the northeast side of the former facility building. Additionally, based on the results of the Membrane Interphase Probe study conducted by Golder in 2004, the chlorinated VOCs detected in the shallow zone groundwater were limited to a small area between the building and monitoring wells MW011 and MW017.
During the 2020 annual FDEP site status meeting, Golder and FDEP discussed conducting a limited field investigation that would include collecting soil samples for laboratory testing, installing Modified Activated Gas Sampling (MAGS) wells, completing a MAGS investigation, and conducting a direct-push technology groundwater screening event prior to any further discussions on site remediation in the area near monitoring wells MW011 and
MW017.
Mr. Ben Grubbs Proposal No. 202208346
Florida Department of Environmental Protection April 27, 2022
Golder completed soil sample collection and MAGS well installation on August 10 and 11, 2020 at six locations (MAG001 through MAG006). Five of the six soil boring locations, where soil samples were collected, did not have chlorinated VOCs at concentrations exceeding the Soil Cleanup Target Levels (SCTLs). Analytical results from one soil boring (MAG003), located between the building and monitoring wells MW011, had two samples collected in the top 2 feet that exceeded the tetrachloroethene (PCE) leachability SCTL. The sample collected at the one foot below ground surface interval exceeded the Groundwater Cleanup Target Level for PCE when analyzed using the Synthetic Precipitation Leaching Procedure for chlorinated VOCs.
Golder completed a MAGS investigation on October 12, 2020. The purpose of the investigation was to evaluate the nature and extent of chlorinated VOC impacts in the vadose zone soils located near monitoring wells MW011 and MW017. PCE was reported in each of the six soil vapor samples submitted for laboratory analysis, ranging from a low of 1.46 milligrams per cubic meter (mg/m3) at MAG002 to a high of 4.90 mg/m3 at MAG006 (inside the building). Other chlorinated VOCs were reported in the six soil vapor samples at relatively low concentrations. The effective radius of influence (ROI) for the site under the applied vacuum range of 27 to 30 inches of water appears to be approximately 14 to 29 feet, defined by a minimum induced vacuum of 0.1 inches of water. In general, flow rates averaged between 4 and 10 cubic feet per minute per foot of well screen during the MAGS investigation.
Based on the results of the MAGS investigation, Golder recommended developing an ISR Work Plan for soil vapor extraction (SVE) at the site. The soil analytical results for PCE and the MAGS analytical results are shown on the figures included in Attachment A.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with FDEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with FDEP requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the FDEP-approved task assignment.
SUBTASK 2 – ISR WORK PLAN
Golder will develop an ISR Work Plan to use SVE to address the chlorinated VOC impacts identified in the vadose zone soils during the October 2020 MAGS investigation. The ISR Work Plan will include the following:
▪ Site location and description.
▪ A summary of previous site assessment and remediation activities completed at the site.
▪ A recommendation for a site visit to identify a location for the SVE system; identify potential electrical power drop locations; and discuss the proposed site activities with the property owner and tenants.
▪ The proposed site preparation activities, including verification of the existing site access agreement, utility location services, and documentation of existing site conditions.
▪ Proposed vacuum extraction well and vacuum monitoring point locations and construction details.
▪ Proposed SVE conveyance piping layout and trenching details, where applicable.
▪ SVE system design criteria, including system operating vacuum, wellhead vacuum and flow rates, ROI, and a piping and instrumentation diagram.
▪ SVE system components, including the manifold, vapor-liquid separator, dilution air valve, vacuum blower, gauges (temperature, pressure, and flow), valves, and sample port locations.
▪ Control panel and telemetry requirements.
▪ Effluent treatment design and water entrainment management.
▪ Review of available and compatible FDEP-owned SVE systems and recommendation for reuse/repair or procurement of new system.
▪ SVE system construction details.
▪ System startup and operation and maintenance procedures.
▪ SVE cleanup goals and system shutdown requirements.
▪ Health and safety considerations, including recommended personal protective equipment.
▪ An estimated cost and schedule to implement the ISR Work Plan.
Golder has included a proposed SVE well and vacuum monitoring point layout on the figures included in Attachment A. The proposed layout was presented to the FDEP via e-mail on October 25, 2021. Golder will confirm the proposed layout is acceptable for full-scale design prior to development of the ISR Work Plan. Golder will also obtain an updated site access agreement during ISR Work Plan activities.
COST AND SCHEDULE
The estimated cost to complete the ISR Work Plan is $9,215.02. The LOE/CEF cost sheets are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule. Golder will discuss any modifications to the proposed schedule with the FDEP.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 Project Management
$1,041.72 July 1, 2022
Subtask 2 ISR Work Plan
$8,173.30 May 27, 2022 (ISR Work Plan)
Total/Completion Date $9,215.02 August 26, 2022
Golder appreciates the opportunity to provide services to the FDEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, Golder Associates USA Inc.
Matthew C. Crews, PE Jesse C. Brown, PE Senior Lead Consultant, Environmental Engineer Director, Environmental Engineer
MCC/JCB/as
Attachments: Attachment A 2020 Soil and MAGS Data
Attachment B Level of Effort Sheets and Cost Estimate Form
G:\Projects\DEP-Drycleaning\Projects\Jax\Jet - HW685\DC021A - Jet Cleaners ISR Work Plan\Proposal\HW685_DC021A - Jet Cleaners - Cost Proposal for ISR Work Plan.rev1.docx
FORMER JET
CLEANERS
FORMER BOILER
ROOM
EXISTING REST ROOMS
FORMER MACHINE LOCATION
FORMER MACHINE LOCATIONS
EXISTING CHURCH
SOUND BOARD
SLIDING DOORS
DOOR
REAR DOORS
FORMER
MACHINE
LOCATION
MAG002
MAG004
MAG005
MAG006
MAG001
G
UNDY STREET
MAG003
1.) SITE MAP BY HARDING ESE, MACTEC COMPANY DATED MARCH 2002.
BUILDING
MONITORING WELL LOCATION
1.) SCTL - SOIL CLEANUP TARGET LEVEL PER CHAPTER 62-777, TABLE II, OF THE
FLORIDA ADMINISTRATIVE CODE.
2.) LEACHABILITY SCTL RESULTS ARE REPORTED IN MILLIGRAMS PER KILOGRAM
(mg/kg).
3.) BOLD FONT INDICATES AN EXCEEDANCE OF THE APPLICABLE LEACHABILITY
SCTL.
4.) SPLP - SYNTHETIC PRECIPITATION LEACHING PROCEDURE.
5.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL REPORTED IN MICROGRAMS
PER LITER (ug/L).
6.) U - INDICATES THE COMPOUND WAS ANALYZED AND NOT DETECTED.
7.) I - REPORTED VALUE IS BETWEEN LABORATORY METHOD DETECTION LIMIT
AND PRACTICAL QUANTITATION LIMIT.
8.) * - RESULT DETERMINED NOT TO EXCEED THE GCTL BASED ON THE FDEP
ROUNDING MEMORANDUM DATED NOVEMBER 17, 2011.
TETRACHLOROETHENE (PCE)
MAG001
8/11/2020
1.0 0.030
MONITORING WELL I.D.
SAMPLE DATE
DEPTH BELOW SURFACE (FT-BGS)
SCTL
SOIL BORING LOCATION
in
FDEP-DC004
Control No.
FDEP-DC004-N004
FIGURE
2020-11-05
BCL/DTS
RFM
RFM
JCB
JET CLEANERS
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FACILITY ID#: ERIC-4540
FL. DEPT. OF ENVIRONMENTAL PROTECTION
PCE CONCENTRATIONS DETECTED IN SOIL
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F
D
EP
\F D
EP
-D
C \D
C N o
Je t C le an er s\ N
O ct
_R pt \A ct iv e D ra w in gs
Fi le
N am e:
F
D
EP
-D C
4-
N
4.
dw g
SCALE
0 10 20
FEET
LEGEND
NOTE(S)
REFERENCE(S)
MAG001
8/11/2020
1.0 0.0017 I
2.0 0.0038
3.0 0.0017 I
4.0 0.00099 U
5.0 0.0010 U
MAG006
8/10/2020
1.0 0.0094
2.0 0.0054
3.0 0.0048
4.0 0.0039
5.0 0.0030
6.0 0.00098 U
MAG002
8/11/2020
1.0 0.0027
2.0 0.0026
3.0 0.0030
4.0 0.0047
5.0 0.029
MAG004
8/11/2020
1.0 0.0048
2.0 0.0046
3.0 0.0081
4.0 0.0068
MAG005
8/11/2020
1.0 0.0041
2.0 0.0053
3.0 0.0039
4.0 0.011
SPLP
3.0
GCTL
MAG003
8/11/2020
1.0 0.20 13
2.0 0.055 3.3*
3.0 0.018
4.0 0.0055
5.0 0.0023 I
PCE EXCEEDING FDEP GCTLs
(DASHED WHERE INFERRED)
AutoCAD SHX Text
MW-002
AutoCAD SHX Text
MW-001
AutoCAD SHX Text
MW-013
AutoCAD SHX Text
MW-005
AutoCAD SHX Text
MW-006
AutoCAD SHX Text
MW-004
AutoCAD SHX Text
MW-003
AutoCAD SHX Text
MW-011
AutoCAD SHX Text
MW-017
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
POND
AutoCAD SHX Text
SPLP
mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Text Box Active SVE
SVE-1
SVE-2
MAG003
MAG005
Vacuum Monitoring Points
VMP-1
MAG002
MAG004
MAG006 (if located) mcrews Callout
SVE-1
mcrews Callout
SVE-2
mcrews Callout
VMP-1
mcrews Oval mcrews Text Box 20-foot ROI
FORMER JET
CLEANERS
FORMER BOILER
ROOM
EXISTING REST ROOMS
FORMER MACHINE LOCATION
FORMER MACHINE LOCATIONS
EXISTING CHURCH
SOUND BOARD
SLIDING DOORS
DOOR
REAR DOORS
FORMER
MACHINE
LOCATION
MAG002
MAG004
MAG005
MAG003
MAG006
MAG001
G
UNDY STREET
1.) SITE MAP BY HARDING ESE, MACTEC COMPANY DATED MARCH 2002.
BUILDING
1. MAGS - MODIFIED ACTIVE GAS SAMPLE.
2. U - INDICATES THE COMPOUND WAS ANALYZED AND NOT DETECTED.
3. I - REPORTED VALUE IS BETWEEN LABORATORY METHOD DETECTION LIMIT
AND PRACTICAL QUANTITATION LIMIT.
4. VOLATILE ORGANIC COMPOUND CONCENTRATIONS ARE IN MILLIGRAMS PER
CUBIC METER (mg/m³).
5. CVOCs - CHLORINATED VOLATILE ORGANIC SOMPOUNDS.
SOIL BORING LOCATION
in
FDEP-DC004
Control No.
FDEP-DC004-N005
FIGURE
2020-11-05
BCL/DTS
RFM
RFM
JCB
JET CLEANERS
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FACILITY ID#: ERIC-4540
FL. DEPT. OF ENVIRONMENTAL PROTECTION
MAGS SOIL VAPOR ANALYTICAL RESULTS
(OCTOBER 2020)
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F
D
EP
\F D
EP
-D
C \D
C N o
Je t C le an er s\ N
O ct
_R pt \A ct iv e D ra w in gs
Fi le
N am e:
F
D
EP
-D C
4-
N
5.
dw g
SCALE
0 10 20
FEET
LEGEND
NOTE(S)
REFERENCE(S)
MAG002
10/12/2020
1.46 0.0055 0.025
0.00019 U
1.521
MAG001 Sample ID 10/12/2020 Date Sampled
3 Tetrachloroethene (PCE)
0.00033 U Trichloroethene (TCE)
0.00028 U Cis-1,2-Dichloroethene (DCE)
0.00018 U Vinyl Chloride (VC)
1.128 TOTAL CVOCS
MAG003
10/12/2020
4.43 0.0173
0.00050 I
0.00019 U
4.511
MAG006
10/12/2020
4.90 0.004
0.00029 U
0.00018 U
4.938
MAG001
10/12/2020
1.88 0.004
0.0003 U
0.00019 U
1.908
MAG004
10/12/2020
2.88 0.0137
0.00048 I
0.00018 U
2.966
MAG005
10/12/2020
2.21 0.0097
0.00029 U
0.00018 U
2.298
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
POND
mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Oval mcrews Callout
VMP-1
mcrews Callout
SVE-2
mcrews Callout
SVE-1
mcrews Text Box Active SVE
SVE-1
SVE-2
MAG003
MAG005
Vacuum Monitoring Points
VMP-1
MAG002
MAG004
MAG006 (if located) mcrews Text Box 20-foot ROI
File details come from the government source that posted it. Updated .