This Task Assignment (TA) document DC003C is executed between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. for environmental remediation services at Prestige Cleaners Inc., located at 3044 W Tharpe Street, Tallahassee, Leon County, Florida (Facility ID: ERIC_4873). The contract is issued under the master contract HW685 and is effective from November 6, 2025, with a completion date of March 27, 2026. Patrick McGrane serves as the FDEP project manager, while Matt Crews represents WSP USA Inc. as the contractor's project manager.
The scope of work consists of five subtasks: Project Management ($1,979.55); Groundwater Sampling and IDW Management ($5,642.93); PFAS-Related Costs and IDW Management ($3,869.66); Confirmation Soil Sampling ($10,117.71); and Reporting ($4,095.00), for a total fixed unit rate contract value of $25,704.85. Work includes collecting groundwater samples from nine monitoring wells for analysis of chlorinated volatile organic compounds and PFAS using EPA Methods 8260B and DEP SOPs, collecting soil samples from seven boring locations, managing investigation-derived waste, and preparing an Annual Groundwater Monitoring Report. Deliverables are scheduled with interim email summaries and field documentation due December 5, 2025, January 16, 2026, and February 13, 2026, with invoicing tied to submission and FDEP approval of specified reports and waste manifests. The contract encompasses 125 total labor hours and includes subcontractor costs for drilling services (Probe Domain and Connelly & Associates estimated at $2,800 and $3,175 respectively) and waste disposal services through Erwin Remediation and US Ecology.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW685
DC003C Completion March 27, 2026
This Task Assignment authorizes WSP to conduct groundwater and soil sampling at Prestige Cleaners Inc in accordance with the October 6, 2025 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor
Contractor Matt Crews Contractor 904-363-3430
ERIC_4873
3044 W Tharpe Street, Tallahassee, Leon County
Prestige Cleaners Inc
Contractor Contractor
✔ $ 25,704.85
$ 25,704.85
Scope of Work
WSP USA Inc.
Contractor Matthew Crews
Environmental Engineer
11/6/2025
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.11.06 10:49:00 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.11.03 17:59:07 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM
HW685
DC003C
Subtask 3 - PFAS Related Costs & IDW Management
Subtask 4 - Confirmatory Soil Sampling & IDW Management
Subtasks 1 & 5 - Project Management; Reporting
Subtask 2 - Annual Groundwater Monitoring 12/05/2025
12/05/2025
01/16/2026
02/13/2026
Subtask 2 & 3 - Submittal and FDEP approval of email summary containing field documentation, certified laboratory reports for VOCs and PFAS, and signed waste manifests
Subtask 4 - Submittal and FDEP approval of email summary containing field documentation, certified laboratory report for soil, and signed waste manifests
Subtasks 1 & 5 - Submittal and FDEP approval of the Annual Groundwater Monitoring Report
$ 9,512.59
$ 25,704.85
$ 10,117.71
$ 6,074.55
Memorandum
TO: Negotiation File
Prestige Cleaners Inc Tallahassee, Leon County
ERIC_4873
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC003C (HW685)
DATE: October 7, 2025
This Task Assignment authorizes WSP USA Inc. (WSP) to perform groundwater and soil sampling at the Prestige Cleaners Inc site.
The scope of work was approved following review of the 2025 Annual Groundwater Monitoring
Report. Sampling locations and intervals were reviewed and approved by Department technical staff.
The total cost for this project is $25,704.85 with 125 total labor hours. All work is to be completed in accordance with the October 6, 2025, Scope of Work, Cost Estimate, and Bid
Documentation.
WSP may invoice according to the included schedule.
FD
EP
C
OS
T
ES
TI
MA
TE
C on tra ct or
W S
P U
S A
, I nc
D at e:
9/
/2
Ta sk
D C
3C
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
S ub Ta sk
G ro un dw at er
S am pl in g an d
ID
W M an ag em en t S ub Ta sk
A ct iv ity
/P ha se
M on ito rin g
Ta sk
P
FA
S
R el at ed
C os ts S ub Ta sk
P ro je ct
M an ag er
P at ric k M cG ra ne
Ta sk
S oi l S am pl in g
S ub
Ta sk
S ub
Ta sk
R ep or tin g
S ub
Ta sk
TTo ta ls
La bo r
R at e C at eg or y
$7 7.
PP
ra ct ic e
Le ad er
X -1
S
C H
A E
FE
R
, G E
O
FF
R E
Y
0.
0.
0.
3.
0.
0.
0.
0.
0.
$5 2.
S en io r C on su lta nt
X
-1
C H
A P
P E
LL
, L
O G
A N
.5 1.
.0 3.
.0 0.
0.
0.
0.
0.
$5
4.
S en io r
C on su lta nt
X -1
LU
C E
R O
, B E
N
0.
4.
0.
4.
0.
0.
0.
0.
0.
$4 3.
S en io r P ro je ct S ci /E ng
P -1
O
IE
N
, E R
IK
.0
7.
.0
0.
0.
0.
0.
0.
0.
$3 9.
P ro je ct S ci /E ng
P -9
D E
L V
A L, L U
IS
.0
3.
0.
0.
0.
0.
0.
0.
0.
$3 6.
S ta ff
S ci
/E ng
P
-8 S
TR
A
Y E
R , A
LI
C
IA
0.
0.
0.
2.
0.
0.
0.
0.
0.
$2 8.
S ta ff
S ci
/E ng
P
-7 C
A
TH
E Y
, D A
V
ID
0.
0.
.0 0.
0.
0.
0.
0.
0.
To ta l H ou rs
.5
.0
.0
.0
.0 0.
0.
0.
0.
0.
D ire ct L ab or
$5
,7
.4
$6
.4
$1 ,3
.4
$1
,2
.4
$1 ,1
.0
$1
,3
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
2.
$9
,9
.1
$1 ,1
.1
$2
,3
.6
$2 ,1
.4
$1
,9
.2
$2 ,3
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or
$1
5, 2.
$1 ,7
.5
$3
,6
.1
$3 ,3
.8
$3
,1
.2
$3 ,7
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Tr av el V eh ic le R en ta l $2
.0
$1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ea ls
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $2
.0
$1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m en t)
P ro be
D om ai n
$2 ,8
.0
$0
.0
$0 .0
$2
,8
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E rw in $3
.0
$0
.0
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O th er $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O th er $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $3
,1
.0
$0 .0
$1
.0
$2
,9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $3
.0
$0
.0
$1 9.
$2
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $3
,5
.0
$0 .0
$2
.5
$3
,2
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$3 ,8
.0
$7
.0
$0
.0
$3 ,1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$3 ,8
.0
$7
.0
$0
.0
$3 ,1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en se s
P er so na l P ro te ct io n
$4
.0
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$8 0.
$4
0.
$0 .0
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $2
.0
$1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$8
.0
$7
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $2
4, 0.
$1 ,7
.5
$5
,2
.1
$3 ,5
.3
$9
,8
.7
$3 ,7
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$1 ,5
.2
$1
.9
$3
.8
$3
.2
$3
.9
$3
.2
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l E st im at ed C os t
$2 5, 4.
$1
,9
.5
$5 ,6
.9
$3
,8
.6
$1 0, 7.
$4
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P re st ig e C le an er s
In c.
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Prestige Cleaners Inc.
SUBTASK 2: Groundwater Sampling and IDW Management
DATE: 9/26/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF TITLE WORK DESCRIPTION HOURS
CHAPPELL, LOGAN Senior Consultant - X-11 1
OIEN, ERIK Senior Project Sci/Eng - P-10 17
DEL VAL, LUIS Project Sci/Eng - P-9 14
TOTAL LABOR 32
VEHICLE TYPE RATE UNIT USEAGE
Utility Van $120.00 Per day 1 $120.00
TOTAL VEHICLE $120.00
MEALS STAFF RATE UNIT USEAGE
TOTAL MEALS $0.00
HOTELS STAFF RATE UNIT USEAGE
TOTAL HOTELS $0.00
SUBCONTRACTOR COSTS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Total VOCs EPA Method 8260B $73.00 9 0 $657.00 Total VOCs - PID/Hall series EPA Method 8021 - IDW $110.00 1 0 $110.00
TOTAL LAB $767.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Deep Groundwater Sampling Kit $415.00 Per Day 1 $415.00 Miscellaneous Expendables $40.00 Per Day 1 $40.00
Tubing, Poly HDPE $0.30 Per Foot 500 $150.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 9 $27.00
Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $732.00
Verification of property ownership prior to groundwater sampling (1 hour).
Field event preparation and breakdown (2 hour). Round trip travel (1 hour). Gauge water levels, calibrate instrumentation, and collect IDW sample and groundwater samples from monitoring wells
MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D (12 hours). Deliver samples to laboratory (1 hour). Scan and upload field documentation (1 hr)
Round trip travel (1 hour). Gauge water levels, calibrate instrumentation, and collect IDW sample and groundwater samples from monitoring wells MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, and MW-7D (12 hours). Deliver samples to laboratory (1 hour).
SUBTASK 3: PFAS Related Costs
DATE: 9/26/2025
LABOR CATEGORY
STAFF-TITLE HOURS
CHAPPELL, LOGAN Senior Consultant - X-11 11
LUCERO, BEN Senior Consultant - X-11 4
OIEN, ERIK Senior Project Sci/Eng - P-10 7
DEL VAL, LUIS Project Sci/Eng - P-9 3
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USEAGE
TOTAL MEALS $0.00
HOTELS STAFF RATE UNIT USEAGE
TOTAL HOTELS $0.00
SUBCONTRACTOR COSTS
NAME RATE COST
Erwin T&D - Non-Haz PFOS/PFAS Water $195 per drum $1.00 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
PURPOSE
*PROVIDE TIME REQUIRED FOR EACH PERSON
WORK DESCRIPTION
Complete forms to arrange for PFAS sample bottle order delivery and shipment from DEP Central Laboratory (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (3 hours). Prepare and submit Trip Report with field documentation and certified laboratory report with results (4 hours). Prepare PFAS section for the draft annual report (3 hours).
Prepare CADD Figures with PFAS data for Annual Groundwater Monitoring Report. (4 hrs)
Collect samples from IDW drum and 9 wells listed in Subtask 2 for PFAS analysis and collect equipment blank for PFAS analysis (1 hour). eliver PFAS samples to DEP Central Laboratory (2 hours). Prepare data tables with PFAS analytical results (4 hours).
Collect samples from IDW drum and 9 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (1 hour). eliver PFAS samples to DEP Central Laboratory (2 hours).
SUBTASK 4: Soil Sampling
DATE: 9/26/2025
LABOR CATEGORY
STAFF-TITLE HOURS
CHAPPELL, LOGAN Senior Consultant - X-11 3
OIEN, ERIK Senior Project Sci/Eng - P-10 15
CATHEY, DAVID Staff Sci/Eng - P-7 12
TOTAL LABOR 30
VEHICLE TYPE RATE UNIT USEAGE
Utility Van $120.00 Per day 1 $120.00
TOTAL VEHICLE $120.00
MEALS STAFF RATE UNIT USEAGE
TOTAL MEALS $0.00
TOTAL HOTELS $0.00
SUBCONTRACTOR COSTS
NAME RATE UNIT COST
Erwin T&D - Non-Haz PFOS/PFAS Soils $195.00 per drum 1 $195.00 Probe Domain Driller $2,800.00 Quote 1 $2,800.00
TOTAL $2,995.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8021 - IDW $110.00 1 0 $110.00 1311/6010 6020/7470 $135.00 1 0 $135.00
EPA Method 8260B $73.00 15 0 $1,095.00 1311/1312 $45.00 15 0 $675.00
Total VOCs - PID/Ha series TCLP Metals Chlorinated VOCs - Soils TCLP/SPLP Bottle Extraction Chlorinated VOCs - SPLP EPA Method 8260B $73.00 15 0 $1,095.00
TOTAL LAB $3,110.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drum, 55-gallon $100.00 Per Drum 1 $100.00 Miscellaneous Expendables $40.00 Per Day 1 $40.00
TOTAL EQUIPMENT $140.00
PURPOSE
*PROVIDE TIME REQUIRED FOR EACH PERSON
WORK DESCRIPTION
Prepare and submit Trip Report, field documentation, and certified laboratory report (3 hours).
Prepare Equipment for event (2 hrs); Mobilization roun trip (1 hr); Pickup and drop off lab kits (1 hr); Collect samples from seven soil borings & IDW sample (10 hrs); Scan and upload field documentation (1 hr);
Prepare field binder/paperwork for event (1 hrs); Mobilization roun trip (1 hr); Collect samples from seven soil borings & IDW sample (10 hrs)
FINAL --7/24/96
SUBTASK 5: Reporting
DATE: 9/26/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
SCHAEFER, GEOFFREYPractice Leader - X-13 3
CHAPPELL, LOGAN Senior Consultant - X-11 16
LUCERO, BEN Senior Consultant - X-11 4
STRAYER, ALICIA Staff Sci/Eng - P-8 2
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USEAGE
TOTAL MEALS $0.00
TOTAL HOTELS $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Develop conclusions and recommendations for Annual Monitoring Report
Prepare report tables and draft Annual Monitoring Report
CADD; update figures for Annual Monitoring Report
Reporting; document production. Prepare PDF for OCULUS.
FINAL --7/24/96
Golder Associates USA Inc.
325 John Knox Road, Bldg. F, Suite 140, Tallahassee, Florida, USA 32303 T: +1 904 363-3430 F: +1 904 363-3445
WSP.com
October 6, 2025
Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR GROUNDWATER MONITORING & CONFIRMATION SOIL SAMPLING
PRESTIGE CLEANERS INC
3044 WEST THARPE STREET
TALLAHASSEE, LEON COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4873
PROPOSED TASK ASSIGNMENT: DC003C
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual groundwater monitoring and confirmation soil sampling activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – GROUNDWATER SAMPLING AND IDW MANAGEMENT
WSP will collect groundwater samples from the following nine (9) monitoring wells: MW001, MW002, MW003, MW004, MW005, MW006RR, MW-7S, MW-7I, MW-7D. The well locations and previous analytical results are shown on the attached Figures 3 & 5.
Patrick McGrane
Florida Department of Environmental Protection October 6, 2025
Prior to groundwater sampling, depth-to-water measurements will be measured using an electronic water level indicator. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary. Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018) and DEP SOPs for Sampling with and Analysis of Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS), dated August 2020. Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures. The samples will be analyzed as follows:
Sample ID Chlorinated VOCs (EPA Method 8260B)
PFAS*
(DEP SOP: LC001-3 or Similar)
MW001 X X
MW002 X X
MW003 X X
MW004 X X
MW005 X X
MW006RR X X
MW-7S X X
MW-7I X X
MW-7D X X
Equipment Blank X
IDW Total VOCs X
The groundwater samples to be analyzed for chlorinated volatile organic compounds (VOCs) will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified, fixed-base laboratory. The groundwater samples to be analyzed for PFAS will be transported to the DEP Central Laboratory in Tallahassee, Florida. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if off-site notification is required.
Quality Assurance/Quality Control WSP will collect one equipment blank sample during the groundwater sampling event. The equipment blank will be collected by pumping (peristaltic pump) PFAS-free water through silicon and/or HDPE tubing and into laboratory-supplied containers. The equipment blank will be analyzed for PFAS using EPA Method 8321 (or similar), as shown in the above table.
SUBTASK 3 – PFAS RELATED COSTS AND IDW TRANSPORTATION
WSP will include costs associated with the expanded PFAS monitoring activities in this subtask. PFAS samples will be collected simultaneously with the VOC sampling; These activities include completing bottle order requests with the DEP Central Laboratory; waste characterization and waste profiling; packaging and shipping PFAS samples to the DEP Central Laboratory; and investigation-derived waste (IDW) transportation and disposal.
Investigation Derived Waste WSP will containerize the investigation derived waste (IDW) purge water and decontamination water in a 55-gallon drum. WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8021 and PFAS using DEP SOP: LC-001-3 (or similar), as shown in the above table. The drum will be temporarily staged onsite, pending waste characterization. For cost estimating purposes, WSP has assumed that the IDW can be transported and disposed as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates one drum of IDW purge water and decontamination water will be generated during groundwater sampling activities.
Interim Deliverable For subtasks 2 & 3, WSP will submit a combined e-mail deliverable to include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report or laboratory sample login checklist, and laboratory chain-of-custody documentation, waste manifest, and a figure which depicts PFAS concentrations exceedances to the DEP Provisional Groundwater Cleanup Target Level (PGCTL) of 70 nanograms per liter for perfluoro-n-octanoic acid (PFOA), perfluorooctanesulfonic acid (PFOS), or the sum of PFOA and PFOS concentrations.
SUBTASK 4 – CONFIRMATION SOIL SAMPLING
In 2006 there were 31 soil borings (SB001 through SB031) advanced to delineate PCE exceedances (Figure 4-1 from 2006 Site Assessment Report). Later, in 2009, additional soil borings were completed preceding an interim source removal, some of the soil boring sample locations coincided with the locations from the 2006 investigation (Figure 2 from 2010 Interim Source Removal Report). During the source removal, three SVE wells were installed once the excavation depth was reached, one vertical SVE well VEW003, and two horizontal extraction wells HVE001 and HVE002 which extend beneath the slab at a depth of 5’ BGS. The purpose of the soil confirmation sampling event is to evaluate the effectiveness of the remedial activities performed to date. The recommended sampling locations and depths are highlighted on the attached figures and tables, and are also summarized below.
All samples will be analyzed for 8260D VOHs and SPLP for 8260D. IDW will be containerized into a 55-gal DOT drum. The drum will be temporarily staged onsite, pending waste characterization. For cost estimating purposes, WSP has assumed that the IDW can be transported and disposed as non-hazardous waste at an approved facility.
The IDW transportation and disposal subcontractor will provide WSP a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates one drum of IDW soil cuttings will be generated during groundwater sampling activities. Each of the borings will be abandoned using backfill and/or grout to surface. If hold times on SPLP samples are nearing expiration, WSP will instruct the laboratory to run analysis so that lab results are not qualified.
Sample ID Sample Depth Intervals (ft BGS) Analysis
SB010 1’, & 3’ Chlorinated VOCs - 8260
SB011 2’ Chlorinated VOCs - 8260
SB012 2’, & 4’-8’ Chlorinated VOCs - 8260
SB013 7’, 12’, 16’, 24’, & 28’ (if not saturated, check nearby well DTW)
Chlorinated VOCs - 8260
SB018 6’, 12’, & 20’ Chlorinated VOCs - 8260
SB020 3’ Chlorinated VOCs - 8260
SB027 2’ Chlorinated VOCs - 8260
IDW Composite Full List VOCs
Interim Deliverable Upon completion of Subtask 4, an e-mail deliverable will be submitted which will include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report or laboratory sample login checklist, and laboratory chain-of-custody documentation
SUBTASK 5 – REPORTING
WSP will prepare an Annual Groundwater Monitoring & Soil Sampling Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; Soil analytical figure; laboratory analytical data; and conclusions and recommendations.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $25,704.85. WSP anticipates the monitoring event will take place in October 2025. The level of effort sheets and cost estimate form are included in Attachment A.
The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 1,979.55 January 21, 2026
Subtask 2 – Groundwater Sampling $ 5,642.93 November 21, 2025 (E-mail summary with
PFAS data figure; field documentation; certified laboratory analytical reports; and IDW manifest)Subtask 3 – PFAS Related Costs & IDW
Management $3,869.66
Subtask 4 – Confirmation Soil Sampling $10,117.71 December 19, 2025 (E-mail summary with PFAS data figure; field documentation; certified laboratory analytical reports; and IDW manifest)
Subtask 5 – Reporting $ 4,095.00 January 21, 2026 (Annual Groundwater Monitoring Report)
Total/Completion Date $ 25,704.85 February 20, 2026
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (719) 306-4640.
Sincerely, WSP USA Inc.
Logan Chappell, PE Environmental Engineer / Project Manager
Attachments:
Figure 3 – Groundwater Analytical Map July 2024 Figure 5 – PFAS Screening July 2024 Figure 4-1 – Soil PCE Concentrations Map Various Historical Tables (2006 – 2009)
Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes
M
4 M icr os icr os of t os of tC or po
Co rp o Co rp o or po r rp o rp or rpp or a po r po r po ra tio n © tio n ©
4 M ax
4 M ax axaxaxaxaxaa r rrr ©
CN
CN
ES
NE
N
(20
) D (20 ist rib uti ion
A irb us D
S DSDSSS
M W
M W
M W
M W
M W
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
M W
-7 S
M W
-7 I
M W
-7 D
M W
6R
R
D
AT
E
IS
SU
ED
C .A
.D . F
IL
E
N O
ER
IC
_4
FI
G
U R
E
G R
O U
N D
W
AT
ER
A
N
AL
YT
IC
AL
M
AP
JU
LY
PR
ES
TI
G
E C
LE
AN
ER
S
SI
TE
TA
LL
AH
AS
SE
E, L
EO
N C
O U
N
TY
, F
LO
R
ID
A
LE
G
E N
D
BU
IL
D
IN
G
SH
AL
LO
W
W
EL
L
LO
C
AT
IO
N
D R
YC
LE
AN
IN
G M
AC
H
IN
E
IN
TE
R M
ED
IA
TE
W
EL
L
LO
C
AT
IO
N
D
EE
P W
EL
L
LO
C
AT
IO
N
A
LL
C O
N C
E N
TR
A
TI
O
N S
A R
E
IN
u g/
L
U
A N
A
LY
ZE
D
F O
R B
U T
N O
T D
E
TE
C
TE
D
I = V
A
LU
E
IS
B E
TW
E
E N
T H
E L
A B
M E
TH
O
D D
E
TE
C
TI
O N
L
IM
IT
T H
E L
A B
P R
A C
TI
C
A L
Q U
A N
TI
TA
TI
O
N L
IM
IT
C
O N
C E
N
TR
A
TI
O N
A B
O V
E G
C
TL
's
PC
E
TC
E
C
IS
TE
TR
A C
H
LO
R O
E
TH
E N
E
TR
IC
H
LO
R O
E
TH
E N
E
C
IS
-1 ,2
-D
IC
H
LO
R O
E
TH
E N
E
TR
AN
S
VC
TR
A
N S
-1 ,2
-D
IC
H
LO
R O
E
TH
E N
E
V
IN
Y L
C H
LO
R
ID
E
X X
AP
PR
O
XI
M
AT
E
PR
O
PE
R
TY
B O
U N
D
AR
Y
FE
N
C E
U N
D
ER
G R
O U
N D
D R
AI
N
AG
E
PI
PE
M W
M W
M W
M W
M W
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
M W
-7 S
M W
-7 I
M W
-7 D
M W
6R
R
D
AT
E
IS
SU
ED
C .A
.D . F
IL
E
N O
ER
IC
_4
FI
G
U R
E
PF
AS
S C
R
EE
N
IN
G
JU
LY
PR
ES
TI
G
E C
LE
AN
ER
S
SI
TE
TA
LL
AH
AS
SE
E, L
EO
N C
O U
N
TY
, F
LO
R
ID
A
LE
G
E N
D
BU
IL
D
IN
G
SH
AL
LO
W
W
EL
L
LO
C
AT
IO
N
D R
YC
LE
AN
IN
G M
AC
H
IN
E
IN
TE
R M
ED
IA
TE
W
EL
L
LO
C
AT
IO
N
D
EE
P W
EL
L
LO
C
AT
IO
N
A
LL
C O
N C
E N
TR
A
TI
O
N S
A R
E
IN
n g/
L
U
A N
A
LY
ZE
D
F O
R B
U T
N O
T D
E
TE
C
TE
D
I = V
A
LU
E
IS
B E
TW
E
E N
T H
E L
A B
M E
TH
O
D D
E
TE
C
TI
O N
L
IM
IT
T H
E L
A B
P R
A C
TI
C
A L
Q U
A N
TI
TA
TI
O
N L
IM
IT
C
O N
C E
N
TR
A
TI
O N
A B
O V
E P
R O
V
IS
IO
N
A L
G R
O U
N D
W A
TE
R
C
LE
A N
U P
TA
R
G E
T
LE
V E
LS
(G
C
TL
's
D E
LI
N
E A
TI
O
N C
O N
TO
U
R B
A S
E D
O N
P G
C
TL
O F
(n g/ L)
D O
TT
E
D L
IN
E
U
N D
E
FI
N E
D C
O N
TO
U
R
X X
AP
PR
O
XI
M
AT
E
PR
O
PE
R
TY
B O
U N
D
AR
Y
FE
N
C E
U N
D
ER
G R
O U
N D
D R
AI
N
AG
E
PI
PE
Source Removal Area to 5' BGS
SOURCE: 2006 Site Assessment Report - E&E
Highlighted borings are proposed confirmation sample locations
Ma y I nt er im S ou rc e Re mo va l Re po rt E &E
20.88 ft ft
45.87 ft
68.05 ft
N O T E
T h i s m a p s h o w s r e s u l t s f r o m t h e s a m p l i n g e v e n t s o m e s a m p l e l o c a t i o n s w e r e p r e v i o u s l y s a m p l e d i n
Ma y I nt er im S ou rc e Re mo va l Re po rt E &E
Florida Department of Environmental Protection-Division of Waste Management-Bureau of Petroleum Storage Systems
PETROLEUM PREAPPROVAL PROGRAM
DIRECT PUSH TECHNOLOGY QUOTE FORM
Contractor Name: ___WSP / Tallahassee / Logan Chappell_______
Site Name and Location: Prestige Cleaners / Tallahassee, FL_ Date:__8/28/25____ FAC ID#: __
PROPOSED SCOPE OF WORK:
Collect continuous soils from 4 locations outside the building to 2',3',20', and 28'.
Collect continuous soils from 3 locations inside the building to 2',3', and 8'.
Unit Unit Rate Number of Units Extended Price
Equipment Type: ___Geoprobe________________
Direct Push Daily Rate 1 - on-site day whole day $2,000.00 1 $2,000.00 Direct Push Remote Access-Day Rate 1 - on-site day whole day $3,125.00 $0.00 Auger Attachment, 2" Well Install per foot $10.00 $0.00 Pre-Packed Well Screen (includes all materials) ID ______ 5' Length Pack OD _______ each $100.00 $0.00 Slotted PVC Well Screen (includes all materials) 5' Length Pack OD _______ each $125.00 $0.00 Well Riser (includes all materials) ID ______ 5' Length each $25.00 $0.00 Well Completion (includes MH w/ cover, concrete pad, and locking well cap) per well $200.00 $0.00
Mobilization - Heavy Duty Truck and Trailer roundtrip $800.00 1 $800.00 Per Diem per crew / per night $450.00 $0.00 DOT Approved 55-gal Drum each $75.00 $0.00 Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $100.00 $0.00 Well Abandonment per foot $10.00 $0.00 Meter rental for hydrant and set-up fee per day $1,500.00 $0.00 750-gallon poly tank rental per day $1,000.00 $0.00
TOTAL QUOTE PRICE $2,800.00
Notes:
1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, development, standby time, steamcleaning decon, and grouting.
2. Actual cost only (no markup allowed).
Days to Complete Scope of Work: __1____ Project No.: ___________________________
Subcontract Company Name: _____Probe Domain, Inc.____________________________________________________________________
Subcontract Mailing Address: _____3020 Thunder Road, Middleburg, FL 32068___________________________________
Signature and Title of Person Submitting Quote: ____PRESIDENT/_James R. Laymon / James R. Laymon_ Date: ___8/28/25___
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Prestige Cleaners Copies of completed quote forms are to be submitted to BPSS Cleanup Team 5 Rev 9/25/02
Prestige Cleaners (currently a print shop) Request Date:
3044 West Tharpe St, Tallahassee, Leon County, FL Facility ID #:
WSP Subcontractor Company Name:
Logan Chappell Subcontractor Contact/Title:
719-306-4640 Subcontractor Phone:
Logan.Chappell@wsp.com Subcontractor Email:
Project Description:
Unit of Measure Qty Price Extended Price per day 1.00 $ 1,775.00 $ 1,775.00 per day $ 1,350.00 $ -per hour $ 275.00 $ -per foot $ 15.00 $ -per foot $ 20.00 $ -per section $ 175.00 $ -per well $ 150.00 $ -per well $ 250.00 $ -per well $ 250.00 $ -per roundtrip 1.00 $ 975.00 $ 975.00 per night $ - $ -per permit $ 75.00 $ -per drum $ 70.00 $ -
Geoprobe Consumables (liners, grout, hole plug, sand, asphalt patch, concrete patch, top soil) per day 1.00 $ 100.00 $ 100.00 per day 1.00 $ 175.00 $ 175.00 lump sum 1.00 $ 150.00 $ 150.00
Total: 3,175.00$
Geoprobe 7822
Quote Accepted By:
Kevin Bonacum / Southeast Operations Manager Consultant Contact:
(727) 430-9412 Consultant Phone:
kevinb@connellyandassociates.com Consultant Email:
Signature:Signature:
Quote Submitted By:
Concrete coring inside the building, shop vac required, plastic sheeting required
Concrete Core Machine, Shop Vac
Plastic Sheeting
Subcontractor Contact/Title:
Subcontractor Phone:
Subcontractor Email:
Permit (s)
55 Gallon Drum
Geoprobe Daily Rate & Crew (up to 10 hours on-site)
Geoprobe Half Day Rate & Crew (up to 5 hours on-site)
Geoprobe Overtime Rate (after 10 hours on site)
Mobilization (includes Geoprobe rig and all support vehicles)
Per Diem
8" Manhole set in 2' x 2'x 4" Concrete Pad
Equipment Type:
Date Quote Expires:
1" PVC Well Installation (includes PVC, sand, bentonite, and grout))
2" PVC Well Installation (includes PVC, sand, bentonite, and grout))
Pre-Packed Well Screen ID 2", Length 5' (if needed)
4" Protectice Casing set in 2' x 2' x 4" Concrete Pad
12" Manhole set in 2' x2' x 4" Concrete Pad
Consultant Phone:
Consultant Email:
Consultant:
Consultant Contact:
Item Description
3 Hand auger borings inside the building after 3:00 PM, 2', 3', and 8' via hand auger, backfill and patch
(727) 430-9412
Connelly & Associates, Inc.
Kevin Bonacum / Southeast Operations Manager
Drum cuttings
2 DPT Soil borings, 20' and 28' in depth, backfill with grout, restore grade
2 Hand auger borings outside, 2' and 3', backfill and patch
Days to Complete Project Description:
Connelly & Associates, Inc.
DIRECT PUSH DRILLING QUOTE FORM
Facility Name:
Facility Address:
Quote Requested By: Quote Requested From:
Logan.Chappell@wsp.com
719-306-4640
Logan Chappell
8/25/2025 kevinb@connellyandassociates.com nb@connellyandassociates.com
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 8/25/25 FAC ID#:
Unit Unit Rate Number of Units Extended Price whole day $1,975.00 1 1,975.00$ half day $1,475.00 -$ per foot $25.00 -$ each $110.00 -$ each $50.00 -$ each $35.00 -$ per well $150.00 -$ roundtrip $750.00 1 750.00$ per crew / per night $575.00 -$ each $75.00 1 75.00$ per day $150.00 1 150.00$ each $35.00 -$ lump sum $350.00 1 350.00$ per day $50.00 -$
TOTAL QUOTE PRICE $3,300.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: RRose Hood , Rose Hood Estimating & Scheduling Manager Date: 8/25/25
(2) Hand auger borings to 3', drum cuttings, backfill with grout, restore grade
3044 W Tharpe St, Tallahassee, Leon County, FL
Well Completion (includes 8" MH w/ cover, concrete pad, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
Auger Attachment, 2" Well Install
Direct Push Half-Day Rate 1 - on-site half day
(1) Hand auger boring to 8', drum cuttings, backfill with grout, restore grade
(2) Hand auger borings to 2', drum cuttings, backfill with grout, restore grade
PDS to provide concrete core drill, Borings in NWF cannot be backfilled with cuttings
Site Name and Location: Prestige Cleaners
Consultant Name: WSP
PROPOSED SCOPE OF WORK:
(1) DPT boring to 20', soil sampling, drum cuttings, backfill with grout, restore grade
(1) DPT boring to 28', soil sampling, drum cuttings, backfill with grout, restore grade
Days to Complete Scope of Work: 1
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, 3230DT, 7822DT, 6620DT, 6712DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Other (specify)
Steam Cleaner
Concrete core drill
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
DOT Approved 55-gal Drum
Per Diem Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Er w in U
S Ec ol og y* H
EP
AC
O T&
D N on H az S oi l -
C
VO
C s, P et ro le um , M et al s pe r d ru m
$1
.0
$0 .0
T&
D N on H az M ud /w at er
C
VO
C s, P et ro le um
, M et al s pe r d ru m
$1
.0
$1
.0
Fa ls e
M ob ili za tio n
(n o dr um fo un d)
$8 5.
$0
.0
PF
AS
P ro fil e
Fe e
(1 p er s ite
$3
.0
$0
.0
T& D
N on
H az
S oi l - P
FA
S/
PF
O
S pe r d ru m
$1
.0
$0 .0
T&
D N on H az M ud /w at er
-P
FA
S/
PF
O S pe r d ru m
$1
.0
$0
.0
D is po sa l N on
H az
S oi l - V
O C s pe r d ru m
$1
.0
$0 .0
D is po sa l N on H az M ud /w at er
VO
C s pe r d ru m
$1
.0
$1
.0
Pr of ile
F ee
(1 p er s ite
$9
5.
$9 5.
D is po sa l N on H az S oi l -
P
FA
S/
PF
O S
$6
.0
$0
.0
D is po sa l N on H az M ud /w at er
-P
FA
S/
PF
O S
$6
.0
$0
.0
Ap pr ov al
F ee
(p er s ite
$7
.0
$0 .0
N on H az S ol ifi ca tio n W as te
P ro fil e fe e
$5
0.
$0 .0
N on H az S ol id s D is po sa l
(p er d ru m
$1
.0
$0
.0
N on
H az
S lu dg e
D is po sa l
$1
.0
$0 .0
PF
AS
W as te ga l d ru m e m el le
A L
$8
.0
$0
.0
Tr uc k w ith li ft ga te a nd d riv er
$1
.0
$5
.0 no n ha z liq ui ds d is po sa l ( pe r d ru m
$1
.7
$1
.7 g al lo n re co nd iti on ed d ru m
$1
.6
$0
.0
LT
L fe es
(l es s th an dr um s
$1
.0
$1
.0
En er gy s ec ur ity re co ve ry fe e
$1
.7
$1
.7
To ta l C os t p er
D ru m $1
.0
$2
.0
$1 ,0
.5
N ot es
* T ra ns po rta tio n co st s w ill b e ca lc ul at ed b as ed o n pi ck up s at v ar io us s ite s an d w as te s tre am v ol um e
ID
W
S U
B C
O N
TR
AC
TO
R
C O
ST
E
ST
IM
AT
ES
F O
R C
H
LO
R
IN
AT
ED
V O
C S, P
ET
R O
LE
U
M C
O M
PO
U
N D
S, A
N D
M
ET
AL
S
Su m m ar y of
ID
W
S ub co nt ra ct or s
C os ts
3_
6_
C
VO
C -P et ro
-M et al s
Pa ge o f 1
408 Ditmar Street Pensacola, FL 32503
To: Mr. Ralph Mongillo
WSP
9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256
June 16, 2023
Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials
Mr. Mongillo:
The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:
For Non-Hazardous Chlorinated Solvent Impacted Materials:
Description Rate Unit T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket
For Non-Hazardous PFAS/PFOS Impacted Materials:
Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.