Task Assignment Summary

This is a Task Assignment (TA) document executed between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. under Contract Number HW685. The TA, numbered DC001E, was signed on June 30, 2023, with a completion date of October 31, 2023. The Department Project Manager is Opeyemi Kehinde (850-245-8887), and the Contractor's Project Manager is Matt Crews (904-363-3430). The TA authorizes WSP to send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes in accordance with the June 28, 2023 Scope of Work and Cost Estimate.

The Task Assignment includes two subtasks: Subtask 1 covers Project Management with labor hours automatically calculated based on total direct labor, and Subtask 2 covers the 2023 Site Review Meeting where WSP will send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes. The total TA value is $12,359.29 on a fixed unit rate basis, representing 68 total labor hours. The cost breakdown includes direct labor of $4,096.51 with overhead at 172.50% totaling $7,066.48, plus travel expenses of $80.00 (vehicle rental), completion fees, and project management costs. The deliverable—Site Review Meeting Notes with Project Management—is due September 30, 2023, with invoice payment required upon FDEP approval of the submitted notes. Labor categories include Project Manager, Senior Consultant, Senior Scientist/Engineer, and Staff Scientist/Engineer positions.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01C.pdf PDF
CN-370000-HW685-BF05ACO2.pdf PDF
CN-370000-HW685-BF05ACO3.pdf PDF
CN-370000-HW685-BF06A.pdf PDF
CN-370000-HW685-BF1ACO1.pdf PDF
CN-370000-HW685-BF6ACO1.pdf PDF
CN-370000-HW685-BIL01C.pdf PDF
CN-370000-HW685-BIL01CO1.pdf PDF
CN-370000-HW685-BIL03A.pdf PDF
CN-370000-HW685-BIL2ACO1.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf.crdownload CRDOWNLOAD file
CN-370000-HW685-DC001A.pdf PDF
CN-370000-HW685-DC002G.pdf PDF
CN-370000-HW685-DC003A.pdf PDF
CN-370000-HW685-DC005C.pdf PDF
CN-370000-HW685-DC006B.pdf PDF
CN-370000-HW685-DC006C.pdf PDF
CN-370000-HW685-DC007C.pdf PDF
CN-370000-HW685-DC008A.pdf PDF
CN-370000-HW685-DC009B.pdf PDF
CN-370000-HW685-DC010A.pdf PDF
CN-370000-HW685-DC011A.pdf PDF
CN-370000-HW685-DC012C.pdf PDF
CN-370000-HW685-DC013A.pdf PDF
CN-370000-HW685-DC013C.pdf PDF
CN-370000-HW685-DC015B.pdf PDF
CN-370000-HW685-DC015C.pdf PDF
CN-370000-HW685-DC016A.pdf PDF
CN-370000-HW685-DC018A.pdf PDF
CN-370000-HW685-DC019B.pdf PDF
CN-370000-HW685-DC01ACO6.pdf PDF
CN-370000-HW685-DC01ACO8.pdf PDF
CN-370000-HW685-DC01ACO9.pdf PDF
CN-370000-HW685-DC020B.pdf PDF
CN-370000-HW685-DC022A.pdf PDF
CN-370000-HW685-DC022B.pdf PDF
CN-370000-HW685-DC022D.pdf PDF
CN-370000-HW685-DC023B.pdf PDF
CN-370000-HW685-DC023C.pdf PDF
CN-370000-HW685-DC027B.pdf PDF
CN-370000-HW685-DC027C.pdf PDF
CN-370000-HW685-DC029B.pdf PDF
CN-370000-HW685-DC029C.pdf PDF
CN-370000-HW685-DC02CCO1.pdf PDF
CN-370000-HW685-DC02FCO1.pdf PDF
CN-370000-HW685-DC031A.pdf PDF
CN-370000-HW685-DC031C.pdf PDF
CN-370000-HW685-DC032B.pdf PDF
CN-370000-HW685-DC035A.pdf PDF
CN-370000-HW685-DC037A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC001E Completion October 31, 2023

This Task Assignment authorizes WSP to send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes in accordance with the June 28, 2023, Scope of Work and Cost Estimate.

Opeyemi Kehinde 850-245-8887 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

WSP USA Inc.

WSP USA Inc.

Matt Crews 904-363-3430 N/A

N/A

N/A

✔ $ 12,359.29

$ 12,359.29

Scope of Work

Matthew Crews

Environmental Engineer

6/30/2023

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2023.06.30 11:02:26 -04'00' Kelly Crain Digitally signed by Kelly Crain

Date: 2023.06.29 20:29:48 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1 & 2: Site Review Meeting Notes; Project Management 09/30/2023

Subtasks 1 & 2: Submittal and FDEP approval of the Site Review Meeting Notes;

Project Management $ 12,359.29

$ 12,359.29

HW685

DC001E

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To:

From:

Date:

HW685 Contract Negotiation File Oasis

Kehinde Opeyemi, Project Manager June 29, 2023

Subject: Negotiation Summary

HW685_DC001E

This Task Assignment authorizes WSP to send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes in accordance with the June 28, 2023, Scope of Work and Cost Estimate.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: 2023 Site Review Meeting

WSP will send two personnel to attend the Annual Site Review Meeting with FDEP and submit meeting notes

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $12,359.29 with 68 labor hours.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $23,386.91 with 115 labor hours. Printed on recycled paper.

FDEP COST ESTI MATEContractor: WSP USA Inc.

Date: 6/28/2023

Task #: DC001E SubTask 1 Project Management SubTask 6

Site: Multiple Sites SubTask 2 2023 Site Summary Meeting SubTask 7

Activity/Phase: Site Review Meeting SubTask 3 SubTask 8

Project Manager: Opeyemi Kehinde SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$64.39 Project Manager (MC) 7 7.3 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0 $0.00 Practice Leader - X-13 0 0 0 0 0 0 0 0 0 0

$64.39 Senior Consultant - X-12 (MC) 39 39 0 0 0 0 0 0 0 0 $53.28 Senior Sci/Eng - X-11 (RM) 19 19 0 0 0 0 0 0 0 0

$0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0 $0.00 Project Sci/Eng - P-9 0 0 0 0 0 0 0 0 0 0

$33.90 Staff Sci/Eng - P-8 (AS) 3 3 0 0 0 0 0 0 0 0 $0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 68 7.3 61.0 0 0 0 0 0 0 0 0

Direct Labor $4,096.51 $471.28 $3,625.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $7,066.48 $812.96 $6,253.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,162.99 $1,284.24 $9,878.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

FDEP COST ESTI MATEContractor: WSP USA Inc.

Date: 6/28/2023

Task #: DC001E SubTask 1 Project Management SubTask 6

Site: Multiple Sites SubTask 2 2023 Site Summary Meeting SubTask 7

Activity/Phase: Site Review Meeting SubTask 3 SubTask 8

Project Manager: Opeyemi Kehinde SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $11,242.99 $1,284.24 $9,958.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,116.30 $128.42 $987.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $12,359.29 $1,412.66 $10,946.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Multiple Sites SUBTASK 2: 2023 Site Summary Meeting

DATE: 6/28/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 20

Senior Consultant (M. Crews) 19

Senior Sci/Eng (R Mongillo) 19

Staff Sci/Eng (A. Strayer) Document production for site summaries 3

TOTAL LABOR 61

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 1 $80.00

TOTAL VEHICLE $80.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Round trip travel and attendance for annual site summary meeting to discuss assessment and remediation sites (13 hours). Teleconference to review remaining sites (6 hours).

Preparation/updating of site summaries for 61 sites. Site summary final deliverable.

Round trip travel and attendance for annual site summary meeting to discuss assessment and remediation sites (13 hours). Teleconference to review remaining sites (6 hours).

FINAL --7/24/96

From: Kehinde, Opeyemi To: "Crews, Matt" Cc: Mongillo, Ralph Subject: RE: DC001E - LOE & CEF for 2023 Site Summary Meeting Date: Thursday, June 29, 2023 12:58:00 PM Attachments: image001.png

Yes, we will task it this fiscal year. However, we will shoot for a new meeting date in the month of September, 2023.

Thanks,

- Opeyemi

Opeyemi Kehinde Environmental Specialist II Division of Waste Management Office: 850-245-8887

From: Crews, Matt <matt.crews@wsp.com> Sent: Wednesday, June 28, 2023 2:48 PM To: Kehinde, Opeyemi <Opeyemi.Kehinde@FloridaDEP.gov> Cc: Mongillo, Ralph <ralph.mongillo@wsp.com> Subject: RE: DC001E - LOE & CEF for 2023 Site Summary Meeting

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Thanks for letting us know. Do you still want to task the meeting this fiscal year?

Matthew Crews, P.E.

Assistant Vice President, Environmental Engineer

T+ 1 904-363-3430

M+ 1 904-327-8420

WSP USA Inc.

9428 Baymeadows Road, Suite 400 Jacksonville, Florida, USA 32256 wsp.com

From: Kehinde, Opeyemi <Opeyemi.Kehinde@FloridaDEP.gov> Sent: Wednesday, June 28, 2023 12:30 PM To: Crews, Matt <matt.crews@wsp.com>

Subject: RE: DC001E - LOE & CEF for 2023 Site Summary Meeting mailto:Opeyemi.Kehinde@FloridaDEP.gov mailto:matt.crews@wsp.com mailto:ralph.mongillo@wsp.com https://secure-web.cisco.com/1Nd12c-5uA8r5gWCzobXj8kLq-jKdzP7B9o02gS8Wh6ZMkE2sqw2En7s0PLqzFDkt-kQi9Frxj8zNokovFoeGyzVDvDGqFizqyu2BHgyrJaUswYlY_6ul7gCqMCYm0yhe7iybQKxLAsW-06R9Nd8liOr1uo69CIXCt2Nfos0Ebw6L6sEfVjuaXh-QIY0YFc4mZWRjnt2c3N1tdjxPcS1RZ0qh-Rawb1mqNzVMPB66S3yUynidS9je3EiEpS6OPlsqhdA77JKWG4teAyDTbf80cK94tNlkT7XPS15Sp_jIMDhpetLUOz-cKiqr3v9CaVpt/https%3A%2F%2Fwww.wsp.com%2F https://secure-web.cisco.com/1Nd12c-5uA8r5gWCzobXj8kLq-jKdzP7B9o02gS8Wh6ZMkE2sqw2En7s0PLqzFDkt-kQi9Frxj8zNokovFoeGyzVDvDGqFizqyu2BHgyrJaUswYlY_6ul7gCqMCYm0yhe7iybQKxLAsW-06R9Nd8liOr1uo69CIXCt2Nfos0Ebw6L6sEfVjuaXh-QIY0YFc4mZWRjnt2c3N1tdjxPcS1RZ0qh-Rawb1mqNzVMPB66S3yUynidS9je3EiEpS6OPlsqhdA77JKWG4teAyDTbf80cK94tNlkT7XPS15Sp_jIMDhpetLUOz-cKiqr3v9CaVpt/https%3A%2F%2Fwww.wsp.com%2F mailto:Opeyemi.Kehinde@FloridaDEP.gov mailto:ralph.mongillo@wsp.com

Thanks, unfortunately we will have to reschedule again due to conflicts, but I will get back to you on that.

- Opeyemi

Opeyemi Kehinde Environmental Specialist II Division of Waste Management Office: 850-245-8887

From: Crews, Matt <matt.crews@wsp.com> Sent: Wednesday, June 28, 2023 9:37 AM To: Kehinde, Opeyemi <Opeyemi.Kehinde@FloridaDEP.gov>

Subject: DC001E - LOE & CEF for 2023 Site Summary Meeting

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Opeyemi, I’ve attached the LOE & CEF for the task assignment to cover costs associated with the 2023 site summary meetings. As discussed previously, given the high number of sites to be reviewed (61), we will review assessment/remediation sites in person on Tuesday, August 1st in Tallahassee, Florida.

We will review any remaining sites via teleconference at a later date.

Please review and let us know if you have any questions.

Matt

Matthew Crews, P.E.

Assistant Vice President, Environmental Engineer

T+ 1 904-363-3430

M+ 1 904-327-8420

WSP USA Inc.

9428 Baymeadows Road, Suite 400 Jacksonville, Florida, USA 32256 wsp.com mailto:Opeyemi.Kehinde@FloridaDEP.gov mailto:ralph.mongillo@wsp.com https://secure-web.cisco.com/15Cqn-Bg0q9c59y3q-oj3D4mCWd0DKkpUBOhyGBwLxK54qbz_C5lV9C6puyU_X1hugccqfvABKxciir1nPjjQbmuF8ae2h7fcUEJmpr4LvhID4dLwCTo-p6EvuN7mTL3wkVWahbUff9vKnCP2eeKMQfScgL77_Smshh8MsJFXY7aaJBZYAnRvWFzfY8OV_7Ysg-66xTDa63F2LJP4PNkHtZ_gozVkBYNfGxo8FJtBHZ6bvMJnJRlwV65PJM1no0fZF75C0zqEnNU8l7KshesC7QeFiZmQepCQPgxHRC-QedxJ2wREYmJbaOrXuAMqakZq/https%3A%2F%2Fwww.wsp.com%2F https://secure-web.cisco.com/15Cqn-Bg0q9c59y3q-oj3D4mCWd0DKkpUBOhyGBwLxK54qbz_C5lV9C6puyU_X1hugccqfvABKxciir1nPjjQbmuF8ae2h7fcUEJmpr4LvhID4dLwCTo-p6EvuN7mTL3wkVWahbUff9vKnCP2eeKMQfScgL77_Smshh8MsJFXY7aaJBZYAnRvWFzfY8OV_7Ysg-66xTDa63F2LJP4PNkHtZ_gozVkBYNfGxo8FJtBHZ6bvMJnJRlwV65PJM1no0fZF75C0zqEnNU8l7KshesC7QeFiZmQepCQPgxHRC-QedxJ2wREYmJbaOrXuAMqakZq/https%3A%2F%2Fwww.wsp.com%2F

Untitled

File details come from the government source that posted it. Updated .