CN-370000-HW680-DC10BCO4.pdf
PDF 2 MB Posted
- Contract number
- HW680
- Issued by
- Florida
About this file
Contract Summary
This document package contains Task Assignment Change Orders (TACO) for Contract Number HW680 between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc., with project management oversight by Gus Suarez (Arcadis) and Theresa Pepe (FDEP). The work concerns groundwater monitoring services for J & D Cleaners (former), a contaminated facility located in Milton, Santa Rosa County, Florida, identified as ERIC_5422 with Facility ID 57-9808602.
The contract encompasses annual groundwater monitoring (Subtask 2) including well sampling, data evaluation, laboratory analysis, and remediation waste (IDW) management. TACO 3 (dated July 2, 2024) extended the task completion date by 90 days from July 10, 2024 to October 8, 2024, maintaining the fixed unit rate of $12,214.75. TACO 4 (dated August 1, 2024) reduced costs by $299.30 due to a scope reduction in the number of wells sampled—three wells could not be sampled (one damaged, one abandoned, one not located)—and adjustments to IDW transportation and disposal costs. The final amended price under TACO 4 is $11,915.45, down from the prior total of $12,214.75. The deliverable is an Annual Monitoring Report/IDW manifest with a due date of August 30, 2024, with invoice payment contingent upon FDEP approval.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC010B 4 HW680
This change order adjusts costs due to a reduction in number of wells sampled.
Theresa Pepe 850-245-8966 Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_5422
J & D Cleaners (former)
$ 11,915.45 $ 12,214.75
$ 11,915.45 $ 12,214.75
10/08/2024 10/08/2024 0
1 1 4
Arcadis U.S. Inc.
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2024.08.01 16:43:32 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.08.01 16:31:55 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File J & D Cleaners Facility ID No. 57-9808602; ERIC_5422 Milton, Santa Rosa County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment Change Order DC010B-4 (HW680) DATE: July 31, 2024
This change order authorizes a reduction in scope of work. Some wells could not be sampled, and subcontractor costs are reduced as noted below. Additional information is found in the July 30, 2024, change order memo from Mike O’Sullivan of Arcadis.
The original total was $12,214.75. Costs are decreased by $299.30 resulting in a new total of $11,915.45. There is no time change to the task assignment. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 2: Annual Groundwater Monitoring During fieldwork, Arcadis could not sample three wells; one was damaged, one was abandoned, and one could not be located. Additionally, final IDW subcontractor costs were decreased (including appropriate handling fees). Subcontractor costs are included in the attached documentation.
FDEP COST ESTIMATE
$85.87 Project Manager Suarez, Gus (GS)
$60.88 Principal Scientist O'Sullivan, Michael (MOS)
$50.00 Senior Scientist O'Connell, Patrick (PJO)
$35.19 Staff Scientist Boros, Anthony (AB)
$28.94 Scientist Martineau, Duncan (DM)
$39.67 Drafter/Designer Oliva, Brian (BO)
$34.40 Drafter/Designer Berndgen, Wendy (WDB)
$35.00 Document Technician Ballheim, Debra (DJB)
$30.00 Document Technician Embras, Susan (SRE)
$37.25 Project Assistant Cruz, Michele (MC)
79.00%
36.00%
37.10%
SITE : J&D Cleaners SUBTASK 2: Annual Groundwater Monitoring
DATE: 6/8/2023
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2023
Scientist Prep, local mob/demob, full round of WLs, Sample 12 MWs; manage IDW; sample delivery 42
Principal Scientist Access, GW monitoring technical oversight and offsite notice review 2
Data Evaluation and Letter Report
Principal Scientist Data evaluation and preparation of a brief letter report, sign and seal report 17
Drafter Figures preparation 5
Document Technician Editing; Letter report preparation 2
TOTAL LABOR 68
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
Per Day $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
IDW Drum Transportation and Disposal IDW $125.00 Per Drum 1 $125.00
$0.00 Lump Sum 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $125.00
TOTAL $125.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 19 $1,387.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,387.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 4 $600.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $600.00
TOTAL LAB $1,987.00
EQUIPMENT
Expendables
Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00
Equipment Items
Tubing, Poly/HDPE $0.30 Per Foot 450 $135.00
55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $235.00
Equipment Kits
Shallow Groundwater Sampling Kit $290.00 Day 3 $870.00
Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Total Equipment Kits: $870.00
TOTAL EQUIPMENT $1,225.00
Contractor: Arcadis, U.S., Inc.
Date: 6/8/2023
Task #: SubTask 1 Project Management Site: J&D Cleaners SubTask 2 Annual Groundwater Monitoring
Activity/Phase: Monitoring SubTask 3 Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 0 0.0
$60.88 Principal Scientist O'Sullivan, Michael (MOS) 0 0 0 0 0
$67.57 Principal Engineer Perella, John (JP) 0 0 0 0 0
$50.00 Senior Scientist O'Connell, Patrick (PJO) 0 0 0 0 0
$50.00 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0
$44.00 Project Engineer Romero Cotrino, Camilo (CR) 0 0 0 0 0
$44.00 Project Engineer Hays, Timothy (TH) 0 0 0 0 0
$35.19 Staff Scientist Boros, Anthony (AB) 0 0 0 0 0
$28.94 Scientist Cochran, Laura (LC) 0 0 0 0 0
$28.94 Scientist Guarino, Andrew (AG) 0 0 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 0 0 0 0 0
$28.94 Scientist Brutscher, Katherine (KEB) 0 0 0 0 0
$30.80 Technician Fortner, Kendrix (KLF) 0 0 0 0 0
$29.13 Technician Rhodes, John (JAR) 0 0 0 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0
$34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0
$35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0
$30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0
$37.25 Project Assistant Cruz, Michele (MC) 0 0 0 0 0
Total Hours 0 0 0 0 0 0
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 79.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 36.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 37.10% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
IDW - T&D ($73.00) ($73.00) $0.00 $0.00 $0.00
Subcontractor Subtotal ($73.00) ($73.00) $0.00 $0.00 $0.00
Handling Fee ($7.30) ($7.30) $0.00 $0.00 $0.00
Total Subcontractor Cost ($80.30) ($80.30) $0.00 $0.00 $0.00
Laboratory
Analytical Costs ($219.00) ($219.00) $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory ($219.00) ($219.00) $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal ($299.30) $0.00 ($299.30) $0.00 $0.00 $0.00
Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($299.30) $0.00 ($299.30) $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
DATE: 6/8/2023
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2023
Scientist Prep, local mob/demob, full round of WLs, Sample 12 MWs; manage IDW; sample delivery 0
Principal Scientist Access, GW monitoring technical oversight and offsite notice review 0
Data Evaluation and Letter Report
Principal Scientist Data evaluation and preparation of a brief letter report, sign and seal report 0
Drafter Figures preparation 0
Document Technician Editing; Letter report preparation 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals
IDW Drum Transportation and Disposal IDW
Rate change from $198 to $125 $198.00 Drum 1 ($73.00)
Handling Fee $0.00 Per Month 1 $0.00
Total Services: ($73.00)
TOTAL ($73.00)
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 -3 ($219.00)
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: ($219.00)
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB ($219.00)
EQUIPMENT
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00
Equipment Items
Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00
55-gallon Drum $100.00 Each 0 $0.00
Total Equipment Items: $0.00
Equipment Kits
Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
Contractor: Arcadis, U.S., Inc.
Date: 6/8/2023
Task #: SubTask 1 Project Management Site: J&D Cleaners SubTask 2 Annual Groundwater Monitoring
Activity/Phase: Monitoring SubTask 3 Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 4 4.0
$60.88 Principal Scientist O'Sullivan, Michael (MOS) 19 19 0 0 0 $67.57 Principal Engineer Perella, John (JP) 0 0 0 0 0
$50.00 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0
$44.00 Project Engineer Romero Cotrino, Camilo (CR) 0 0 0 0 0
$44.00 Project Engineer Hays, Timothy (TH) 0 0 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 42 42 0 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0
$34.40 Drafter/Designer Berndgen, Wendy (WDB) 5 5 0 0 0
$35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0
$30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0
$37.25 Project Assistant Cruz, Michele (MC) 2 2 0 0 0
Total Hours 72 4 68 0 0 0
Direct Labor $2,959.13 $340.43 $2,618.70 $0.00 $0.00 $0.00
Overhead 79.00% $2,337.71 $268.94 $2,068.77 $0.00 $0.00 $0.00
Gen & Admin 36.00% $1,065.28 $122.55 $942.73 $0.00 $0.00 $0.00
Fringe 37.10% $1,097.84 $126.30 $971.54 $0.00 $0.00 $0.00
Total Labor $7,459.96 $858.22 $6,601.74 $0.00 $0.00 $0.00
Travel
Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $360.00 $360.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW - T&D $198.00 $198.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $198.00 $198.00 $0.00 $0.00 $0.00
Handling Fee $19.80 $19.80 $0.00 $0.00 $0.00
Total Subcontractor Cost $217.80 $217.80 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $1,606.00 $1,606.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $600.00 $600.00 $0.00 $0.00 $0.00
Total Laboratory $2,206.00 $2,206.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $120.00 $120.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $135.00 $135.00 $0.00 $0.00 $0.00
Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00
Equipment (Other) $870.00 $870.00 $0.00 $0.00 $0.00
Total Field Expenses $1,225.00 $1,225.00 $0.00 $0.00 $0.00
Subtotal $11,468.76 $858.22 $10,610.54 $0.00 $0.00 $0.00
Completion Fee $745.99 $85.82 $660.17 $0.00 $0.00 $0.00
Total Estimated Cost $12,214.75 $944.04 $11,270.71 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
DATE: 6/8/2023
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2023
Scientist Prep, local mob/demob, full round of WLs, Sample 21 MWs; manage IDW; sample delivery 42
Principal Scientist Access, GW monitoring technical oversight and offsite notice review 2
Data Evaluation and Letter Report
Principal Scientist Data evaluation and preparation of a brief letter report, sign and seal report 17
Drafter Figures preparation 5
Document Technician Editing; Letter report preparation 2
TOTAL LABOR 68
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals
IDW Drum Transportation and Disposal IDW $198.00 Drum 1 $198.00
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $198.00
TOTAL $198.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 22 $1,606.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,606.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 4 $600.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $600.00
TOTAL LAB $2,206.00
EQUIPMENT
Expendables
Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00
Equipment Items
Tubing, Poly/HDPE $0.30 Per Foot 450 $135.00
55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $235.00
Equipment Kits
Shallow Groundwater Sampling Kit $290.00 Day 3 $870.00
Total Equipment Kits: $870.00
TOTAL EQUIPMENT $1,225.00
From: OSullivan, Mike To: Pepe, Theresa Subject: Re: Annual Monitoring Report, J&D Cleaners (former), ERIC_5422 Date: Tuesday, July 30, 2024 9:02:03 AM Attachments: image002.png image003.png image004.png image005.png image006.png Outlook-l32ryleu.png Outlook-A picture .png Outlook-Shape Des.png Outlook-Shape Des.png Outlook-Shape Des.png HW680 CEF (ARC)_2023_J&D Cleaners GWM 2023 - Delta.xlsm HW680 CEF (ARC)_2023_J&D Cleaners GWM 2023 - Final.xlsx HW680 CEF (ARC)_2023_J&D Cleaners GWM 2023.xlsm ER Quote - Arcadis - Drum - 07.24.2024.pdf
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Theresa, Only one drum of IDW was crated and the cost for T&D was $125 (see attached quote). I have updated the TACO to reduce the cost of the drum T&D and back out 3 groundwater samples.
Thanks, Mike
Mike O’Sullivan PG Principal Geologist Arcadis U.S., Inc.
1705 Metropolitan Boulevard Tallahassee, FL | 32308 | USA T +1 850 895 4739 M +1 850 491 2346 www.arcadis.com
Professional Geologist / PG-FL, 2468
From: Pepe, Theresa <Theresa.Pepe@FloridaDEP.gov> Sent: Wednesday, July 24, 2024 10:49 AM To: OSullivan, Mike <Mike.OSullivan@arcadis.com> Subject: RE: Annual Monitoring Report, J&D Cleaners (former), ERIC_5422
Arcadis Warning: Exercise caution with email messages from external sources such as this message. Always verify the sender and avoid clicking on links or scanning QR codes unless certain of their authenticity.
Good morning Mike, Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department�s Project Manager: Department�s Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC010B 3 HW680
This change order authorizes a time extension of 90 days to complete the work.
Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor
Contractor Gus Suarez Contractor 813-205-4703
ERIC_5422
J & D Cleaners (former)
$ 12,214.75 $ 12,214.75
$ 12,214.75 $ 12,214.75
Completion Completion 07/10/2024 10/08/2024 90
1 1 3
Arcadis U.S. Inc.
Contractor
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2024.07.10 08:25:32 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.07.02 13:12:21 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW680
DC010B
$ 12,214.75
Annual Monitoring Report/IDW manifest/Project Management
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management
08/30/2024
$ 12,214.75
File details come from the government source that posted it. Updated .