This document is a Task Assignment (TA) executed under Contract Number HW680 between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S., Inc. The task assignment is for remedial system shutdown preventative maintenance at the Former Donna's Cleaners facility located at 1421 W. Main Street, Leesburg, Lake County, Florida (FACID NO. 35-9502053; ERIC_4824). The Department Project Manager is Theresa Pepe (850-245-8966), and the Contractor's Project Manager is Gus Suarez (813-205-4703). The task assignment was signed on December 12, 2024, and is set to be completed by December 12, 2025.
Arcadis will conduct four quarters of Soil Vapor Extraction System Shutdown Preventative Maintenance (SSPM) for the remedial system, with activities performed in accordance with FDEP guidelines and the November 22, 2024, Work Plan submitted by Arcadis. The total task assignment value is $6,172.03, comprised of a fixed unit rate of $5,932.03 and cost reimbursement for utilities of $240.00. The contract includes three subtasks: Project Management (automatically calculated as a percentage of total labor), four quarters of SSPM with quarterly email updates, and utility invoice costs with handling fees. Invoicing is contingent upon FDEP approval of quarterly SSPM maintenance events and utility invoices, with each of the four quarters billed at approximately $1,286 to $1,833 plus $120 for utilities. The payment of utility invoices is the only portion structured as cost-plus, not to exceed $60.00 per month with a $60 handling fee.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW680
DC013F Completion December 12, 2025
Arcadis will complete four quarters of remedial system shutdown preventive maintenance consistent with FDEP guidance. Activities will be performed according to the November 22, 2024, Work Plan submitted by Arcadis.
The payment of utility invoices is the only portion of this Task Assignment that is Cost Plus.
Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor
Contractor Gus Suarez Contractor 813-205-4703
ERIC_4824
1421 W. Main Street, Leesburg, Lake County
Donna's Cleaners
Contractor Contractor
✔ $ 5,932.03 ✔ $ 240.00
$ 6,172.03
Scope of Work
Arcadis U.S. Inc.
Contractor Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2024.12.12 10:39:43 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.12.12 09:13:44 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number: HW680 Task Assignment #: DC013F
Deliverables:
Deliverable Deliverable Due Date One quarter System Shutdown Maintenance & email update 10-Jan-25
3 Months Utility invoices 28-Feb-25
One quarter System Shutdown Maintenance & email update 4-Apr-25
3 Months Utility invoices 30-May-25
One quarter System Shutdown Maintenance & email update 7-Jul-25
3 Months Utility invoices 29-Aug-25 One quarter System Shutdown Maintenance & email update/Project Management 3-Oct-25
3 Months Utility invoices 28-Nov-25
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced FDEP approval of one Qtr. System Shutdown Maintenance & email update $1,286.34
FDEP approval of 3 months utility invoices Utilities (Cost Plus Fixed Fee) = not to exceed $60.00 Utilities Handling Fee = $60
$120.00
FDEP approval of one Qtr. System Shutdown Maintenance & email update $1,286.34
FDEP approval of 3 months utility invoices Utilities (Cost Plus Fixed Fee) = not to exceed $60.00 Utilities Handling Fee = $60
$120.00
FDEP approval of one Qtr. System Shutdown Maintenance & email update $1,286.33
FDEP approval of 3 months utility invoices Utilities (Cost Plus Fixed Fee) = not to exceed $60.00 Utilities Handling Fee = $60
$120.00
FDEP approval of one Qtr. System Shutdown Maintenance & email update/Project Management $1,833.02
FDEP approval of 3 months utility invoices Utilities (Cost Plus Fixed Fee) = not to exceed $60.00 Utilities Handling Fee = $60
$120.00
TOTAL COST $6,172.03
BWC TAFORM 01/18
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette NNuñez
Lt. Governor
Alexis A. Lambert Secretary
Memorandum
TO: Negotiation File Donna’s Cleaners
FACID NO. 35-9502053; ERIC_4824
Leesburg, Lake County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC013F (HW680) DATE: December 10, 2024
Arcadis U.S., Inc. will conduct four quarters of System Shutdown Preventative Maintenance (SSPM) for the remedial system on site. This work will be performed in accordance with FDEP guidelines and the November 22, 2024, Work Plan submitted by Chad Hanna of Arcadis.
The final task assignment equals $6,172.03. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated based on a percentage of total labor.
Subtask 2: Four Quarters SSPM/Email updates A signed site access form was obtained from the property owner in December 2021.
There have been no changes in ownership since that date.
Per FDEP’s engineer, the remedial system is presently inactive but may be operated again for vapor control if additional molasses injections are performed. This subtask provides costs for four quarters of System Shutdown Preventative Maintenance. A brief email update regarding site/system conditions will be submitted as the deliverable after each event.
Donna’s Cleaners
(ERIC_4824)
Subtask 3: Utilities Subtask three includes hours for utility invoices as well as the appropriate handling fees. Arcadis will only invoice for actual charges and any remainder will be adjusted via change order.
Hours and costs are comparable to past task assignment of similar work.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 11/22/24
Task #: DC013F SubTask 1 Project Management Site: Former Donna's Cleaner SubTask 2 System Shutdown Preventative Maintenance
Activity/Phase: SSPM SubTask 3 Utilities Project Manager: Gus Suarez SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$87.59 Project Manager Suarez, Gus (GS) 2 2.3 $69.76 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 $50.00 Senior Engineer Hanna, Chad (CH) 8 8 0 0 0 $34.89 Technician Welch, David (DJW) 32 32 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0 $38.28 Project Assistant Cruz, Michele (MC) 0 0 0 0 0
Total Hours 42 2 40 0 0 0
Direct Labor $1,713.62 $197.14 $1,516.48 $0.00 $0.00 $0.00
Overhead 79.00% $1,353.76 $155.74 $1,198.02 $0.00 $0.00 $0.00 Gen & Admin 36.00% $616.90 $70.97 $545.93 $0.00 $0.00 $0.00 Fringe 37.10% $635.75 $73.14 $562.61 $0.00 $0.00 $0.00 Total Labor $4,320.03 $496.99 $3,823.04 $0.00 $0.00 $0.00
Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $480.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
Erwin IDW $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $240.00 $0.00 $240.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $240.00 $0.00 $240.00 $0.00 $0.00 Handling Fee $240.00 $0.00 $240.00 $0.00 $0.00 Total Subcontractor Cost $480.00 $0.00 $480.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $160.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $300.00 $300.00 $0.00 $0.00 $0.00 Total Field Expenses $460.00 $460.00 $0.00 $0.00 $0.00
Subtotal $5,740.03 $496.99 $4,763.04 $480.00 $0.00 $0.00 Completion Fee $432.00 $49.70 $382.30 $0.00 $0.00 $0.00
Total Estimated Cost $6,172.03 $546.69 $5,145.34 $480.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Former Donna's Cleaners SUBTASK 2: System Shutdown Preventative Maintenance
DATE: 11/22/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities and Email Updates Senior Eng (CH) Field readiness with field staff, field support, FDEP email updates 8 Technician (DJW) Field prep, mobilization, SSPM and compound maintenance 32
TOTAL LABOR 40
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 4 $480.00 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals $36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals EESI AWS $2,000.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals Erwin IDW $125.00 per drum 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOCs 8260 Aqueous $73.00 1.00 0 $0.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 4 $160.00
Total Expendables: $160.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits Construction/O&M Supplies $75.00 Day 4 $300.00
Total Equipment Kits: $300.00
Total Equipment Kits: $460.00
SITE : Former Donna's Cleaners SUBTASK 3: Utilities
DATE: 11/22/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals $36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals City of Leesburg Utilities -Electric $20.00 Per Month 12 $240.00 City of Leesburg Handling Fee $20.00 Per Month 12 $240.00
Total Services: $480.00
TOTAL $480.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totalsy
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
Total Equipment Kits: $0.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Arcadis U.S., Inc.
4300 W Cypress Street Suite 450 Tampa Florida 33607 Phone: 813 903 3100 Fax: 813 350 9046 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
1/2
Theresa Pepe Hazardous Waste Cleanup Section Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399
Date: November 22, 2024 Our Ref: TBD Subject: Proposal for Soil Vapor Extraction System Shutdown Preventative Maintenance Former Donna’s Cleaners 1421 W Main Street, Leesburg Lake County, Florida Facility ID No. ERIC_4824
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to provide the Florida Department of Environmental Protection (FDEP) this proposal and cost estimate to perform four quarters of Soil Vapor Extraction (SVE) System Shutdown Preventative Maintenance (SSPM) events for the subject facility. The SVE system was shut down on September 2, 2014.
This proposal includes completion of four quarterly SSPM events (December 2024, March 2025, June 2025 and September 2025). Per FDEP guidelines, the SVE system will be operated for approximately 2 hours during each SSPM visit to verify operational status. Additionally, the equipment compound will be cleaned and maintained during this period. An electronic mail update notification of maintenance completion will be submitted within 10 days of completion of the field event.
Cost Estimate A Cost Estimate Form and Level of Effort (CEF-LOE) to complete the proposed work is presented as Attachment
1. The CEF-LOE includes nominal costs to maintain the utility account for a period of 12 months (December 2024 through November 2025). The invoices will be submitted on a quarterly basis.
Ms. Theresa Pepe Florida Department of Environmental Protection November 22, 2024
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
www.arcadis.com
2024.11.22 - Donna's Cleaners SSPM Proposal
2/2
Closing Remarks Arcadis appreciates the opportunity to assist the FDEP on this project. Please call if you have any questions or wish to discuss this proposal further.
Sincerely, Arcadis U.S., Inc.
Chad Hanna Brian Burke, P.G.
Senior Environmental Specialist Project Manager Email: Chad.Hanna@arcadis.com Email: Brian.Burke@arcadis.com Phone: 813.353.5765 Phone: 813.353.5755
File details come from the government source that posted it. Updated .