Task Assignment Summary

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for environmental site assessment services at the Parisian Deluxe Cleaners facility located at 8731 SW 136th Street in Miami, Miami-Dade County, Florida. The task assignment is authorized under Contract Number HW680 and is identified as TA Number DC032B, with a completion date of March 31, 2025. The department project manager is Theresa Pepe, and the contractor's project manager is Gus Suarez. This task assignment represents a specific work order issued under an existing indefinite delivery contract vehicle.

The scope of work requires Arcadis to complete a Site Assessment at the Parisian Deluxe Cleaners facility according to an approved Work Plan, with deliverables including completion of fieldwork activities by October 25, 2024, and submission of a Site Assessment Report with investigative derived waste manifests and project management documentation by February 28, 2025. The total task assignment value is $61,578.00, with a fixed unit rate payment structure. Invoicing is tied to specific milestones: $48,119.02 upon FDEP approval of fieldwork activities and $13,458.98 upon FDEP approval of the Site Assessment Report and related documents. The work includes soil, vapor, and groundwater screening; monitor well installation; and laboratory analysis, with subcontractors including Earth Tech Drilling ($19,975.00), Bloodhound GPR ($945.00), and Erwin for investigative derived waste disposal ($500.00). All work will be performed in accordance with FDEP Standard Operating Procedures and the site-specific Health and Safety Plan.

View the file

Other files

File Type Posted
CN-370000-HW680-DC001C.pdf PDF
CN-370000-HW680-DC002B.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-DC004A.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC004E.pdf PDF
CN-370000-HW680-DC007A.pdf PDF
CN-370000-HW680-DC008A.pdf PDF
CN-370000-HW680-DC008B.pdf PDF
CN-370000-HW680-DC010C.pdf PDF
CN-370000-HW680-DC011B.pdf PDF
CN-370000-HW680-DC013D.pdf PDF
CN-370000-HW680-DC013E.pdf PDF
CN-370000-HW680-DC013F.pdf PDF
CN-370000-HW680-DC014A.pdf PDF
CN-370000-HW680-DC014B.pdf PDF
CN-370000-HW680-DC014G.pdf PDF
CN-370000-HW680-DC014H.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015C.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-DC015E.pdf PDF
CN-370000-HW680-DC016D.pdf PDF
CN-370000-HW680-DC016E.pdf PDF
CN-370000-HW680-DC018A.pdf PDF
CN-370000-HW680-DC019D.pdf PDF
CN-370000-HW680-DC01ACO2.pdf PDF
CN-370000-HW680-DC021C.pdf PDF
CN-370000-HW680-DC022D.pdf PDF
CN-370000-HW680-DC023A.pdf PDF
CN-370000-HW680-DC023C.pdf PDF
CN-370000-HW680-DC024C.pdf PDF
CN-370000-HW680-DC025B.pdf PDF
CN-370000-HW680-DC026A.pdf PDF
CN-370000-HW680-DC026C.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC032A.pdf PDF
CN-370000-HW680-DC038A.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-DC040C.pdf PDF
CN-370000-HW680-DC040D.pdf PDF
CN-370000-HW680-DC041A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC052B.pdf PDF
CN-370000-HW680-DC053A.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05ACO2.pdf PDF
CN-370000-HW680-DC05BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW680

DC032B March 31, 2025

Arcadis will complete a Site Assessment according to the approved Work Plan.

Theresa Pepe 850-245-8966 Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_4378

8731 SW 136th St., Miami, Miami-Dade County

Parisian Deluxe Cleaners

$ 61,578.00

$ 61,578.00

Scope of Work

Arcadis U.S. Inc.

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2024.04.17 16:00:18 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.04.15 21:07:29 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Parisian Deluxe Cleaners

FACID NO. 13-9501174; ERIC_4378

Miami, Miami-Dade County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC032B (HW680) DATE: April 9, 2024

This Task Assignment authorizes Arcadis to complete a Site Assessment at the Parisian Deluxe Cleaners site. The initial fieldwork will be completed in approximately six days and a Site Assessment Report (SAR) will be submitted as the final deliverable. The assessment may be expanded or reduced via change order depending on the complexity of the site. All work will be performed in accordance with the approved work plan.

The final task assignment total is $61,578.00. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.

Subtask 2: Site Assessment This subtask provides funds for soil, vapor and groundwater screening and monitor well installation at the facility. Arcadis will present the data in an interim deliverable after which a change order may be authorized for additional work, if needed. The Waste Site Cleanup Section’s geologist approved sampling locations and the overall approach to the assessment presented in the July 2023 Work Plan.

Blood Hound will provide a GPR survey to check for underground utilities, based on their low bid of three bids solicited.

Parisian Deluxe Cleaners

(ERIC_4378)

Earth Tech Drilling was selected as the drilling subcontractor based on their low bid of three bids solicited.

Erwin will transport and dispose of IDW. Note: IDW is presumed to be non-hazardous but will be characterized before disposal.

Subtask 3: Site Assessment Report (SAR) All activities and analytical results obtained during site assessment work will be submitted to FDEP as a written report. This report will include appropriate figures, graphs, data tables, etc. IDW manifests will also be provided to FDEP as part of the final deliverable.

FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.

Date: 3/15/2024

Task #: SubTask 1 Project Management Site: Parisian Deluxe Cleaners SubTask 2 Field Activities

Activity/Phase: Site Assessment SubTask 3 Site Assessment Report Project Manager: Gus Suarez SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$85.87 Project Manager Suarez, Gus (GS) 13 13.1

$67.07 Principal Scientist McGlone, Douglas (DMc) 15 7 8 0 0

$67.57 Principal Engineer Perella, John (JP) 7 3 4 0 0

$50.00 Senior Engineer Hanna, Chad (CH) 58 18 40 0 0

$28.94 Scientist Brooks, Eric (EAB) 86 86 0 0 0

$34.89 Technician Welch, David (DJW) 18 18 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 12 0 12 0 0

$37.25 Project Assistant Cruz, Michele (MC) 18 6 12 0 0

Total Hours 227 13 138 76 0 0

Direct Labor $9,765.96 $1,123.52 $4,912.56 $3,729.88 $0.00 $0.00

Overhead 79.00% $7,715.11 $887.58 $3,880.92 $2,946.61 $0.00 $0.00

Gen & Admin 36.00% $3,515.75 $404.47 $1,768.52 $1,342.76 $0.00 $0.00

Fringe 37.10% $3,623.18 $416.83 $1,822.56 $1,383.79 $0.00 $0.00

Total Labor $24,620.00 $2,832.40 $12,384.56 $9,403.04 $0.00 $0.00

Travel

Vehicle Rental $720.00 $720.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $744.00 $744.00 $0.00 $0.00 $0.00

Total Travel $1,464.00 $1,464.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

ETD Drilling (Conventional) $19,975.00 $19,975.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

Erwin IDW $500.00 $500.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

Bloodhound GPR $945.00 $945.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $21,420.00 $21,420.00 $0.00 $0.00 $0.00

Handling Fee $2,142.00 $2,142.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $23,562.00 $23,562.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $5,391.00 $5,391.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $450.00 $450.00 $0.00 $0.00 $0.00

Total Laboratory $5,841.00 $5,841.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $240.00 $240.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $1,039.00 $1,039.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $2,350.00 $2,350.00 $0.00 $0.00 $0.00

Total Field Expenses $3,629.00 $3,629.00 $0.00 $0.00 $0.00

Subtotal $59,116.00 $2,832.40 $46,880.56 $9,403.04 $0.00 $0.00

Completion Fee $2,462.00 $283.24 $1,238.46 $940.30 $0.00 $0.00

Total Estimated Cost $61,578.00 $3,115.64 $48,119.02 $10,343.34 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : Parisian Deluxe SUBTASK 2: Field Activities

DATE: 3/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Soil Sampling, Vertical Profile GW Sampling, PZ/MW Install

Principal Sci (DMc) PG field support and daily updates (4 hrs) 4

Senior Eng (CH) HASP (5 hrs), Property owner updates and field event preparation, data review (4 hrs) 9

Staff Sci (EB) GPR oversight (8 hrs), Prep (3 hrs), Soil sampling and VP GW sampling (5 x 12 hrs = 60), logs/field notes (3 hrs) 74

Project Assistant (MC) HASP (3 hrs) 3

MAGS Testing and Monitor Well Sampling

Principal Eng (JP) PE field support and MAGS data evaluation (3 hrs) 3

Senior Eng (CH) Field event preparation (2 hrs), IDW characterization and waste profiling for disposal (2 hrs) 4

Staff Sci (EB) MAGS Field Testing, restoration, and logs (12 hrs) 12

Technician (DW) MAGS Field Testing, restoration, and logs (12 hrs) 12

Technician (DW) Survey PZs, Guage WLs, Sample one well (6 hrs) 6

Initial Site Assessment Report Deliverable

Principal Sci (DMc) Teleconference call with FDEP, next assessment or remediation discussion planning 3

Senior Eng (CH) Sketch GW gradient and data figures. Field deliverable package submit to FDEP 5

Project Assistant (MC) Field support, database management, assemble field deliverable package, lab reports 3

TOTAL LABOR 138

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 6 $720.00 $720.00

TOTAL VEHICLE $720.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

Staff Sci (EB) $36.00 Per Day 4 $144.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

Staff Sci (EB) $150.00 Per Day 4 $600.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $744.00

TOTAL PER DIEM $744.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals ETD Direct-push services $19,975.00 Lump Sum 1 $19,975.00 Erwin IDW $125.00 Drum 4 $500.00 Blood Hound Utility Locate / GPR Survey $945.00 Lump Sum 1 $945.00 NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $21,420.00

TOTAL $21,420.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOC 8260 Aqueous $73.00 1.00 27 $1,971.00

VOC 8260 Soil $73.00 1.00 20 $1,460.00

SPLP Extraction 1311/1312 Soil/Sediment $50.00 1.00 5 $250.00

VOC analysis on SPLP extracted sample 8260 Soil/Sediment $73.00 1.00 5 $365.00

VOC TO-15 Vapor $200.00 1.00 5 $1,000.00

TCLP Benzene for IDW 1311/8260 Soil $210.00 1.00 1 $210.00

TCLP metals for IDW 1311/6010 Soil $135.00 1.00 1 $135.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $5,391.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 3 $450.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $450.00

TOTAL LAB $5,841.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 6 $240.00

Total Expendables: $240.00

Equipment Items

Survey Station transit/rod/level/tape $50.00 Per Day 1 $50.00

Tubing, Poly/HDPE $0.30 Per Foot 30 $9.00

Tubing, Silicon 3/16x3/8 $3.00 Per Foot 5 $15.00

EWE SVE Trailer for MAGS $2,350.00 Per Day 1 $2,350.00

Total Equipment Items: $2,424.00

Equipment Kits

Monitor Well Installation Kit $325.00 Day 1 $325.00

Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00

Soil Assessment Kit $175.00 Day 2 $350.00

Total Equipment Kits: $965.00

TOTAL EQUIPMENT $3,629.00

SITE : Parisian Deluxe SUBTASK 3: Site Assessment Report

DATE: 3/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

SAR

Principal Sci / DMc PG write/certification of final SAR; results/risk-based mngt options with FDEP 8

Principal Engineer / JP PE analysis of SAR; remedial characterization data/preliminary remedial options evaluation 4

Senior / CH SAR writing (24 hrs); SAR figures/graphs generation (8 hrs); SAR tables (8 hrs) 40

Designer - Database Mgr / BO SAR figures/graphs generation (8 hrs); data mgmt, import to CAD (4 hrs) 12

Project Assistant / MMc Process field notes, sample tracking, database entry, report assembly, report submittal 12

TOTAL LABOR 76

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00

Equipment Items

Total Equipment Items: $0.00

TOTAL EQUIPMENT $0.00

INITIAL SITE ASSESSMENT WORK PLAN

www.arcadis.com Parisian Dry Cleaners ISA Work Plan 2023

5.1 Site Preparation and Utility Locate

Arcadis will contact the current site operator and current property owner to share proposed sampling locations and advise schedule/notification requirements prior to completing field work. Arcadis will oversee a subsurface private utility locate using ground penetrating radar (GPS) on the site and surrounding areas. The purpose of the utility locate will be to establish/confirm the suspected locations of underground utilities (Sunshine State One Call will initially locate utilities on and surrounding the site). The initial site visit indicated the presence of underground water, sewer, natural gas, and electrical lines.

5.2 Soil Assessment and Sub-Slab Soil-Gas Sampling

5.2.1 Unsaturated Soil Assessment

One continuous soil boring (SB001) will be installed in the rear of the former facility location to a depth of approximately 50 ft bg or into the basal confining clay at the bottom of the surficial aquifer to characterize site lithology, or refusal. A lithologic log of the general geology at the site will be developed from the soil samples collected from this soil boring. Soil samples from each boring will be described by an onsite Arcadis geologist.

To confirm if past drycleaning operations at the site had an adverse impact to unsaturated soil quality conditions, up to 5 soil borings (SB001-SB005) for collection of soil samples are proposed for installation at the locations shown in Figure 3. The initial sample location will be placed in vicinity of the confirmed vinyl chloride soil impacts inside the unit; additional boring/sample locations will be placed within and surrounding the former building location. Soil boring locations may be adjusted based on the GPR results and location of the sewer lateral.

The soil borings will be installed using a hand auger and DPT. Soil samples at all soil borings will be collected at

0.5 ft bg, 2 ft bg, and then at two-foot depth intervals to a depth just above the water table (estimated to be at 8 ft bg). All soil samples (up to 4 samples/boring x 5 initial boring locations or a total of up to 20 soil samples) will be submitted to a fixed-based laboratory for confirmatory analysis of VOCs by EPA Method 8260. Each soil sample will also be collected in encore samplers in anticipation of SPLP analysis. Five SPLP analysis are included in the initial costs. Following the sampling, the boreholes will be completed with MAGS wells as described below.

5.2.2 Modified Active Gas Sampling

MAGS is proposed for completion inside and outside the former building location. MAGS will be completed in general agreement with the Modified Active Gas Sampling Manual, dated October 12, 2004. Five MAGS wells (MAG01 � MAG05) will be completed. The MAGS points will be constructed of 2-inch diameter PVC with 0.010-inch slotted screen set approximately one foot below ground surface to approximately 6 ft bg. Final MAGS well construction will be field determined. One vapor sample will be collected from each MAGS well during the test for analysis of VOCs by EPA Test Method TO-15. Proposed MAGS well layout locations are depicted on Figure 3.

Parisian Dry Cleaners ISA Work Plan 2023

INITIAL SITE ASSESSMENT WORK PLAN

5.3 Groundwater Assessment

5.3.1 Groundwater Vertical Profiling

Groundwater assessment will be conducted utilizing vertical profiling by a direct-push drill rig to collect water samples for VOCs analysis. Two vertical profile (VP) locations (VP001 � VP002) are proposed as shown on Figure 3. Assuming the water table will be encountered at approximately 8 ft bg and the base of the surficial aquifer is approximately 50 ft bg, samples starting at the water table and at 10-ft depth intervals to a total depth of 50 ft-bg will be collected. Lithologic information from Soil Boring SB001 will be used to determine exact sample intervals. Each VP water sample will be submitted to a fixed-based laboratory for confirmatory analysis of VOCs by EPA Method 8260. Following sampling, each vertical profile borehole will be completed with a piezometer as described below.

5.3.2 Piezometer Installation

Arcadis will install four piezometers and utilize the source area monitor well MW001 (described below) to provide groundwater gradient information. For purposes of this Work Plan, it is assumed that two shallow piezometers (PZ001 - PZ002) will be installed with 10-ft of 0.010-inch slot pre-pack screen, between 10 to 20 ft bg using DPT (Figure 3). Final location, dimensions, including depth, and screen interval will be determined based upon groundwater elevations encountered during the initial assessment activities. The piezometers will be developed and completed in a method to allow them to be converted to monitor wells in the future, if necessary. Arcadis will also survey the top of casing elevations of MW001, PZ001, and PZ002 relative to common point so that the groundwater gradient can be determined.

5.3.3 Monitor Well Installation and Sampling

Arcadis will hand-install a source area well inside the facility (MW001) into the water table to maximum depth possible at the location presented on Figure 3. The well will be constructed with 0.010-inch slot pre-pack screen, developed, and completed within a manhole. Arcadis will sample MW001 per SOP 001/01 methodology for laboratory analysis of VOCs using EPA Method 8260.

Based on the results of the initial assessment activities and vertical profiling results, the installation of additional monitor wells and sampling analyses in a subsequent phase will be developed in consultation with FDEP. Also, sampling for per- and polyfluoroalkyl substances (PFAS) will be screened per FDEP guidance and tasked separately.

6 REPORTING

An Initial Site Assessment Report (ISAR) including field logs, photographs, laboratory reports will be submitted to FDEP within 30 days of receipt of laboratory data as an interim deliverable to document the fieldwork. The ISAR will provide a basis for the next phase of work which may include additional soil sampling, the installation of permanent monitor wells, a professional survey, etc. to be completed under a Task Assignment Change Order

(TACO).

INITIAL SITE ASSESSMENT WORK PLAN

Parisian Dry Cleaners ISA Work Plan 2023

A final Site Assessment Report (SAR) will serve as the final deliverable. The SAR will describe the results of the proposed site assessment tasks described in this Work Plan and will be delivered to FDEP within 60 days of completion of the field work. The SAR will contain field logs, laboratory reports, tables, and figures summarizing the results of assessment activities and include conclusions and recommendations based upon findings.

7 INVESTIGATIVE DERIVED WASTE

Investigative derived wastes (IDW - drill cuttings and purge water) generated during site assessment activities will be drummed, labeled, and temporarily staged on-site in Department of Transportation (DOT)-approved, 55-gallon steel drums. Arcadis will coordinate with a waste disposal contractor for non-hazardous disposal of the IDW and provide copies of final disposal manifests to FDEP.

8 QUALITY ASSURANCE & QUALITY CONTROL

All fieldwork will be performed in accordance with FDEP�s SOP (001/01), and the site-specific HASP, to be submitted under separate cover prior to commencing field activities. Additionally, sample analyses will be performed by NELAP-certified laboratories to method practical quantitation limits. Appropriate QA/QC samples will be collected during the assessment.

9 PROJECT SCHEDULE AND COST

Cost estimate/level of effort (CEF-LOE) worksheets and subcontractor bid copies for the implementation of this ISAWP will be provided separately upon approval of this Work Plan. A proposed schedule for the site assessment activities, ISAR, and the final SAR document package, is presented below.

Milestone Estimated Timeline for Completion

ISAWP Approval / TA Receipt 0 days

Commence Site Assessment Activities 100 days

ISAR Deliverable 160 days

Additional Assessment (if needed) 220 days

Submittal of SAR 280 days

10 REFERENCES

Arcadis U.S., Inc. 2022. Interim Assessment Report, Sunshine #214, Miami, Florida.

USGS. 1955. Geologic Cross Section Maps of Miami-Dade County.

FDEP. 2022. Waste Cleanup Program Pollution Response Action Contract (WCP PRAC) Summary Slides.

5315 56th Commerce Park Blvd.

Tampa, FL 33610

Phone (813) 413-7760 eWe – Your Partner in Remediation Fax (813) 413-7761

- 2 - EWE-2388

PROPOSAL

8 Hr Mags Testing

Arcadis U.S., Inc.

Parisian Deluxe

8731 SW 136th Street Miami, FL

Please initial and return to the attention of: Thomas Twitmyer – Tomt@ewithe.net

APPROVED ITEM DESCRIPTION RATES UNIT QUANTITY COST

Remedial Equipment AS/SVE mobile unit $1,500 /job 1 $1,500

Transportation $350 /job 1 $350

Power Supply 55 KW three phase generator $500 /job 1 $500

TOTAL ESTIMATED COSTS $2,350

NOTES:

Estimate valid for 90 days

DATE SERVICES NEEDED: PROPOSAL PREPARED: 3/14/2024

START TIME: ESTIMATED HOURS ON SITE:

PURCHASE ORDER NO.: EWE JOB NO.: EWE -2388

PAYMENT TERMS: Net 30 Days APPROVED COST

BILLING INFORMATION: Officer* Date *Signature Acts as Notice to Proceed at Contract Price

Payment Remitted to: ATTENTION: Mr. Chad Hanna Equipment with Experience, LLC Arcadis U.S., Inc.

5309 56th Commerce Park Blvd 3109 Martin Luther King Blvd, Suite 350 Tampa, FL 33610 Tampa, FL 33607-

Email: Chad.Hanna@arcadis-us.com

Thomas F. Twitmyer, EWE Arcadis U.S., Inc.