About this file

This Task Assignment (TA) document DC007A under Contract HW680 is entered into between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc. for annual groundwater monitoring services at the Herman Jackson Cleaners site located at 1981 San Marco Boulevard, Jacksonville, Duval County, Florida (ERIC_4587). The project is managed by FDEP Project Manager Theresa Pepe and Arcadis Project Manager Gus Suarez. The work will be performed in accordance with the March 3, 2022 Work Plan submitted by Arcadis.

The contract provides for a fixed unit rate of $10,424.64 for annual groundwater monitoring from thirteen monitoring wells and five injection wells at the site. Services include project management (Subtask 1), which is calculated as a percentage of total labor, and annual groundwater monitoring (Subtask 2), which encompasses site access updates, groundwater sampling, groundwater data analysis, and preparation of an annual monitoring report with recommendations for additional actions. The work includes sample analysis for volatile organic compounds (VOCs), container disposal waste (IDW) management, and laboratory analytical costs. The deliverable is an Annual Monitoring Report with IDW manifest and project management documentation due June 17, 2022, with invoice submission contingent upon FDEP approval. The total task assignment value of $10,424.64 covers direct labor costs ($2,637.35), overhead ($2,083.50), general and administrative costs ($949.45), fringe benefits ($978.46), travel ($612.00), subcontractor services for IDW disposal ($165.00), laboratory costs ($1,322.00), and field equipment and expendables ($1,012.00), with a completion fee of $664.88.

View the file

Other files

File Type Posted
CN-370000-HW680-DC001A.pdf PDF
CN-370000-HW680-DC001D.pdf PDF
CN-370000-HW680-DC002A.pdf PDF
CN-370000-HW680-DC004D.pdf PDF
CN-370000-HW680-DC006A.pdf PDF
CN-370000-HW680-DC006B.pdf PDF
CN-370000-HW680-DC013C.pdf PDF
CN-370000-HW680-DC014E.pdf PDF
CN-370000-HW680-DC014F.pdf PDF
CN-370000-HW680-DC016B.pdf PDF
CN-370000-HW680-DC017B.pdf PDF
CN-370000-HW680-DC017C.pdf PDF
CN-370000-HW680-DC018B.pdf PDF
CN-370000-HW680-DC018C.pdf PDF
CN-370000-HW680-DC020A.pdf PDF
CN-370000-HW680-DC021D.pdf PDF
CN-370000-HW680-DC022C.pdf PDF
CN-370000-HW680-DC024B.pdf PDF
CN-370000-HW680-DC027A.pdf PDF
CN-370000-HW680-DC028A.pdf PDF
CN-370000-HW680-DC028B.pdf PDF
CN-370000-HW680-DC030B.pdf PDF
CN-370000-HW680-DC031B.pdf PDF
CN-370000-HW680-DC031E.pdf PDF
CN-370000-HW680-DC034B.pdf PDF
CN-370000-HW680-DC035B.pdf PDF
CN-370000-HW680-DC035C.pdf PDF
CN-370000-HW680-DC036B.pdf PDF
CN-370000-HW680-DC039A.pdf PDF
CN-370000-HW680-DC039C.pdf PDF
CN-370000-HW680-DC039D.pdf PDF
CN-370000-HW680-DC03ACO2.pdf PDF
CN-370000-HW680-DC042A.pdf PDF
CN-370000-HW680-DC043A.pdf PDF
CN-370000-HW680-DC044A.pdf PDF
CN-370000-HW680-DC046A.pdf PDF
CN-370000-HW680-DC047A.pdf PDF
CN-370000-HW680-DC06ACO1.pdf PDF
CN-370000-HW680-DC06ACO2.pdf PDF
CN-370000-HW680-DC09BCO1.pdf PDF
CN-370000-HW680-DC10BCO4.pdf PDF
CN-370000-HW680-DC11ACO1.pdf PDF
CN-370000-HW680-DC11CCO2.pdf PDF
CN-370000-HW680-DC14BCO2.pdf PDF
CN-370000-HW680-DC14BCO3.pdf PDF
CN-370000-HW680-DC14BCO4.pdf PDF
CN-370000-HW680-DC14BCO9.pdf PDF
CN-370000-HW680-DC14FCO1.pdf PDF
CN-370000-HW680-DC14FCO2.pdf PDF
CN-370000-HW680-DC14FCO4.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW680

DC007A Completion July 15, 2022

Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the March 3, 2022, Work Plan submitted by Arcadis.

Theresa Pepe 850-245-8966 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Arcadis U.S. Inc.

Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_4587

1981 San Marco Blvd, Jacksonville, Duval County

Herman Jackson Cleaners

✔ $ 10,424.64

$ 10,424.64

Scope of Work

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2022.03.08 08:06:27 -05'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.03.07 15:32:12 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Annual Monitoring Report/IDW manifest/Project Management 06/17/2022

FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 10,424.64

$ 10,424.64

HW680

DC007A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Herman Jackson Cleaners

FACID NO. 16-9502441; ERIC_4587

Jacksonville, Duval County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC007A (HW680) DATE: March 7, 2022

Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. Mobilization will be combined with the nearby Butler Cleaners as a cost saving measure. All activities will be conducted in accordance with the March 3, 2022, Work Plan submitted by Mike O’Sullivan of Arcadis.

The final task assignment total is $10,424.64. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.

Subtask 2: Annual Groundwater Monitoring Arcadis will update site access before fieldwork commences.

Arcadis will sample thirteen wells for drycleaning solvents based on recommendations from the previous monitoring report. IDW will be drummed and disposed by a licensed waste hauler per FDEP’s preference. Prior to disposal, one IDW sample will be collected and if determined to be hazardous, Arcadis will submit a change order to cover the additional costs. An Annual Monitoring Report including recommendations for additional actions will be provided under this subtask.

Hours and costs are comparable to past task assignments of similar scope.

FDEP COST ESTIMATE

Contractor: Arcadis, U.S., Inc.

Date: 3/2/2022

Task #: SubTask 1 Project Management

Site: Herman Jackson Cleaners SubTask 2 Annual Groundwater Monitoring 2022

Activity/Phase: Monitoring SubTask 3

Project Manager: Mike O'Sullivan SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$50.00 Project Manager O'Sullivan, Mike (MO) 6 6.1

$50.00 Senior Scientist O'Sullivan, Mike (MO) 28 28 0 0 0

$28.94 Scientist Martineau, Duncan (DM) 25 25 0 0 0

$31.48 Drafter/Designer Berndgen, Wendy (WDB) 5 5 0 0 0

$26.52 Document Technician Embras, Susan (SRE) 2 2 0 0 0

$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0

Total Hours 66 6 60 0 0 0

Direct Labor $2,637.35 $303.41 $2,333.94 $0.00 $0.00 $0.00

Overhead 79.00% $2,083.50 $239.69 $1,843.81 $0.00 $0.00 $0.00

Gen & Admin 36.00% $949.45 $109.23 $840.22 $0.00 $0.00 $0.00

Fringe 37.10% $978.46 $112.57 $865.89 $0.00 $0.00 $0.00

Total Labor $6,648.76 $764.90 $5,883.86 $0.00 $0.00 $0.00

Travel

Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $372.00 $372.00 $0.00 $0.00 $0.00

Total Travel $612.00 $612.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $150.00 $150.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $150.00 $150.00 $0.00 $0.00 $0.00

Handling Fee $15.00 $15.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $165.00 $165.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $1,022.00 $1,022.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $300.00 $300.00 $0.00 $0.00 $0.00

Total Laboratory $1,322.00 $1,322.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $80.00 $80.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $932.00 $932.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $1,012.00 $1,012.00 $0.00 $0.00 $0.00

Subtotal $9,759.76 $764.90 $8,994.86 $0.00 $0.00 $0.00

Completion Fee $664.88 $76.49 $588.39 $0.00 $0.00 $0.00

Total Estimated Cost $10,424.64 $841.39 $9,583.25 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : Herman Jackson Cleaners SUBTASK 2: Annual Groundwater Monitoring 2022

DATE: 3/2/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Annual Groundwater Monitoring - 2022 Scientist Prep; local mob/demob; 13 WLs; sample 13 MWs; manage IDW; sample delivery 23 Senior Scientist GW monitoring technical oversight and offsite notice review 3 Senior Scientist Site Access - 6 Properties including the City of Jacksonville 8

Data Evaluation and Letter Report Senior Scientist Technical review; sign and seal report 2 Senior Scientist Data evaluation and preparation of a brief letter report 15 Scientist Data evaluation 2 Drafter Figures preparation 5 Document Technician Editing; Letter report preparation 2

TOTAL LABOR 60

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals Scientist $36.00 Per Day 2 $72.00

$36.00 Per Day 0 $0.00 Hotel

Category/Staff Rate Unit Usage Totals Scientist $150.00 Per Day 2 $300.00

Total Meal/Hotel: $372.00

TOTAL PER DIEM $372.00

SUBCONTRACTOR COSTS

Services Procurement

Name Purpose Rate Units Usage Totals Erwin Remediation IDW $150.00 Drum 1 $150.00

Total Services: $150.00

TOTAL $150.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 13 $949.00 IDW 8260C Aqueous $73.00 1.00 1 $73.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,022.00 Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 2 $300.00 Total Shipping: $300.00

TOTAL LAB $1,322.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals Total PPE: $0.00

Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00

Total Expendables: $80.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 340 $102.00

Total Equipment Items: $102.00 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 2 $830.00

Total Equipment Kits: $830.00

TOTAL EQUIPMENT $1,012.00

Arcadis U.S., Inc.

1705 Metropolitan

Boulevard

Suite 101

Tallahassee

Florida 32308

Phone: 850 422 2555

Fax: 850 668 0080 www.arcadis.com

FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062

Ms. Theresa Pepe

Bureau of Waste Cleanup

Division of Waste Management

Florida Department of Environmental Protection

2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400

Date: March 3, 2022

Our Ref: TL006004

Subject: Proposal for Annual Groundwater Monitoring at Herman Jackson

Cleaners, 1981 San Marco Boulevard, Jacksonville, Florida; FDEP Facility

Identification Number ERIC_4587.

Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the annual groundwater monitoring activities at Herman Jackson Cleaners, 1981 San Marco Boulevard, Jacksonville, Florida

(FDEP Facility Identification Number ERIC_4587; “the Site”; Figure 1). This proposal includes one groundwater monitoring event, and one letter report summarizing field activities. The FDEP cost estimating spreadsheets

(Attachment A) and subcontractor quote (Attachment B) are attached.

SCOPE OF WORK

Subtask 1 - Project Management

Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).

Subtask 2 - Groundwater Monitoring (2022)

Prior to collecting groundwater samples Arcadis will update the Access Agreements for multiple properties including the City of Jacksonville to access monitoring wells. Arcadis proposes to collect groundwater samples from 8 monitoring and 5 injection wells (MW002, MW004, MW010, MW011, MW020, MW022, MW025, MW027, IW-1, IW-3S, IW-3D, IW-4S, and IW-4D) in accordance with FDEP SOPs. Monitoring well locations are shown on attached figure. Samples will be submitted to a certified laboratory for analysis by EPA Method 8260C or equivalent (VOHs only). One QA/QC sample (trip blank) and duplicate sample (MW002) will be collected and submitted to the laboratory. Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly. Monitoring well locations are shown on Figure 1.

Arcadis will incorporate the data collected during the groundwater sampling event into a letter report summarizing the field activities. Based on the concentrations of target analytes in injection wells IW-3D, IW-4S, and IW-4D, FDEP – Herman Jackson Cleaners Proposal 2022 www.arcadis.com _Herman Jackson AGM proposal_Mar2022

Arcadis will evaluate the need to conduct an ethyl lactate injection event. The report will include laboratory analytical data, figures presenting groundwater analytical data, and recommendations for the Site.

SCHEDULE

Arrangements for groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP.

ESTIMATED COST

A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as

Attachment A.

Please contact me if you have any questions regarding this proposal.

Sincerely, Arcadis U.S., Inc.

Mike O’Sullivan, P.G.

Senior Geologist

Email: mike.osullivan@arcadis.com

Direct Line: 850.895.4739

Mobile: 850.491.2346

Attachment:

Figure

Attachment A – Cost Estimate Form and Level of Effort forms

Attachment B – Subcontractor quote

Figures

O

H

E

O

H

E

W

P P

O H

E

U

G

O

H

E

U

G

U

G

E

13" WPP

C O

V E

R E

D A

R E

A

C O

V E

R E

D A

R E

A

C O

V E

R E

D

A

R E

A

CONCRETE VALLEY CURB

A

S

P

H

A

L

T

GRASS

CONCRETE

S

ID

E W

A L K

PARK

BALIS

ASPHALT

ASPHALT

A

L

L

E

Y

ASPHALT

WELL

POTABLE

ON-SITE

S A

N M

A R

C O

B O

U L E

V A

R D

O

H

E

C

U

R

B

U

G

E

SAN MARCO FOUNTAIN

MW005

MW023

MW008

MW009

MW010

MW011

MW012

MW013

MW027

MW026

MW025

MW020

MW021

MW022

MW017

MW018

MW019

MW015

MW014

MW016

MW002

MW004

ASW-1

ASW-2

ASW-3

ASW-4

MW001

SVE004

SVE006

SVE003

SVE002

SVE007

SVE008

SVE010

SVE009

SVE005

SVE001

MW024

ASW-8

MW006

MW007

IW-1

IW-3D

IW-3S

IW-2D

IW-2S

IW-4D

IW-4S

IW-5

IW-6

IW-7

PZ-02

1 & 2 STORY

MASONRY BUILDING # 1981

(HERMAN JACKSON CLEANERS)

FIRE

STATION

MW003

ASPHALT

MONITORING WELL LOCATION

AIR SPARGE WELL LOCATION

INJECTION WELL LOCATION

SOIL VAPOR EXTRACTION WELL LOCATION

DEEP MONITORING WELL LOCATION

WOOD TELEPHONE POLE

OVERHEAD TELEPHONE LINE

UNDERGROUND GAS LINE

OVERHEAD ELECTRIC LINE

SHALLOW MONITORING WELL LOCATION

UNDERGROUND ELECTRIC LINE

WTP

UGE

OHE

UG

OTL

WOOD POWER POLE

WPP

SITE LAYOUT

AND WELL LOCATIONS

HERMAN JACKSON CLEANERS

ERIC SITE ID: 4587

1981 SAN MARCO BLVD.

JACKSONVILLE, FLORIDA

C I T

Y

B

B

F

L

D

I V

G

R O

U P

E

N

B

B

O

L I V

A

O p t

P

C

O p t

M

M

D

U N

C

T

M

D

U N

C

Y R

O p t O

N

O

F F

R

E F

C U s e r s w d b e r n d g

A

R C

A D

I S

U

S B

A r c a d i s A

F

L O

R I D

A

D

E P

T

O

F

E

N V

I R

O N

M E

N T

R O

T E

C T

I O

N P r o j e c t

F i l e s H e r m a n

J a x

G

W

M o n

T

L

D

W G

T

L

S

M d w g

Y

O U

T

F

S I

S

V

E D

C A

D V

E R

S

L

S

C

H

G

E S

E T

U P

O

T S

T Y

L E

T A

B L

E

A C

S C

O L

O R

A

N A

L Y

T I C

A L

C

O

T T

E D

Y

B

E R

N D

G E

N

W

E N

D Y

FIGURE

LEGEND

30'

60'

GRAPHIC SCALE

Attachment B

Subcontractor Quote

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Mike O’Sullivan

Arcadis U.S., Inc.

1705 Metropolitan Blvd

Tallahassee, FL 32308

March 4, 2022

Re: Drum Disposal Quote – Herman Jackson Cleaners – ERIC_4587 – Jacksonville, FL

Mr. O’Sullivan:

The price for transportation and disposal of a single (1) 55-gallon drum of non-hazardous VOH impacted groundwater located in Jacksonville, FL will be $100.00 per drum, total, for both transportation and disposal.

Good used drums are available free of charge when picked up from our location in Pensacola, FL.

Delivery of an empty drum to your jobsite in Jacksonville, FL will be an additional $50.00.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

hj negsum.pdf
Subtask 1: Project Management
Subtask 2: Annual Groundwater Monitoring