CN-370000-HW680-DC007A.pdf
PDF 1 MB Posted
- Contract number
- HW680
- Issued by
- Florida
About this file
This Task Assignment (TA) document DC007A under Contract HW680 is entered into between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc. for annual groundwater monitoring services at the Herman Jackson Cleaners site located at 1981 San Marco Boulevard, Jacksonville, Duval County, Florida (ERIC_4587). The project is managed by FDEP Project Manager Theresa Pepe and Arcadis Project Manager Gus Suarez. The work will be performed in accordance with the March 3, 2022 Work Plan submitted by Arcadis.
The contract provides for a fixed unit rate of $10,424.64 for annual groundwater monitoring from thirteen monitoring wells and five injection wells at the site. Services include project management (Subtask 1), which is calculated as a percentage of total labor, and annual groundwater monitoring (Subtask 2), which encompasses site access updates, groundwater sampling, groundwater data analysis, and preparation of an annual monitoring report with recommendations for additional actions. The work includes sample analysis for volatile organic compounds (VOCs), container disposal waste (IDW) management, and laboratory analytical costs. The deliverable is an Annual Monitoring Report with IDW manifest and project management documentation due June 17, 2022, with invoice submission contingent upon FDEP approval. The total task assignment value of $10,424.64 covers direct labor costs ($2,637.35), overhead ($2,083.50), general and administrative costs ($949.45), fringe benefits ($978.46), travel ($612.00), subcontractor services for IDW disposal ($165.00), laboratory costs ($1,322.00), and field equipment and expendables ($1,012.00), with a completion fee of $664.88.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC007A Completion July 15, 2022
Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the March 3, 2022, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4587
1981 San Marco Blvd, Jacksonville, Duval County
Herman Jackson Cleaners
✔ $ 10,424.64
$ 10,424.64
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.03.08 08:06:27 -05'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.03.07 15:32:12 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Monitoring Report/IDW manifest/Project Management 06/17/2022
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 10,424.64
$ 10,424.64
HW680
DC007A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Herman Jackson Cleaners
FACID NO. 16-9502441; ERIC_4587
Jacksonville, Duval County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC007A (HW680) DATE: March 7, 2022
Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. Mobilization will be combined with the nearby Butler Cleaners as a cost saving measure. All activities will be conducted in accordance with the March 3, 2022, Work Plan submitted by Mike O’Sullivan of Arcadis.
The final task assignment total is $10,424.64. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Annual Groundwater Monitoring Arcadis will update site access before fieldwork commences.
Arcadis will sample thirteen wells for drycleaning solvents based on recommendations from the previous monitoring report. IDW will be drummed and disposed by a licensed waste hauler per FDEP’s preference. Prior to disposal, one IDW sample will be collected and if determined to be hazardous, Arcadis will submit a change order to cover the additional costs. An Annual Monitoring Report including recommendations for additional actions will be provided under this subtask.
Hours and costs are comparable to past task assignments of similar scope.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 3/2/2022
Task #: SubTask 1 Project Management
Site: Herman Jackson Cleaners SubTask 2 Annual Groundwater Monitoring 2022
Activity/Phase: Monitoring SubTask 3
Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$50.00 Project Manager O'Sullivan, Mike (MO) 6 6.1
$50.00 Senior Scientist O'Sullivan, Mike (MO) 28 28 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 25 25 0 0 0
$31.48 Drafter/Designer Berndgen, Wendy (WDB) 5 5 0 0 0
$26.52 Document Technician Embras, Susan (SRE) 2 2 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0
Total Hours 66 6 60 0 0 0
Direct Labor $2,637.35 $303.41 $2,333.94 $0.00 $0.00 $0.00
Overhead 79.00% $2,083.50 $239.69 $1,843.81 $0.00 $0.00 $0.00
Gen & Admin 36.00% $949.45 $109.23 $840.22 $0.00 $0.00 $0.00
Fringe 37.10% $978.46 $112.57 $865.89 $0.00 $0.00 $0.00
Total Labor $6,648.76 $764.90 $5,883.86 $0.00 $0.00 $0.00
Travel
Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $372.00 $372.00 $0.00 $0.00 $0.00
Total Travel $612.00 $612.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $150.00 $150.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $150.00 $150.00 $0.00 $0.00 $0.00
Handling Fee $15.00 $15.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $165.00 $165.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $1,022.00 $1,022.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $300.00 $300.00 $0.00 $0.00 $0.00
Total Laboratory $1,322.00 $1,322.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $80.00 $80.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $932.00 $932.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $1,012.00 $1,012.00 $0.00 $0.00 $0.00
Subtotal $9,759.76 $764.90 $8,994.86 $0.00 $0.00 $0.00
Completion Fee $664.88 $76.49 $588.39 $0.00 $0.00 $0.00
Total Estimated Cost $10,424.64 $841.39 $9,583.25 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Herman Jackson Cleaners SUBTASK 2: Annual Groundwater Monitoring 2022
DATE: 3/2/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2022 Scientist Prep; local mob/demob; 13 WLs; sample 13 MWs; manage IDW; sample delivery 23 Senior Scientist GW monitoring technical oversight and offsite notice review 3 Senior Scientist Site Access - 6 Properties including the City of Jacksonville 8
Data Evaluation and Letter Report Senior Scientist Technical review; sign and seal report 2 Senior Scientist Data evaluation and preparation of a brief letter report 15 Scientist Data evaluation 2 Drafter Figures preparation 5 Document Technician Editing; Letter report preparation 2
TOTAL LABOR 60
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals Scientist $36.00 Per Day 2 $72.00
$36.00 Per Day 0 $0.00 Hotel
Category/Staff Rate Unit Usage Totals Scientist $150.00 Per Day 2 $300.00
Total Meal/Hotel: $372.00
TOTAL PER DIEM $372.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals Erwin Remediation IDW $150.00 Drum 1 $150.00
Total Services: $150.00
TOTAL $150.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 13 $949.00 IDW 8260C Aqueous $73.00 1.00 1 $73.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,022.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 2 $300.00 Total Shipping: $300.00
TOTAL LAB $1,322.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00
Total Expendables: $80.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 340 $102.00
Total Equipment Items: $102.00 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 2 $830.00
Total Equipment Kits: $830.00
TOTAL EQUIPMENT $1,012.00
Arcadis U.S., Inc.
1705 Metropolitan
Boulevard
Suite 101
Tallahassee
Florida 32308
Phone: 850 422 2555
Fax: 850 668 0080 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
Ms. Theresa Pepe
Bureau of Waste Cleanup
Division of Waste Management
Florida Department of Environmental Protection
2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400
Date: March 3, 2022
Our Ref: TL006004
Subject: Proposal for Annual Groundwater Monitoring at Herman Jackson
Cleaners, 1981 San Marco Boulevard, Jacksonville, Florida; FDEP Facility
Identification Number ERIC_4587.
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the annual groundwater monitoring activities at Herman Jackson Cleaners, 1981 San Marco Boulevard, Jacksonville, Florida
(FDEP Facility Identification Number ERIC_4587; “the Site”; Figure 1). This proposal includes one groundwater monitoring event, and one letter report summarizing field activities. The FDEP cost estimating spreadsheets
(Attachment A) and subcontractor quote (Attachment B) are attached.
SCOPE OF WORK
Subtask 1 - Project Management
Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).
Subtask 2 - Groundwater Monitoring (2022)
Prior to collecting groundwater samples Arcadis will update the Access Agreements for multiple properties including the City of Jacksonville to access monitoring wells. Arcadis proposes to collect groundwater samples from 8 monitoring and 5 injection wells (MW002, MW004, MW010, MW011, MW020, MW022, MW025, MW027, IW-1, IW-3S, IW-3D, IW-4S, and IW-4D) in accordance with FDEP SOPs. Monitoring well locations are shown on attached figure. Samples will be submitted to a certified laboratory for analysis by EPA Method 8260C or equivalent (VOHs only). One QA/QC sample (trip blank) and duplicate sample (MW002) will be collected and submitted to the laboratory. Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly. Monitoring well locations are shown on Figure 1.
Arcadis will incorporate the data collected during the groundwater sampling event into a letter report summarizing the field activities. Based on the concentrations of target analytes in injection wells IW-3D, IW-4S, and IW-4D, FDEP – Herman Jackson Cleaners Proposal 2022 www.arcadis.com _Herman Jackson AGM proposal_Mar2022
Arcadis will evaluate the need to conduct an ethyl lactate injection event. The report will include laboratory analytical data, figures presenting groundwater analytical data, and recommendations for the Site.
SCHEDULE
Arrangements for groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP.
ESTIMATED COST
A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as
Attachment A.
Please contact me if you have any questions regarding this proposal.
Sincerely, Arcadis U.S., Inc.
Mike O’Sullivan, P.G.
Senior Geologist
Email: mike.osullivan@arcadis.com
Direct Line: 850.895.4739
Mobile: 850.491.2346
Attachment:
Figure
Attachment A – Cost Estimate Form and Level of Effort forms
Attachment B – Subcontractor quote
Figures
O
H
E
O
H
E
W
P P
O H
E
U
G
O
H
E
U
G
U
G
E
13" WPP
C O
V E
R E
D A
R E
A
C O
V E
R E
D A
R E
A
C O
V E
R E
D
A
R E
A
CONCRETE VALLEY CURB
A
S
P
H
A
L
T
GRASS
CONCRETE
S
ID
E W
A L K
PARK
BALIS
ASPHALT
ASPHALT
A
L
L
E
Y
ASPHALT
WELL
POTABLE
ON-SITE
S A
N M
A R
C O
B O
U L E
V A
R D
O
H
E
C
U
R
B
U
G
E
SAN MARCO FOUNTAIN
MW005
MW023
MW008
MW009
MW010
MW011
MW012
MW013
MW027
MW026
MW025
MW020
MW021
MW022
MW017
MW018
MW019
MW015
MW014
MW016
MW002
MW004
ASW-1
ASW-2
ASW-3
ASW-4
MW001
SVE004
SVE006
SVE003
SVE002
SVE007
SVE008
SVE010
SVE009
SVE005
SVE001
MW024
ASW-8
MW006
MW007
IW-1
IW-3D
IW-3S
IW-2D
IW-2S
IW-4D
IW-4S
IW-5
IW-6
IW-7
PZ-02
1 & 2 STORY
MASONRY BUILDING # 1981
(HERMAN JACKSON CLEANERS)
FIRE
STATION
MW003
ASPHALT
MONITORING WELL LOCATION
AIR SPARGE WELL LOCATION
INJECTION WELL LOCATION
SOIL VAPOR EXTRACTION WELL LOCATION
DEEP MONITORING WELL LOCATION
WOOD TELEPHONE POLE
OVERHEAD TELEPHONE LINE
UNDERGROUND GAS LINE
OVERHEAD ELECTRIC LINE
SHALLOW MONITORING WELL LOCATION
UNDERGROUND ELECTRIC LINE
WTP
UGE
OHE
UG
OTL
WOOD POWER POLE
WPP
SITE LAYOUT
AND WELL LOCATIONS
HERMAN JACKSON CLEANERS
ERIC SITE ID: 4587
1981 SAN MARCO BLVD.
JACKSONVILLE, FLORIDA
C I T
Y
B
B
F
L
D
I V
G
R O
U P
E
N
B
B
O
L I V
A
O p t
P
C
O p t
M
M
D
U N
C
T
M
D
U N
C
Y R
O p t O
N
O
F F
R
E F
C U s e r s w d b e r n d g
A
R C
A D
I S
U
S B
A r c a d i s A
F
L O
R I D
A
D
E P
T
O
F
E
N V
I R
O N
M E
N T
R O
T E
C T
I O
N P r o j e c t
F i l e s H e r m a n
J a x
G
W
M o n
T
L
D
W G
T
L
S
M d w g
Y
O U
T
F
S I
S
V
E D
C A
D V
E R
S
L
S
C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L
E
A C
S C
O L
O R
A
N A
L Y
T I C
A L
C
O
T T
E D
Y
B
E R
N D
G E
N
W
E N
D Y
FIGURE
LEGEND
30'
60'
GRAPHIC SCALE
Attachment B
Subcontractor Quote
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Mike O’Sullivan
Arcadis U.S., Inc.
1705 Metropolitan Blvd
Tallahassee, FL 32308
March 4, 2022
Re: Drum Disposal Quote – Herman Jackson Cleaners – ERIC_4587 – Jacksonville, FL
Mr. O’Sullivan:
The price for transportation and disposal of a single (1) 55-gallon drum of non-hazardous VOH impacted groundwater located in Jacksonville, FL will be $100.00 per drum, total, for both transportation and disposal.
Good used drums are available free of charge when picked up from our location in Pensacola, FL.
Delivery of an empty drum to your jobsite in Jacksonville, FL will be an additional $50.00.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
| hj negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Annual Groundwater Monitoring |
File details come from the government source that posted it. Updated .