Summary
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for site closure activities at South Park Dry Cleaner, located at 12671 S. Dixie Highway, Miami, Miami-Dade County, Florida (ERIC_4386). The Task Assignment is entered under Contract Number HW680, with TA Number DC002B, and is effective through July 28, 2023. Theresa Pepe serves as the FDEP Project Manager, while Gus Suarez represents Arcadis U.S., Inc. as the Contractor's Project Manager.
The scope of work involves the proper abandonment of all groundwater monitoring wells, MAGs wells, and recovery wells installed during prior site rehabilitation activities, in accordance with the May 17, 2023 Work Plan submitted by Arcadis. Specifically, the contractor will abandon seventeen monitor wells, five MAGs wells, and one recovery well; remove manways from interior wells; and submit a brief report with site photographs documenting completion activities. The total Task Assignment value is $11,433.34, compensated on a fixed unit rate basis. This amount comprises three subtasks: Project Management ($567.77), Site Closure/Well Abandonment ($9,488.39), and Reporting ($1,377.18). Invoicing is contingent upon FDEP approval of the Well Abandonment/Site Closure Report and Project Management, with a deliverable due date of June 30, 2023. EESI was selected as the drilling subcontractor based on the lowest of three competitive bids solicited for this work.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC002B Completion July 28, 2023
FDEP has issued a Site Rehabilitation Completion Order for No Further Actions without Institutional Controls. Therefore, Arcadis will properly abandon all wells installed during prior work at the site. All activities will be performed according to the May 17, 2023, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4386
12671 S. Dixie Hwy, Miami, Miami-Dade County
South Park Dry Cleaner
✔ $ 11,433.34
$ 11,433.34
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2023.05.19 08:10:32 -04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.05.18 15:21:50 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Well Abandonment/Site Closure Report & Project Management 06/30/2023
FDEP approval of Well Abandonment/Site Closure Report & Project Management $ 11,433.34
$ 11,433.34
HW680
DC002B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File South Park Dry Cleaner Facility ID No. 13-9501302; ERIC_4386 Miami, Miami-Dade County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC002B (HW680) DATE: May 17, 2023
The site qualified for No Further Action without Engineering or Institutional Controls according to Chapter 62-780.680(1) F.A.C. FDEP issued a Site Rehabilitation Completion Order (SRCO) on February 16, 2023. Updated site access with new owners was obtained May 4, 2023. Arcadis U.S., Inc. will properly abandon all groundwater monitor wells, MAGS wells and recovery wells to close out the site. Work will be performed as described in the May 17, 2023, Work Plan from Doug McGlone of Arcadis.
The final task assignment total is $11,433.34. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated based on a percentage of total labor.
Subtask 2: Site Closure/Well Abandonment This subtask provides costs for abandoning seventeen monitor wells, five MAGs wells, and one recovery well installed during prior work at the site. Manways will be removed from interior wells. Other site restoration activities may be conducted as needed with approval from the property manager.
EESI was chosen as the drilling subcontractor based on their low bid of three bids solicited.
Subtask 3: Reporting Arcadis will submit a brief report and site photos to document the above activities.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 5/17/2023
Task #: SubTask 1 Project Management Site: South Park Cleaners SubTask 2 Well Abandonment
Activity/Phase: Well Abandonment SubTask 3 Reporting Project Manager: Doug McGlone SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$67.07 Project Manager McGlone, Douglas (DMc) 3 3.1$100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0 $85.87 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 $67.07 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 $67.07 Principal Scientist McGlone, Douglas (DMc) 3 2 1 0 0 $39.34 Staff Scientist Riley, Joel (JR) 30 24 6 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 3 0 3 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 2 0 2 0 0
Total Hours 41 3 26 12 0 0
Direct Labor $1,779.66 $204.74 $1,078.30 $496.62 $0.00 $0.00
Overhead 79.00% $1,405.93 $161.74 $851.86 $392.33 $0.00 $0.00 Gen & Admin 36.00% $640.68 $73.71 $388.19 $178.78 $0.00 $0.00 Fringe 37.10% $660.26 $75.96 $400.05 $184.25 $0.00 $0.00 Total Labor $4,486.53 $516.15 $2,718.40 $1,251.98 $0.00 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Telemetry $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW EnviroServe $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00
EESI $5,616.50 $5,616.50 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $5,616.50 $5,616.50 $0.00 $0.00 $0.00 Handling Fee $561.65 $561.65 $0.00 $0.00 $0.00 Total Subcontractor Cost $6,178.15 $6,178.15 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $80.00 $80.00 $0.00 $0.00 $0.00
Subtotal $10,984.68 $516.15 $9,216.55 $1,251.98 $0.00 $0.00 Completion Fee $448.66 $51.62 $271.84 $125.20 $0.00 $0.00
Total Estimated Cost $11,433.34 $567.77 $9,488.39 $1,377.18 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : South Park Cleaners SUBTASK 2: Well Abandonment
DATE: 5/17/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (DMc) Field Support 2 Project Engineer (TH) Staff Scientist (JR) Mob (2hrs x 2), oversee and document abandonment of 23 wells 24 Project Asst (MMc) Process field notes, sample tracking, data entry, report assembly Drafter/Designer(BO)
TOTAL LABOR 26
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals Per Day $0.00
Total Equip.: $0.00
Services Procurement Name Purpose Rate Units Usage Totals
EESI Well Abandonment $5,616.50 Lump Sum 1 $5,616.50 NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $5,616.50
TOTAL $5,616.50
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00
Total Expendables: $80.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00
Total Equipment Items: $0.00 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $80.00
SITE : South Park Cleaners
SUBTASK 3: Reporting
DATE: 5/17/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (DMc) PG verification; certification of report 1
Project Engineer (TH)
Staff Scientist (JR) Report preparation with photographs 6
Project Asst (MMc) Process field notes, sample tracking, data entry, report assembly 2
Drafter/Designer(BO) Figures prodution for report 3
TOTAL LABOR 12
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 Handling Fee $0.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples TotalsVOC TO-15 Vapor $200.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00
Total Equipment Items: $0.00 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Arcadis U.S., Inc.
1500 Gateway Boulevard
Suite 200
Boynton Beach
Florida 33426
Tel 561 697 7000
Fax 561 369 4731 www.arcadis.com
Page:
1/2
Ms. Theresa Pepe, Project Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400
Subject:
Proposal for Well Abandonment Activities South Park Dry Cleaner (ERIC_4386) 12671 S. Dixie Highway, Miami, Florida
Dear Ms. Pepe:
Enclosed is a proposal to complete well abandonment activities at South Park Dry Cleaners – this will include abandoning seventeen (17) monitor wells, one recovery well and five (5) MAGs wells; photo documentation of field activities;
and reporting these activities to FDEP. A proposed scope of work, schedule, and CEF-LOE are included herein, along with copies of contractor bids.
SCOPE OF WORK
In accordance with Chapter 62-780 of the Florida Administrative Code (FAC), the following scope of work is proposed:
Task 1
This task is reserved for project management activities.
Task 2
The following site rehabilitation activities are proposed:
• Obtaining site access from current operator/owner;
• Abandonment of seventeen (17) monitor wells;
ENVIRONMENTAL
Date:
May 17, 2023
Contact:
Douglas J. McGlone
Phone:
561-662-7978
Email:
douglas.mcglone@arcadis.com
Our ref:
TBD
Florida License Numbers
Engineering
Geology
GB564
Surveying
LB7062
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com C:\Users\Pepe_T\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\XI9NOPPB\Roma Well Abandonment Proposal 4-6-22.docx
Theresa Pepe
FDEP
May 17, 2023
Page:
2/2
• Abandonment five (5) MAG wells,
• Abandonment of one recovery well; and
• Photographing and documenting activities and providing brief letter report to FDEP.
SCHEDULE
Arrangements will be conducted immediately upon receipt of a Task Assignment (TA) from the FDEP.
We currently anticipate that the work can be completed/reported within 45 days of receipt of the TA.
ESTIMATED COST
A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are presented in the enclosures.
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP in completing the remaining site rehabilitation activities at this site. If you have any questions or wish to discuss this proposal, please contact us.
Sincerely, Arcadis U.S., Inc.
Douglas J. McGlone, P.G.
Senior Hydrogeologist
Enclosures:
CEFLOE
j
I z o o ù
F ts o
I ill o
I d ô ò ò t z l o t
9o 1o rt gH [{oe oÔ o:Æ EEì¿ ryi, 4+z9 d ia
OF
op rõtx õ-.,=
UO
0do;
ìD 9O oo õio
^iAô4" -¡æ q
" ãF o-_
9è g H*-
¿tE
SOUTH PARK DRY CLEANER
FDEP FACILITY l.D. NO. 13-9501302
12671 S. DIXIE HWY., MIAMI-DADE COUNTY, FLORIDA
GROUNDWATER MONITORING REPORT
tulW"2lM j':r:: /
DAY
i!-l i¡
0 20'
I
L
I
L
MW-11o l.: :la' a 'rrr r':i MW.20 r: iirrr i
1l
I
:ti. :l ra: ì .:t ì
SITE LAYOUT
ARCADIS l''ä'
IVCDONALD'S
P¡NECREST
BUILOING ANÐ
PLANNING
LEGEND
DUMPSTERS o
I t
.t
SHALLOW IV]ONITOR WELL
INTERMEDIATE MONITOR WELL
DEEP MONITOR WELL
RÉCOVERY WELL
DESTROYED SHALLOW IVIONITOR WELL
DESTROYED INTERIV]EDIATE MONITOR WELL
STORM DRAIN AND TRENCH/SOAKAGE PIT
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND NATURAL GAS
SANITARY SEWER
UNDERGROUND FIBER OPTIC
È\ OUMPSTERS
ê*t ---ê---:==å\=====A.
ès wEsJ:rJgDg4rÞ, I I I
MW:3
a') o o -Át
MW.6 I --1
rl tl iì i lr1 :otzl lx,mi< tl tl tl L__ J
SUNRISE
POINT
CONDOMINIUIVS
RAMF UPTO ROOF PARKING t M
I
3M
I I I
I I I
I I I
GAS ME
SOUTIII PARX
ROOF PARKING
DRY c+EANER tt FOUR-STORY OFFICE gUILOING
L l--- I r n", ' tr ll i ll
I
I
I
) o NlW.1 2[¡ MW.9 ll il llo ìì¿ ¡¡ñ ::E' iip riE u<
,t PAVED PARKING n il
II
rl lt il ü
ROOF PARKING
PAVEg PARKING
--ìþ- lt rllI
II
t7r= = = = = = = = = -- = = + j' = = = = == = = = = --"õË = = = = = = = = a - = = = = sDfl- - - lr
====."f l{ ll t ENTRANgÊ ll, ll ìl I ll il ll ll 1l il il Í il
^ü il lì lt il il ,l ll U ll t
PAVED PARKING
'Ì===-=ll
PAVED PARKING
It t ì
I Ì I il
'lll ìl il il ll ll l{ ,l l il il !l lt ll tì
I
A , -a)tu ri tì tl I ll ll ll il t I
I
II ¡
I I I
ROOF PARKING
CHASE BANK
IFORMER PINECRESI
U.GAS GAS SIATION)
. , :i! :)j \ : ji ¡{lj lilAi RAMP DOWN TO PARKING tll
PAVED -===--==--====ø= Ivrw.s ¡l
---ø'==--====== PIVEN]'LAYOU-T DETAIL
/ erurnq¡¡ce!_-- /i
EXIT
--J---'- -'--¿!*-- ÊNTRANCE
:: Hliri.ì l]rlí\la. ri/Al.!
0 60' 120'
AASEMAPSOURCES: :
1. Asrial imåge - USGS D¡g¡tal OrthogEphic Ouarts Quadrang!el99ogLZ!15--_
2. fa¡cel-Bü¡øris -4riffii-Þaô eõúflyPlò¡t"êrt-ÆFralw GIS dataþass.
sw 128th sTRÊÉf
GRAPHIC SCALE
i o l F o
È
É ô
I
E a ö
F f o f
I z È
Il o f
I o
=o
I i'o
\ö qf, o+ lv.
1ts ìp t )z Í=r'ñ6 r>4 go-i40 o¿>8ú' dB= z tY ü9:
-eFtoE c¿a 7ø i :1b g.o 3 oãE qØ< ùÈ:
d7lú ãØ t¿9
SOUTH PARK DRY CLEANER
FDEP FACILITY l.D. NO. 13-9501302
12671 S. DIXIE HWY,, MIAMI-DADE COUNTY, FLORIDA
PILOT TEST WORK PLAN
REMEDIATION SYSTEM LAYOUT
ÊIrRCADIS | ¿ l¡\!/i t) rt I I Y
SVS-6
E
MW.2
Ø
2'DIA SCH,40 PVC STICKUPS
(5 SVE.2 SPARÉ)
LEGEND
¡ sHALLow MoNtroR WELL
J TNTERMEDTATE MoNlroR WELL ü DEEP MoNtroR wELL o9 solL BoRING
E sorL vAPoR SAMPLE (EBl, 7/2016)
L VAPOR MONITORING POINT (EBl, 9/2016)
É-{V STORM DRAIN AND TRENCH/SOAKAGE PIT
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND NATURAL GAS
SANITARY SEWER
UNDERGROUND FIBER OPTIC
C SOIL VAPOR EXTRACTION (SVE) WELL
SVE TRENCH ROUTE
MW-12M
':ìElûr) l
-t-r', 1''t I l.:
;tl l I I l I I I 1..
t I I I I I I I I I I I I I
I
- :.1 -sve¡ .ì ..h
\¡ irlP.á
SVE-3 ,L
SVE-2 V ivì
., e'----- SVS-1 E]\ ît-r0i).1
SVS-2 v lvìi: I ât
:I \/i?lÞ i
Irilit t r c:lr'
I
I
It ti:
ìiÌ
I I I I I I I I ¡,'ò aq' I I I I I I l I I t I I Ic a
MW.I,I
ú! r-ì[i0r ).., i 'DÀ ,.r , .P, I
\,ììr.r) Vl,iil :1
SVE.4
SVS-3 SVS-4
tì,1 lj'i iii:i tìt I
I lNl, ,¡l,,.1'l¡'iì,\l'iìi I I /,1 l¡!l'l
Ft ..;t .l ll."1u t
E
'.-1, P
:Pl
\ìr'' l ìË.:l )rìil i l à f.
I
0 10' 20'
I ttrit¡ I
I f.t ì f: t.t;-ii l?.:)f j r
; 1.1 l1:..irL,l
GRAPHIC SCALE
SVS-5
P o fo+ f ma ooz m u
P oro4f ma o z m ou N
P
P
P
P P r.:)r,l i:i ll í.ìl.Jtì ,.1 l'. ..a
Well ID Total Depth Screen Interval Diameter
MW-1 15 5-15 2"
MW-2 15 5-15 2"
MW-2M 35 30-35 2"
MW-2D 60 55-60 2"
MW-3 15 5-15 2"
MW-3M 35 30-35 2"
MW-4 15 5-15 2"
MW-4M 35 30-35 2"
MW-5 15 5-15 2"
MW-5M 35 30-35 2"
MW-6 15 5-15 2"
MW-7 15 5-15 2"
MW-8 15 5-15 2"
MW-9 15 5-15 2"
MW-10 13 3-13 2"
MW-12M 35 30-35 2"
RW-1 40 5-40 4"
MW-11 13 3-13 2" indoors need manway removed
SVE-1 5 1-5 2" indoors need manway removed
SVE-2 5 1-5 2" indoors need manway removed
SVE-3 5 1-5 2" indoors need manway removed
SVE-4 5 1-5 2" indoors need manway removed
SVE-5 5 1-5 2" indoors need manway removed
South Park Wells
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
Outdoors, grout only
*!!4.i+#-ê-k ffis Í¡fe¡NEIntø ã.w?rf¡ÀIr¿fÀ'flJ sortf?{ÞY$, ffc
Engineered Environmental Solutions, lnc.
601 N East Goast Avenue Lantana, FL 33462 561-721-0062 56'l-721-0127 Fax erockett@enoineeredenvironmental. com
TO:
Douglas J. McGlone PG Arcadis 1500 Gateway Boulevard, Suite 200
Boynton Beach, Florida 33426
Phone: 561 .662.7978 Fax:
E-mail:
PROPOSAL
1l-May-23
JOB DESCRIPTION/LOCATION
Monitoring Well Abandonments South Park Dry Cleaner
126715. DIXIE HWY.,
MIAMI, FI
Signature, Title, Date
9"tu< Erika Rockett, Project Manager
ITEM DESCRIPTION RATE UNITS Qry AMOUNT
Mobilization
Permits for Well Abandonments- Actual cost will be charged
Abandonment of 4" wells
Abandonment of 2" wells
Remove manhole and patch with concrete
SCHEDULE:2 DAYS
$650.00
$610.00
$9.25
$6.50
$100.00 way
Total
Foot
Foot
Each
$1,300.00
$610.00
$370.00
$2,736.50
$600.00
TOTAL $5,616.50
PAGE,l
GROUNDWATER
llllt"" il llll"" ' llll lt"¡ SonÍc Auger DPT Well Abandonment
DATE:
PROTECTION
A O¡v¡s¡on of DRILLPRO. LLC ESTIMATE #:
CUSTOMER PROJECT
South Park Cleaners 883912671S Dixie HwY
Miami, Florida
Well Abandonment night each each the client*n responsibility of the client" lnjection
51812023
523020
TOTAL
1,200 00
300:00
2,681.00
380.00
250.00
5,891 .00
Project Description:
(6) 2" Well Abandonment (Total of 38'). Remove Lid/Ring w/Concrete Patch' (lndoors)
(16) 2'Well Abandonment (Total of 25'). No Removals of Surface Completion, Just Grout up Well
(1) a" Well Abandonment (Total of 40'). No Removals of Surface Completion, Just Grout up Well.
17 Wells are located Outside and 6 are located inside cleaners.
Douglas McGlone Arcadis 1500 Gateway Blvd.
Boynton Beach, Florida 33426 (561 ) 662-7978
Per Diem (2 Man Crew)
Up to 2" Well Abandonment (Total of 202') Outdoors
Up to 2" Well Abandonment (Total of 38') lndoors
Well Abandonment (Total of 40') Outdoors lRemoval of Lid and Ring Fill w/Concrete (lndoors)
¡Drums Soil (As Needed) lorums Water (As Needed) iPermits- (Miami Dade County-up to 10 pe¡ app) MW Only
Gompletion: 1 to 1'5 DaYs
*n*Utility Locates on Private Property is the responsibility of **Damages to utilities on private property during borehole clearance are the
ID iDESCRIPTION . Unit lsMobilization/Demobi lization
3 7.00
10.00
12.00
100.00
70.00
70 00
125.00 foot each each eagh each
THANK YOU FOR YOUR BUSINESS!
Subtotal
TOTAL
Tod"drl{odqtow "Actua¡ quantities used and days on site will be invoiced"
Todd Hodgson Partner lf you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com
5,891
2300 Silver Star Road, Orlando, Florida (4071426-7885 fax (407) 426-7586
EARTH TECH DRILLING
2703 NW 1gTH STREET, POMPANO BEACH, FL 33069
954.974.2424 FfiX:954'9742423
Contractor Name: Arcadis' Doug McGlone - 561 662'7978
Site Name: South Park Cleaners' 1267't S Dixie Hwy - Pinecrest, FL (Miami)
PROPOSED SCOPE OF WORK:
Date:
FAG ID#:
5t512023
Grout Abandon 122) 2" MW's = 421'Total
Grout Abandon ì 4" RW's = 40' Total
Remove (6) Well ComDletions flnside Bldq) and Patch
Outside well pads will be left in place
Number of llnits Extended PriceUnit RateUnitDRILLING
Well Abandonment peJ foot p:f fot per.fool per foot per foot each l
"- 2" Well Abandonment (¡ncludes srout¡ng)
4" Well Abandonment (includes grouting)
6" Well Abandonment (¡ncludes srout¡ng)
8" - 10" Well Abandonment (includes grout¡ns)
16" Well Abandonment (¡ncìudes srouting)
Remove Standard Pad/Manhole
8.00 o$1
MISCELLANEOUS
q4e5 g0
$0 00
$0 00
$560:00
$0.00
$0.00
$0.00
$0.00 per crew / per night per hourStandby/Delay/Diff¡cult Access T¡me roundtrip
.00$495.00 lization
Diem
Approved 55-gal Drum each each each
$140.00 each lump sum
Permits & Well Completi:n RePorts
Trafftc Safèty Cones (Left onsite)
Debris Disposal
& Well Completion Reports
$7,637.00
DaystoCompleteScopeofwork: 1 DaY
Subcontract Company Name: EARTH TECH DRILLING 954.974'2424
Subcontract Mailing Address: 2703 NW 1gth St., Pompano Bch. FL 33069
Signature and Title of Person Submitting Quote: Charles Bucher/ Sr. Project Manager
TOTAL QUOTE PRICE
Dãte: 5t512023
Monitoring wells Sparge wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push
| SP Well Abandonment Proposal.pdf |
| Scope of Work |
| Task 1 |
| Task 2 |
| Schedule |
| Estimated Cost |
| Closing Remarks |
File details come from the government source that posted it. Updated .