CN-370000-HW680-DC002B.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW680|454e104ae8fbcb5641ac6acc30583968
Contract number
HW680
Issued by
Florida

About this file

Summary

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for site closure activities at South Park Dry Cleaner, located at 12671 S. Dixie Highway, Miami, Miami-Dade County, Florida (ERIC_4386). The Task Assignment is entered under Contract Number HW680, with TA Number DC002B, and is effective through July 28, 2023. Theresa Pepe serves as the FDEP Project Manager, while Gus Suarez represents Arcadis U.S., Inc. as the Contractor's Project Manager.

The scope of work involves the proper abandonment of all groundwater monitoring wells, MAGs wells, and recovery wells installed during prior site rehabilitation activities, in accordance with the May 17, 2023 Work Plan submitted by Arcadis. Specifically, the contractor will abandon seventeen monitor wells, five MAGs wells, and one recovery well; remove manways from interior wells; and submit a brief report with site photographs documenting completion activities. The total Task Assignment value is $11,433.34, compensated on a fixed unit rate basis. This amount comprises three subtasks: Project Management ($567.77), Site Closure/Well Abandonment ($9,488.39), and Reporting ($1,377.18). Invoicing is contingent upon FDEP approval of the Well Abandonment/Site Closure Report and Project Management, with a deliverable due date of June 30, 2023. EESI was selected as the drilling subcontractor based on the lowest of three competitive bids solicited for this work.

View the file

Other files

File Type Posted
CN-370000-HW680-DC001C.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-DC004A.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC004E.pdf PDF
CN-370000-HW680-DC007A.pdf PDF
CN-370000-HW680-DC008A.pdf PDF
CN-370000-HW680-DC008B.pdf PDF
CN-370000-HW680-DC010C.pdf PDF
CN-370000-HW680-DC011B.pdf PDF
CN-370000-HW680-DC013D.pdf PDF
CN-370000-HW680-DC013E.pdf PDF
CN-370000-HW680-DC013F.pdf PDF
CN-370000-HW680-DC014A.pdf PDF
CN-370000-HW680-DC014B.pdf PDF
CN-370000-HW680-DC014G.pdf PDF
CN-370000-HW680-DC014H.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015C.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-DC015E.pdf PDF
CN-370000-HW680-DC016D.pdf PDF
CN-370000-HW680-DC016E.pdf PDF
CN-370000-HW680-DC018A.pdf PDF
CN-370000-HW680-DC019D.pdf PDF
CN-370000-HW680-DC01ACO2.pdf PDF
CN-370000-HW680-DC021C.pdf PDF
CN-370000-HW680-DC022D.pdf PDF
CN-370000-HW680-DC023A.pdf PDF
CN-370000-HW680-DC023C.pdf PDF
CN-370000-HW680-DC024C.pdf PDF
CN-370000-HW680-DC025B.pdf PDF
CN-370000-HW680-DC026A.pdf PDF
CN-370000-HW680-DC026C.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC032A.pdf PDF
CN-370000-HW680-DC032B.pdf PDF
CN-370000-HW680-DC038A.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-DC040C.pdf PDF
CN-370000-HW680-DC040D.pdf PDF
CN-370000-HW680-DC041A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC052B.pdf PDF
CN-370000-HW680-DC053A.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05ACO2.pdf PDF
CN-370000-HW680-DC05BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW680

DC002B Completion July 28, 2023

FDEP has issued a Site Rehabilitation Completion Order for No Further Actions without Institutional Controls. Therefore, Arcadis will properly abandon all wells installed during prior work at the site. All activities will be performed according to the May 17, 2023, Work Plan submitted by Arcadis.

Theresa Pepe 850-245-8966 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Arcadis U.S. Inc.

Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_4386

12671 S. Dixie Hwy, Miami, Miami-Dade County

South Park Dry Cleaner

✔ $ 11,433.34

$ 11,433.34

Scope of Work

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2023.05.19 08:10:32 -04'00'

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.05.18 15:21:50 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Well Abandonment/Site Closure Report & Project Management 06/30/2023

FDEP approval of Well Abandonment/Site Closure Report & Project Management $ 11,433.34

$ 11,433.34

HW680

DC002B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File South Park Dry Cleaner Facility ID No. 13-9501302; ERIC_4386 Miami, Miami-Dade County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC002B (HW680) DATE: May 17, 2023

The site qualified for No Further Action without Engineering or Institutional Controls according to Chapter 62-780.680(1) F.A.C. FDEP issued a Site Rehabilitation Completion Order (SRCO) on February 16, 2023. Updated site access with new owners was obtained May 4, 2023. Arcadis U.S., Inc. will properly abandon all groundwater monitor wells, MAGS wells and recovery wells to close out the site. Work will be performed as described in the May 17, 2023, Work Plan from Doug McGlone of Arcadis.

The final task assignment total is $11,433.34. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated based on a percentage of total labor.

Subtask 2: Site Closure/Well Abandonment This subtask provides costs for abandoning seventeen monitor wells, five MAGs wells, and one recovery well installed during prior work at the site. Manways will be removed from interior wells. Other site restoration activities may be conducted as needed with approval from the property manager.

EESI was chosen as the drilling subcontractor based on their low bid of three bids solicited.

Subtask 3: Reporting Arcadis will submit a brief report and site photos to document the above activities.

FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.

Date: 5/17/2023

Task #: SubTask 1 Project Management Site: South Park Cleaners SubTask 2 Well Abandonment

Activity/Phase: Well Abandonment SubTask 3 Reporting Project Manager: Doug McGlone SubTask 4

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$67.07 Project Manager McGlone, Douglas (DMc) 3 3.1$100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0 $85.87 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 $67.07 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 $67.07 Principal Scientist McGlone, Douglas (DMc) 3 2 1 0 0 $39.34 Staff Scientist Riley, Joel (JR) 30 24 6 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 3 0 3 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 2 0 2 0 0

Total Hours 41 3 26 12 0 0

Direct Labor $1,779.66 $204.74 $1,078.30 $496.62 $0.00 $0.00

Overhead 79.00% $1,405.93 $161.74 $851.86 $392.33 $0.00 $0.00 Gen & Admin 36.00% $640.68 $73.71 $388.19 $178.78 $0.00 $0.00 Fringe 37.10% $660.26 $75.96 $400.05 $184.25 $0.00 $0.00 Total Labor $4,486.53 $516.15 $2,718.40 $1,251.98 $0.00 $0.00

Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Telemetry $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW EnviroServe $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00

EESI $5,616.50 $5,616.50 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $5,616.50 $5,616.50 $0.00 $0.00 $0.00 Handling Fee $561.65 $561.65 $0.00 $0.00 $0.00 Total Subcontractor Cost $6,178.15 $6,178.15 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $80.00 $80.00 $0.00 $0.00 $0.00

Subtotal $10,984.68 $516.15 $9,216.55 $1,251.98 $0.00 $0.00 Completion Fee $448.66 $51.62 $271.84 $125.20 $0.00 $0.00

Total Estimated Cost $11,433.34 $567.77 $9,488.39 $1,377.18 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : South Park Cleaners SUBTASK 2: Well Abandonment

DATE: 5/17/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title) Principal (DMc) Field Support 2 Project Engineer (TH) Staff Scientist (JR) Mob (2hrs x 2), oversee and document abandonment of 23 wells 24 Project Asst (MMc) Process field notes, sample tracking, data entry, report assembly Drafter/Designer(BO)

TOTAL LABOR 26

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals Per Day $0.00

Total Equip.: $0.00

Services Procurement Name Purpose Rate Units Usage Totals

EESI Well Abandonment $5,616.50 Lump Sum 1 $5,616.50 NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $5,616.50

TOTAL $5,616.50

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals Total PPE: $0.00

Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00

Total Expendables: $80.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00

Total Equipment Items: $0.00 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00

Total Equipment Kits: $0.00

TOTAL EQUIPMENT $80.00

SITE : South Park Cleaners

SUBTASK 3: Reporting

DATE: 5/17/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title) Principal (DMc) PG verification; certification of report 1

Project Engineer (TH)

Staff Scientist (JR) Report preparation with photographs 6

Project Asst (MMc) Process field notes, sample tracking, data entry, report assembly 2

Drafter/Designer(BO) Figures prodution for report 3

TOTAL LABOR 12

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 Handling Fee $0.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples TotalsVOC TO-15 Vapor $200.00 1.00 0 $0.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00

Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00

Total Equipment Items: $0.00 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00

Total Equipment Kits: $0.00

TOTAL EQUIPMENT $0.00

Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.

Arcadis U.S., Inc.

1500 Gateway Boulevard

Suite 200

Boynton Beach

Florida 33426

Tel 561 697 7000

Fax 561 369 4731 www.arcadis.com

Page:

1/2

Ms. Theresa Pepe, Project Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400

Subject:

Proposal for Well Abandonment Activities South Park Dry Cleaner (ERIC_4386) 12671 S. Dixie Highway, Miami, Florida

Dear Ms. Pepe:

Enclosed is a proposal to complete well abandonment activities at South Park Dry Cleaners – this will include abandoning seventeen (17) monitor wells, one recovery well and five (5) MAGs wells; photo documentation of field activities;

and reporting these activities to FDEP. A proposed scope of work, schedule, and CEF-LOE are included herein, along with copies of contractor bids.

SCOPE OF WORK

In accordance with Chapter 62-780 of the Florida Administrative Code (FAC), the following scope of work is proposed:

Task 1

This task is reserved for project management activities.

Task 2

The following site rehabilitation activities are proposed:

• Obtaining site access from current operator/owner;

• Abandonment of seventeen (17) monitor wells;

ENVIRONMENTAL

Date:

May 17, 2023

Contact:

Douglas J. McGlone

Phone:

561-662-7978

Email:

douglas.mcglone@arcadis.com

Our ref:

TBD

Florida License Numbers

Engineering

Geology

GB564

Surveying

LB7062

This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.

arcadis.com C:\Users\Pepe_T\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\XI9NOPPB\Roma Well Abandonment Proposal 4-6-22.docx

Theresa Pepe

FDEP

May 17, 2023

Page:

2/2

• Abandonment five (5) MAG wells,

• Abandonment of one recovery well; and

• Photographing and documenting activities and providing brief letter report to FDEP.

SCHEDULE

Arrangements will be conducted immediately upon receipt of a Task Assignment (TA) from the FDEP.

We currently anticipate that the work can be completed/reported within 45 days of receipt of the TA.

ESTIMATED COST

A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are presented in the enclosures.

CLOSING REMARKS

Arcadis appreciates the opportunity to assist the FDEP in completing the remaining site rehabilitation activities at this site. If you have any questions or wish to discuss this proposal, please contact us.

Sincerely, Arcadis U.S., Inc.

Douglas J. McGlone, P.G.

Senior Hydrogeologist

Enclosures:

CEFLOE

j

I z o o ù

F ts o

I ill o

I d ô ò ò t z l o t

9o 1o rt gH [{oe oÔ o:Æ EEì¿ ryi, 4+z9 d ia

OF

op rõtx õ-.,=

UO

0do;

ìD 9O oo õio

^iAô4" -¡æ q

" ãF o-_

9è g H*-

¿tE

SOUTH PARK DRY CLEANER

FDEP FACILITY l.D. NO. 13-9501302

12671 S. DIXIE HWY., MIAMI-DADE COUNTY, FLORIDA

GROUNDWATER MONITORING REPORT

tulW"2lM j':r:: /

DAY

i!-l i¡

0 20'

I

L

I

L

MW-11o l.: :la' a 'rrr r':i MW.20 r: iirrr i

1l

I

:ti. :l ra: ì .:t ì

SITE LAYOUT

ARCADIS l''ä'

IVCDONALD'S

P¡NECREST

BUILOING ANÐ

PLANNING

LEGEND

DUMPSTERS o

I t

.t

SHALLOW IV]ONITOR WELL

INTERMEDIATE MONITOR WELL

DEEP MONITOR WELL

RÉCOVERY WELL

DESTROYED SHALLOW IVIONITOR WELL

DESTROYED INTERIV]EDIATE MONITOR WELL

STORM DRAIN AND TRENCH/SOAKAGE PIT

OVERHEAD ELECTRIC

UNDERGROUND ELECTRIC

UNDERGROUND NATURAL GAS

SANITARY SEWER

UNDERGROUND FIBER OPTIC

È\ OUMPSTERS

ê*t ---ê---:==å\=====A.

ès wEsJ:rJgDg4rÞ, I I I

MW:3

a') o o -Át

MW.6 I --1

rl tl iì i lr1 :otzl lx,mi< tl tl tl L__ J

SUNRISE

POINT

CONDOMINIUIVS

RAMF UPTO ROOF PARKING t M

I

3M

I I I

I I I

I I I

GAS ME

SOUTIII PARX

ROOF PARKING

DRY c+EANER tt FOUR-STORY OFFICE gUILOING

L l--- I r n", ' tr ll i ll

I

I

I

) o NlW.1 2[¡ MW.9 ll il llo ìì¿ ¡¡ñ ::E' iip riE u<

,t PAVED PARKING n il

II

rl lt il ü

ROOF PARKING

PAVEg PARKING

--ìþ- lt rllI

II

t7r= = = = = = = = = -- = = + j' = = = = == = = = = --"õË = = = = = = = = a - = = = = sDfl- - - lr

====."f l{ ll t ENTRANgÊ ll, ll ìl I ll il ll ll 1l il il Í il

^ü il lì lt il il ,l ll U ll t

PAVED PARKING

'Ì===-=ll

PAVED PARKING

It t ì

I Ì I il

'lll ìl il il ll ll l{ ,l l il il !l lt ll tì

I

A , -a)tu ri tì tl I ll ll ll il t I

I

II ¡

I I I

ROOF PARKING

CHASE BANK

IFORMER PINECRESI

U.GAS GAS SIATION)

. , :i! :)j \ : ji ¡{lj lilAi RAMP DOWN TO PARKING tll

PAVED -===--==--====ø= Ivrw.s ¡l

---ø'==--====== PIVEN]'LAYOU-T DETAIL

/ erurnq¡¡ce!_-- /i

EXIT

--J---'- -'--¿!*-- ÊNTRANCE

:: Hliri.ì l]rlí\la. ri/Al.!

0 60' 120'

AASEMAPSOURCES: :

1. Asrial imåge - USGS D¡g¡tal OrthogEphic Ouarts Quadrang!el99ogLZ!15--_

2. fa¡cel-Bü¡øris -4riffii-Þaô eõúflyPlò¡t"êrt-ÆFralw GIS dataþass.

sw 128th sTRÊÉf

GRAPHIC SCALE

i o l F o

È

É ô

I

E a ö

F f o f

I z È

Il o f

I o

=o

I i'o

\ö qf, o+ lv.

1ts ìp t )z Í=r'ñ6 r>4 go-i40 o¿>8ú' dB= z tY ü9:

-eFtoE c¿a 7ø i :1b g.o 3 oãE qØ< ùÈ:

d7lú ãØ t¿9

SOUTH PARK DRY CLEANER

FDEP FACILITY l.D. NO. 13-9501302

12671 S. DIXIE HWY,, MIAMI-DADE COUNTY, FLORIDA

PILOT TEST WORK PLAN

REMEDIATION SYSTEM LAYOUT

ÊIrRCADIS | ¿ l¡\!/i t) rt I I Y

SVS-6

E

MW.2

Ø

2'DIA SCH,40 PVC STICKUPS

(5 SVE.2 SPARÉ)

LEGEND

¡ sHALLow MoNtroR WELL

J TNTERMEDTATE MoNlroR WELL ü DEEP MoNtroR wELL o9 solL BoRING

E sorL vAPoR SAMPLE (EBl, 7/2016)

L VAPOR MONITORING POINT (EBl, 9/2016)

É-{V STORM DRAIN AND TRENCH/SOAKAGE PIT

OVERHEAD ELECTRIC

UNDERGROUND ELECTRIC

UNDERGROUND NATURAL GAS

SANITARY SEWER

UNDERGROUND FIBER OPTIC

C SOIL VAPOR EXTRACTION (SVE) WELL

SVE TRENCH ROUTE

MW-12M

':ìElûr) l

-t-r', 1''t I l.:

;tl l I I l I I I 1..

t I I I I I I I I I I I I I

I

- :.1 -sve¡ .ì ..h

\¡ irlP.á

SVE-3 ,L

SVE-2 V ivì

., e'----- SVS-1 E]\ ît-r0i).1

SVS-2 v lvìi: I ât

:I \/i?lÞ i

Irilit t r c:lr'

I

I

It ti:

ìiÌ

I I I I I I I I ¡,'ò aq' I I I I I I l I I t I I Ic a

MW.I,I

ú! r-ì[i0r ).., i 'DÀ ,.r , .P, I

\,ììr.r) Vl,iil :1

SVE.4

SVS-3 SVS-4

tì,1 lj'i iii:i tìt I

I lNl, ,¡l,,.1'l¡'iì,\l'iìi I I /,1 l¡!l'l

Ft ..;t .l ll."1u t

E

'.-1, P

:Pl

\ìr'' l ìË.:l )rìil i l à f.

I

0 10' 20'

I ttrit¡ I

I f.t ì f: t.t;-ii l?.:)f j r

; 1.1 l1:..irL,l

GRAPHIC SCALE

SVS-5

P o fo+ f ma ooz m u

P oro4f ma o z m ou N

P

P

P

P P r.:)r,l i:i ll í.ìl.Jtì ,.1 l'. ..a

Well ID Total Depth Screen Interval Diameter

MW-1 15 5-15 2"

MW-2 15 5-15 2"

MW-2M 35 30-35 2"

MW-2D 60 55-60 2"

MW-3 15 5-15 2"

MW-3M 35 30-35 2"

MW-4 15 5-15 2"

MW-4M 35 30-35 2"

MW-5 15 5-15 2"

MW-5M 35 30-35 2"

MW-6 15 5-15 2"

MW-7 15 5-15 2"

MW-8 15 5-15 2"

MW-9 15 5-15 2"

MW-10 13 3-13 2"

MW-12M 35 30-35 2"

RW-1 40 5-40 4"

MW-11 13 3-13 2" indoors need manway removed

SVE-1 5 1-5 2" indoors need manway removed

SVE-2 5 1-5 2" indoors need manway removed

SVE-3 5 1-5 2" indoors need manway removed

SVE-4 5 1-5 2" indoors need manway removed

SVE-5 5 1-5 2" indoors need manway removed

South Park Wells

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

Outdoors, grout only

*!!4.i+#-ê-k ffis Í¡fe¡NEIntø ã.w?rf¡ÀIr¿fÀ'flJ sortf?{ÞY$, ffc

Engineered Environmental Solutions, lnc.

601 N East Goast Avenue Lantana, FL 33462 561-721-0062 56'l-721-0127 Fax erockett@enoineeredenvironmental. com

TO:

Douglas J. McGlone PG Arcadis 1500 Gateway Boulevard, Suite 200

Boynton Beach, Florida 33426

Phone: 561 .662.7978 Fax:

E-mail:

PROPOSAL

1l-May-23

JOB DESCRIPTION/LOCATION

Monitoring Well Abandonments South Park Dry Cleaner

126715. DIXIE HWY.,

MIAMI, FI

Signature, Title, Date

9"tu< Erika Rockett, Project Manager

ITEM DESCRIPTION RATE UNITS Qry AMOUNT

Mobilization

Permits for Well Abandonments- Actual cost will be charged

Abandonment of 4" wells

Abandonment of 2" wells

Remove manhole and patch with concrete

SCHEDULE:2 DAYS

$650.00

$610.00

$9.25

$6.50

$100.00 way

Total

Foot

Foot

Each

$1,300.00

$610.00

$370.00

$2,736.50

$600.00

TOTAL $5,616.50

PAGE,l

GROUNDWATER

llllt"" il llll"" ' llll lt"¡ SonÍc Auger DPT Well Abandonment

DATE:

PROTECTION

A O¡v¡s¡on of DRILLPRO. LLC ESTIMATE #:

CUSTOMER PROJECT

South Park Cleaners 883912671S Dixie HwY

Miami, Florida

Well Abandonment night each each the client*n responsibility of the client" lnjection

51812023

523020

TOTAL

1,200 00

300:00

2,681.00

380.00

250.00

5,891 .00

Project Description:

(6) 2" Well Abandonment (Total of 38'). Remove Lid/Ring w/Concrete Patch' (lndoors)

(16) 2'Well Abandonment (Total of 25'). No Removals of Surface Completion, Just Grout up Well

(1) a" Well Abandonment (Total of 40'). No Removals of Surface Completion, Just Grout up Well.

17 Wells are located Outside and 6 are located inside cleaners.

Douglas McGlone Arcadis 1500 Gateway Blvd.

Boynton Beach, Florida 33426 (561 ) 662-7978

Per Diem (2 Man Crew)

Up to 2" Well Abandonment (Total of 202') Outdoors

Up to 2" Well Abandonment (Total of 38') lndoors

Well Abandonment (Total of 40') Outdoors lRemoval of Lid and Ring Fill w/Concrete (lndoors)

¡Drums Soil (As Needed) lorums Water (As Needed) iPermits- (Miami Dade County-up to 10 pe¡ app) MW Only

Gompletion: 1 to 1'5 DaYs

*n*Utility Locates on Private Property is the responsibility of **Damages to utilities on private property during borehole clearance are the

ID iDESCRIPTION . Unit lsMobilization/Demobi lization

3 7.00

10.00

12.00

100.00

70.00

70 00

125.00 foot each each eagh each

THANK YOU FOR YOUR BUSINESS!

Subtotal

TOTAL

Tod"drl{odqtow "Actua¡ quantities used and days on site will be invoiced"

Todd Hodgson Partner lf you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com

5,891

2300 Silver Star Road, Orlando, Florida (4071426-7885 fax (407) 426-7586

EARTH TECH DRILLING

2703 NW 1gTH STREET, POMPANO BEACH, FL 33069

954.974.2424 FfiX:954'9742423

Contractor Name: Arcadis' Doug McGlone - 561 662'7978

Site Name: South Park Cleaners' 1267't S Dixie Hwy - Pinecrest, FL (Miami)

PROPOSED SCOPE OF WORK:

Date:

FAG ID#:

5t512023

Grout Abandon 122) 2" MW's = 421'Total

Grout Abandon ì 4" RW's = 40' Total

Remove (6) Well ComDletions flnside Bldq) and Patch

Outside well pads will be left in place

Number of llnits Extended PriceUnit RateUnitDRILLING

Well Abandonment peJ foot p:f fot per.fool per foot per foot each l

"- 2" Well Abandonment (¡ncludes srout¡ng)

4" Well Abandonment (includes grouting)

6" Well Abandonment (¡ncludes srout¡ng)

8" - 10" Well Abandonment (includes grout¡ns)

16" Well Abandonment (¡ncìudes srouting)

Remove Standard Pad/Manhole

8.00 o$1

MISCELLANEOUS

q4e5 g0

$0 00

$0 00

$560:00

$0.00

$0.00

$0.00

$0.00 per crew / per night per hourStandby/Delay/Diff¡cult Access T¡me roundtrip

.00$495.00 lization

Diem

Approved 55-gal Drum each each each

$140.00 each lump sum

Permits & Well Completi:n RePorts

Trafftc Safèty Cones (Left onsite)

Debris Disposal

& Well Completion Reports

$7,637.00

DaystoCompleteScopeofwork: 1 DaY

Subcontract Company Name: EARTH TECH DRILLING 954.974'2424

Subcontract Mailing Address: 2703 NW 1gth St., Pompano Bch. FL 33069

Signature and Title of Person Submitting Quote: Charles Bucher/ Sr. Project Manager

TOTAL QUOTE PRICE

Dãte: 5t512023

Monitoring wells Sparge wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push

SP Well Abandonment Proposal.pdf
Scope of Work
Task 1
Task 2
Schedule
Estimated Cost
Closing Remarks