CN-370000-HW680-DC016E.pdf
PDF 701 KB Posted
- Contract number
- HW680
- Issued by
- Florida
About this file
This Task Assignment (TA) document, numbered DC016E under Contract HW680, is executed between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S., Inc. The task assignment pertains to environmental remediation work at the Town Custom Cleaners site located at 10201 Hammocks Boulevard, Miami, Miami-Dade County, Florida (ERIC_4393). The Department Project Manager is Theresa Pepe (850-245-8966), and the Contractor's Project Manager is Gus Suarez (813-205-4703). The task assignment is effective through July 31, 2025.
Arcadis U.S., Inc. will conduct a final groundwater sampling event and prepare a Site Rehabilitation Completion Report (SRCR) in accordance with the February 27, 2025 Work Plan. The work comprises three subtasks: Project Management (calculated as a percentage of total labor), Groundwater Sampling (involving sampling of five monitoring wells for drycleaning solvents and disposal of investigation-derived waste), and preparation of the SRCR including justification for site closure with soil, groundwater, and vapor data analysis. The total task assignment value is $6,677.47 on a fixed unit rate basis. The deliverable—a Site Rehabilitation Completion Report including IDW manifest and project management documentation—is due May 30, 2025, with invoice payment contingent upon FDEP approval. The cost estimate breakdown allocates $579.77 to project management, $2,869.83 to groundwater sampling, and $2,723.92 to the SRCR preparation, with labor, overhead, general and administrative costs, fringe benefits, travel, subcontractor services (IDW disposal at $125.00), laboratory analysis ($515.00), and field expenses included in the total.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW680
DC016E Completion July 31, 2025
Arcadis will conduct groundwater sampling from select wells and prepare a Site Rehabilitation Completion Report. Work will be performed according to the February 27, 2025, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor
Contractor Gus Suarez Contractor 813-205-4703
ERIC_4393
10201 Hammocks Boulevard, Miami, Miami-Dade County
Town Custom Cleaners
Contractor Contractor
✔ $ 6,677.47
$ 6,677.47
Scope of Work
Arcadis U.S. Inc.
Contractor Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2025.03.06 10:28:23 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.03.05 15:04:43 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Rehabilitation Completion Report (SRCR)/IDW manifest/Project Management 05/30/2025
FDEP approval of Site Rehabilitation Completion Report (SRCR)/IDW manifest/Project Management $ 6,677.47
$ 6,677.47
HW680
DC016E
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
AAlexis A. Lambert
Secretary
Memorandum
TO: Negotiation File Town Custom Cleaners
FACID NO. 13-9501049; ERIC_4393
Miami, Miami-Dade County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC016E (HW680) DATE: February 28, 2025
Per FDEP’s direction, Arcadis U.S. Inc. will conduct a final groundwater sampling event and, assuming the data remains clean, they will submit a Site Rehabilitation Completion Report (SRCR). Activities will be performed in accordance with the February 27, 2025, Work Plan submitted by Doug McGlone of Arcadis.
The final task assignment total is $6,677.47. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Groundwater Sampling An access agreement with the current property owner was signed in April 2021.
Arcadis will sample five wells for drycleaning solvents as recommended by the Waste Site Cleanup Section’s geologist. IDW will be disposed of by a licensed waste hauler.
Subtask 3: Site Rehabilitation Completion Report Arcadis will submit a written report as the final deliverable. This report will include justification for site closure including the most recent soil, groundwater, and vapor data. The report will also summarize prior remedial actions taken at the site.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 6/14/24
Task #: SubTask 1 Project Management Site: Town Custom Cleaners SubTask 2 Groundwater Sampling
Activity/Phase: SRCR SubTask 3 SRCR Project Manager: Doug McGlone SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$70.09 Project Manager McGlone, Douglas (DMc) 3 3.3 $100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0
$91.57 Principal Engineer Burtnett, Susan (SB) 0 0 0 0 0 $87.59 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 $70.09 Principal Scientist McGlone, Douglas (DMc) 7 3 4 0 0 $44.00 Project Scientist Salinas, Kendall (KS) 0 0 0 0 0 $44.00 Project Scientist Riley, Joel (JR) 22 10 12 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 3 0 3 0 0 $35.26 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $38.28 Project Assistant Cruz, Michele (MC) 5 1 4 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $31.20 Document Technician Embras, Susan (SRE) 0 0 0 0 0
Total Hours 40 3 14 23 0 0
Direct Labor $1,999.02 $229.98 $688.55 $1,080.49 $0.00 $0.00
Overhead 79.00% $1,579.22 $181.68 $543.95 $853.59 $0.00 $0.00 Gen & Admin 36.00% $719.65 $82.79 $247.88 $388.98 $0.00 $0.00 Fringe 37.10% $741.63 $85.32 $255.45 $400.86 $0.00 $0.00 Total Labor $5,039.52 $579.77 $1,735.83 $2,723.92 $0.00 $0.00
Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW Erwin $125.00 $125.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00 Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00
Laboratory Analytical Costs $365.00 $365.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 Total Laboratory $515.00 $515.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $31.50 $31.50 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $290.00 $290.00 $0.00 $0.00 $0.00 Total Field Expenses $361.50 $361.50 $0.00 $0.00 $0.00
Subtotal $6,173.52 $579.77 $2,869.83 $2,723.92 $0.00 $0.00 Completion Fee $503.95 $57.98 $173.58 $272.39 $0.00 $0.00
Total Estimated Cost $6,677.47 $637.75 $3,043.41 $2,996.31 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Town Custom Cleaners SUBTASK 2: Groundwater Sampling
DATE: 6/14/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (DMc) Verify property ownership, coordinate sampling event 3 Project Engineer (TH) Project Scientist (JR) Mob/demob (2 hrs), sample 5 monitor wells, pack/ship, IDW management (8 hrs) 10 Project Asst (MMc) Track samples 1 Drafter/Designer(BO)
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals $36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals EESI AWS $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals Erwin IDW $125.00 Lump Sum 1 $125.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $125.00
TOTAL $125.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOH 8260 Aqueous $73.00 1.00 5 $365.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $365.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $150.00
TOTAL LAB $515.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 1 $40.00
Total Expendables: $40.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 75 $22.50 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 3 $9.00
Total Equipment Items: $31.50 Equipment Kits Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00
Total Equipment Kits: $290.00
Total Equipment Kits: $361.50
SITE : Town Custom Cleaners
SUBTASK 3:
DATE: 6/14/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (DMc) PG data analysis, recommendations/certification of report 4 Project Engineer (TH) Project Scientist (JR) Prepare report including historical data from others 12 Project Asst (MMc) Report assembly, deliverable production 4 Drafter/Designer(BO) Figures for report 3
TOTAL LABOR 23
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
Total Equipment Kits: $0.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
arcadis.com C:\Users\pepe_t\Desktop\Town Custom SRCR Proposal.docx
Page:
1/2
Theresa Pepe, Contract Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Subject:
Site Rehabilitation Completion Report Proposal Town Custom Cleaners (ERIC_4393) 10201 Hammocks Blvd, Miami, Miami-Dade County, Florida
Dear Ms. Pepe:
Arcadis is pleased to provide the Florida Department of Environmental Protection (FDEP) this proposal for the former Town Custom Cleaners site, located in Davie, Broward County, Florida. The proposal includes the preparation of a Site Rehabilitation Completion Report (SRCR).
SCOPE OF WORK
The following sections provide a brief description of the tasks to be completed by Arcadis.
Task 1 – Project Management
This task includes project management activities associated with completion of Tasks 2.
Task 2 – Groundwater Sampling
Groundwater samples will be collected from MW001, MW003, MW004, MW005 and MW006 for analysis of VOHs by EPA 8260. Purge water will be containerized in a 55-gallon drum for offsite disposal.
ENVIRONMENT
Date:
February 2 , 2025
Contact:
Doug McGlone
Phone:
561.662.7978
Email:
Douglas.mcglone@arcadis.com
Our ref:
30036221
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com C:\Users\pepe_t\Desktop\Town Custom SRCR Proposal.docx
SRCR Proposal 28 February 2025
Page:
2/2
Task 3 – SRCR
As requested, if the groundwater samples are below GCTLs, a SRCR will be prepared for the site. The report will include a summary of assessment activities and current and historical soil and groundwater data and figures.
SCHEDULE
The SRCR will be submitted within 45 days of receipt of task assignment.
COST ESTIMATE
A Cost Estimate Form and Level of Effort (CEF-LOE) Form are attached for the above scope of work (Attachment 1).
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP at this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Douglas J. McGlone, P.G.
Principal Geologist
Attachments:
CEF-LOE
Invoice
Date
2/12/2024 Invoice #
AUS109
Arcadis U.S., Inc.
Attn: Douglas McGlone 1705 Metropolitan Boulevard Tallahassee, FL 32308 invoices_us@arcadis.com
P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511 ErwinRemediation@gmail.com
Site City
Palm Beach Gardens
Proj #30199600
Site Name
Dapper Dan
Total
Quantity Rate AmountDate Item
1 125.00 125.002/5/2024 Drum Disp - Non-Haz Groundwater
$125.00
File details come from the government source that posted it. Updated .