CN-370000-HW680-DC015B.pdf
PDF 1 MB Posted
- Contract number
- HW680
- Issued by
- Florida
About this file
This Task Assignment (TA) is a contract document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for environmental remediation services at the Miami Dry Cleaners facility (Facility ID 13-9501077; ERIC_4372) located at 810 West Flagler Street, Miami, Miami-Dade County, Florida. The Task Assignment, numbered DC015B, is issued under the underlying Contract Number HW680 and was executed on October 10, 2022, with a completion date of May 31, 2023. The project manager for FDEP is Theresa Pepe (850-245-8966), and the contractor's project manager is Gus Suarez (813-205-4703).
The scope of work consists of six months of Operation and Maintenance (O&M) activities for a soil vapor extraction (SVE) system, performed according to Arcadis's October 5, 2022 Work Plan. The services include monthly system monitoring, vapor sampling, system optimization, and reporting. The contract compensation structure is fixed unit rate of $21,743.73 for labor and services, plus cost reimbursement of $3,900.00 for utility invoices and associated handling fees, for a total Task Assignment value of $25,643.73. The deliverables include a Year 2 Quarter 2 semi-annual O&M report (due 01/13/2023), utility invoices (01/27/2023), a Year 2 Quarter 3 quarterly email update (due 04/14/2023), and utility invoices (due 04/28/2023). Invoicing is contingent upon FDEP approval of deliverables, with utility costs limited to a not-to-exceed amount of $1,950.00 per quarterly billing period plus a $60.00 handling fee per period. The funding information indicates no additional grant or appropriation information was provided.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC015B Completion May 31, 2023
Arcadis will conduct six months of O&M activities at the site. Work will be performed according to the October 5, 2022, Work Plan submitted by Arcadis.
The payment of utility invoices is the only portion of this Task Assignment that is Cost Plus.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4372
810 West Flagler Street, Miami, Miami-Dade County
Miami Dry Cleaners
✔ $ 21,743.73 ✔ $ 3,900.00
$ 25,643.73
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.10.10 16:42:38 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.10.10 15:48:06 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Year 2, Quarter 2 - Semi-Annual O&M report 01/13/2023
3 months Utility Invoices 01/27/2023
Year 2, Quarter 3 - Quarterly O&M email update/Project Management 04/14/2023
3 months utility invoices 04/28/2023
FDEP approval of Year 2, Quarter 2 - Semi-Annual O&M report $ 10,148.03
FDEP approval of 3 months utility invoices Utilities (Cost Plus Fixed Fee) = not to exceed $1,950.00 Utilities Handling Fee = $60
$ 2,010.00
FDEP approval of Year 2, Quarter 3 - Quarterly O&M email update/Project Management $ 11,475.70
FDEP approval of 3 months utility invoices Utilities (Cost Plus Fixed Fee)= not to exceed $1,950.00 Utilities Handling Fee = $60
$ 2,010.00
$ 25,643.73
HW680
DC015B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Miami Dry Cleaners Facility ID No. 13-9501077; ERIC_4372 Miami, Miami-Dade County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC015B (HW680) DATE: October 7, 2022
Task Assignment DC015B is for six months of O&M activities at Miami Dry Cleaners.
Additional information is described in the October 5, 2022, Work Plan from Doug McGlone of Arcadis.
The final task assignment equals $25,643.73. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management This subtask is calculated automatically based on a percentage of total labor.
Subtask 2: Quarterly O&M & Reporting This subtask provides costs for one quarter (October - December 2022) of monthly O&M site visits including vapor sampling per the approved ISR Work Plan. One Semi-annual report will be submitted to FDEP summarizing the above data.
Subtask 3: Quarterly O&M & Reporting This subtask provides costs for one quarter (January – March 2023) of monthly O&M site visits including vapor sampling. One brief email update will be submitted to FDEP summarizing the above data.
Subtask 4: Utilities This subtask provides costs for six months of utilities and associated handling fees.
Arcadis will only invoice for actual charges and any remainder will be adjusted by change order.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 10/5/2022
Task #: SubTask 1 Project Management
Site: Miami Dry Cleaners SubTask 2 Y2 Q2 O&M
Activity/Phase: O&M SubTask 3 Y2 Q3 O&M
Project Manager: Doug McGlone SubTask 4 Utilities
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$65.11 Project Manager McGlone, Douglas (DMc) 11 10.9
$100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0
$65.43 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0
$65.11 Principal Scientist McGlone, Douglas (DMc) 11 6 5 0 0
$44.00 Project Engineer Hays, Timothy (TH) 28 15 13 0 0
$39.34 Staff Scientist Riley, Joel (JR) 74 37 37 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 10 6 4 0 0
$35.81 Project Assistant McLemore, Michele (MMc) 6 3 3 0 0
Total Hours 140 11 67 62 0 0
Direct Labor $6,182.15 $711.22 $2,851.69 $2,619.24 $0.00 $0.00
Overhead 79.00% $4,883.90 $561.86 $2,252.84 $2,069.20 $0.00 $0.00
Gen & Admin 36.00% $2,225.58 $256.04 $1,026.61 $942.93 $0.00 $0.00
Fringe 37.10% $2,293.58 $263.86 $1,057.98 $971.74 $0.00 $0.00
Total Labor $15,585.21 $1,792.98 $7,189.12 $6,603.11 $0.00 $0.00
Travel
Vehicle Rental $720.00 $360.00 $360.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $720.00 $360.00 $360.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $3,900.00 $0.00 $0.00 $3,900.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,900.00 $0.00 $0.00 $3,900.00 $0.00
Handling Fee $120.00 $0.00 $0.00 $120.00 $0.00
Total Subcontractor Cost $4,020.00 $0.00 $0.00 $4,020.00 $0.00
Laboratory
Analytical Costs $400.00 $200.00 $200.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $300.00 $150.00 $150.00 $0.00 $0.00
Total Laboratory $700.00 $350.00 $350.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $240.00 $120.00 $120.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $660.00 $330.00 $330.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) -MAGS, recon, etc. $2,160.00 $1,080.00 $1,080.00 $0.00 $0.00
Total Field Expenses $3,060.00 $1,530.00 $1,530.00 $0.00 $0.00
Subtotal $24,085.21 $1,792.98 $9,429.12 $8,843.11 $4,020.00 $0.00
Completion Fee $1,558.52 $179.30 $718.91 $660.31 $0.00 $0.00
Total Estimated Cost $25,643.73 $1,972.28 $10,148.03 $9,503.42 $4,020.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Miami Dry Cleaners
SUBTASK 2: Y2 Q2 O&M
DATE: 10/5/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Y2 Q2 O&M Pricipal / DMc Verification of property ownership; field event preparation, utilities 6 Staff Scientist / JR Prep for fieldwork (1 hr), mob/demob (2 hrs x 3); 3 months O&M, vapor sampling (30 hrs) 37 Project Engineer (TH) Report results, system performance, report prep/submittal 15 Project Asst - MMc Field notes processing, field support 3 Drafter/Designer (BO) Figure production for email update 6
TOTAL LABOR 67
VEHICLE TYPE RATE UNIT USEAGE
Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Staff Scientist / JR Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
Staff Scientist / JR $150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals Lump Sum $0.00
Enviroserve IDW $198.00 Drum 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC Soil Vapor TO-15 Vapor $200.00 1.00 1 $200.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $200.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $150.00
TOTAL LAB $350.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00 Equipment ItemsTubing, Poly/HDPE $0.30 Per Foot 0 $0.00 PID (ppbRae) $110.00 Per Day 3 $330.0055-gallon Drum $100.00 Each 0 $0.00
Total Equipment Items: $330.00 Equipment KitsSoil Assessment Kit $175.00 Day 0 $0.00 Construction/O&M/Pilot Test Kit $360.00 Day 3 $1,080.00
Total Equipment Kits: $1,080.00
TOTAL EQUIPMENT $1,530.00
SITE : Miami Dry Cleaners
SUBTASK 3: Y2 Q3 O&M
DATE: 10/5/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
PFAS Reporting Principal / DMc Verification of property ownership; field event preparation, utilities 5 Staff Scientist / JR Prep for fieldwork (1 hr), mob/demob (2 hrs x 3); 3 months O&M, vapor sampling (30 hrs) 37 Project Engineer (TH) Report results, system performance, prep email 13 Drafter / BO Figures production for O&M update 4 Project Asst - MMc Process field notes, submittals 3
TOTAL LABOR 62
VEHICLE TYPE RATE UNIT USEAGE
Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals Drum $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC Soil Vapor TO-15 Vapor $200.00 1.00 1 $200.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $200.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00
Total Shipping: $150.00
TOTAL LAB $350.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00 Equipment Items PID (ppbRae) $110.00 Per Day 3 $330.00
Total Equipment Items: $330.00 Equipment Kits Construction/O&M/Pilot Test Kit $360.00 Day 3 $1,080.00
Total Equipment Kits: $1,080.00
TOTAL EQUIPMENT $1,530.00
SITE : Aristocrat Cleaners
SUBTASK 4: Utilities
DATE: 9/23/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
VOH Monitoring
Pricipal / DMc 0
Staff Scientist / JR Project Asst - MMc
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Purpose Rate Units Usage TotalsName
FPL Utilities -Telemetry $650.00 Per Month 6 $3,900.00 Handling Fee $20.00 Per Month 6 $120.00
Total Services: $4,020.00
TOTAL $4,020.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00
Equipment ItemsTubing, Poly/HDPE $0.30 Per Foot 0 $0.00
Total Equipment Items: $0.00
Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com C:\Users\Pepe_T\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\XI9NOPPB\Miami DC SVE 2023 OMM Proposal_100522.docx
Page:
1/3
Ms. Theresa Pepe, Contract Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Subject:
Proposal for Six Months of Operation and Maintenance Miami Dry Cleaner (ERIC_4370), 8410 West Flagler Street, Miami, Florida
Dear Ms. Pepe:
Arcadis U.S., Inc. (Arcadis) is pleased to submit this proposal/cost estimate for the Miami Dry Cleaner Site, located in Miami, Miami-Dade County, Florida. This proposal includes operation, maintenance and monitoring (OM&M) of the soil vapor extraction (SVE) system for six months (October 2022 – March 2023), vapor sampling, one semi-annual remedial action status report and one e-mail update. This proposal includes a description of the proposed scope of services, and an estimated cost and schedule for their completion.
TASK 1: PROJECT MANAGEMENT
As specified by FDEP, project management is calculated automatically in the CEF as the first subtask.
TASK 2 THROUGH TASK 3: GENERAL OM&M ACTIVITIES
In accordance with the approved ISRWP, the SVE system’s performance will be monitored monthly for six months (Oct 2022 – March 2023). The following will be performed during each monthly event:
• The ROI of the SVE system will be measured by sequentially isolating the
SVE wells and measuring the vacuum influence of the nearby SVE or monitor wells.
• Vapor extraction flow rate and vacuums will be recorded using meters and gauges located within the system. Adjustments will be made as necessary to optimize system performance.
ENVIRONMENTAL
Date:
October 5, 2022
Contact:
Doug McGlone
Phone:
561.662.7978
Email:
Douglas.mcglone@arcadis.com
Our ref:
30041815
Florida License Numbers
Engineering
Geology
GB564
Surveying
LB7062
The extraction blower will be inspected and adjusted for proper operation, including periodic oil changes, grease, and filter replacement.
• The SVE system will be operated to minimize the capture and entrainment of groundwater.
• The system interlocking controls and fail-safe mechanisms will be inspected for proper operation
Recovered vapors from the SVE system will be monitored quarterly. The SVE vapor sample will be collected from system influent to calculate mass removal.
TASK 2: SVE SYSTEM OM&M YEAR 2 QUARTER 2 (OCTOBER THROUGH
DECEMBER 2022)
Task 2 consists of system monthly OM&M visits for one quarter and semi-annual reporting. The SVE vapor sample will be collected from system influent to calculate mass removal.
A Semi-Annual OM&M Report will be submitted at the completion of the quarter and include six months of system operational data (i.e., July through December 2022). The semi-annual report will include results and data analysis of the vapor monitoring events and recommendations to optimize system operation.
TASK 3: SVE SYSTEM OM&M YEAR 2 QUARTER 3 (JANUARY THROUGH
MARCH 2023)
Task 3 consists of system monthly OM&M visits for one quarter and quarterly reporting. A vapor sample will be collected from the influent sample port in a Summa™ canister and analyzed for VOHs using EPA Method TO-15 to calculate mass removal.
A Quarterly email update consisting of tables and figures will be submitted to the FDEP following the March 2023 OM&M event.
TASK 4: UTILITIES MANAGEMENT
This task will be used to manage and process FPL invoices for six months of system operation included in this proposal. Based upon prior FPL invoices, it is anticipated that the utility budget be estimated at $650 per month. A monthly handing fee of $20 per month is also included. Actual utility costs will be invoiced, and any differences will be adjusted through Task Assignment Change Orders.
SCHEDULE
Arcadis will begin implementing the OM&M activities in October 2022 upon receipt of a Task Assignment (TA) from the FDEP. The following deliverables and estimated timeframe for completion are included below:
Deliverable Anticipated Submittal
Date
Year 2 Quarter 1 & 2 Semi-Annual Remedial Action System Status Report January 2023
Year 2 Quarter 3 Email Update April 2022
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP at this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Doug McGlone, P.G.
Principal Scientist.
Enclosures:
CEF-LOE
| negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Quarterly O&M & Reporting |
| Subtask 3: Quarterly O&M & Reporting |
| Subtask 4: Utilities |
| Miami DC SVE 2023 OMM Proposal_100522.pdf |
| task 1: Project Management |
| task 2 through task 3: General OM&M Activities |
| task 2: SVE System OM&M Year 2 Quarter 2 (October through December 2022) |
| task 3: SVE System OM&M Year 2 Quarter 3 (January through March 2023) |
| task 4: Utilities Management |
| Schedule |
| Closing Remarks |