This Task Assignment (TA) is a state and local contract between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S., Inc. for environmental remediation services at the Imperial Laundry & Dry Cleaners site located at 901 West Fairbanks Avenue, Winter Park, Orange County, Florida. The contract is designated as HW680, Task Assignment DC041A, with a completion date of May 17, 2024. Theresa Pepe serves as the FDEP Project Manager, while Gus Suarez represents Arcadis U.S., Inc. as the Contractor's Project Manager.
The scope of work includes conducting two quarters of groundwater monitoring from select monitor wells (MW001 and MW002), abandonment of three monitoring wells (MW006, MW010, and MW011) in the path of a new street turning lane being constructed by the City of Winter Park, preparation and submission of an off-site notice package based on recent PFAS data, and associated project management and reporting activities. The total contract value is $13,246.93 on a fixed unit rate basis. The invoicing schedule includes three milestone payments: $7,206.36 upon FDEP approval of October 2023 monitoring and well abandonment field activities and off-site notice package; $3,072.53 upon FDEP approval of January 2024 monitoring field activity logs; and $2,968.04 upon FDEP approval of the monitoring report, IDW manifest, and project management deliverables. Earth Tech Drilling was selected as the subcontractor for well abandonment services based on a competitive bid of $3,090.00, with additional subcontractor services including IDW disposal and transportation by EnviroServe at $198.00.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC041A Completion May 17, 2024
Arcadis will conduct groundwater monitoring from select wells at the site. Additionally, three wells will be abandoned and an off-site notice package will be submitted. All activities will be performed according to the October 11, 2023, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_5039
901 W. Fairbanks Ave, Winter Park, Orange County
Imperial Laundry & Dry Cleaners
✔ $ 13,246.93
$ 13,246.93
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2023.10.12 15:50:18 -04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.10.12 15:31:50 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
October 2023 Monitoring/Well Abandonment field activities and Off-Site Notice Package 11/17/2023
January 2024 Monitoring field activities 02/16/2024
Monitoring Report/IDW manifest/Project Management 04/05/2024
FDEP approval of October 2023 Monitoring/Well Abandonment field activities email summary and Off-Site Notice Package $ 7,206.36
FDEP approval of January 2024 Monitoring field activities logs $ 3,072.53
FDEP approval of Monitoring Report/IDW manifest/Project Management $ 2,968.04
$ 13,246.93
HW680
DC041A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Imperial Laundry and Dry Cleaners
FACID NO. 48-9503059; ERIC_5039
Winter Park, Orange County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC041A (HW680) DATE: October 12, 2023
Arcadis U.S. Inc. will perform two quarters of groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. Other work under this task assignment is described below. All activities will be conducted in accordance with the October 11, 2023, Work Plan submitted by Chad Hanna of Arcadis.
The final task assignment total is $13,246.93. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Quarterly Groundwater Monitoring & Well Abandonment FDEP obtained an access agreement from the property owner in December 2021. No changes in ownership have occurred since that date.
Arcadis will conduct two quarters of groundwater sampling from monitor wells MW001 and MW002, per FDEP’s geologist. IDW will be disposed and transported by a licensed waste hauler.
The City of Winter Park is turning part of the site into a street turning lane. Therefore, three wells in the path of the new street will be properly abandoned. These wells are not within the boundaries of the plume and are no longer necessary for site remediation.
Imperial, ERIC_5039
Earth Tech is the subcontractor chosen to complete the well abandonments based on their low bid of three bids solicited and their immediate availability.
Subtask 3: Reporting Arcadis will provide an email summary after the first quarter field activities.
Arcadis will submit a written report as the final deliverable including recommendations for additional actions as needed.
Subtask 4: Off-Site Notice Arcadis will submit an off-site notice package to the Waste Site Cleanup Section based on the recent PFAS data.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 10/11/2023
Task #: SubTask 1 Project Management Site: Imperial Laundry & Drycleaners SubTask 2 Field Activities
Activity/Phase: NAM SubTask 3 NAM Report Project Manager: Gus Suarez SubTask 4 Off-Site Notice
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 4 3.9 $67.07 Principal Scientist Burke, Brian (BRB) 4 2 1 1 0 $50.00 Senior Engineer Hanna, Chad (CH) 19 6 9 4 0 $34.89 Technician Welch, David (DJW) 26 26 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 6 0 4 2 0 $30.00 Document Technician Embras, Susan (SRE) 7 4 2 1 0
Total Hours 66 4 38 16 8 0
Direct Labor $2,907.99 $334.55 $1,461.28 $735.75 $376.41 $0.00
Overhead 79.00% $2,297.30 $264.29 $1,154.41 $581.24 $297.36 $0.00 Gen & Admin 36.00% $1,046.88 $120.44 $526.06 $264.87 $135.51 $0.00 Fringe 37.10% $1,078.86 $124.12 $542.13 $272.96 $139.65 $0.00 Total Labor $7,331.03 $843.40 $3,683.88 $1,854.82 $948.93 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $3,090.00 $3,090.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
EnviroServe IDW $198.00 $198.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00
GPR $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,288.00 $3,288.00 $0.00 $0.00 $0.00 Handling Fee $328.80 $328.80 $0.00 $0.00 $0.00 Total Subcontractor Cost $3,616.80 $3,616.80 $0.00 $0.00 $0.00
Laboratory Analytical Costs $292.00 $292.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 Total Laboratory $512.00 $512.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $634.00 $634.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $814.00 $814.00 $0.00 $0.00 $0.00
Subtotal $12,513.83 $843.40 $8,866.68 $1,854.82 $948.93 $0.00 Completion Fee $733.10 $84.34 $368.39 $185.48 $94.89 $0.00
Total Estimated Cost $13,246.93 $927.74 $9,235.07 $2,040.30 $1,043.82 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Imperial Laundry & Drycleaners SUBTASK 2: Field Activities
DATE: 10/11/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Quarterly NAM Events (2) Principal Geologist - Burke Field readiness with project team, PG oversight (2 hr) 2 Senior Engineer - Hanna Notifications, field scheduling / support (2 hrs), Field readiness with field crew (2 hr), prep paperwk/figure, analyze field logs/notes (2 hr) 6 Field Technician - Welch FRR & prep (2 hrs), travel (5 hrs each sampling event), gauge wells (3 hrs each event), sample 2 wells for VOCs (2 hrs each event), IDW management (1 hr each event) 26 Administrator - Embras Admin support (2 hrs), field documentation processing (2 hrs) 4
TOTAL LABOR 38
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals EarthTech Drilling services - abandonments $3,090.00 Lump Sum 1 $3,090.00 EnviroServe IDW $198.00 Drum 1 $198.00NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $3,288.00
TOTAL $3,288.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $73.00 1.00 4 $292.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $292.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 2 $220.00
Total Shipping: $220.00
TOTAL LAB $512.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00 Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Total Expendables: $80.00
Equipment Items
Tubing, Poly/HDPE $0.30 Per Foot 120 $36.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 6 $18.00 55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $154.00 Equipment Kits
Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Total Equipment Kits: $580.00
TOTAL EQUIPMENT $814.00
SUBTASK 3: NAM Report
DATE: 10/11/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Reporting Principal Geologist - Burke P.G. author final deliverable (1 hr) 1
Senior Engineer - Hanna Prepare report (6 hrs), update tables (1 hrs), figures (1 hr), trends (1 hr) 9
CAD Drafter - Oliva Figure updates (4 hrs) 4
Administrator - Embras Reporting support and submittal (2 hrs) 2
TOTAL LABOR 16
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals Utilities -Electric $20.00 Per Month 0 $0.00 Handling Fee $20.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00
TOTAL EQUIPMENT $0.00
SUBTASK 4: Off-Site Notice
DATE: 10/11/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Off-Site Notification Package Principal - Brian Burke Notification Package PG finalization and submittal 1
Senior - Chad Hanna Prepare Notification Package for DEP 4
Drafter - Brian Oliva Figure Updates 2
Assistant - Susan Embras Submittal support 1
TOTAL LABOR 8
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples TotalsVOC 8260 Aqueous $150.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00
Total Equipment Items: $0.00 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
Arcadis U.S., Inc.
4300 W Cypress Street
Suite 450
Tampa
Florida 33607
Phone: 813 903 3100
Fax: 813 350 9046 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
1/3
Theresa Pepe
Hazardous Waste Cleanup Section
Florida Department of Environmental Protection
2600 Blair Stone Road
Tallahassee, Florida 32399
Date: October 11, 2023
Our Ref: TBD
Subject: Natural Attenuation Monitoring Proposal
Imperial Laundry and Drycleaners
901 West Fairbanks Avenue
Winter Park, Florida
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit to the Florida Department of Environmental Protection (FDEP) the following proposal for Natural Attenuation Monitoring (NAM) activities at the Imperial Laundry and Drycleaners
(Site), located in Winter Park, Florida. This proposal includes background information, a description of the proposed scope of work (SOW), and an estimated cost and schedule for their completion.
Site Background
Arcadis completed Task Assignment (TA) #HW012A, which included the annual NAM sampling event (December
2022) and associated reporting, including the December 12, 2022 PFAS Report. The 2022 Annual NAM Report was submitted on February 9, 2023. Tetrachloroethene (PCE) was detected above the FDEP GCTL in the samples collected from monitor wells MW001 (7.2 µg/L) and MW002 (4.5 µg/L), and below the FDEP GCTL in the sample collected from MW009 (0.87 µg/L). Arcadis recommended replacing MW001, repair of damaged monitor well pads (MW003, MW004, and MW012), and continuing with annual NAM groundwater sampling of MW001, MW002, MW004, MW009, and MW012. The FDEP reviewed the report and instead requested that Arcadis perform quarterly groundwater sampling at monitor wells MW001 and MW002 in an effort to achieve closure requirements.
Scope of Work
Task 1: Project Management
This task consists of project management activities and health and safety efforts in relation to the completion of
Tasks 2 through 4.
Ms. Theresa Pepe
Florida Department of Environmental Protection
October 11, 2023 www.arcadis.com
2023.10 - Imperial NAM Proposal
2/3
Task 2: Quarterly NAM Field Events
The proposed groundwater NAM program includes depth-to-water measurements and the sampling of monitor wells MW001 and MW002 on a quarterly basis for two quarters. The events will be completed at least 90 days apart to satisfy the quarterly schedule requirement.
Depth-to-water measurements will be collected from all accessible site monitor wells and samples will be collected from MW001 and MW002. The groundwater sampling activities will be performed per the FDEP standard operating procedures (SOP) (DEP-SOP-001/01).
Samples will be shipped to Eurofins located in Altamonte Springs, Florida, and analyzed for CVOCs by United
States Environmental Protection Agency (USEPA) Method 8260. In accordance with FDEP guidance, the IDW generated during sampling activities will be containerized on-site and removed for transportation and disposal by a licensed waste hauler (EnviroServe) following the second event.
Additionally, abandonment of monitoring wells MW006, MW010, and MW011 will be performed by a licensed driller during the first quarterly monitoring event.
Task 3: NAM Reporting
An email summary will be provided following the first quarter and a NAM Report will be submitted to the FDEP within 60 days of receipt of the laboratory analytical report from the second quarterly monitoring event. The
Report will contain tables and figures summarizing the results of both quarterly events and include conclusions and recommendations based upon findings.
Task 4: Off-Site Notification Package
This task includes the efforts to prepare the off-site notification package in October 2023 with the data collected during the December 2022 PFAS sampling event.
Cost Estimate
Arcadis will schedule the field activities following receipt of a TA from the FDEP. The CEF/LOE is included as
Attachment 1. The total cost to complete this scope of work is $13,246.93 (Attachment 1). Arcadis proposes the following invoicing schedule:
Completion of October 2023 NAM field activities & Off-Site Notice $7,251.95
Completion of January 2024 NAM field activities $3,026.94
NAM Report submittal and PM $2,968.04
Ms. Theresa Pepe
Florida Department of Environmental Protection
October 11, 2023 www.arcadis.com
2023.10 - Imperial NAM Proposal
3/3
Closing Remarks
Arcadis appreciates the opportunity to assist the FDEP at this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Chad Hanna Brian Burke, P.G.
Senior Environmental Specialist Project Manager
Email: Chad.hanna@arcadis.com Email: Brian.burke@arcadis.com
Phone: 813.353.5765 Phone: 813.353.5755
MW007 MW008 MW010
MW003
MW005
MW004
MW002
MW001
MW011
MW006
MW009
MW013
MW012
40'20'
GRAPHIC SCALE
SITE LAYOUT MAP
IMPERIAL LAUNDRY AND DRY CLEANERS
WINTER PARK, FLORIDA
1C
IT
Y:
B
B, F
L
D
IV
/G R
O U
P:
E
N
B:
B .O
LI
VA
L
O pt
P
IC
O pt
P
M
R eq d)
T M
: C .H
AN
N
A
LY
R
:(O pt
)O N
;O
FF
R
EF
C
:\U se rs \b ol iv a\
AC
C D oc s\
Ar ca di s\
AU
S-
FD
EP
-D C
-IM
PE
R
IA
L- W
IN
TE
R P
AR
K
Fl or id a\
Pr oj ec t F ile s\
\0 1-
In P ro gr es s\
-D
W G
\Im pe ria lD
C
3-
SM
.d w g
L
AY
O U
T:
J
AN
-F 1_
SM
SA
VE
D : 1
/3 1/
0:
A
M
AC
AD
VE
R
: 2 4.
1S (L
M S
TE
C
H
P
AG
ES
ET
U P:
P
LO
TS
TY
LE
TA
BL
E:
A C
S- C
O
LO
R _A
N
AL
YT
IC
AL
.C
TB
PL
O
TT
ED
: 1 /3
1/
0:
A M
BY
: O
LI
VA
, B R
IA
N
FIGURE
INTERMEDIATE MONITOR WELL LOCATION
LEGEND
SHALLOW MONITOR WELL LOCATION
SVE WELL LOCATION
AIR INLET WELL LOCATION
ABANDONED WELL LOCATION
OVERHEAD POWER LINE
SANITARY SEWER LINE
GAS LINE
TRENCH LINE
FENCE
channa Callout 1 inch diameter screened 8-18 ft bls channa Callout 1 inch diameter screened 28-33 ft bls channa Callout 1 inch diameter screened 8-18 ft bls
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.9742423
Date: 9/30/2023
FAC ID#:
Unit Unit Rate Number of Units Extended Price per foot $15.00 69 $1,035.00 per foot $0.00 per foot $0.00 per foot $0.00 per foot $0.00 each $225.00 3 $675.00 roundtrip $1,200.00 1 $1,200.00 per crew / per night $0.00 each $80.00 0 $0.00 each $60.00 3 $180.00 each $0.00 each $50.00 0 $0.00 lump sum $0.00
$0.00 per hour $495.00 $0.00
TOTAL QUOTE PRICE $3,090.00
Date: 9/30/2023
Subcontract Mailing Address: 2703 NW 19th St., Pompano Bch. FL 33069
DOT Approved 55-gal Drum
Traffic Safety Cones (Left onsite)
Permits & Well Completion Reports
Subcontract Company Name: EARTH TECH DRILLING 954.974.2424
1"- 2" Well Abandonment (includes grouting)
Contractor Name: Arcadis - Chad Hanna - 813 353-5765
Site Name: Imperial Cleaners - 901 W Fairbanks - Winter Park, FL
Per Diem
Rig Type: Well Abandonment
Days to Complete Scope of Work: 1/2 Day
PROPOSED SCOPE OF WORK:
Mobilization
3"- 4" Well Abandonment (includes grouting)
Signature and Title of Person Submitting Quote: Charles Bucher / Sr. Project Manager
8" - 10" Well Abandonment (includes grouting)
DRILLING
MISCELLANEOUS
16" Well Abandonment (includes grouting)
Standby/Delay/Difficult Access Time
5"- 6" Well Abandonment (includes grouting)
Grout Abandon (3) 1" MW's - Total of 69' - Remove Well Completions & cut well 3' bls - restore with sand
Remove Standard Pad/Manhole & cut well 3' BLS
Debris Disposal
Permits & Well Completion Reports
Monitoring Wells Sparge Wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 10/3/23 FAC ID#: ERIC_5039
Unit Unit Rate Number of Units Extended Price whole day $1,850.00 -$ half day $1,450.00 1 1,450.00$ per foot $25.00 -$ each $110.00 -$ each $50.00 -$ each $35.00 -$ per well $125.00 -$ roundtrip $750.00 1 750.00$ per crew / per night $550.00 -$ each $70.00 -$ per day $100.00 -$ each $55.00 3 165.00$ per foot $12.00 69 828.00$
TOTAL QUOTE PRICE $3,193.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 10/3/23
901 W Fairbanks Ave, Winter Park, Orange County, FL
Well Completion (includes MH w/ cover, concrete pad, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
Auger Attachment, 2" Well Install
Direct Push Half-Day Rate 1 - on-site half day
Site Name & Location: Imperial Laundry and Dry Cleaners
Consultant Name: Arcadis US Inc
PROPOSED SCOPE OF WORK:
Abandon (3) 1" MW's between 18' - 33', total depth: 69', overdrill each well to 3' below grade, remove pads and manholes, restore grade
Days to Complete Scope of Work:
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Other (specify)
Other (specify)
Abandonment, 1"
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
DOT Approved 55-gal Drum
Per Diem Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Cascade Remediation Services • 6100 Coca Cola Blvd • Columbus, GA 31909 • (478) 200-7360
This quote is based on information provided by you and is valid for 45 days from the bid date. Your firm is responsible for 1) Obtaining any site specific permits, 2) Locating and clearly marking underground installations or utilities, 3) Furnishing dig Alert numbers at least three working days prior to scheduled start date and proof of private locating services, 4) Obtaining access to site with no overhead wires within 20' of
$4,789.00Quote Total
$0.00Taxes
0.0000%Tax Percentage
$4,789.00Pre-Tax Total
Cascade will provide a 66/78 Series Track Mounted Geoprobe Unit with a 2 Man crew to provide the following.
- We will be prepared to abandon Three (3) 1" wells by grouting in place and destroying the top 5' of casing.
- All locations will be patched to existing.
- This is NOT a prevailing wage site.
- Due to a volatile pricing environment, Cascade is unable to guarantee the pricing for a period longer than SIX MONTHS from the date of the bid submittal. If the work extends past this DATE, the agreement can be amended to extend the period of performance and address any potential adjustment in pricing resulting from actual increases in costs of labor, materials, and fuel. If you would like to discuss it further, please feel free to reach out.
zfordley@cascade-env.comEmailZachary FordleyPrepared By
901 W. Fairbanks Ave Winter Park, FL 32789
Work Site
Arcadis U.S. Inc - Winter Park, Fl - Abandonment - 00183745
Opportunity Name
10/6/2023 7:41 AMQuote Revision Date
00079644Quote Number
10/6/2023Bid Date
2ARCADI129Bill To Account Number
(813) 353-5765Phone chad.hanna@arcadis-us.comEmail
Chad HannaContact Name
3109 W Dr. Martin Luther King Jr. Blvd, Suite Tampa, Florida 33607
Address
Arcadis U.S. IncAccount Name
Cascade Rep Contact Information
Scope of Work
Product Description Quantity Unit Sales Price Optional Subtotal
Mob/Demob 1.00 Each $1,900.00 $1,900.00
DPT Rig, Crew 1.00 Day $2,250.00 $2,250.00
Per diem 1.00 Day $500.00 $500.00
Grouting 69.00 Feet $1.00 $69.00
Florida Permit 1.00 Each $70.00 $70.00
Patching - As needed 1.00 Each $15.00 $0.00
09/20/2023 03:21 PM PAGE 1 OF 7
Scope of Work
Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required
TCLP Benzene and 4 Metals with Completed Profile required for each site
Drum Pickup /Transportation/Disposal
Drums south of Miami not included (Keys) additional costs apply
Drums North Tallahassee Not Included Additional Costs apply
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0039485
DATE: 09/20/2023 PROJECT PROPOSAL
CLIENT
DOUGLAS MALONE
ARCADIS
1500 GATEWAY BLVD, SUITE 200, BOYTON BEACH, FLORIDA,
33426
P: (561) 662-7978
PROJECT DESCRIPTION
DRUM PICKUP #65
VARIOUS SITES SOUTH FLORIDA
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION 55 GAL DRUMS
NOTES:SUBJECT TO FUEL SURCHARGE,
1.00 $50.00 DRUM $50.00
STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GALLON NON HAZ DRUM
NOTES: Drum DOT Shippable Drum accessible on hard Surface
80.00 $1.00 EACH $80.00
ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $18.00 EACH $18.00
DISPOSAL SUBTOTAL: $98.00
TOTAL JOB ESTIMATE: $198.00
| Peerless Cleaners #3416 Annual Monitoring Proposal 4-18-2022.pdf |
| Annual Groundwater Monitoring |
| Annual Groundwater Monitoring Report |
| Schedule |
| Cost Estimate |
| Closing Remarks |
| HW680_DC041A negsum.pdf |
| Subtask 1: Project Management |
| PDS (abandonment)(overdrill) - $3,193 - available 01.02.2024.pdf |
| Direct Push |
File details come from the government source that posted it. Updated .