This is a Task Assignment (TA) document under Contract Number HW680 between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S., Inc. The task assignment covers operation and maintenance (O&M) activities at the Aristocrat Cleaners site (ERIC_4071) located at 6745 Pembroke Road, Pembroke Pines, Broward County, Florida. The FDEP Project Manager is Theresa Pepe, and the contractor's Project Manager is Gus Suarez. The task assignment is effective as of February 15, 2022, with a completion date of September 30, 2022.
The contract specifies six months of O&M activities to be performed according to Arcadis's February 9, 2022 Work Plan. The total TA value is $23,314.14, structured as a fixed unit rate of $20,914.14 and cost reimbursement of $2,400.00 for utilities. Work is divided into four subtasks: (1) Project Management calculated as a percentage of total labor ($1,678.45); (2) Year 4 Quarter 1 O&M activities including monthly site visits and vapor sampling ($7,375.71); (3) Year 4 Quarter 2 O&M activities including groundwater sampling and semi-annual reporting ($11,739.98); and (4) Utilities management covering six months of utility costs at $400 per month plus a $20 monthly handling fee ($2,520.00). Invoicing is contingent upon FDEP approval of deliverables including quarterly email updates and a semi-annual report. Utility costs are paid on a cost-plus basis with actual charges invoiced and any remainder adjusted by change order. The contract includes specific labor allocations, travel expenses, laboratory analytical costs, and field equipment expenses across the four subtasks.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC004A Completion September 30, 2022
Arcadis will conduct six months of O&M activities at the site. Work will be performed according to the February 9, 2022, Work Plan submitted by Arcadis.
The payment of utility invoices is the only portion of this Task Assignment that is Cost Plus.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4071
6745 Pembroke Rd, Pembroke Pines, Broward County
Aristocrat Cleaners
✔ $ 20,914.14 ✔ $ 2,400.00
$ 23,314.14
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.02.15 10:08:37 -05'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.02.15 09:26:26 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Year 4, Quarter 1 - Quarterly O&M email update 05/20/2022
3 months Utility Invoices 06/10/2022
Year 4, Quarter 2 - Semi-Annual O&M report/Project Management 08/19/2022
3 months utility invoices 09/09/2022
FDEP approval of Year 4, Quarter 1 - Quarterly O&M email update $ 7,375.71
FDEP approval of 3 months utility invoices Utilities (Cost Plus Fixed Fee) = not to exceed $1,200.00 Utilities Handling Fee = $60
$ 1,260.00
FDEP approval of Year 4, Quarter 2 - Semi-Annual O&M report/IDW Manifest/Project Management $ 13,418.43
FDEP approval of 3 months utility invoices Utilities (Cost Plus Fixed Fee)= not to exceed $1,200.00 Utilities Handling Fee = $60
$ 1,260.00
$ 23,314.14
HW680
DC004A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Aristocrat Cleaners
FACID NO. 06-9500381; ERIC_4071
Pembroke Pines, Broward County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC004A (HW680) DATE: February 14, 2022
Task Assignment DC004A is for six months of O&M activities at Aristocrat Cleaners.
Additional information is described in the February 9, 2022, Work Plan from Doug McGlone of Arcadis.
The final task assignment equals $23,314.14. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management This subtask is calculated automatically based on a percentage of total labor.
Subtask 2: Quarterly O&M & Reporting This subtask provides costs for one quarter (February – April 2022) of monthly O&M site visits including vapor sampling. One email update will be submitted to FDEP summarizing the above data.
Subtask 3: Quarterly O&M & Reporting This subtask provides costs for one quarter (May - July 2022) of monthly O&M site visits including vapor and annual groundwater sampling per the approved RAP. One Semi-annual report will be submitted to FDEP summarizing the above data. IDW will be disposed of by an appropriate waste hauler per FDEP preference.
Subtask 4: Utilities This subtask provides costs for six months of utilities and associated handling fees.
Arcadis will only invoice for actual charges and any remainder will be adjusted by change order.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 2/11/2022
Task #: SubTask 1 Project Management
Site: Aristocrat Cleaners SubTask 2 Y 4 Q 1 O&M
Activity/Phase: O&M SubTask 3 Y4 Q 2 O&M
Project Manager: Doug McGlone SubTask 4 Utilities
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$79.12 Project Manager Suarez, Gus (GS) 8 7.7
$96.76 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0
$81.24 Principal Engineer Burtnett, Susan (SB) 0 0 0 0 0
$79.12 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0$75.11 Principal Scientist McManus, Andrew (ATM) 0 0 0 0 0
$61.38 Principal Scientist McGlone, Douglas (DMc) 13 5 8 0 0
$43.88 Project Engineer Hays, Timothy (TH) 34 12 22 0 0$41.21 Staff Scientist Mott, Lyndi (LM) 0 0 0 0 0
$28.94 Scientist Salinas, Kendall (KS) 63 27 36 0 0$28.94 Scientist Bishton, Dan (DB) 0 0 0 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 9 4 5 0 0$30.99 Drafter/Designer Richards, Jim (JR) 0 0 0 0 0
$31.48 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0
$35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0
$26.52 Document Technician Embras, Susan (SRE) 0 0 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 6 3 3 0 0
Total Hours 133 8 51 74 0 0
Direct Labor $5,261.13 $605.26 $1,866.40 $2,789.47 $0.00 $0.00
Overhead 79.00% $4,156.30 $478.16 $1,474.46 $2,203.68 $0.00 $0.00
Gen & Admin 36.00% $1,894.00 $217.89 $671.90 $1,004.21 $0.00 $0.00
Fringe 37.10% $1,951.87 $224.55 $692.43 $1,034.89 $0.00 $0.00
Total Labor $13,263.30 $1,525.86 $4,705.19 $7,032.25 $0.00 $0.00
Travel
Vehicle Rental $720.00 $360.00 $360.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $720.00 $360.00 $360.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
Clark IDW $150.00 $0.00 $150.00 $0.00 $0.00
Utilities $2,400.00 $0.00 $0.00 $2,400.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,550.00 $0.00 $150.00 $2,400.00 $0.00
Handling Fee $135.00 $0.00 $15.00 $120.00 $0.00
Total Subcontractor Cost $2,685.00 $0.00 $165.00 $2,520.00 $0.00
Laboratory
Analytical Costs $984.00 $200.00 $784.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $370.00 $110.00 $260.00 $0.00 $0.00
Total Laboratory $1,354.00 $310.00 $1,044.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $240.00 $120.00 $120.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $3,625.50 $1,410.00 $2,215.50 $0.00 $0.00
Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $3,965.50 $1,530.00 $2,435.50 $0.00 $0.00
Subtotal $21,987.80 $1,525.86 $6,905.19 $11,036.75 $2,520.00 $0.00
Completion Fee $1,326.34 $152.59 $470.52 $703.23 $0.00 $0.00
Total Estimated Cost $23,314.14 $1,678.45 $7,375.71 $11,739.98 $2,520.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Aristocrat Cleaners
SUBTASK 2: Y 4 Q 1 O&M
DATE: 2/11/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal (DM) Owner notification, PG review of data and email update, utilities 5
Project Engineer (TH) Report results, system performance, prep email update 12
Scientist (KS) Mob/demob (2hr x 3), 3 months O&M visits (21 hr) 27
Designer (BO) Figure production for email update 4
Project Assistant (MMc) Process field notes, sample tracking, data entry 3
TOTAL LABOR 51
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00 Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC Soil Vapor TO-15 Vapor $200.00 1.00 1 $200.00TRPH FL PRO Soil $88.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $200.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $310.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00
Equipment Items
PID (ppbRae) $110.00 Per Day 3 $330.00
Total Equipment Items: $330.00 Equipment Kits
Construction/O&M/Pilot Test Kit $360.00 Day 3 $1,080.00MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $1,080.00
TOTAL EQUIPMENT $1,410.00
SUBTASK 3: Y4 Q 2 O&M
DATE: 2/11/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal (DM) PG review of data, review report, utilities 8
Project Engineer (TH) Report results, system performance, prep report 22
Scientist (KS) Mob/demob (2hr x 3), 3 months O&M visits (21 hr) 27
Scientist (KS) Sample 8 monitor wells, pack ship samples 9
Designer (BO) Figure production for email update 5
Project Assistant (MMc) Process field notes, sample tracking, data entry 3
TOTAL LABOR 74
VEHICLE TYPE RATE UNIT USEAGE
Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals CLARK IDW $150.00 Drum 1 $150.00
Total Services: $150.00
TOTAL $150.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC Soil Vapor TO-15 Vapor $200.00 1.00 1 $200.00
VOH 8260 Water $73.00 1.00 8 $584.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $784.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $260.00
TOTAL LAB $1,044.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Expendables
Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00
Equipment ItemsSurvey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 255 $76.50
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 8 $24.00Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 3 $330.00
55-gallon Drum $100.00 Each 1 $100.00Regenerative Blower $180.00 Per Day 0 $0.00
Total Equipment Items: $530.50
Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00
Deep Groundwater Sampling Kit $415.00 Day 1 $415.00
Construction/O&M/Pilot Test Kit $360.00 Day 3 $1,080.00MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $1,785.00
TOTAL EQUIPMENT $2,315.50
SUBTASK 4: Utilities
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal 0
Senior Sci 0
Staff Sci 0
Technician 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Utilities $400.00 Per Month 6 $2,400.00
Handling Fee $20.00 Per Month 6 $120.00
Total Services: $2,520.00
TOTAL $2,520.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples TotalsVOC 8260 Aqueous $150.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00
Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com C:\Users\Pepe_T\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\R01B7NH4\Aristocrat SVE 2022 OMM Proposal_20220209 (002).docx
Page:
1/3
Ms. Theresa Pepe, Contract Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Subject:
Proposal for Six Months of Operation and Maintenance Former Aristocrat Cleaners (ERIC_4071), 6745 Pembroke Road, Pembroke Pines, Florida
Dear Ms. Pepe:
Arcadis U.S., Inc. (Arcadis) is pleased to submit this proposal/cost estimate for the Former Aristocrat Cleaners Site, located in Pembroke Pines, Broward County, Florida. This proposal includes operation, maintenance and monitoring (OM&M) of the soil vapor extraction (SVE) system for six months (February-July 2022), vapor sampling, one semi-annual remedial action status report and one e-mail update. This proposal includes a description of the proposed scope of services, and an estimated cost and schedule for their completion.
TASK 1: PROJECT MANAGEMENT
As specified by FDEP, project management is calculated automatically in the CEF as the first subtask.
TASK 2 THROUGH TASK 3: GENERAL OM&M ACTIVITIES
In accordance with the approved ISRWP, the SVE system’s performance will be monitored monthly for six months (February-July 2022). The following will be performed during each monthly event:
• The ROI of the SVE system will be measured by sequentially isolating the
SVE wells and measuring the vacuum influence of the nearby SVE wells.
Additionally, depending on the seasonal variation in the groundwater table at the site, monitor well MW001 may be utilized to measure the ROI of the SVE wells.
ENVIRONMENTAL
Date:
February 9, 2022
Contact:
Doug McGlone
Phone:
561.662.7978
Email:
Douglas.mcglone@arcadis.com
Our ref:
30063270
Florida License Numbers
Engineering
Geology
GB564
Surveying
LB7062
• Vapor extraction flow rate and vacuums will be recorded using meters and gauges located within the system. Adjustments will be made as necessary to optimize system performance.
The extraction blower will be inspected and adjusted for proper operation, including periodic oil changes, grease, and filter replacement.
• The SVE system will be operated to minimize the capture and entrainment of groundwater.
• The system interlocking controls and fail-safe mechanisms will be inspected for proper operation
Recovered vapors from the SVE system will be monitored quarterly. The SVE vapor sample will be collected from system influent to calculate mass removal.
TASK 2: SVE SYSTEM OM&M YEAR 4 QUARTER 1 (FEBRUARY THROUGH
APRIL 2022)
Task 2 consists of system monthly OM&M visits for one quarter (Month 37 through Month 39) and quarterly reporting. A vapor sample will be collected in a Summa™ canister and analyzed for VOHs using EPA Method TO-15. The SVE vapor sample will be collected from system influent to calculate mass removal.
A Quarterly email update consisting of tables and figures will be submitted to the FDEP following the April 2022 OM&M event.
TASK 3: SVE SYSTEM OM&M YEAR 4 QUARTER 2 (MAY THROUGH JULY
2022)
Task 3 consists of system monthly OM&M visits for one quarter (Month 40 through Month 42) and semi-annual reporting. A vapor sample will be collected from the influent sample port in a Summa™ canister and analyzed for VOHs using EPA Method TO-15 to calculate mass removal. Eight monitor wells (MW001, MW006, MW007, MW008R, MW009R, MW010R, MW011R and MW013 will be sampled and analyzed for VOHs by EPA 8260. Purge water will be containerized in a drum for offsite disposal.
A Semi-Annual OM&M Report will be submitted at the completion of the quarter and include six months of system operational data (i.e., February through July 2022). The semi-annual report will include results and data analysis of the vapor and groundwater monitoring events and recommendations to optimize system operation.
TASK 4: UTILITIES MANAGEMENT
This task will be used to manage and process FPL invoices for six months of system operation included in this proposal. Based upon prior FPL invoices, it is anticipated that the utility budget be estimated at
$400 per month. A monthly handing fee of $20 per month is also included. Actual utility costs will be invoiced, and any differences will be adjusted through Task Assignment Change Orders.
SCHEDULE
Arcadis will begin implementing the OM&M activities in February 2022 upon receipt of a Task Assignment (TA) from the FDEP. The following deliverables and estimated timeframe for completion are included below:
Deliverable Anticipated Submittal
Date
Year 4 Quarter 1 Email Update May 2022
Year 4 Quarter 1 & 2 Semi-Annual Remedial Action System Status Report August 2022
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP at this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Doug McGlone, P.G.
Principal Scientist.
Enclosures:
CEF-LOE
6/9/2021 Clark Environmental Inc.: Quote Builder file:///C:/Users/channa/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/55TP28C8/Arcadis 1530 1st.html 1/2
Quote Number: 18737
QUOTE
QUOTED TO: Chad Hanna QUOTE DATE: 6/9/2021 COMPANY NAME: Arcadis QUOTED BY: Steve Harris PHONE NUMBER: 813-480-8498 Ext.
FAX NUMBER: email only PROJECT REFERENCE: Transportation and Disposal of Non Haz. Water Drum.
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: 1530 1st Street Sarasota FL
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE
FOLLOWING COST ESTIMATE FOR THE SITE/ PROJECT LISTED
ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ. "WATER" DRUM DISPOSAL W/CUSTOMER SUPPLIED
ACCEPTABLE NON HAZ. ANALYTICAL AND PROFILE STATING SAME.
$60.00 1 55 GAL $60.00
DRUM TRANSPORTTATION <100 MILES FROM CLARK ENVIRONMENTAL
INC. DRUM LOCATED ON HARD BLACK TOP OR CONCRETE SURFACE
EASILY ACCESSIBLE WITH 53 FOOT TRACTOR TRAILER WITH
LIFTGATE NO CURBS, GRASS OR DIRT TO CROSS.
$40.00 1 55 GAL $40.00
DRUM LOW VOLUME STOP CHARGE FOR 5 DRUMS OR LESS. $50.00 1 FLAT RATE $50.00
TOTAL REQUIRED ITEMS $150.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $150.00
NOTES: Quote is based on acceptable customer supplied non haz. analyticals and matching profile. TCLP Metals and Volatiles Analitical Testing will be required .Quote based on DOT shippable drums from this location easily accessable with 53 foot tractor trailer with no grass, curbs or sand to cross.If Required, I will need a signed accepted quote with purchase order and non haz. profile. Please call with any questions. Thanks. Steve Harris 863-559-
This quote will remain valid for thirty (30) days from the date listed above except for transportation which is subject to weekly change and is based on upon payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
| HW680_DC004A neg sum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Quarterly O&M & Reporting |
| Subtask 3: Quarterly O&M & Reporting |
| Subtask 4: Utilities |
| Aristocrat SVE 2022 OMM Proposal_20220209 (002).pdf |
| task 1: Project Management |
| task 2 through task 3: General OM&M Activities |
| task 2: SVE System OM&M Year 4 Quarter 1 (February through April 2022) |
| task 3: SVE System OM&M Year 4 Quarter 2 (May through July 2022) |
| task 4: Utilities Management |
| Schedule |
| Closing Remarks |