This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. for groundwater monitoring services at the Concord Custom Cleaners #208 facility located at 1100 West Tennessee Street in Tallahassee, Leon County, Florida. The TA is issued under Contract Number HW680 and is designated TA Number DC005B. The project involves annual groundwater monitoring activities at a drycleaning facility site (FDEP Facility Identification Number ERIC_4876) to ensure continued natural attenuation of contaminants.
Arcadis will conduct groundwater monitoring of eleven monitoring wells and prepare an Annual Monitoring Report, with all activities performed according to the June 1, 2023 Work Plan. The contract employs a fixed unit rate pricing structure with a Total TA Value of $9,597.28. The scope includes two subtasks: Subtask 1 for Project Management (automatically calculated as a percentage of total labor) and Subtask 2 for Annual Groundwater Monitoring, which encompasses sampling, well surveying, industrial waste disposal, laboratory analysis for volatile organic compounds, and report preparation. The deliverable—an Annual Monitoring Report with IDW manifest and project management documentation—is due October 20, 2023, with invoice payment contingent upon FDEP approval. The TA was effective June 16, 2023, with a completion date of November 30, 2023.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC005B Completion November 30, 2023
Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the June 1, 2023, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4876
1100 West Tennessee Street, Tallahassee, Leon County
Concord Custom Cleaners #208
✔ $ 9,597.28
$ 9,597.28
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2023.06.16 13:37:48 -04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.06.16 12:09:03 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Monitoring Report/IDW manifest/Project Management 10/20/2023
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 9,597.28
$ 9,597.28
HW680
DC005B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Concord Custom Cleaners #208
FACID NO. 37-9600306; ERIC_4876
Tallahassee, Leon County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC005B (HW680) DATE: June 12, 2023
Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. All activities will be conducted in accordance with the June 1, 2023, Work Plan submitted by Mike O’Sullivan of Arcadis.
The final task assignment total is $9,597.28. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Annual Groundwater Monitoring Arcadis will sample eleven wells for drycleaning solvents based on recommendations from the previous monitoring report. IDW will be drummed and disposed by a licensed waste hauler per FDEP’s preference. An Annual Monitoring Report including recommendations for additional actions will be provided under this subtask.
Hours and costs are comparable to past task assignments of similar scope.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 6/1/2023
Task #: SubTask 1 Project Management Site: Concord Custom Cleaners #208 SubTask 2 Annual Groundwater Monitoring
Activity/Phase: Monitoring SubTask 3 Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 3 3.3 $60.88 Principal Scientist O'Sullivan, Michael (MOS) 18 18 0 0 0 $67.57 Principal Engineer Perella, John (JP) 0 0 0 0 0$50.00 Senior Scientist O'Connell, Patrick (PJO) 0 0 0 0 0 $28.94 Scientist Guarino, Andrew (AG) 0 0 0 0 0 $28.94 Scientist Martineau, Duncan (DM) 29 29 0 0 0 $28.94 Scientist Brutscher, Katherine (KEB) 0 0 0 0 0 $30.80 Technician Fortner, Kendrix (KLF) 0 0 0 0 0 $29.13 Technician Rhodes, John (JAR) 0 0 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 4 4 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 2 2 0 0 0
Total Hours 56 3 53 0 0 0
Direct Labor $2,426.34 $279.14 $2,147.20 $0.00 $0.00 $0.00
Overhead 79.00% $1,916.81 $220.52 $1,696.29 $0.00 $0.00 $0.00 Gen & Admin 36.00% $873.48 $100.49 $772.99 $0.00 $0.00 $0.00 Fringe 37.10% $900.17 $103.56 $796.61 $0.00 $0.00 $0.00 Total Labor $6,116.80 $703.71 $5,413.09 $0.00 $0.00 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW - T&D $198.00 $198.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $198.00 $198.00 $0.00 $0.00 $0.00 Handling Fee $19.80 $19.80 $0.00 $0.00 $0.00 Total Subcontractor Cost $217.80 $217.80 $0.00 $0.00 $0.00
Laboratory Analytical Costs $876.00 $876.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $300.00 $300.00 $0.00 $0.00 $0.00 Total Laboratory $1,176.00 $1,176.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $225.00 $225.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $830.00 $830.00 $0.00 $0.00 $0.00 Total Field Expenses $1,235.00 $1,235.00 $0.00 $0.00 $0.00
Subtotal $8,985.60 $703.71 $8,281.89 $0.00 $0.00 $0.00 Completion Fee $611.68 $70.37 $541.31 $0.00 $0.00 $0.00
Total Estimated Cost $9,597.28 $774.08 $8,823.20 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Concord Custom Cleaners #208 SUBTASK 2: Annual Groundwater Monitoring
DATE: 6/1/2023
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2023 Scientist Prep; local mob/demob; full round of WLs; sample 11 MWs (1 EB); manage IDW; sample delivery 26 Scientist Top of Casing Survey 1 Principal Scientist Access, GW monitoring technical oversight, top of casing survey, and offsite notice review 6 Data Evaluation and Letter Report Principal Scientist Data evaluation and preparation of a brief letter report, sign and seal report 12 Scientist Data evaluation 2 Drafter Figures preparation 4 Document Technician Editing; Letter report preparation 2
TOTAL LABOR 53
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00
TOTAL VEHICLE $240.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals IDW Drum Transportation and Disposal IDW $198.00 Drum 1 $198.00
Handling Fee $0.00 Per Month 1 $0.00 Total Services: $198.00
TOTAL $198.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 12 $876.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $876.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 2 $300.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $300.00
TOTAL LAB $1,176.00
EQUIPMENT
Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00
Total Expendables: $80.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 750 $225.00 55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $325.00 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 2 $830.00Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Total Equipment Kits: $830.00
TOTAL EQUIPMENT $1,235.00
Arcadis U.S., Inc.
1705 Metropolitan
Boulevard
Suite 101
Tallahassee
Florida 32308
Phone: 850 422 2555
Fax: 850 668 0080 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
Ms. Theresa Pepe
Bureau of Waste Cleanup
Division of Waste Management
Florida Department of Environmental Protection
2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400
Date: June 1, 2023
Subject: Proposal for 2023 Annual Groundwater Monitoring at Concord Custom
Cleaners #208, 1100 West Tennessee Street, Tallahassee, Florida, FDEP
Facility Identification Number ERIC_4876.
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the annual groundwater monitoring activities at the Concord Custom Cleaners #208 facility located at 1100 West Tennessee
Street, Tallahassee, Florida (FDEP Facility Identification Number ERIC_4876; “the Site”; Figure 1). This proposal includes one groundwater monitoring event, and one letter report summarizing field activities. The FDEP cost estimating spreadsheets (Attachment A) is attached.
SCOPE OF WORK
Subtask 1 - Project Management
Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).
Subtask 2 - Groundwater Monitoring (2023)
Arcadis will conduct one annual groundwater monitoring event to collect groundwater samples from eleven monitoring wells (MW005, MW006, MW007, MW013, MW015, MW017, MW018, MW020, MP-3D, MW008, and
MW19). Samples will be collected in accordance with the FDEP SOPs and submitted to a certified laboratory for analysis by EPA Method 8260C or equivalent (VOHs only). Prior to conducting groundwater sampling activities
Arcadis will obtain Site Access.
Arcadis proposes to collect groundwater elevation measurements in selected wells (MW005, MW006, MW007, MW013, MW015, MW017, MW018, MW020, MP-3D, MW008, and MW19). Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly. Arcadis also proposes to conduct a top of casing survey of monitoring wells MW015, MW018, MW020, MP-3D during the groundwater monitoring event. Monitoring well locations are shown on Figure 1.
FDEP – Concord Custom Cleaners #208 Proposal 2023 www.arcadis.com _Concord 208 AGM proposal_jun23
Arcadis will incorporate the data collected during the groundwater sampling event into a letter report summarizing the field activities. The report will include laboratory analytical data, figures presenting groundwater analytical data, and recommendations for the Site.
SCHEDULE
Arrangements for monitoring well replacement and groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP.
ESTIMATED COST
A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as
Attachment A.
Please contact me if you have any questions regarding this proposal.
Sincerely, Arcadis U.S., Inc.
Mike O’Sullivan, P.G.
Principal Geologist
Email: mike.osullivan@arcadis.com
Direct Line: 850.895.4739
Mobile: 850.491.2346
Attachment:
Figures
Attachment A – Cost Estimate Form and Level of Effort Form
FLORIDA STATE UNIVERSITY
GRANDMARC
APARTMENTS
MR ROBOTO
TOKYO GRILL
P A
N D
A
E X
P R
E S
S
B R
Y A
N
S
T R
E E
T
M U
R P
H R
E
S
R T
E E
T
P
A
K
I
N
G
P A R K I N G
A-Z LIQUORS
KING
BURGER
DRYCLEANING
FACILITY
LOCATION
RESIDENTIAL
AREA
AREA
RESIDENTIAL
BIG TEN
TIRE STORE
BOOKSTORE
BILL'S
W
E
T
N
N
E
S
S
R
E
E
T
FORMER
BREVARD STREET
R I C
H M
O N
D
S
T R
E E
T
W A
D S
W O
R T
H
S
T R
E E
T
JIMMY
JOHN'S
SANDWICHES
MP-3D
MW003
MW009
MW013
MW014
MW004 MW010
MP-1D
MW012
MW006
NS
MW017
SVE-1D
MP-2D
MW012
MW007
MW008
NS
NS
NS
3/08
1 U
1 U
1 U
1 U
1 U
MW016
5/10
1,000 U
16,000
1,200
1,000 U
1,000 U
5/10
15,000
1 U
1 U
MW005
NS
3/08
1 U
2.0
1 U
1 U
1 U
3/09
1 U
1 U
1 U
1 U
1 U
1 U
1 U
1 U
1 U
1 U
2/14
2/14
1 U
1 U
1 U
1 U
1 U
2/14
1 U
5.7
1 U
1 U
1 U
1 U
1 U
1 U
1 U
1 U
2/15
2/15
1 U
1 U
1 U
1 U
1 U
2/15
1 U
1 U
1 U
1.1
1 U
3/17
2,330
0.190 U
13.6
72.9
1.09
9/18
1,360
0.190 U
10.3
31.9
0.210 U
11/19
0.160 U
0.190 U
0.210 U
0.210 U
0.190 U
11/19
37.5
0.190 U
0.210 U
0.210 U
0.190 U
11/19
0.190 U
0.210 U
0.210 U
1.83
11/19
12.0
0.190 U
0.210 U
0.210 U
0.190 U
11/19
0.190 U
0.190 U
0.210 U
0.210 U
6.52
11/19
1.09
0.190 U
0.210 U
0.210 U
0.190 U
3/21
0.26 U
0.32 U
0.39 U
0.61 U
3/21
0.50 U
0.26 U
0.32 U
0.39 U
0.61 U
3/21
0.26 U
0.32 U
0.39 U
0.61 U
3/21
3.5
3/21
0.26 U
0.61 U
0.32 U
0.39 U
3/21
6.4
0.26 U
0.32 U
0.39 U
0.61 U
0.26 U
0.32 U
0.39 U
0.61 U
7/22
0.50 U
0.15 U
0.20 U
0.50 U
0.30 U
7/22
4.3
0.26 U
0.20 U
0.50 U
0.15 U
7/22
1,200
1.0 U
1.0 U
7/22
0.50 U
0.48 I
0.50 U
4.4
7/22
0.50 U
0.20 U
0.50 U
0.15 U
7/22
0.50 U
0.20 U
0.50 U
0.15 U
7/22
0.90 U
0.50 U
0.20 U
0.50 U
0.15 U
MW015
MW002
SCALE IN FEET
200'100'50'
NOTE: "FSU BIOLOGY WELL" -->
(APPROXIMATELY 1,400 FEET TO THE SOUTHEAST)
FIGURE
TARGET ANALYTE CONCENTRATIONS IN
SHALLOW GROUNDWATER (35-65 FT BGS) WITH
PCE AND TCE ISOCONCENTRATIONS
JULY 2022
CONCORD CUSTOM CLEANERS #208
1100 WEST TENNESSEE STREET
TALLAHASSEE, FLORIDA
P R
O J E
C T
N A
M
C I T
Y R e q d
D
V
G
R O
U P
R e q
B R e q
L
O p t
C
O p
M R e q
O p
Y R
O p t O
N
O
F F
R
E F
C U s e r s w d b e r n d g
A
R C
A D
I S
U
S A
C C
D o c s A r c a d i s A
U S
F
D E
P C
O N
C O
T
A L
L A
H A
S S
F l o r i d a P r o j e c t
F i l e s n r o g r e s s
D
W G
G
C
O N
C O
A
J U d w g
Y
O U
T
F
V
E D
A
D V
E R
S
L
C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L
E
F D
E P
C
O
T T
E D
B
E R
N D
G E
N
W
E N
D Y
I M
A G
E e o g o j p g
X R
E F
S
MW001
MONITORING WELL LOCATION
LEGEND
VINYL CHLORIDE (µg/l)
SAMPLE DATE
3/12
TRANS-1,2-DICHLOROETHENE (µg/l)
CIS-1,2-DICHLOROETHENE (µg/l)
TRICHLOROETHENE (µg/l) TCE
TETRACHLOROETHENE (µg/l) PCE
<1
<1
<1
<1
<1
MICROGRAMS PER LITER
µg/l
NS
NOT SAMPLED
SOIL VAPOR EXTRACTION WELL LOCATION
SVE-RW
VADOSE ZONE MONITORING POINT
MW003
ABANDONED MONITORING WELL
PCE CONCENTRATION CONTOUR (µg/l)
TETRACHLOROETHENEPCE
TCE CONCENTRATION CONTOUR (µg/l)
FLORIDA STATE UNIVERSITY
GRANDMARC
APARTMENTS
MR ROBOTO
TOKYO GRILL
P A
N D
A
E X
P R
E S
S
B R
Y A
N
S
T R
E E
T
M U
R P
H R
T
E E
T
K
N
P A R K I N G
A-Z LIQUORS
KING
BURGER
DRYCLEANING
FACILITY
LOCATION
RESIDENTIAL
AREA
AREA
RESIDENTIAL
BIG TEN
TIRE STORE
BOOKSTORE
BILL'S
W
E
N
N
E
S
S
R
E
E
T
FORMER
BREVARD STREET
R I C
H M
O N
D
S
T R
E E
T
W A
D S
W O
R T
H
S
T R
E E
T
JIMMY
JOHN'S
SANDWICHES
MW019
FSU BIOLOGY WELL
MW018
MW020
11/19
0.160 U
0.190 U
0.210 U
0.210 U
0.190 U
11/19
0.190 U
1.03
0.210 U
0.190 U
11/19
97.3
0.190 U
0.190 U
1.53
0.210 U
3/21
0.50 U
0.26 U
0.32 U
0.39 U
0.61 U
3/21
0.26 U
2.7
0.39 U
2.8
3/21
0.26 U
2.2
2.3
0.39 U
NS
7/22
0.50 U
1.7
0.50 U
1.8
7/22
0.50 U
1.2
1.6
0.50 U
7/22
0.90 U
0.50 U
0.20 U
0.50 U
0.15 U
SCALE IN FEET
200'100'50'
NOTE: "FSU BIOLOGY WELL" -->
(APPROXIMATELY 1,400 FEET TO THE SOUTHEAST)
FIGURE
TARGET ANALYTE CONCENTRATIONS IN
DEEP GROUNDWATER (98-180 FT BGS) WITH PCE
ISOCONCENTRATIONS
JULY 2022
CONCORD CUSTOM CLEANERS #208
1100 WEST TENNESSEE STREET
TALLAHASSEE, FLORIDA
P R
O J E
C T
N A
M
C I T
Y R e q
V
G
R O
U P
R e q
R e q
O p
C
O p
R e q
O p
R
O p t O
N
O
F F
R
E F
C U s e r s w d b e r n d g
A
R C
A D
I S
U
S A
C C
D o c s A r c a d i s A
U S
F
D E
P C
O N
C O
T
A L
L A
H A
S S o r i d a P r o j e c t
F i l e s r o g r e s s
D
W G
G
O N
C O
A
J U d g
Y
O U
T
F
V
E D
A
D V
E R
S
L
C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L
E
F D
E P
C
O
T T
E D
B
E R
N D
G E
N
W
E N
D Y
I M
A G
E e o g o j p g
X R
E F
S
MW001
MONITORING WELL LOCATION
LEGEND
VINYL CHLORIDE (µg/l)
SAMPLE DATE
3/12
TRANS-1,2-DICHLOROETHENE (µg/l)
CIS-1,2-DICHLOROETHENE (µg/l)
TRICHLOROETHENE (µg/l)
TETRACHLOROETHENE (µg/l)
<1
<1
<1
<1
<1
MICROGRAMS PER LITER
µg/l
PCE CONCENTRATION CONTOUR (µg/l)
TETRACHLOROETHENEPCE
09/07/2022 03:24 PM PAGE 1 OF 7
Scope of Work
Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required
TCLP Benzene and 4 Metals with Completed Profile required for each site
Drum Pickup /Transportation/Disposal
Drums south of Miami not included (Keys) additional costs apply
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0030388
DATE: 09/07/2022 PROJECT PROPOSAL
CLIENT
DOUGLAS MALONE
ARCADIS
1500 GATEWAY BLVD, SUITE 200, BOYTON BEACH, FLORIDA,
33426
P: (561) 662-7978
PROJECT DESCRIPTION
DRUM PICKUP
VARIOUS SITES SOUTH FLORIDA
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION 55 GAL DRUMS
NOTES:SUBJECT TO FUEL SURCHARGE,
1.00 $50.00 DRUM $50.00
STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GALLON NON HAZ DRUM
NOTES: Drum DOT Shippable Drum accessible on hard Surface
1.00 $80.00 EACH $80.00
ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $18.00 EACH $18.00
DISPOSAL SUBTOTAL: $98.00
TOTAL JOB ESTIMATE: $198.00
| 5B negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Annual Groundwater Monitoring |
| _Concord 208 AGM proposal_jun23.pdf |
| Insert from: "amr_figures_aug22_Concord208.pdf" |
| Sheets and Views |
| FIG 2 SITE MAP |
| Sheets and Views |
| FIG 3 GWE |
| Sheets and Views |
| FIG 4 CE |
| Sheets and Views |
| FIG 5 CE |
File details come from the government source that posted it. Updated .