CN-370000-HW680-DC023C.pdf
PDF 984 KB Posted
- Contract number
- HW680
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for groundwater monitoring and reporting services at the Scott's Custom Cleaners site (ERIC_5297) located at 755 North Indian Rocks Road in Belleair, Pinellas County, Florida. The task assignment is issued under Contract Number HW680, with TA Number DC023C, and is effective through August 22, 2025. The Department Project Manager is Theresa Pepe, and the Contractor's Project Manager is Gus Suarez. The document was signed on April 4, 2025.
The scope of work comprises four subtasks: (1) Project Management, calculated as a percentage of total labor; (2) Annual Groundwater Monitoring for volatile organic hydrocarbons (VOHs) involving sampling of seventeen wells for drycleaning solvents using low-flow sampling methodology; (3) Reporting, which includes preparation of an Annual Monitoring Report with recommendations; and (4) PFAS Sampling, involving analysis of three wells using FDEP's laboratory in Tallahassee. The total task assignment value is $13,494.18, payable on a fixed unit rate basis. Invoice schedule requires FDEP approval of the Annual Monitoring Report/IDW manifest/Project Management ($11,232.98) and PFAS sampling ($2,261.20). The fieldwork is scheduled for April/May 2025, with the monitoring report due within 60 days of receiving laboratory analytical data. Indirect waste (IDW) will be removed by licensed waste hauler Erwin Remediation, Inc.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW680
DC023C August 22, 2025
Arcadis will conduct annual groundwater monitoring including sampling for PFAS compounds from select wells at the site. All activities will be performed according to the March 26, 2025, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_5297
755 N Indian Rocks Rd, Belleair, Pinellas County
Scott's Custom Cleaners
$ 13,494.18
$ 13,494.18
Scope of Work
Arcadis U.S. Inc.
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2025.04.04 13:20:50 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.04.04 12:41:54 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum
TO: Negotiation File Scott’s Custom Cleaners
FACID NO. 52-9501285; ERIC_5297
Belleair, Pinellas County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC023C (HW680) DATE: April 2, 2025
Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Additionally, select wells will be sampled for PFAS compounds. All activities will be conducted in accordance with the March 26, 2025, Work Plan submitted by Chad Hanna of Arcadis.
The final task assignment total is $13,494.18. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Annual Groundwater Monitoring FDEP obtained a signed site access form from the current property owner in June 2022.
Arcadis will sample seventeen wells for drycleaning solvents based on recommendations from DEP’s geologist. This is the first sampling event after the site assessment, so trends have not yet been established. IDW will be removed by a licensed waste hauler.
Subtask 3: Reporting An Annual Monitoring Report including recommendations for additional actions will be provided under this subtask.
Scott’s Custom Cleaners
ERIC_5297
Subtask 4: PFAS sampling Arcadis will sample three wells for PFAS compounds using FDEP’s laboratory in Tallahassee. The wells have been chosen based on prior PFAS results and FDEP’s new guidance/flow chart.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 3/26/25
Task #: DC023C SubTask 1 Project Management Site: Scott's Custom Cleaners SubTask 2 Groundwater Monitoring Event - VOHs
Activity/Phase: Groundwater Monitoring SubTask 3 Reporting Project Manager: Gus Suarez SubTask 4 Groundwater Monitoring Event - PFAS
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$87.59 Project Manager Suarez, Gus (GS) 5 4.9
$87.59 Principal Engineer Suarez, Gus (GS) 4 1 2 1 0
$50.00 Senior Engineer Hanna, Chad (CH) 28 4 20 4 0
$34.50 Technician Dankerl, David (DJD) 32 24 0 8 0
$39.67 Drafter/Designer Oliva, Brian (BO) 5 0 5 0 0
$38.28 Project Assistant Cruz, Michele (MC) 7 2 3 2 0
Total Hours 81 5 31 30 15 0
Direct Labor $3,752.36 $431.69 $1,192.15 $1,488.37 $640.15 $0.00
Overhead 79.00% $2,964.37 $341.04 $941.80 $1,175.81 $505.72 $0.00
Gen & Admin 36.00% $1,350.84 $155.41 $429.17 $535.81 $230.45 $0.00
Fringe 37.10% $1,392.14 $160.16 $442.29 $552.19 $237.50 $0.00
Total Labor $9,459.71 $1,088.30 $3,005.41 $3,752.18 $1,613.82 $0.00
Travel
Vehicle Rental $360.00 $240.00 $0.00 $120.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $360.00 $240.00 $0.00 $120.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
Erwin IDW $125.00 $125.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00
Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00
Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $1,241.00 $1,241.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00
Total Laboratory $1,351.00 $1,351.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $120.00 $80.00 $0.00 $40.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $1,020.00 $694.00 $0.00 $326.00 $0.00
Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $1,240.00 $874.00 $0.00 $366.00 $0.00
Subtotal $12,548.21 $1,088.30 $5,607.91 $3,752.18 $2,099.82 $0.00
Completion Fee $945.97 $108.83 $300.54 $375.22 $161.38 $0.00
Total Estimated Cost $13,494.18 $1,197.13 $5,908.45 $4,127.40 $2,261.20 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Scott's Custom Cleaners
SUBTASK 2: Groundwater Monitoring Event - VOHs
DATE: 3/26/25
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities and Email Updates
Principal Engineer - GS Field readiness with project team, PE oversight (1hr) 1
Senior Enginner - CMH Notifications, field scheduling / support (1hr); prep paperwk/figures, order bottles (1hr), Field readiness with field crew (1hr) field logs/notes (1hr) 4
Field Technician - DJD 24
Project Assistant - MC Process and file field notes (2hrs) 2
TOTAL LABOR 31
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 2 $240.00 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
EESI AWS $2,000.00 Per Day 0 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
Erwin IDW $125.00 per drum 1 $125.00
Total Services: $125.00
TOTAL $125.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOCs 8260 Aqueous $73.00 1.00 17 $1,241.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,241.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $1,351.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 2 $80.00
Total Expendables: $80.00
Equipment Items
Tubing, Poly/HDPE $0.30 Per Foot 300 $90.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 8 $24.00
55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $214.00
Equipment Kits
Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00
Total Equipment Kits: $580.00
Total Equipment Kits: $874.00
Field prep, load equipment/calibrations (2hrs); Mob/Demob x 2 (2hrs); measure water levels in 17 MWs (1hr); sample 17 wells (17 hrs); IDW management/sampling (1hrs); package/ship samples (1hrs)
SUBTASK 3: Reporting
DATE: 3/26/25
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Groundwater Monitoring Report
Principal Engineer - GS PE analysis/certification 2
Senior Enginner - CMH Report text, table, figure generation, report table validation, IDW T&D coordination 20
CAD Designer - BO Develop figures for GW results 5
Project Assistant - MC Data entry, report assembly, formatting 3
TOTAL LABOR 30
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
$0.00 Per Day 0 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00
Equipment Items
Total Equipment Items: $0.00
Equipment Kits
Total Equipment Kits: $0.00
Total Equipment Kits: $0.00
SUBTASK 4: Groundwater Monitoring Event - PFAS
DATE: 3/26/25
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities and Email Updates
Principal Engineer - GS Field readiness with project team, PE oversight (1hr) 1
Senior Enginner - CMH Notifications, field scheduling / support (1hr); prep paperwk/figures, order bottles (1hr), Field readiness with field crew (1hr) field logs/notes (1hr) 4
Field Technician - DJD Field prep, load equipment/calibrations (2hrs); Mob/Demob (2hrs); sample 3 wells (3 hrs); IDW management/sampling (1hrs); package/ship samples (1hrs) 8
Project Assistant - MC Process and file field notes (2hrs) 2
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
$0.00 Per Day 0 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
Handling Fee $20.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 1 $40.00
Total Expendables: $40.00
Equipment Items
Tubing, Poly/HDPE $0.30 Per Foot 100 $30.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 2 $6.00
Total Equipment Items: $36.00
Equipment Kits
Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00
Total Equipment Kits: $290.00
TOTAL EQUIPMENT $366.00
Arcadis U.S., Inc.
4300 W Cypress Street Suite 450 Tampa Florida 33607 Phone: 813 903 3100 Fax: 813 350 9046 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
1/3
Theresa Pepe Hazardous Waste Cleanup Section Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399
Date: March 26, 2025 Our Ref: TBD Subject: Groundwater Monitoring Event Proposal
Scott’s Custom Cleaners 755 North Indian Rocks Road Belleair Bluffs, Florida FDEP Facility ID: ERIC_5297
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit to the Florida Department of Environmental Protection (FDEP) this proposal to complete groundwater monitoring and reporting activities for the Scott’s Custom Cleaners site in Belleair Bluffs, Pinellas County, Florida (Site). This proposal includes a description of the proposed scope of work, and the associated estimated cost and schedule for their completion.
Scope of Work
The scope of work is comprised of four tasks. The tasks include project management, groundwater monitoring for VOHs, reporting, and groundwater monitoring for PFAS. A brief description of each task follows.
Task 1: Project Management
This task consists of project management activities and health and safety efforts in relation to the completion of Tasks 2 through 4.
Task 2: Groundwater Sampling for VOHs
This proposal includes the sampling of 17 wells in April/May 2025 as listed below:
Surficial Aquifer: Monitor wells MW001, MW002, MW003, MW004, MW005, MW006, MW007, MW-A, MW-B, PZ001, and PZ002; and, Ms. Theresa Pepe Florida Department of Environmental Protection March 26, 2025 www.arcadis.com
2025.03 - Scott's Cleaners GWM Proposal
2/3
Upper and Lower Intermediate Aquifer Zones: Monitor wells MW002B, MW003B, MW005B, MW005C, MW006B, and MW007B.
Arcadis will collect samples from the monitoring network using low-flow sampling methodology in accordance with FDEP standard operating procedures (SOP) (DEP-SOP-001/01). Groundwater will be transferred to laboratory supplied sample vials for the analysis of VOHs using Environmental Protection Agency (EPA) Test Method 8260.
The samples will be analyzed by a fixed-based National Environmental Laboratory Accreditation Program (NELAP)-certified laboratory (Eurofins). Additionally, a full round of water levels will be obtained to assist in calculating lateral and vertical flow gradients/direction in each of the subsurface depth-intervals. IDW generated during sampling activities will be containerized on-site and removed for transportation and disposal by a licensed waste hauler (Erwin Remediation, Inc.).
Task 3: Reporting
A Groundwater Monitoring Report (GMR) documenting the sampling methodology and results, including updated tables summarizing the analytical results, figures depicting groundwater flow, estimated extent/magnitude of VOH and PFAS impacts, and laboratory report will be provided to the FDEP. The report will be signed and sealed by a Florida-registered professional geologist or engineer.
Task 4: Groundwater Sampling for PFAS
Groundwater samples will be collected from MW001, MW004, and PZ002 using the low-flow sampling technique and shipped to the FDEP laboratory in Tallahassee, Florida for PFAS analysis. Results will be included in the GMR described above and a comprehensive table will be maintained with all PFAS data obtained for the Site.
IDW generated during the PFAS sampling activities will be combined with the VOH sampling IDW and transported off-Site once both events have been completed.
Cost Estimate and Schedule A CEF is attached for the above scope of work. The total cost to complete this scope of work is $13,494.18 (Attachment 1). Arcadis proposes the following invoicing schedule:
Completion of groundwater monitoring field activities $8,169.65
GMR submittal and PM $5,324.53
Arcadis proposes to complete the groundwater sampling event in April/May 2025. The GMR will be submitted within 60 days of receipt of the laboratory analytical data.
Ms. Theresa Pepe Florida Department of Environmental Protection March 26, 2025 www.arcadis.com
2025.03 - Scott's Cleaners GWM Proposal
3/3
Closing Remarks Arcadis appreciates the opportunity to assist the FDEP at this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Chad M. Hanna Gus Suarez, P.E.
Senior Environmental Specialist Project Manager Email: Chad.hanna@arcadis.com Email: Gus.suarez@arcadis.com Phone: 813.353.5765 Phone: 813.353.5778
File details come from the government source that posted it. Updated .