This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for site rehabilitation and closure activities at the Hamlet Cleaners facility located at 4051 W Atlantic Avenue, Delray Beach, Palm Beach County, Florida. The underlying contract is HW680, with Task Assignment number DC040D. The Department Project Manager is Theresa Pepe, and the Contractor's Project Manager is Gus Suarez. The task assignment is effective through January 15, 2026.
Arcadis will perform well abandonment and site closure services following a Site Rehabilitation Completion Order issued by FDEP on September 30, 2025, for a fixed price of $6,211.07. The scope of work includes three subtasks: (1) Project Management calculated as a percentage of total labor costs; (2) Site Closure/Well Abandonment involving the abandonment of three monitoring wells and four MAGS wells, with drilling subcontracted to Preferred Drilling Solutions based on their low bid of $2,350.00; and (3) Reporting consisting of a brief report and site photographs documenting the abandonment activities. The deliverable is a Well Abandonment/Site Closure Report due December 12, 2025, with invoice payment authorized upon FDEP approval. The total estimated cost breakdown includes $3,150.97 in labor, $120.00 in travel, $2,585.00 in subcontractor drilling services with handling fee, and $40.00 in field expendables, plus a $315.10 completion fee.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW680
DC040D Completion January 15, 2026
FDEP has issued a Site Rehabilitation Completion Order for No Further Actions without Institutional Controls. Therefore, Arcadis will properly abandon all remaining wells installed during the Site Assessment. All activities will be performed according to the October 10, 2025, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor
Contractor Gus Suarez Contractor 813-205-4703
ERIC_5154
4051 W Atlantic Ave, Delray Beach, Palm Beach County
Hamlet Cleaners
Contractor Contractor
✔ $ 6,211.07
$ 6,211.07
Scope of Work
Arcadis U.S. Inc.
Contractor Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2025.11.03 12:10:59 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.11.01 11:22:55 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Well Abandonment/Site Closure Report & Project Management 12/12/2025
FDEP approval of Well Abandonment/Site Closure Report & Project Management $ 6,211.07
$ 6,211.07
HW680
DC040D
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins
Lt. Governor
AAlexis A. Lambert Secretary
Memorandum
TO: Negotiation File Hamlet Cleaners Facility ID No. 50-9501471; ERIC_5154 Delray Beach, Palm Beach County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC040D (HW680) DATE: October 20, 2025
The site qualified for No Further Action without Engineering or Institutional Controls according to Chapter 62-780.680(1) F.A.C. FDEP issued a Site Rehabilitation Completion Order (SRCO) on September 30, 2025. Therefore, Arcadis U.S., Inc. will properly abandon all remaining wells to close out the site. Work will be performed as described in the October 10, 2025, Work Plan from Doug McGlone of Arcadis.
The final task assignment total is $6,211.07. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated based on a percentage of total labor.
Subtask 2: Site Closure/Well Abandonment This subtask provides costs for abandoning three monitoring wells and four MAGS wells installed during the site assessment. This includes both interior and exterior wells.
Preferred Drilling Solutions was chosen as the drilling subcontractor based on their low bid of three bids solicited.
Subtask 3: Reporting Arcadis will submit a brief report and site photos to document the above activities.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 10/10/2025
Task #: SubTask 1 Project Management
Site: SubTask 2 Well Abandonment
Activity/Phase: Well Abandonment SubTask 3 Reporting
Project Manager: Theresa Pepe SubTask 4
SubTask 5
TTotals 1 2 3 4 5 Labor Rate Category
$89.78 Principal Engineer Suarez, Gus (GS) 1.6 $73.45 Principal Engineer Perella, John (JFP) 0 0 0 0 0 $73.04 Principal Scientist McGlone, Douglas (DMc) 4 3 1 0 00 0 0 0 0 $50.00 Senior Engineer Hays, Timothy (TPH) 0 0 0 0 0 $39.34 Staff Engineer Tran, Thuy-Min (MT) 6 0 6 0 0 $34.89 Technician Fox, Brian (BF) 12 12 0 0 0 $39.67 Drafter/Design Oliva, Brian (BO) 2 0 2 0 0 $39.94 Project Assistant Cruz, Michele (MC) 2 0 2 0 0
$0.00 0 0 0 0 0 $0.00 0 0 0 0 0
Total Hours 28 1.6 15.0 11.0 0.0 0.0
Direct Labor $1,249.89 $143.79 $637.80 $468.30 $0.00 $0.00
Overhead 79.00% $987.41 $113.59 $503.86 $369.96 $0.00 $0.00 Gen & Admin 36.00% $449.96 $51.76 $229.61 $168.59 $0.00 $0.00 Fringe 37.10% $463.71 $53.35 $236.62 $173.74 $0.00 $0.00 Total Labor $3,150.97 $362.49 $1,607.89 $1,180.59 $0.00 $0.00
Travel Vehicle $120.00 $120.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Meals $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $2,350.00 $2,350.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
Erwin IDW $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,350.00 $2,350.00 $0.00 $0.00 $0.00 Handling Fee $235.00 $235.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,585.00 $2,585.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $40.00 $40.00 $0.00 $0.00 $0.00
Subtotal $5,895.97 $362.49 $4,352.89 $1,180.59 $0.00 $0.00 Completion Fee $315.10 $36.25 $160.79 $118.06 $0.00 $0.00
Total Estimated Cost $6,211.07 $398.74 $4,513.68 $1,298.65 $0.00 $0.00
Hamlet Cleaners
REV: 09/25 CEF ARCADIS Page 1
SITE : Hamlet Cleaners 0 SUBTASK 2: Well Abandonment
DATE: 10/10/25
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities and Email Updates Principal / DMc Event coordination, site owner/tenant access, subcontractor agreement 3 Technician / BF Mob/demob (2 hrs), oversee/document well abandonment (10 hrs) 12
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
Hotel charged as Cost Reimbursement $150.00 Per Day 0 $0.00 Provide room rate including taxes & fees $150.00 Per Day 0 $0.00 Exceeds $225 per night, require add info
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $2,000.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 PDS Drilling services (DPT, MAG wells, SBs, VPs) $2,350.00 Lump Sum 1 $2,350.00 Erwin IDW $125 00 per drum 0 $0 00
Total Services: $2,350.00
TOTAL $2,350.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 1 $40.00
Total Expendables: $40.00 Equipment Items PID/FID Combo or FID $125 00 Per Day 0 $0 00
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
Total Equipment Kits: $40.00
SITE : Hamlet Cleaners 0 SUBTASK 3: Reporting
DATE: 10/10/25
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities and Email Updates Principal / DMc PG certification of report 1 Staff Engineer / MT Well abandonment report preparation 6 Project Assistant / MMc Report production/submittal 2 Designer / BO Report figures 2
TOTAL LABOR 11
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
Hotel charged as Cost Reimbursement $150.00 Per Day 0 $0.00 Provide room rate including taxes & fees $150.00 Per Day 0 $0.00 Exceeds $225 per night, require add info
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $2,000.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0 00 Lump Sum 0 $0 00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items PID/FID Combo or FID $125 00 Per Day 0 $0 00
Total Equipment Items: $0.00 Equipment Kits Site Reconnaissance Kit $150 00 Day 0 $0 00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Arcadis U.S., Inc.
1500 Gateway Boulevard Suite 200 Boynton Beach Florida 33426 Phone: 561 697 7000 Fax: 561 369 4731 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
1/2
Ms. Theresa Pepe, Project Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400
Date: October 8, 2025 Our Ref: 30277292 Subject: Proposal for Well Abandonment Activities
Dear Ms. Pepe, Enclosed is a proposal to complete well abandonment activities at Former Hamlet Cleaners (ERIC_5154) – this will include abandoning three (3) monitor wells or piezometers and four (4) MAGs wells; photo documentation of field activities; and reporting these activities to FDEP. A proposed scope of work, schedule, and CEF-LOE are included herein, along with copies of contractor bids.
Scope of Work In accordance with Chapter 62-780 of the Florida Administrative Code (FAC), the following scope of work is proposed:
Task 1 This task is reserved for project management activities.
Task 2 The following site rehabilitation activities are proposed:
Obtaining site access from current operator/owner;
Abandonment of three (3) monitor wells or piezometers;
Abandonment four (4) MAG wells; and
Photographing and documenting activities and providing brief letter report to FDEP.
Theresa Pepe
FDEP
October 10, 2025
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
www.arcadis.com Hamlet Well Abandonment Proposal
2/2
Schedule Arrangements will be conducted immediately upon receipt of a Task Assignment (TA) from the FDEP. We currently anticipate that the work can be completed/reported within 45 days of receipt of the TA.
Estimated Cost A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are presented in the enclosures.
Closing Remarks Arcadis appreciates the opportunity to assist the FDEP in completing the remaining site rehabilitation activities at this site. If you have any questions or wish to discuss this proposal, please contact us.
Sincerely, Arcadis U.S., Inc.
Douglas J. McGlone, P.G.
Senior Hydrogeologist
Email: douglas.mcglone@arcadis.com Mobile: 561-662-7978
Enclosures: CEFLOE
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Date: 10/6/25 FAC ID#:
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____
HSA Drilling & Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Double Cased Well $0.00
6" Surface Casing per foot $0.00 per well $0.00
1"- 2" Well Abandonment (includes grouting) per foot $15.00 60.0 $900.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $150.00 4 $600.00
Mobilization roundtrip $750.00 1 $750.00
Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum each $0.00 lump sum $100.00 1 $100.00
$0.00
$0.00
$0.00 Standby/Delay/Difficult Access Time per hour $0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00
TOTAL QUOTE PRICE $2,350.00
Project No.:
Signature and Title of Person Submitting Quote: _____________________________________ Rose Hood, Estimating & Scheduling Mgr Date: 10/6/25
Consultant Name: Arcadis
Site Name & Location: Hamlet Cleaners
PROPOSED SCOPE OF WORK:
Abandon (7) 1" - 2" wells, depths 4' - 29', total footage: 60', remove pads and manholes, restore grade
Some work indoors, indoor wells to have rig removed & flush patch
Days to Complete Scope of Work: 0.5
6274 W Indiantown Rd, Palm Beach, Palm Beach County, FL
Well Completion (includes MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Permits/Well Completion or Abandonment Reports
Arcadis, Hamlet Cleaners, Delray Beach,FL.xlsx
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.9742423
Date: 10/6/2025
FAC ID#:
Unit Unit Rate Number of Units Extended Price per foot $14.00 60 $840.00 per foot $0.00 per foot $0.00 per foot $0.00 per foot $0.00 each $135.00 7 $945.00 roundtrip $550.00 1 $550.00 per crew / per night $0.00 each $80.00 0 $0.00 each $85.00 1 $85.00 each $0.00 each $50.00 0 $0.00 lump sum $0.00
$0.00 per hour $495.00 $0.00
TOTAL QUOTE PRICE $2,420.00
Date: 10/6/2025
Rig Type: Well Abandonment
Grout Abandon (3) 1"-2" MW/PZ's = 36' Total - Remove Well Completions and Patch (1 Inside)
Remove Standard Pad/Manhole
16" Well Abandonment (includes grouting)
Contractor Name: Arcadis - Doug McGlone - 561 662-7978
Site Name: Hamlet Cleaners - 4051 W Atlantic Ave - Delray Beach, FL
Permits & Well Completion Reports
PROPOSED SCOPE OF WORK:
Mobilization
3"- 4" Well Abandonment (includes grouting)
1"- 2" Well Abandonment (includes grouting)
Per Diem
Subcontract Mailing Address: 2703 NW 19th St., Pompano Bch. FL 33069
Signature and Title of Person Submitting Quote: Charles Bucher / Sr. Project Manager
8" - 10" Well Abandonment (includes grouting)
Grout Abandon (4) 2" MAGs = 24' Total - Remove Well Completions and Patch (2 Inside)
DRILLING
MISCELLANEOUS
Standby/Delay/Difficult Access Time
5"- 6" Well Abandonment (includes grouting)
Days to Complete Scope of Work: 1 Day
Subcontract Company Name: EARTH TECH DRILLING 954.974.2424
DOT Approved 55-gal Drum
Traffic Safety Cones (Left onsite)
Permits & Well Completion Reports
Debris Disposal
Monitoring Wells Sparge Wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push
Arcadis 10/8/2025 7000 North Federal HWY 206937 Boca Raton, FL 33487
Delray Beach, FL
Douglas McGlone 4051-4057 W. Atlantic Ave douglas.mcglone@arcdais.com Delray Beach
561-662-7978 FL
33445
Cascade Rep Contact Information
Scope of Work
Quantity Unit Sales Price Subtotal Mobilization/Demobilization 1 Each 3,300.00$ 3,300.00$ DPT Rig and Crew Daily Rate 1 Day 2,250.00$ 2,250.00$ Per Diem and Lodging (per worker) 2 Man/Day 225.00$ 450.00$ 1" PVC well abandonment 26 Foot 2.00$ 52.00$ 2" PVC well abandonment 34 Foot 2.00$ 68.00$ Patch 7 Each 15.00$ 105.00$ Rubble removal 1 Lump Sum 200.00$ 200.00$ Florida permit 1 Lump Sum 100.00$ 100.00$
Pre-Tax Total
Tax Percentage
Taxes
Quote Total $6,525.00
This quote is based on information provided by you and is valid for 45 days from the bid date. Unless previously agreed, Cascade requires a 2-week notice prior to mobilization. Your firm is responsible for 1) Obtaining any site specific permits, 2) Locating and clearly marking underground installations or utilities, 3) Furnishing dig Alert numbers at least three working days prior to scheduled start date and proof of private locating services, 4) Obtaining access to site with no overhead wires within 20' of the holes. Cascade Drilling shall not be responsible for damages to underground improvements not clearly and accurately marked. If bedrock, cobbles, flowing sands or other adverse or unsafe drilling conditions are encountered, drilling may continue on a time and materials basis or be terminated at the discretion of Cascade. Additional costs may apply if scope is significantly changed. Well development by others may void some or all of Cascade warranties of workmanship and materials. Prices assume standard labor rates and no work hour restrictions. Due to a volatile pricing environment, Cascade is unable to guarantee the pricing for a period longer than SIX MONTHS from the date of the bid submittal. If the work extends past this DATE, the agreement can be amended to extend the period of performance and address any potential adjustment in pricing resulting from actual increases in costs of labor, materials, and fuel. If you would like to discuss it further, please feel free to reach out to Will Burdette.
Number
Prepared By Email zfordley@cascade-env.comZachary Fordley, Project Manager
Cascade will provide a track mounted Geoprobe unit with a 2-man crew to provide the following.
Abandon Seven (7) existing monitoring wells by grouting them in place and destroying the top 5' of casing. All exterior wells we will remove the pads and patch to existing.
The interior wells we will remove the ring and patch with concrete.
Decon all tooling between locations. Decon is included in the day rate.
Cacsade will obtain the abandonment permit.
No union/prevailing wages or additional training is expected.
Work schedule will be daily work hours of 8am - 4:30pm including lunch and safety meetings.
Level D PPE is expected.
Cascade estimates 1 day to complete this project. All quantities are estimates. Actual accrued totals will be invoiced. Day rate includes a crew of 2. Additional crew at the site will require additional charges. Standby time, if accrued, is included in the day rate.
Description
$6,525.00
Account Name Bid Date Address Quote Number
Quote Revision Date
Bill To Account Project Zip
Project Name
Contact Name Project Address Email Project City Phone Project State
File details come from the government source that posted it. Updated .