This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc., a environmental consulting contractor. The TA is executed pursuant to Contract Number HW680 and is designated as Task Assignment DC042A, effective through March 29, 2024. The project involves groundwater monitoring activities at the Majik Touch Cleaners facility located at 1420 Seven Springs Boulevard, New Port Richey, Pasco County, Florida (Facility ID 51-9502292). Theresa Pepe serves as the FDEP Project Manager, while Gus Suarez represents Arcadis as the Contractor's Project Manager.
Arcadis will conduct annual natural attenuation monitoring (NAM) of seventeen monitor wells at the site for volatile organic compounds (VOCs) according to the October 28, 2023 Work Plan. The scope consists of three subtasks: Project Management, Groundwater Sampling with water level measurements and passive diffusion bag samplers, and Annual NAM Reporting. The total Task Assignment value is $10,919.45 on a fixed unit rate basis. The deliverable is an Annual Monitoring Report/IDW manifest/Project Management due by February 29, 2024, with invoice payment contingent upon FDEP approval. Cost components include direct labor ($2,792.42), overhead and administrative charges (79% overhead and 36% general and administrative), laboratory analytical costs ($1,241.00), field equipment ($1,247.00), vehicle rental ($360.00), and disposal services through EnviroServe ($217.80 including handling). No additional funding information or special conditions are documented.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC042A Completion March 29, 2024
Arcadis will conduct groundwater monitoring from select wells at the site. All activities will be performed according to the October 28, 2023, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_5244
1420 Seven Springs Blvd, New Port Richey, Pasco County
Majik Touch Cleaners
✔ $ 10,919.45
$ 10,919.45
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2023.11.01 15:32:57 -04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.11.01 14:53:15 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Monitoring Report/IDW manifest/Project Management 02/29/2024
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 10,919.45
$ 10,919.45
HW680
DC042A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Majik Touch Cleaners Facility ID No. 51-9502292; ERIC_5244 New Port Richey, Pasco County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC042A (HW680) DATE: October 31, 2023
Arcadis U.S., Inc. will conduct annual groundwater monitoring from select wells at the site. This work will be conducted in accordance with the October 28, 2023, Work Plan submitted by Chad Hanna of Arcadis.
The final task assignment total is $10,919.45. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management This subtask is calculated automatically based on a percentage of total labor hours.
Subtask 2: Groundwater Sampling An updated access agreement was signed with the current owner in April 2023.
This subtask provides costs to sample seventeen monitor wells for drycleaning solvents.
Some of these wells will utilize Passive Diffusion Bags (PBDs) previously installed.
Water levels will be measured to determine the direction of groundwater flow. IDW will be drummed and transported by a licensed waste hauler.
Subtask 3: Annual NAM Reporting Arcadis will submit a written report as the final deliverable including recommendations for additional actions as needed.
Hours and costs are comparable to past task assignments of similar work.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 10/28/2023
Task #: SubTask 1 Project Management Site: Majik Touch Cleaners SubTask 2 Field Activities
Activity/Phase: NAM SubTask 3 NAM Report Project Manager: Gus Suarez SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 4 3.7 $67.07 Principal Scientist Burke, Brian (BRB) 5 2 3 0 0 $50.00 Senior Engineer Hanna, Chad (CH) 19 3 16 0 0 $34.89 Technician Welch, David (DJW) 26 26 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 4 0 4 0 0 $30.00 Document Technician Embras, Susan (SRE) 4 2 2 0 0
Total Hours 62 4 33 25 0 0
Direct Labor $2,792.42 $321.25 $1,251.28 $1,219.89 $0.00 $0.00
Overhead 79.00% $2,206.01 $253.79 $988.51 $963.71 $0.00 $0.00 Gen & Admin 36.00% $1,005.27 $115.65 $450.46 $439.16 $0.00 $0.00 Fringe 37.10% $1,035.98 $119.18 $464.22 $452.58 $0.00 $0.00 Total Labor $7,039.68 $809.87 $3,154.47 $3,075.34 $0.00 $0.00
Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
EnviroServe IDW $198.00 $198.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00
GPR $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $198.00 $198.00 $0.00 $0.00 $0.00 Handling Fee $19.80 $19.80 $0.00 $0.00 $0.00 Total Subcontractor Cost $217.80 $217.80 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,241.00 $1,241.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 Total Laboratory $1,351.00 $1,351.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,027.00 $1,027.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,247.00 $1,247.00 $0.00 $0.00 $0.00
Subtotal $10,215.48 $809.87 $6,330.27 $3,075.34 $0.00 $0.00 Completion Fee $703.97 $80.99 $315.45 $307.53 $0.00 $0.00
Total Estimated Cost $10,919.45 $890.86 $6,645.72 $3,382.87 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Majik Touch Cleaners SUBTASK 2: Field Activities
DATE: 10/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities and Email Updates Principal Geologist - Burke Field readiness with project team (1hr), PG oversight (1hr) 2 Senior Engineer - Hanna Field scheduling / support (1hr), Field readiness with field crew (1hr), prep paperwk/figure, analyze field logs/notes (1hr) 3 Field Technician - Welch FRR & Prep (2 hrs), Travel (2 hrs), gauge wells (4 hrs), sample 17 wells for VOCs (17 hrs), IDW management (1 hr) 26 Administrator - Embras Admin support (1hr), field documentation processing (1hr) 2
TOTAL LABOR 33
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals EnviroServe IDW $198.00 Drum 1 $198.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $198.00
TOTAL $198.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $73.00 1.00 17 $1,241.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,241.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $1,351.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 450 $135.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 8 $24.00 55-gallon Drum $100.00 Each 1 $100.00 PDBs $36.00 Each 8 $288.00
Total Equipment Items: $547.00 Equipment Kits Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00
Total Equipment Kits: $580.00
TOTAL EQUIPMENT $1,247.00
SITE : Majik Touch Cleaners SUBTASK 3: NAM Report
DATE: 10/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal Geologist - Burke P.G. Author Final Deliverable (3 hrs) 3
Senior Engineer - Hanna Prepare report (10 hrs), update tables (2 hrs), figures (2 hrs), trends (2 hrs) 16
CAD Drafter - Oliva Figure updates (4 hrs) 4
Administrator - Embras Reporting support and submittal (2 hrs) 2
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals Utilities -Electric $20.00 Per Month 0 $0.00 Handling Fee $20.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
Arcadis U.S., Inc.
4300 W Cypress Street
Suite 450
Tampa
Florida 33607
Phone: 813 903 3100
Fax: 813 350 9046 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
1/3
Theresa Pepe
Hazardous Waste Cleanup Section
Florida Department of Environmental Protection
2600 Blair Stone Road
Tallahassee, Florida 32399
Date: October 28, 2023
Our Ref: TBD
Subject: Annual Natural Attenuation Monitoring Proposal
Majik Touch Cleaners
1420 Seven Springs Blvd.
New Port Richey, Florida
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to provide the Florida Department of Environmental Protection (FDEP) this
Natural Attenuation Monitoring (NAM) proposal for the Majik Touch Cleaners Site (Majik Touch Cleaners) in New
Port Richey, Pasco County, Florida. This proposal includes background information on the Site, a description of the proposed scope of work (SOW) with an estimated cost and schedule for their completion.
Site Background
In December 2022, Arcadis conducted field activities which included the measurement of groundwater levels and collection of groundwater samples for the analysis of volatile organic compounds (VOCs) and Per- and
Polyfluoroalkyl Substances (PFAS) in accordance with Task Assignment HW013A. The results of the sampling efforts were included in the December 15, 2022 PFAS Results Summary and March 31, 2023 Annual NAM
Report. The annual NAM report recommended continuation of annual groundwater sampling to monitor VOC concentration trends and to confirm plume extent.
Scope of Work
Task 1: Project Management
This task consists of project management activities and health and safety efforts in relation to the completion of
Tasks 2 and 3.
Task 2: Annual NAM Field Event
The proposed groundwater NAM program includes the sampling of 17 wells listed below in Table 1. These wells were selected to monitor groundwater quality trends in various aquifer zones at the site over time and/or to
Ms. Theresa Pepe
Florida Department of Environmental Protection
October 28, 2023 www.arcadis.com
2023.10 - Majik Touch Annual NAM Proposal
2/3 confirm the lateral extent of impacts. Groundwater analytical results obtained in December 2022 confirmed that contaminant of concern (COC) concentrations above the FDEP cleanup criteria are limited to on-site monitor wells only.
Depth-to-water measurements will be collected during the sampling event from all accessible site monitor wells.
The selected monitor wells will be sampled per the FDEP standard operating procedures (SOP) (DEP-SOP-
001/01). During the most recent sampling event, passive diffusion bag (PDB) samplers were installed in eight of the wells (MW008, MW009, MW012, MW014, MW015, MW016, MW017, and MW018); therefore, those wells will continue to be monitored utilizing PDB samplers. Groundwater samples will be analyzed for VOCs using United
States Environmental Protection Agency (USEPA) Method 8260 by the National Environmental Laboratory
Accreditation Program (NELAP) certified Eurofins Laboratory. Purge water generated during sampling activities will be placed in a 55-gallon drum and removed for transportation and disposal by a licensed waste hauler
(EnviroServe).
Table 1- Proposed Monitor Wells to be Sampled
Aquifer Zone Monitor Well
Shallow Surficial Aquifer (0-15 ft bls): MW009
Upper Middle Surficial Aquifer (15-30 ft bls): MW008, MW020
Lower Middle Surficial Aquifer (30-35 ft bls):
MW010, MW011, MW023, MW024, MW026,
MW031R, MW033R
Lower Surficial Aquifer (35-60 ft bls): MW028
Floridan Aquifer (60-120 ft bls):
MW012, MW014, MW015, MW016, MW017,
MW018
Task 3: NAM Reporting
A NAM Report will be submitted to the FDEP within 60 days of receipt of the laboratory analytical report. The
Report will contain tables and figures summarizing the results of the monitoring event and include conclusions and recommendations based upon findings.
Schedule and Cost Estimate
Arcadis will schedule the field activities following receipt of a TA from the FDEP. The CEF/LOE is included as
Attachment 1. The total cost to complete this scope of work is $10,919.45 (Attachment 1). Arcadis proposes the following invoicing schedule:
Completion of NAM field activities $6,645.72
Annual NAM submittal and PM $4,273.73
Ms. Theresa Pepe
Florida Department of Environmental Protection
October 28, 2023 www.arcadis.com
2023.10 - Majik Touch Annual NAM Proposal
3/3
Closing Remarks
Arcadis appreciates the opportunity to assist the FDEP at this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Chad Hanna Brian Burke, P.G.
Senior Environmental Specialist Project Manager
Email: Chad.hanna@arcadis.com Email: Brian.burke@arcadis.com
Phone: 813.353.5765 Phone: 813.353.5755
09/20/2023 03:21 PM PAGE 1 OF 7
Scope of Work
Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required
TCLP Benzene and 4 Metals with Completed Profile required for each site
Drum Pickup /Transportation/Disposal
Drums south of Miami not included (Keys) additional costs apply
Drums North Tallahassee Not Included Additional Costs apply
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0039485
DATE: 09/20/2023 PROJECT PROPOSAL
CLIENT
DOUGLAS MALONE
ARCADIS
1500 GATEWAY BLVD, SUITE 200, BOYTON BEACH, FLORIDA,
33426
P: (561) 662-7978
PROJECT DESCRIPTION
DRUM PICKUP #65
VARIOUS SITES SOUTH FLORIDA
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION 55 GAL DRUMS
NOTES:SUBJECT TO FUEL SURCHARGE,
1.00 $50.00 DRUM $50.00
STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GALLON NON HAZ DRUM
NOTES: Drum DOT Shippable Drum accessible on hard Surface
80.00 $1.00 EACH $80.00
ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $18.00 EACH $18.00
DISPOSAL SUBTOTAL: $98.00
TOTAL JOB ESTIMATE: $198.00
| HW680_DC042A negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Groundwater Sampling |
| Subtask 3: Annual NAM Reporting |