This is a Task Assignment (TA) document executed between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc. for environmental remediation services at the Imperial Laundry & Dry Cleaners site located at 901 W. Fairbanks Avenue, Winter Park, Orange County, Florida. The task assignment is numbered DC041B under underlying Contract Number HW680, with an effective completion date of June 6, 2025. The Department Project Manager is Theresa Pepe (850-245-8966), and the Contractor's Project Manager is Gus Suarez (813-205-4703).

Arcadis will conduct annual groundwater monitoring including sampling for PFAS compounds from six select wells at the site, with all activities performed according to the December 9, 2024 Work Plan submitted by Arcadis. The scope of work is divided into four subtasks: Project Management (automatically calculated as a percentage of total labor), Annual Groundwater Monitoring (sampling six wells for drycleaning solvents with IDW disposal by licensed waste hauler), Reporting (written report with recommendations), and PFAS Sampling (six monitor wells analyzed using FDEP's laboratory in Tallahassee). The total Task Assignment value is $11,521.73 on a fixed unit rate basis, with invoicing contingent upon FDEP approval of deliverables. The Annual Monitoring Report/IDW manifest/Project Management deliverable is due May 2, 2025 with $8,621.05 to be invoiced upon approval, and PFAS sampling is due February 28, 2025 with $2,900.68 to be invoiced upon approval. The task assignment was executed on December 11, 2024.

View the file

Other files

File Type Posted
CN-370000-HW680-DC001C.pdf PDF
CN-370000-HW680-DC002B.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-DC004A.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC004E.pdf PDF
CN-370000-HW680-DC007A.pdf PDF
CN-370000-HW680-DC008A.pdf PDF
CN-370000-HW680-DC008B.pdf PDF
CN-370000-HW680-DC010C.pdf PDF
CN-370000-HW680-DC011B.pdf PDF
CN-370000-HW680-DC013D.pdf PDF
CN-370000-HW680-DC013E.pdf PDF
CN-370000-HW680-DC013F.pdf PDF
CN-370000-HW680-DC014A.pdf PDF
CN-370000-HW680-DC014B.pdf PDF
CN-370000-HW680-DC014G.pdf PDF
CN-370000-HW680-DC014H.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015C.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-DC015E.pdf PDF
CN-370000-HW680-DC016D.pdf PDF
CN-370000-HW680-DC016E.pdf PDF
CN-370000-HW680-DC018A.pdf PDF
CN-370000-HW680-DC019D.pdf PDF
CN-370000-HW680-DC01ACO2.pdf PDF
CN-370000-HW680-DC021C.pdf PDF
CN-370000-HW680-DC022D.pdf PDF
CN-370000-HW680-DC023A.pdf PDF
CN-370000-HW680-DC023C.pdf PDF
CN-370000-HW680-DC024C.pdf PDF
CN-370000-HW680-DC025B.pdf PDF
CN-370000-HW680-DC026A.pdf PDF
CN-370000-HW680-DC026C.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC032A.pdf PDF
CN-370000-HW680-DC032B.pdf PDF
CN-370000-HW680-DC038A.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-DC040C.pdf PDF
CN-370000-HW680-DC040D.pdf PDF
CN-370000-HW680-DC041A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC052B.pdf PDF
CN-370000-HW680-DC053A.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05ACO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW680

DC041B June 6, 2025

Arcadis will conduct annual groundwater monitoring including sampling for PFAS compounds from select wells at the site. All activities will be performed according to the December 9, 2024, Work Plan submitted by Arcadis.

Theresa Pepe 850-245-8966 Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_5039

901 W. Fairbanks Ave, Winter Park, Orange County

Imperial Laundry & Dry Cleaners

$ 11,521.73

$ 11,521.73

Scope of Work

Arcadis U.S. Inc.

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2024.12.11 09:34:08 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.12.11 07:47:03 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Alexis A. Lambert Secretary

Memorandum

TO: Negotiation File Imperial Laundry & Dry Cleaners

FACID NO. 48-9503059; ERIC_5039

Winter Park, Orange County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC041B (HW680) DATE: December 10, 2024

Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. Additionally, select wells will be sampled for PFAS compounds. All activities will be conducted in accordance with the December 9, 2024, Work Plan submitted by Chad Hanna of Arcadis.

The final task assignment total is $11,521.73. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.

Subtask 2: Annual Groundwater Monitoring FDEP obtained an access agreement in December 2021 with the City of Winter Park, who remains the real property owner of the former Prather’s site.

Arcadis will sample six wells for drycleaning solvents. IDW will be disposed by a licensed waste hauler.

Subtask 3: Reporting Arcadis will submit a written report as the final deliverable including recommendations for additional actions as needed.

Imperial Laundry

ERIC_5039

Subtask 4: PFAS sampling

Arcadis will sample six monitor wells for PFAS compounds using FDEP’s laboratory in Tallahassee. The wells have been chosen based on prior PFAS results and FDEP’s new guidance/flow chart.

Hours and costs are comparable to past task assignments of similar scope.

FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.

Date: 11/26/24

Task #: DC041B SubTask 1 Project Management Site: Former Imperial Cleaners SubTask 2 Groundwater Monitoring Event - VOHs

Activity/Phase: NAM SubTask 3 Reporting Project Manager: Gus Suarez SubTask 4 Groundwater Monitoring Event - PFAS

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$87.59 Project Manager Suarez, Gus (GS) 5 4.5

$69.76 Principal Scientist Burke, Brian (BRB) 4 1 2 1 0

$50.00 Senior Engineer Hanna, Chad (CH) 20 4 12 4 0

$34.89 Technician Welch, David (DJW) 40 25 0 15 0

$34.50 Technician Dankerl, David (DJD) 0 0 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 4 0 4 0 0

$38.28 Project Assistant Cruz, Michele (MC) 6 2 2 2 0

Total Hours 79 5 32 20 22 0

Direct Labor $3,461.19 $398.19 $1,218.57 $974.76 $869.67 $0.00

Overhead 79.00% $2,734.34 $314.57 $962.67 $770.06 $687.04 $0.00

Gen & Admin 36.00% $1,246.03 $143.35 $438.69 $350.91 $313.08 $0.00

Fringe 37.10% $1,284.11 $147.73 $452.09 $361.64 $322.65 $0.00

Total Labor $8,725.67 $1,003.84 $3,072.02 $2,457.37 $2,192.44 $0.00

Travel

Vehicle Rental $360.00 $240.00 $0.00 $120.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $360.00 $240.00 $0.00 $120.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

Erwin IDW $125.00 $125.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00

Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00

Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $438.00 $438.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00

Total Laboratory $548.00 $548.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $120.00 $80.00 $0.00 $40.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $658.00 $329.00 $0.00 $329.00 $0.00

Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $878.00 $509.00 $0.00 $369.00 $0.00

Subtotal $10,649.17 $1,003.84 $4,506.52 $2,457.37 $2,681.44 $0.00

Completion Fee $872.56 $100.38 $307.20 $245.74 $219.24 $0.00

Total Estimated Cost $11,521.73 $1,104.22 $4,813.72 $2,703.11 $2,900.68 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : Former Imperial Cleaners

SUBTASK 2: Groundwater Monitoring Event - VOHs

DATE: 11/26/24

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities and Email Updates

Principal Geologist - BB Field readiness with project team, PG oversight (1hr) 1

Senior Enginner - CMH Notifications, field scheduling / support (1hr); prep paperwk/figures, order bottles (1hr), Field readiness with field crew (1hr) review field logs/notes (1hr) 4

Field Technician - DJW 25

Project Assistant - MC Process and file field notes (2hrs) 2

TOTAL LABOR 32

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 2 $240.00 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals

EESI AWS $2,000.00 Per Day 0 $0.00

Total Equip.: $0.00

Services Procurement

Name Purpose Rate Units Usage Totals

Erwin IDW $125.00 per drum 1 $125.00

Total Services: $125.00

TOTAL $125.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOCs 8260 Aqueous $73.00 1.00 6 $438.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $438.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00

Total Shipping: $110.00

TOTAL LAB $548.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 2 $80.00

Total Expendables: $80.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot 100 $30.00

Tubing, Silicon 3/16x3/8 $3.00 Per Foot 3 $9.00

55-gallon Drum $100.00 Each 1 $100.00

Total Equipment Items: $139.00

Equipment Kits

Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00

Total Equipment Kits: $290.00

Total Equipment Kits: $509.00

Prep equipment/calibrations (2hrs); Mob/Demob x 2 (10hrs); locate wells and assess viability (4hrs); measure water levels in 9 MWs (1hr); sample 6 wells (6 hrs); IDW management/sampling (1hrs); package/ship samples (1hrs)

SUBTASK 3: Reporting

DATE: 11/26/24

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Annual Groundwater Monitoring Report

Principal Geologist - BB PG analysis/certification 2

Senior Enginner - CMH Report text, table, figure generation, report table validation, IDW T&D coordination 12

CAD Designer - BO Develop figures for GW results 4

Project Assistant - MC Data entry, report assembly, formatting 2

TOTAL LABOR 20

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals

$0.00 Per Day 0 $0.00

Total Equip.: $0.00

Services Procurement

Name Purpose Rate Units Usage Totals

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00

Equipment Items

Total Equipment Items: $0.00

Equipment Kits

Total Equipment Kits: $0.00

Total Equipment Kits: $0.00

SUBTASK 4: Groundwater Monitoring Event - PFAS

DATE: 11/26/24

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities and Email Updates

Principal Geologist - BB Field readiness with project team, PG oversight (1hr) 1

Senior Enginner - CMH Notifications, field scheduling / support (1hr); prep paperwk/figures, order bottles (1hr), Field readiness with field crew (1hr) review field logs/notes (1hr) 4

Field Technician - DJW Prep equipment/calibrations (2hrs); Mob/Demob (5hrs); sample 6 wells (6hrs); IDW management/sampling (1hrs); package/ship samples (1hrs) 15

Project Assistant - MC Process and file field notes (2hrs) 2

TOTAL LABOR 22

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 1 $120.00 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals

$0.00 Per Day 0 $0.00

Total Equip.: $0.00

Services Procurement

Name Purpose Rate Units Usage Totals

Handling Fee $20.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 1 $40.00

Total Expendables: $40.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot 100 $30.00

Tubing, Silicon 3/16x3/8 $3.00 Per Foot 3 $9.00

Total Equipment Items: $39.00

Equipment Kits

Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00

Total Equipment Kits: $290.00

TOTAL EQUIPMENT $369.00

Arcadis U.S., Inc.

4300 W Cypress Street Suite 450 Tampa Florida 33607 Phone: 813 903 3100 Fax: 813 350 9046 www.arcadis.com

FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062

1/3

Theresa Pepe Hazardous Waste Cleanup Section Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399

Date: December 9, 2024 Our Ref: TBD Subject: Natural Attenuation Monitoring Proposal

Former Imperial Laundry and Drycleaners 901 West Fairbanks Avenue Winter Park, Florida

Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit to the Florida Department of Environmental Protection (FDEP) the following proposal for Natural Attenuation Monitoring (NAM) activities at the Imperial Laundry and Drycleaners (Site), located in Winter Park, Florida. This proposal includes background information, a description of the proposed scope of work (SOW), and an estimated cost and schedule for their completion.

Site Background

Arcadis completed Task Assignment (TA) #DC041A, which included the 2023 annual NAM sampling event (October 2023) and associated reporting. Monitoring wells MW006, MW010, and MW011 were properly abandoned during the October sampling event in anticipation for construction of a turn lane by the City of Winter Park. An additional sampling event was attempted in January 2024, but construction activities impeded completion of the sampling event.

The 2023 Annual NAM Report was submitted on April 5, 2024. Tetrachloroethene (PCE) was detected above the FDEP GCTL in the samples collected from monitor wells MW001 (8.2 µg/L) and MW002 (6.6 µg/L). Arcadis recommended continued monitoring of MW001 and MW002. The FDEP reviewed the report and requested a site inspection to locate wells and determine their viability, and sampling of all viable shallow wells in an email dated April 22, 2024.

Scope of Work

Task 1: Project Management

This task consists of project management activities and health and safety efforts in relation to the completion of Tasks 2 through 4.

Ms. Theresa Pepe Florida Department of Environmental Protection December 9, 2024 www.arcadis.com

2024.12 - Imperial NAM Proposal

2/3

Task 2: Site Inspection and NAM Field Event

Arcadis will mobilize to the Site, attempt to locate remaining monitoring wells and assess their viability for sampling. The proposed groundwater NAM program includes depth-to-water measurements and the sampling of six shallow monitoring wells. Depth-to-water measurements will be collected from all accessible site monitor wells and samples will be collected from MW001, MW002, MW004, MW005, MW009, and MW012. The groundwater sampling activities will be performed per the FDEP standard operating procedures (SOP) (DEP-SOP-001/01).

Samples will be shipped to Eurofins located in Altamonte Springs, Florida, and analyzed for CVOCs by United States Environmental Protection Agency (USEPA) Method 8260. In accordance with FDEP guidance, the IDW generated during sampling activities will be containerized on-site and removed for transportation and disposal by a licensed waste hauler (Erwin Remediation Inc.) following receipt of the laboratory analytical report.

Task 3: NAM Reporting

A NAM Report will be submitted to the FDEP within 60 days of receipt of the laboratory analytical report. The Report will contain tables and figures summarizing the results of the NAM event and include conclusions and recommendations based upon findings.

Task 4: Groundwater Sampling for PFAS

Groundwater samples will be collected from monitoring wells MW001, MW002, MW004, MW005, MW009, and MW012 using the low-flow sampling technique and shipped to the FDEP laboratory in Tallahassee, Florida for PFAS analysis. Results will be included in the GMR described above and a comprehensive table will be maintained with all PFAS data obtained for the Site. IDW generated during the PFAS sampling activities will be combined with the VOH sampling IDW and transported off-Site once both events have been completed.

Cost Estimate

Arcadis will schedule the field activities following receipt of a TA from the FDEP. The CEF/LOE is included as Attachment 1. The total cost to complete this scope of work is $11,521.73 (Attachment 1). Arcadis proposes the following invoicing schedule:

Completion of NAM field event and PFAS Sampling $7,714.40

NAM Report submittal and PM $3,807.33

Ms. Theresa Pepe Florida Department of Environmental Protection December 9, 2024 www.arcadis.com

2024.12 - Imperial NAM Proposal

3/3

Closing Remarks

Arcadis appreciates the opportunity to assist the FDEP at this Site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.

Sincerely, Arcadis U.S., Inc.

Chad Hanna Brian Burke, P.G.

Senior Environmental Specialist Project Manager Email: Chad.hanna@arcadis.com Email: Brian.burke@arcadis.com Phone: 813.353.5765 Phone: 813.353.5755