CN-370000-HW680-DC039A.pdf
PDF 1 MB Posted
- Contract number
- HW680
- Issued by
- Florida
About this file
This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. for environmental remediation services at the Admiral Cleaners site located at 4645 Gun Club Road, West Palm Beach, Palm Beach County, Florida. The task assignment is entered pursuant to underlying Contract Number HW680 and is identified as Task Assignment DC039A. Theresa Pepe serves as the FDEP Project Manager, while Gus Suarez is the Contractor's Project Manager for Arcadis U.S. Inc.
The scope of work consists of annual groundwater monitoring activities to be performed according to the September 12, 2023 Work Plan submitted by Arcadis. The deliverable includes an Annual Monitoring Report with IDW (Investigative Derived Waste) manifest and project management, due December 8, 2023, with payment contingent upon FDEP approval. The contract employs a fixed unit rate payment structure with a Total TA Value of $6,615.31, comprised of three subtasks: Project Management ($609.17), Annual Groundwater Monitoring ($3,279.10), and Reporting ($2,727.04). Services include sampling of five monitor wells for drycleaning solvents (MW-X, MW-Y, MW004, MW006, and MW007) via EPA Method 8260, water level measurements for flow mapping, drumming of purge water for offsite disposal by EnviroServe at a cost of $198.00, laboratory analysis at $515.00, and vehicle rental costs of $120.00. The TA completion date is January 12, 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC039A Completion January 12, 2024
Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the September 12, 2023, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_5186
4645 Gun Club Rd, West Palm Beach, Palm Beach County
Admiral Cleaners
✔ $ 6,615.31
$ 6,615.31
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2023.09.21 16:45:27 -04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.09.21 14:53:50 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Monitoring Report/IDW manifest/Project Management 12/08/2023
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 6,615.31
$ 6,615.31
HW680
DC039A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Admiral Cleaners
FACID NO. 50-9502906; ERIC_5186
West Palm Beach, Palm Beach County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC039A (HW680) DATE: September 14, 2023
Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. All activities will be conducted in accordance with the September 12, 2023, Work Plan submitted by Doug McGlone of Arcadis.
The final task assignment total is $6,615.31. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Annual Groundwater Monitoring FDEP obtained an access agreement from the property owner in October 2018. No changes in ownership have occurred since that date.
Arcadis will sample five monitor wells for drycleaning solvents. IDW will be collected by EnviroServe, formerly Clark Environmental.
Subtask 3: Reporting Arcadis will submit a written report as the final deliverable including recommendations for additional actions as needed.
Hours and costs are comparable to past task assignments of similar scope.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 9/12/2023
Task #: SubTask 1 Project Management Site: Admiral Cleaners SubTask 2 Groundwater Monitoring
Activity/Phase: Annual NAM 2023 SubTask 3 Reporting Project Manager: Gus Suarez SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$67.07 Project Manager McGlone, Douglas (DMc) 3 3.3 $85.87 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 $67.07 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 $67.07 Principal Scientist McGlone, Douglas (DMc) 6 3 3 0 0 $39.34 Staff Scientist Riley, Joel (JR) 22 10 12 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 5 0 5 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 6 3 3 0 0
Total Hours 42 3 16 23 0 0
Direct Labor $1,909.42 $219.67 $706.36 $983.39 $0.00 $0.00
Overhead 79.00% $1,508.44 $173.54 $558.02 $776.88 $0.00 $0.00 Gen & Admin 36.00% $687.39 $79.08 $254.29 $354.02 $0.00 $0.00 Fringe 37.10% $708.40 $81.50 $262.06 $364.84 $0.00 $0.00 Total Labor $4,813.65 $553.79 $1,780.73 $2,479.13 $0.00 $0.00
Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW EnviroServe $198.00 $198.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $198.00 $198.00 $0.00 $0.00 $0.00 Handling Fee $19.80 $19.80 $0.00 $0.00 $0.00 Total Subcontractor Cost $217.80 $217.80 $0.00 $0.00 $0.00
Laboratory Analytical Costs $365.00 $365.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 Total Laboratory $515.00 $515.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $37.50 $37.50 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $290.00 $290.00 $0.00 $0.00 $0.00 Total Field Expenses $467.50 $467.50 $0.00 $0.00 $0.00
Subtotal $6,133.95 $553.79 $3,101.03 $2,479.13 $0.00 $0.00 Completion Fee $481.36 $55.38 $178.07 $247.91 $0.00 $0.00
Total Estimated Cost $6,615.31 $609.17 $3,279.10 $2,727.04 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Admiral Cleaners SUBTASK 2: Groundwater Monitoring
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GW sampling
Principal (DMc) Access; technical analysis; oversight with field crew 3
Staff Scientist (JR) Prp for field work (1 hr), mob/demob (1 hr); round of WLs, purge & sample 5 wells (6 hrs) , pack/ship, IDW stage (2 hrs) 10
Project Assistant (MC) Process field notes, field support 3
TOTAL LABOR 16
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals EnviroServe IDW $198.00 Drum 1 $198.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $198.00
TOTAL $198.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons only) 8260 Aqueous $73.00 1.00 5 $365.00Dissolved Solids, Total SM2540 C Aqueous $16.00 1.00 0 $0.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $365.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $150.00
TOTAL LAB $515.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Total Expendables: $40.00
Equipment Items
Tubing, Poly/HDPE $0.30 Per Foot 75 $22.50 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 5 $15.00 55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $137.50 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Total Equipment Kits: $290.00
TOTAL EQUIPMENT $467.50
SITE : Admiral Cleaners
SUBTASK 3: Reporting
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal (DMc) Technical analysis; sign and seal report 3
Staff Scientist (JR) Data evaluation and preparation of report 12
Project Assistant (MC) Process field notes, data entry, report assembly, ADaPT processing/upload 3
Drafter/Designer (BO) Figures production for report 5
TOTAL LABOR 23
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00
Services Procurement Name Purpose Rate Units Usage Totals
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons only) 8260 Aqueous $73.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00
Total Equipment Items: $0.00 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
arcadis.com C:\Users\Pepe_T\Desktop\Admiral Drycleaner 2023 Monitoring Proposal.docx
Page:
1/2
Theresa Pepe, Contract Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Subject:
Annual Groundwater Monitoring Proposal Admiral Cleaners (ERIC_5186) 4645 Gun Club Road, West Palm Beach, Palm Beach County, Florida
Dear Ms. Pepe:
Arcadis is pleased to provide the Florida Department of Environmental Protection (FDEP) this proposal for the former Admiral Cleaners USA site, located in West Palm Beach, Palm Beach County, Florida. The proposal includes the groundwater sampling of four monitor wells and reporting.
SCOPE OF WORK
The following sections provide a brief description of the tasks to be completed by Arcadis.
Task 1 – Project Management
This task includes project management activities associated with completion of Tasks 2 and 3.
Task 2 – Monitor Wells sampling – VOH
As requested, groundwater samples will be collected from five monitor wells (MW-X, MW-Y, MW004, MW006, and MW007) for analysis of VOHs by EPA Method 8260 by an accredited laboratory. Water levels will be measured in the five wells for purposes of preparing a flow map. Purge water will be drummed for offsite disposal.
Task 3 – Reporting - VOH
An Annual Groundwater Monitoring Report documenting the sampling and results will be prepared and include conclusions and recommendations for future site work.
ENVIRONMENT
Date:
September 14, 2023
Contact:
Doug McGlone
Phone:
561.662.7978
Email:
Douglas.mcglone@arcadis.com
Our ref:
Admiral Monitoring 2022
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com C:\Users\Pepe_T\Desktop\Admiral Drycleaner 2023 Monitoring Proposal.docx
Annual Monitoring Proposal 14 September 2023
Page:
2/2
SCHEDULE
Arcadis will schedule field activities immediately upon receipt of the Task Assignment. The deliverable will be submitted within 45 days of completion of field work.
COST ESTIMATE
A Cost Estimate Form and Level of Effort (CEF-LOE) Form are attached for the above scope of work (Attachment 1).
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP at this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Douglas J. McGlone, P.G.
Principal Geologist
Attachments:
CEF-LOE
09/07/2022 03:24 PM PAGE 1 OF 7
Scope of Work
Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required
TCLP Benzene and 4 Metals with Completed Profile required for each site
Drum Pickup /Transportation/Disposal
Drums south of Miami not included (Keys) additional costs apply
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0030388
DATE: 09/07/2022 PROJECT PROPOSAL
CLIENT
DOUGLAS MALONE
ARCADIS
1500 GATEWAY BLVD, SUITE 200, BOYTON BEACH, FLORIDA,
33426
P: (561) 662-7978
PROJECT DESCRIPTION
DRUM PICKUP
VARIOUS SITES SOUTH FLORIDA
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION 55 GAL DRUMS
NOTES:SUBJECT TO FUEL SURCHARGE,
1.00 $50.00 DRUM $50.00
STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GALLON NON HAZ DRUM
NOTES: Drum DOT Shippable Drum accessible on hard Surface
1.00 $80.00 EACH $80.00
ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $18.00 EACH $18.00
DISPOSAL SUBTOTAL: $98.00
TOTAL JOB ESTIMATE: $198.00
| Peerless Cleaners #3416 Annual Monitoring Proposal 4-18-2022.pdf |
| Annual Groundwater Monitoring |
| Annual Groundwater Monitoring Report |
| Schedule |
| Cost Estimate |
| Closing Remarks |
| HW680_DC039A negsum.pdf |
| Subtask 1: Project Management |
| Admiral Drycleaner 2023 Monitoring Proposal.pdf |
| Scope of Work |
| Task 1 – Project Management |
| Task 2 – Monitor Wells sampling – VOH |
| Task 3 – Reporting - VOH |
| Schedule |
| Cost Estimate |
| Closing Remarks |
File details come from the government source that posted it. Updated .