This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc., a contractor, pursuant to Contract Number HW680. The task assignment, designated as DC027A, was executed in September 2022 and is effective through January 6, 2023. The primary parties involved are FDEP, with Project Manager Theresa Pepe, and Arcadis U.S., Inc., with Project Manager Gus Suarez. The project involves site closure and well abandonment activities at the former Bacons Drive-In Cleaners facility, located at 21 North 7th Street, Haines City, Polk County, Florida (Facility ID ERIC_5362).
The scope of work requires Arcadis to properly abandon all groundwater monitor wells (four wells: MW001-MW004) and modified active gas sampling (MAGS) wells (nine wells) installed during the site assessment, in accordance with the September 9, 2022 Work Plan and Rule 62-532.500(5), Florida Administrative Code. Work includes well abandonment field activities, removal and restoration of well pads and concrete areas using asphalt or concrete patches, and submission of a Well Abandonment/Site Closure Report with supporting documentation. The total contract value is $9,846.33, compensated on a fixed unit rate basis. The cost breakdown includes labor ($4,479.26), subcontractor drilling services from Preferred Drilling Solutions ($4,759.15), travel expenses ($120.00), field expenses ($40.00), and completion fees ($447.92). Invoicing is contingent upon FDEP approval of the Well Abandonment/Site Closure Report, with the deliverable due date of December 2, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC027A Completion January 6, 2023
FDEP has issued a Site Rehabilitation Completion Order for No Further Actions without Institutional Controls. Therefore, Arcadis will properly abandon all monitor wells and MAGS wells installed during the Site Assessment. All activities will be performed according to the September 9, 2022, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_5362
21 N 7th St, Haines City, Polk County
Bacons Drive-In Cleaners
✔ $ 9,846.33
$ 9,846.33
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.09.21 11:33:50 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.09.20 16:17:55 -04'00'
N/A
Farrell_JA Inserted Text Je
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Well Abandonment/Site Closure Report & Project Management 12/02/2022
FDEP approval of Well Abandonment/Site Closure Report & Project Management $ 9,846.33
$ 9,846.33
HW680
DC027A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Bacons Drive-In Cleaners Facility ID No. 53-9500573; ERIC_5362 Haines City, Polk County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC027A (HW680) DATE: September 13, 2022
The site qualified for No Further Action without Engineering or Institutional Controls according to Chapter 62-780.680(1) F.A.C. FDEP issued a Site Rehabilitation Completion Order (SRCO) on June 24, 2022. Therefore, Arcadis U.S., Inc. will properly abandon all groundwater monitor wells and MAGS wells to close out the site. Work will be performed as described in the September 9, 2022, Work Plan from Chad Hanna of Arcadis.
The final task assignment total is $9,846.33. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated based on a percentage of total labor.
Subtask 2: Site Closure/Well Abandonment The property owner signed a site access form on October 29, 2019. FDEP and Arcadis have confirmed that the property ownership has not changed since this date.
This subtask provides costs for abandoning four monitor wells and nine MAGs wells installed during the site assessment. Asphalt patching and other site restoration activities will be conducted as needed. Preferred Drilling Solutions was chosen as the drilling subcontractor based on their low bid of three bids solicited.
Subtask 3: Reporting Arcadis will submit a brief report and site photos to document the above activities.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 9/9/2022
Task #: DC027A SubTask 1 Project Management Site: Bacons Drive-In Cleaners SubTask 2 Well Abandonments
Activity/Phase: Closure SubTask 3 Closure Report Project Manager: Gus Suarez SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$84.18 Project Manager Suarez, Gus (GS) 2 2.4 $65.43 Principal Scientist Burke, Brian (BRB) 3 1 2 0 0 $48.63 Senior Engineer Hanna, Chad (CH) 15 3 12 0 0 $34.89 Technician Welch, David (DJW) 13 13 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 2 0 2 0 0 $28.43 Document Technician Embras, Susan (SRE) 4 2 2 0 0
Total Hours 39 2 19 18 0 0
Direct Labor $1,776.78 $204.41 $721.75 $850.62 $0.00 $0.00
Overhead 79.00% $1,403.65 $161.48 $570.18 $671.99 $0.00 $0.00 Gen & Admin 36.00% $639.64 $73.59 $259.83 $306.22 $0.00 $0.00 Fringe 37.10% $659.19 $75.84 $267.77 $315.58 $0.00 $0.00 Total Labor $4,479.26 $515.32 $1,819.53 $2,144.41 $0.00 $0.00
Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) PDS Drilling (Conventional) $4,326.50 $4,326.50 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $4,326.50 $4,326.50 $0.00 $0.00 $0.00 Handling Fee $432.65 $432.65 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,759.15 $4,759.15 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $40.00 $40.00 $0.00 $0.00 $0.00
Subtotal $9,398.41 $515.32 $6,738.68 $2,144.41 $0.00 $0.00 Completion Fee $447.92 $51.53 $181.95 $214.44 $0.00 $0.00
Total Estimated Cost $9,846.33 $566.85 $6,920.63 $2,358.85 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Bacons Drive-In Cleaners SUBTASK 2: Well Abandonments
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Well Abandonment Field Work Principal - Burke Field readiness with project team, PG evaluation 1
Senior - Hanna Notifications, field support (1hr), Field readiness with field crew (1hr), prep paperwk/figure, analyze field logs/notes (1hr) 3 Technician - Welch Travel (3 hrs), Fieldwork (10 hrs) 13
Admin - Embras Field support 2
TOTAL LABOR 19
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals PDS Well Abandonments by licensed driller $4,326.50 Lump Sum 1 $4,326.50NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $4,326.50
TOTAL $4,326.50
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $150.00 1.00 0 $0.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00 Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Total Expendables: $40.00
Equipment Items Total Equipment Items: $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $40.00
SITE : Bacons Drive-In Cleaners
SUBTASK 3: Closure Report
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Reporting Principal - Burke PG certification, report preparation 2
Senior - Hanna Closure report preparation 12
Drafter - Oliva Figure updates 2
Admin - Embras Reporiting support and submittal 2
TOTAL LABOR 18
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
Arcadis U.S., Inc.
4300 W Cypress Street
Suite 450
Tampa
Florida 33607
Phone: 813 903 3100
Fax: 813 350 9046 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
1/2
Theresa Pepe, Contract Manager
Hazardous Waste Cleanup Section
Florida Department of Environmental Protection
Bob Martinez Center, MS 4520
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Date: September 9, 2022
Our Ref: TBD
Subject: Former Bacons Cleaners Well Abandonment Proposal
Facility ID No. ERIC_5362
Task Assignment: #DC052A
Dear Ms. Pepe, Arcadis is pleased to provide the Florida Department of Environmental Protection (FDEP) this proposal to abandon the monitor wells and modified active gas sampling (MAGS) points at the Former Bacons Cleaners, located at 21
North 7th Street, Haines City, Polk County, Florida (Site). The FDEP issued a Site Rehabilitation Completion Order for the Site in June 2022. This proposal includes a description of the proposed scope of work, the associated estimated cost, and schedule for completion.
Scope of Work
Well Abandonment Field Activities
The proposed field event will include the abandonment all site monitoring wells (MW001, MW002, MW003, and
MW004) and nine MAGS wells (2-inch diameter, screened 0.5 – 5.5 feet below ground) presented on the attached
Figure 1 in accordance with the requirements of Rule 62-532.500(5), F.A.C. After the abandonments, the well vaults and concrete pads within asphalt paved areas will be removed and replaced by concrete flush to the existing pavement. Based on costs provided by three bidders, Arcadis recommends that Florida licensed driller, Preferred
Drilling Solutions, perform the work with Arcadis oversight.
Reporting
A Well Abandonment Report will be submitted to the FDEP within 60 days of the field event to document the field activities.
Ms. Theresa Pepe
Florida Department of Environmental Protection
September 9, 2022 www.arcadis.com
2022.09.09 Bacons Cleaners Abandonment Proposal
2/2
SCHEDULE AND COST ESTIMATE
Arcadis will schedule the field activities for October 2022, following receipt of a TA from the FDEP. The CEF/LOE is included as Attachment 1. The total cost to complete this scope of work is $9,846.33 and will be invoiced to FDEP upon approval of the Well Abandonment Report.
CLOSING REMARKS
Arcadis appreciates the opportunity to provide environmental services to the FDEP. Please call if you have any questions or wish to discuss this proposal further.
Sincerely, Arcadis U.S., Inc.
Chad M. Hanna Brian R. Burke, P.G.
Senior Environmental Specialist Project Manager/Principal Geologist
Email: Chad.hanna@arcadis.com Email: Brian.burke@arcadis.com
Phone: 813.353.5765 Phone: 813.353.5755
V A
C A
N T
O'REILLY
AUTO PARTS
V A
C A
N T
SHOPPING
PLAZA
V A
C A
N T
V
A
C
A
N
T
UP
UP
UP
UP
UP
UP
UP
UP
SD SD
FRONT
ENTRANCE
FRONT
ENTRANCE
FORMER
BOILER ROOM
REST ROOM
STORAGE
CLOSET
FREEZER
FORMER
AST AREA
ASPHALT
C A
N O
P Y
C O
N C
R E
T E
ASPHALT
ASPHALT
GRASS
GRASS
DUMPSTER
N t h
S
T R
E E
T
N h
R
E E
T
BDC-001
FORMER
REAR DOOR
MW004
MG09
MG01
MG02
MG03
MG05 MG04
MG06
MG08
MG07
SB006
SB005
SB007
MW003
MW002
SB008
MW001
SB001
SB010
SB009
SB002
SB004
SB003
SW
SW
SW
SD
A
A'
B
B'
SITE LAYOUT
BACONS CLEANERS & LAUNDRY SERVICE (ERIC_5362)
21 N. 7th STREET, HAINES CITY, POLK COUNTY, FLORIDA
WELL ABANDONMENT PROPOSAL
C I T
Y
B
B
F
L
D
I V
G
R O
U P
E
N
B
B
O
L I V
O p
P
C
W
V
O G
E L S
O
G
M
B
B
U R
K
E
B
R O
O K
Y
R O p t O
N
O
F F
R
E F
C U s e r s b o l i v a B
A r c a d i s A
F
L O
R I D
A
D
E P
T
O
F
E
N V
I R
O N
M E
N T
A L
P
R O
T E
C T
I O
N P r o j e c t
F i l e s B a c o n s
D
C D
W G
S
M d w g
Y O
U T
S
A R
F
S
I
V
E D
C A
D V
E R
M
S
T
E C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L E
A
C S
C
O L O
R A
N A
L Y
T I C
A L C
B
O
T T
E D
P
M
B Y
O
L I V
A
B
R I A
N
FIGURE
30'
60'0
GRAPHIC SCALE
LEGEND
SUBJECT SITE PARCEL BOUNDARY
OVERHEAD ELECTRIC UTILITY
NATURAL GAS UTILITY
PARCEL BOUNDARY
WATER UTILITY
STORM WATER UTILITY
UNDERGROUND ELECTRIC UTILITY
CABLE TV
SITE SCREENING SOIL SAMPLE BDC-001
COLLECTED FROM 0-0.5' IN JUNE 1996
SOIL BORING LOCATION
MAGS WELL LOCATION
MONITOR WELL LOCATION
COMMUNICATION UTILITY
UNKNOWN UTILITY
SANITARY SEWER UTILITY
LINE OF CROSS SECTIONA'A
channa Stamp channa Text Box Nine MAGS wells (MAS01 - MAGS09) 2 inch dia.; total depth 5.5 ft bgs
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Date: 8/24/22 FAC ID#: ERIC_5362
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____
Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes steam cleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes steam cleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Double Cased Well $0.00
6" Surface Casing per foot $0.00 per well $0.00 and saw/jackhammer prep.)
1"- 2" Well Abandonment (includes grouting) per foot $9.00 258.5 $2,326.50 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $100.00 13 $1,300.00
Mobilization roundtrip $550.00 1 $550.00
Per Diem per man / per night $0.00 DOT Approved 55-gal Drum each $0.00 Permits (Drilling or abandonment only) each $150.00 1 $150.00
$0.00
$0.00
$0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00 Standby/Delay/Difficult Access Time per hour $0.00
TOTAL QUOTE PRICE $4,326.50
Project No.:
Signature and Title of Person Submitting Quote: _________________________________ Kevin Bonacum, Estimator Date: 8/24/22
Days to Complete Scope of Work: 1
21 N 7th St, Haines City, Polk County, FL
Well Completion (includes 30 minute development, MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Consultant Name: Arcadis U.S., Inc.
Site Name & Location: Bacons Drive-In Cleaners
PROPOSED SCOPE OF WORK:
Abandon (13) 2" wells between 5.5' - 55', total depth: 258.5', remove pads and manholes, restore grade with concrete
Wells in asphalt will be restored with black dyed concrete
Arcadis, Bacons Drive-In Cleaners, Haines City, FL (abandonment)(revised)
Sonic Auger DPT Injection Well Abandonment
DATE: 8/23/2022
ESTIMATE #: 822048
ID QTY Unit Rate TOTAL
1 1 ls 600.00$ 600.00$
2 0 night 250.00$ -$
3 2" Well Abandonment (Total of 259') 259 foot 7.00$ 1,813.00$
4 Removal of 2' x 2' Concrete Pad, 8" BD Manhole, Concrete Patch 11 each 150.00$ 1,650.00$
5 Removal of 8" Lid and Ring, fill w/ Concrete Flush to Floor (Indoor) 2 each 125.00$ 250.00$
6 Offsite Disposal of Concrete/Manhole Debris 1 each 110.00$ 110.00$
7 0 each 65.00$ -$
8 0 each 65.00$ -$
9 -$
Subtotal 4,423.00$
Signature : Todd Hodgson
Todd Hodgson TOTAL 4,423.00$ Partner
(7) 2" x 5.5' PVC MAGS Well Abandonment (Total 38.5') w/Removal of 2' x 2' Pad w/8" BD Completion
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
DESCRIPTION
THANK YOU FOR YOUR BUSINESS!
PROJECT DESCRIPTION:
"Damages to utilities on private property during borehole clearance is the responsibility of the client"
Drum (Soil) (As Needed)
Drum (Water) (As Needed)
"Actual quantities used & days onsite will be invoiced"
Completion: 1 Day
Permits (SWFLWMD-Not Applicable for FDEP Sites)
Locations in Concrete and Asphalt (Black dye needed for patches in Asphalt)
PROJECT
Bacon's Clearners Service 21 N. 7th Street
CUSTOMER
Chad Hanna Arcadis
Haines City, Florida
Per Diem
Tampa, Florida 33607
Mobilization/Demobilization
2" Well Abandonments
***Utility Locates on Private Property are the responsibility of the client***
All locations must be accessible with Track Mounted DPT Rig
3109 W. Dr. Martin Luther King Jr. Blvd. Suite 350
(813) 353-5765
(4) 2" PVC Monitoring Well Abandonment (Total of 209') w/Removal of 2' x 2' Concrete Pad w/8" BD Completion
(2) 2" x 5.5' Indoor PVC MAGS Well Abandonment (Total 11') w/Removal of 8" Lid/Ring, Fill w/Concrete.
Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated immediately and the boring location will need to be relocated to a clear location by the client.
Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.9742423
Date: 8/24/2022
FAC ID#:
Unit Unit Rate Number of Units Extended Price per foot $12.00 259.0 $3,108.00 per foot $0.00 per foot $0.00 per foot $0.00 per foot $0.00 each $135.00 13 $1,755.00 roundtrip $1,200.00 1 $1,200.00 per crew / per night $575.00 1 $575.00 each $80.00 0 $0.00 each $0.00 1 $0.00 each $0.00 each $50.00 0 $0.00
$0.00
$0.00 per hour $495.00 $0.00
TOTAL QUOTE PRICE $6,638.00
Date: 8/24/2022
Days to Complete Scope of Work: 1 Day + Travel
Subcontract Company Name: EARTH TECH DRILLING 954.974.2424
DOT Approved 55-gal Drum
Traffic Safety Cones (Left onsite)
Permits & Well Completion Reports
Subcontract Mailing Address: 2703 NW 19th St., Pompano Bch. FL 33069
Signature and Title of Person Submitting Quote: Charles Bucher / Sr. Project Manager
8" - 10" Well Abandonment (includes grouting)
Grout Abandon (9) 2" MAG = 50' Total - Remove Pad/Manhole & Patch
DRILLING
MISCELLANEOUS
Standby/Delay/Difficult Access Time
5"- 6" Well Abandonment (includes grouting)
Contractor Name: Arcadis - Chad Hanna - 813 480-8498
Site Name: Bacons Cleaners - 21 N. 7th Street - Haines City, FL
Permits & Well Completion Reports (Additional Wells)
PROPOSED SCOPE OF WORK:
Mobilization
3"- 4" Well Abandonment (includes grouting)
1"- 2" Well Abandonment (includes grouting)
Per Diem
Rig Type: Well Abandonment
Grout Abandon (4) 2" MW = 209' Total - Remove Pad/Manhole & Patch
Dye Concrete Black for patches
Remove Pad/Manhole
16" Well Abandonment (includes grouting)
Monitoring Wells Sparge Wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push
| Figure1-Bacons Site Layout Figure.pdf |
| F1_SLM |
| Sheets and Views |
| SAR-F1_SLM |
| F2_Vicinity |
| Sheets and Views |
| SAR-F2_Vicinity |
| F3_Site |
| Sheets and Views |
| SAR-F3_Site |
| F4_CS AA |
| Sheets and Views |
| SAR-F4_CS AA |
| F5_CS BB |
| Sheets and Views |
| SAR-F5_CS BB |
| F6_SGWE 20201118 |
| Sheets and Views |
| SAR-F6_SGWE 20201118 |
| F7_Sgas Dec2020 |
| Sheets and Views |
| SAR-F7_Sgas Dec2020 |
| F8_SQ 20201118 |
| Sheets and Views |
| SAR-F8_SQ 20201118 |
| F9_SGWQ 20201118 |
| Sheets and Views |
| SAR-F9_SGWQ 20201118 |
| F10_Typical SMW |
| Sheets and Views |
| SAR-F10_Typical SMW |
| PDS - $4,326.50.pdf |
| Drilling |
File details come from the government source that posted it. Updated .