This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. for groundwater monitoring services at the Saufley Square Dry Cleaners site located at 4508 Saufley Field Road, Pensacola, Escambia County, Florida (FDEP Facility ID ERIC_4661). The Task Assignment is entered under Contract Number HW680 and is designated as TA Number DC021D. The Department Project Manager is Theresa Pepe, and the Contractor's Project Manager is Gus Suarez. This TA represents a specific task order issued under an existing indefinite delivery vehicle contract between FDEP and Arcadis.
The scope of work consists of three subtasks: Project Management (automatically calculated as a percentage of total labor), Groundwater Monitoring involving sampling of three monitoring wells (MW003RR, MW005R, and MW007R) for volatile organic hydrocarbons using EPA Method 8260C with proper characterization and disposal of purge water, and Reporting requiring submission of a Site Rehabilitation Completion Report or routine groundwater sampling report depending on analytical results. The total TA value is $7,424.04 on a fixed unit rate basis, with payment contingent upon FDEP approval of the Site Rehabilitation Completion Report/IDW manifest/Project Management deliverable due March 14, 2026. The TA Completion Date is April 24, 2026. Cost components include direct labor ($2,296.17), overhead and administrative markups, travel ($120.00 for vehicle), IDW disposal ($125.00), laboratory analytical costs ($219.00), sample shipping ($150.00), field equipment and expendables ($430.00), and a completion fee. Work will be performed in accordance with Arcadis's December 11, 2025 Work Plan, utilizing signed site access obtained in 2001 with no change of property ownership since that date.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW680
DC021D Completion April 24, 2026
Arcadis will conduct groundwater monitoring from select wells at the site. All activities will be performed according to the December 11, 2025, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor
Contractor Gus Suarez Contractor 813-205-4703
ERIC_4661
4508 Saufley Field Rd, Pensacola, Escambia County
Saufley Square Dry Cleaners
Contractor Contractor
✔ $ 7,424.04
$ 7,424.04
Scope of Work
Arcadis U.S. Inc.
Contractor Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2025.12.19 13:25:58 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.12.19 12:00:19 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Rehabilitation Completion Report/IDW manifest/Project Management 03/14/2026
FDEP approval of Site Rehabilitation Completion Report/IDW manifest/Project Management $ 7,424.04
$ 7,424.04
HW680
DC021D
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins
Lt. Governor
AAlexis A. Lambert Secretary
Memorandum
TO: Negotiation File Former Saufley Square Dry Cleaners
FACID NO. 17-9800747; ERIC_4661
Pensacola, Escambia County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC021D (HW680) DATE: December 12, 2025
Arcadis U.S. Inc. will perform groundwater monitoring from select wells to determine if the site can be issued a Site Rehabilitation Completion Order. The last round of groundwater sampling was clean; one additional clean sampling event will satisfy conditions for site closure. All activities will be conducted in accordance with the December 11, 2025, Work Plan submitted by Mike O’Sullivan of Arcadis.
The final task assignment total is $7,424.04. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Groundwater Monitoring Signed site access was obtained by the property owner in 2001. There has been no change of ownership since that date.
Arcadis will sample three wells for drycleaning solvents based on recommendations from the previous monitoring report. IDW will be disposed by a licensed waste hauler.
Subtask 3: Reporting A Site Rehabilitation Completion Report (SRCR) will be submitted as the final deliverable, if the groundwater sampling is clean. Otherwise, the data will be submitted in a routine groundwater sampling report.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 12/10/2025
Task #: SubTask 1 Project Management
Site: SubTask 2 Groundwater Monitoring (VOHs)
Activity/Phase: Monitoring SubTask 3 Reporting (VOHs)
Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
TTotals 1 2 3 4 5 Labor Rate Category
$64.44 Project Manager O'Sullivan, Mike (MOS) 4 4.1 $64.44 Principal Scientist O'Sullivan, Mike (MOS) 17 5 12 0 0 $28.94 Scientist Cassidy, Brandon (BC) 15 14 1 0 0 $39.67 Drafter/Design Oliva, Brian (BO) 5 0 5 0 0 $32.22 Document Technician Embras, Susan (SRE) 2 0 2 0 0 $39.94 Project Assistant Cruz, Michele (MC) 6 2 4 0 0
Total Hours 49 4 21 24 0 0
Direct Labor $2,296.17 $264.16 $807.24 $1,224.77 $0.00 $0.00
Overhead 79.00% $1,813.98 $208.69 $637.72 $967.57 $0.00 $0.00 Gen & Admin 36.00% $826.63 $95.10 $290.61 $440.92 $0.00 $0.00 Fringe 37.10% $851.88 $98.00 $299.49 $454.39 $0.00 $0.00 Total Labor $5,788.66 $665.95 $2,035.06 $3,087.65 $0.00 $0.00
Travel Vehicle $120.00 $120.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Meals $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Connelly & Associates Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Landmark Surveying $0.00 $0.00 $0.00 $0.00 $0.00 Erwin IDW $125.00 $125.00 $0.00 $0.00 $0.00 GeoView Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00 Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00
Laboratory Analytical Costs $219.00 $219.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 Total Laboratory $369.00 $369.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $290.00 $290.00 $0.00 $0.00 $0.00 Total Field Expenses $430.00 $430.00 $0.00 $0.00 $0.00
Subtotal $6,845.16 $665.95 $3,091.56 $3,087.65 $0.00 $0.00 Completion Fee $578.88 $66.60 $203.51 $308.77 $0.00 $0.00
Total Estimated Cost $7,424.04 $732.55 $3,295.07 $3,396.42 $0.00 $0.00
Saufley Square Dry Cleaner
REV: 09/25 CEF ARCADIS Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Saufley Square Dry Cleaner SUBTASK 2: Groundwater Monitoring (VOHs)
DATE: 12/10/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Groundwater Monitoring Principal Scientist (MOS) Property owners verification, notification and site access agreement updates. Lab coordination. Field personnel ovesight. Staffing. 5 Scientist (BC) Mob/demob, prepare sampling kits/equipment, DTW/field measurements, purge and sample MWs. Pack and ship samples 14 Project Asst (MC) Sample container ordering, preparation, electronic transcriptions of field data 2
TOTAL LABOR 21
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00 Van/Truck $480.00 Per Week 0 $0.00 $0.00
TOTAL VEHICLE $120.00
MEALS STAFF RATE UNIT USEAGE
Totals Project Sci (EB) $36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USEAGE
Totals Project Sci (EB) $150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equipment: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals Erwin IDW - Liquid $125.00 Drum 1 $125.00
Total Services: $125.00
TOTAL SUBCONTRACTOR $125.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $73.00 1.00 3 $219.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) -week=20% (1.20) Total Lab: $219.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $150.00
TOTAL LAB $369.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 1 $40.00
Total Expendables: $40.00 Equipment Items 55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $100.00 Equipment Kits Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00
Total Equipment Kits: $290.00
TOTAL EQUIPMENT $430.00
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Saufley Square Dry Cleaner SUBTASK 3: Reporting (VOHs)
DATE: 12/10/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Site Assessment Reporting Principal Scientist (MOS) Data evaluation. Preparation of an Annual GW Monitoring Report, sign and seal report 12 Scientist (BC) Data evaluation 1 Drafter/Designer (BO) Figures preparation 5 Document Technician (SRE Editing; Report preparation 2 Project Asst (MC) Report editing/formatting, and report production/submittal/delivery 4
TOTAL LABOR 24
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USEAGE
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USEAGE
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
$0.00 Per Day 0 $0.00
Total Equipment: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals $0.00 Per Day
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65)-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lb --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personal Protection
Item Rate Unit Usage Totals PPE Level D $35.00 Per Man Day 0 $0.00 PPE Level C $150.00 Per Man Day 0 $0.00 PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
FINAL --7/24/96
Arcadis U.S., Inc.
1705 Metropolitan Boulevard Suite 101 Tallahassee Florida 32308 Phone: 850 422 2555 Fax: 850 668 0080 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
Ms. Theresa Pepe Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400
Date: December 10, 2025 Subject: Proposal for Groundwater Monitoring at Saufley Square Dry Cleaners, 4508 Saufley Field Road, Pensacola, Florida, FDEP Facility Identification Number ERIC_4661.
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the groundwater monitoring activities at Saufley Square Dry Cleaners, located at 4508 Saufley Field Road, Pensacola, Florida (FDEP Facility Identification Number ERIC_4661; “the Site”). This proposal includes one groundwater monitoring event, and one letter report summarizing field activities. The FDEP cost estimating spreadsheets (Attachment A) is attached.
SCOPE OF WORK
Subtask 1 - Project Management Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).
Subtask 2 - Groundwater Monitoring (VOH) Arcadis proposes to collect groundwater samples from three monitoring wells (MW003RR, MW005R, and MW007R) in accordance with FDEP SOPs. Monitoring well locations are shown on attached figure. Samples will be submitted to a certified laboratory for analysis by EPA Method 8260C or equivalent (VOHs only). Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly.
Monitoring well locations are shown on attached figures.
Subtask 3 - Reporting (VOHs) Arcadis will incorporate the data collected during the groundwater sampling event into a letter report summarizing the field activities. The report will include laboratory analytical data, figures presenting groundwater analytical data, and recommendations for the Site.
FDEP – Saufley Square Dry Cleaners Proposal December 2025 www.arcadis.com _Saufley Square Dry Cleaners AGM proposal_dec25
SCHEDULE
Arrangements for groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP.
ESTIMATED COST
A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as Attachment A.
Please contact me if you have any questions regarding this proposal.
Sincerely, Arcadis U.S., Inc.
Mike O’Sullivan, P.G.
Principal Geologist
Email: mike.osullivan@arcadis.com Direct Line: 850.895.4739 Mobile: 850.491.2346
Attachment:
Figures Attachment A – Cost Estimate Form and Level of Effort forms Attachment B – Subcontractor Quotes
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511
To: Mr. Mike O’Sullivan Arcadis US, Inc.
1705 Metropolitan Boulevard Tallahassee, FL 32308
December 10, 2025
Re: Drum Disposal – 4508 Saufley Field Road – Pensacola, FL
Mr. O’Sullivan:
The price for transportation and disposal (T&D) of one (1) 55-gallon drums of non-hazardous water located at your site in Pensacola, FL will be $125.00 per drum/total.
All drums should be staged in a central location. Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.).
A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@ErwinRemediation.com Phone: (850) 466-2358