CN-370000-HW680-DC021B.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW680|454e104ae8fbcb5641ac6acc30583968
Contract number
HW680
Issued by
Florida

About this file

Summary

This document is a Task Assignment (TA) executed between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S., Inc. for environmental remediation services at the Saufley Square Dry Cleaners site located at 4508 Saufley Field Road, Pensacola, Escambia County, Florida (FDEP Facility ID ERIC_4661). The TA is issued under underlying Contract Number HW680, with Task Assignment Number DC021B effective through January 19, 2024.

The scope of work consists of annual groundwater monitoring from five selected monitoring wells (MW003RR, MW004R, MW005R, MW007R, and MW009R) conducted according to the June 9, 2023 Work Plan submitted by Arcadis. Services include groundwater sampling for drycleaning solvents using EPA Method 8260C analysis, characterization and disposal of investigative-derived waste (IDW) by licensed waste hauler, and preparation of an Annual Monitoring Report with recommendations. The total fixed unit rate value is $6,530.88, comprised of $595.36 for project management and $5,935.52 for annual groundwater monitoring activities. Costs include direct labor (41 hours), overhead, general and administrative charges, fringe benefits, vehicle rental ($120.00), laboratory analysis ($588.00), IDW transportation and disposal ($217.80), and field equipment and expendables ($430.00). The contractor may invoice upon FDEP approval of the Annual Monitoring Report, IDW manifest, and project management deliverables, with a due date of December 1, 2023.

View the file

Other files

File Type Posted
CN-370000-HW680-DC001C.pdf PDF
CN-370000-HW680-DC002B.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-DC004A.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC004E.pdf PDF
CN-370000-HW680-DC007A.pdf PDF
CN-370000-HW680-DC008A.pdf PDF
CN-370000-HW680-DC008B.pdf PDF
CN-370000-HW680-DC010C.pdf PDF
CN-370000-HW680-DC011B.pdf PDF
CN-370000-HW680-DC013D.pdf PDF
CN-370000-HW680-DC013E.pdf PDF
CN-370000-HW680-DC013F.pdf PDF
CN-370000-HW680-DC014A.pdf PDF
CN-370000-HW680-DC014B.pdf PDF
CN-370000-HW680-DC014G.pdf PDF
CN-370000-HW680-DC014H.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015C.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-DC015E.pdf PDF
CN-370000-HW680-DC016D.pdf PDF
CN-370000-HW680-DC016E.pdf PDF
CN-370000-HW680-DC018A.pdf PDF
CN-370000-HW680-DC019D.pdf PDF
CN-370000-HW680-DC01ACO2.pdf PDF
CN-370000-HW680-DC021C.pdf PDF
CN-370000-HW680-DC022D.pdf PDF
CN-370000-HW680-DC023A.pdf PDF
CN-370000-HW680-DC023C.pdf PDF
CN-370000-HW680-DC024C.pdf PDF
CN-370000-HW680-DC025B.pdf PDF
CN-370000-HW680-DC026A.pdf PDF
CN-370000-HW680-DC026C.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC032A.pdf PDF
CN-370000-HW680-DC032B.pdf PDF
CN-370000-HW680-DC038A.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-DC040C.pdf PDF
CN-370000-HW680-DC040D.pdf PDF
CN-370000-HW680-DC041A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC052B.pdf PDF
CN-370000-HW680-DC053A.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05ACO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW680

DC021B Completion January 19, 2024

Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the June 9, 2023, Work Plan submitted by Arcadis.

Theresa Pepe 850-245-8966 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Arcadis U.S. Inc.

Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_4661

4508 Saufley Field Rd, Pensacola, Escambia County

Saufley Square Dry Cleaners

✔ $ 6,530.88

$ 6,530.88

Scope of Work

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2023.06.22 08:26:38 -04'00'

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.06.20 11:39:23 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Annual Monitoring Report/IDW manifest/Project Management 12/01/2023

FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 6,530.88

$ 6,530.88

HW680

DC021B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Former Saufley Square Dry Cleaners

FACID NO. 17-9800747; ERIC_4661

Pensacola, Escambia County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC021B (HW680) DATE: June 16, 2023

Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. Natural attenuation is expected to bring the site to unconditional closure within approximately five years. All activities will be conducted in accordance with the June 9, 2023, Work Plan submitted by Mike O’Sullivan of Arcadis.

The final task assignment total is $6,530.88. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.

Subtask 2: Annual Groundwater Monitoring Signed site access was obtained by the property owner in 2001. There has been no change of ownership since that date.

Arcadis will sample five wells for drycleaning solvents based on recommendations from the previous monitoring report. IDW will be drummed and disposed by a licensed waste hauler. An Annual Monitoring Report including recommendations for additional actions will be submitted as the final Deliverable.

Hours and costs are comparable to past task assignments of similar scope.

FDEP COST ESTIMATE

Contractor: Arcadis, U.S., Inc.

Date: 6/9/2023

Task #: SubTask 1 Project Management Site: Saufley Square Dry Cleaners SubTask 2 Annual Groundwater Monitoring

Activity/Phase: Monitoring SubTask 3 Project Manager: Mike O'Sullivan SubTask 4

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$85.87 Project Manager Suarez, Gus (GS) 3 2.5 $60.88 Principal Scientist O'Sullivan, Michael (MOS) 15 15 0 0 0 $67.57 Principal Engineer Perella, John (JP) 0 0 0 0 0 $50.00 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0 $44.00 Project Engineer Romero Cotrino, Camilo (CR) 0 0 0 0 0 $44.00 Project Engineer Hays, Timothy (TH) 0 0 0 0 0 $28.94 Scientist Martineau, Duncan (DM) 12 12 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 5 5 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 2 2 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 4 4 0 0 0

Total Hours 41 3 38 0 0 0

Direct Labor $1,866.17 $214.69 $1,651.48 $0.00 $0.00 $0.00

Overhead 79.00% $1,474.28 $169.61 $1,304.67 $0.00 $0.00 $0.00 Gen & Admin 36.00% $671.82 $77.29 $594.53 $0.00 $0.00 $0.00 Fringe 37.10% $692.35 $79.65 $612.70 $0.00 $0.00 $0.00 Total Labor $4,704.62 $541.24 $4,163.38 $0.00 $0.00 $0.00

Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW - T&D $198.00 $198.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $198.00 $198.00 $0.00 $0.00 $0.00 Handling Fee $19.80 $19.80 $0.00 $0.00 $0.00 Total Subcontractor Cost $217.80 $217.80 $0.00 $0.00 $0.00

Laboratory Analytical Costs $438.00 $438.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 Total Laboratory $588.00 $588.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment(Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $290.00 $290.00 $0.00 $0.00 $0.00 Total Field Expenses $430.00 $430.00 $0.00 $0.00 $0.00

Subtotal $6,060.42 $541.24 $5,519.18 $0.00 $0.00 $0.00 Completion Fee $470.46 $54.12 $416.34 $0.00 $0.00 $0.00

Total Estimated Cost $6,530.88 $595.36 $5,935.52 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : Saufley Square Dry Cleaners SUBTASK 2: Annual Groundwater Monitoring

DATE: 6/9/2023

LABOR CATEGORY

STAFF-TITLE WORK DESCRIPTION HOURS

Annual Groundwater Monitoring - 2023 Scientist Prep, local mob/demob, full round of WLs, Sample 5 MWs; manage IDW; sample delivery 12 Principal Scientist Access; field support (2 hrs); data analysis 4 Data Evaluation and Letter Report Principal Scientist Data evaluation and preparation of a brief letter report; sign and seal report 11 Drafter Figures preparation 5 Document Technician Editing; Letter report preparation 2 Project Assistant (MMc) Report editing/formatting (2hrs); report production/submittal/delivery (1hr); ADaPT (1hr) 4

TOTAL LABOR 38

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00

TOTAL VEHICLE $120.00

SUBCONTRACTOR COSTS

Services Procurement

Name Purpose Rate Units Usage Totals IDW Drum Transportation and Disposal IDW $198.00 Drum 1 $198.00

Handling Fee $0.00 Per Month 1 $0.00 Total Services: $198.00

TOTAL $198.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 6 $438.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $438.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $150.00

TOTAL LAB $588.00

EQUIPMENT

Expendables Miscellaneous Expendables $40.00 Per Day 1 $40.00

Total Expendables: $40.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot $0.00 55-gallon Drum $100.00 Each 1 $100.00

Total Equipment Items: $100.00 Equipment Kits

Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00Deep Groundwater Sampling Kit $415.00 Day 0 $0.00 Total Equipment Kits: $290.00

TOTAL EQUIPMENT $430.00

Arcadis U.S., Inc.

1705 Metropolitan

Boulevard

Suite 101

Tallahassee

Florida 32308

Phone: 850 422 2555

Fax: 850 668 0080 www.arcadis.com

FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062

Ms. Theresa Pepe

Bureau of Waste Cleanup

Division of Waste Management

Florida Department of Environmental Protection

2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400

Date: June 9, 2023

Subject: Proposal for Annual Groundwater Monitoring at Saufley Square Dry

Cleaners, 4508 Saufley Field Road, Pensacola, Florida, FDEP Facility

Identification Number ERIC_4661.

Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the annual groundwater monitoring activities at Saufley Square Dry Cleaners, located at 4508 Saufley Field Road, Pensacola, Florida (FDEP Facility Identification Number ERIC_4661; “the Site”). This proposal includes one groundwater monitoring event, and one letter report summarizing field activities. The FDEP cost estimating spreadsheets (Attachment A) is attached.

SCOPE OF WORK

Subtask 1 - Project Management

Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).

Subtask 2 - Groundwater Monitoring (2023)

Arcadis proposes to collect groundwater samples from five monitor wells (MW003RR, MW004R, MW005R, MW007R, and MW009R) in accordance with FDEP SOPs. Monitoring well locations are shown on attached figure. Samples will be submitted to a certified laboratory for analysis by EPA Method 8260C or equivalent (VOHs only). Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly. Monitoring well locations are shown on attached figures.

Arcadis will incorporate the data collected during the groundwater sampling event into a letter report summarizing the field activities. The report will include laboratory analytical data, figures presenting groundwater analytical data, and recommendations for the Site.

FDEP – Saufley Square Dry Cleaners Proposal 2023 www.arcadis.com _Saufley Square Dry Cleaners AGM proposal_jun23

SCHEDULE

Arrangements for groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP.

ESTIMATED COST

A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as

Attachment A.

Please contact me if you have any questions regarding this proposal.

Sincerely, Arcadis U.S., Inc.

Mike O’Sullivan, P.G.

Senior Geologist

Email: mike.osullivan@arcadis.com

Direct Line: 850.895.4739

Mobile: 850.491.2346

Attachment:

Figures

Attachment A – Cost Estimate Form and Level of Effort forms

SAUFLEY FIELD ROAD STATE ROAD 296

SAUFLEY FIELD

SHOPPING CENTER

M O

BILE HIG

HW

AY STATE RO

AD 10 US 90

CURRENT LOCATION OF CVS

MW003RR

MW003

MW009

MW004

MW003R

MW002 MW004R

MW009R

MW005R

MW007R

MW008

MW005

MW007

MW006

MW001

SVE-2I

SVE-2D

SVE-3I

SVE-3D

SVE-4I

SVE-4D

SVE-1I

SVE-1D

LOCATION OF

EQUIPMENT

COMPOUND

FORMER

BUILDING LOCATION

LEGEND

GROUNDWATER ANALYTICAL RESULTS

SAUFLEY SQUARE DRY CLEANERS

4508 SAUFLEY FIELD ROAD

PENSACOLA, ESCAMBIA COUNTY, FLORIDA

ANNUAL MONITORING REPORT

4C

IT

Y:

B

B, FL

D

IV

/G

R O

U P:

E N

B:

B

.O

LI

VA

L

P

IC

: W

.V O

G

EL

SO

N

G

P M

: S .J

EF

FR

IE

S

TM

: A .G

R

AV

EL

Y

L

YR

:(O pt

)O N

;O

FF

R

EF

C

:\U se rs \b ol iv a\

AC

C D oc s\

Ar ca di s\

AU

S-

FD

EP

-D C

-S

AU

LE

Y

SQ

U

AR

E-

PE

N

SA

C

O

LA

F lo rid a\

Pr oj ec t F ile s\

\0 1-

In P ro gr es s\

-D

W G

\S au fle yS qu ar eD C

2-

SM

.d w g L

AY

O

U T:

J U

L2 2-

F4 _G

W Q

S

AV

ED

: 7

/2 5/

:5

PM

AC

AD

VE

R : 2

4.

1S

(L M

S

TE

C H

P

AG

ES

ET

U

P:

P

LO

TS

TY

LE

TA

BL

E:

A

C S-

C O

LO

R

_A N

AL

YT

IC

AL

.C

TB

PL

O

TT

ED

: 7 /2

5/

:5

PM

BY

: O

LI

VA

, B R

IA

N

120' 240'0

GRAPHIC SCALE

FIGURE

SHALLOW MONITOR WELL

DESTROYED OR ABANDONED SHALLOW MONITOR WELL

DEEP MONITOR WELL

SVE WELL PAIRS

APPROXIMATE PROPERTY BOUNDARY LIMITS

OVERHEAD POWER LINES

MW009R

3/22/18 3/20/19 5/28/20 8/2/21 5/31/22 <0.58 0.67 I <0.58 <0.58 2.70 <0.50 <0.50 <0.50 <0.50 <0.15 <0.50 <0.50 <0.50 <0.50 <0.20 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50

MW005R

3/22/18 3/20/19 5/29/20 8/2/21 5/31/22

4.50 2.9 0.60 I <0.58 1.6 <0.50 <0.50 <0.50 <0.50 <0.15 <0.50 <0.50 <0.50 <0.50 <0.20 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50

MW007R

3/22/18 3/20/19 5/29/20 8/2/21 5/31/22 <0.58 <0.58 <0.58 <0.58 <0.90 <0.50 <0.50 <0.50 <0.50 <0.15 <0.50 <0.50 <0.50 <0.50 <0.20 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50

MW003R

4/2/15 5/18/15 4/26/16

78.5 61.8 5.75

5.69 3.95 <0.190

28.1 12.7 <0.210

<0.210 <0.210 <0.210 <0.200 <0.200 <0.200 <0.190 <0.190 <0.190

MW004R

3/22/18 3/20/19 5/28/20 8/2/21 5/31/22

0.92 I <0.58 <0.58 <0.58 <0.90

<0.50 <0.50 <0.50 <0.50 <0.15 <0.50 <0.50 <0.50 <0.50 <0.20 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50

PCE CONCENTRATION (µg/L) TCE CONCENTRATION (µg/L) cis-1,2-DCE CONCENTRATION (µg/L) trans-1,2-DCE CONCENTRATION (µg/L) 1,1-DCE CONCENTRATION (µg/L)

APPROXIMATE EXTENT OF COMPOUND

IN GROUNDWATER ABOVE GCTL

VINYL CHLORIDE CONCENTRATION (µg/L)

SAMPLE DATE

(Bold indicates GCTL exceedance, italicized indicates NADC exceedance, "I" indicates result is between laboratory Practical Quantitation Limit [PQL] and laboratory Method Detection Limit [MDL], "Q" indicates sample held beyond accepted holding time)

MW005R

5/31/22

1.6 <0.15 <0.20 <0.50 <0.50 <0.50

SAMPLE I.D.

COMPOUND GCTL

TETRACHLOROETHYLENE (PCE) 3

TRICHLOROETHYLENE (TCE) 3

cis-1,2-DICHLOROETHYLENE (cis-1,2-DCE) 70 trans-1,2-DICHLOROETHYLENE (trans-1,2-DCE) 100

1,1-DICHLOROETHYLENE (1,1-DCE) 7

VINYL CHLORIDE 1

MW003RR

3/22/18 3/20/19 5/28/20 8/2/21 5/31/22

130 89 24 32 56 10 5.9 2.3 2.6 3.9 56 14 5.6 5.2 7.4

<0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50 <0.50

09/07/2022 03:24 PM PAGE 1 OF 7

Scope of Work

Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required

TCLP Benzene and 4 Metals with Completed Profile required for each site

Drum Pickup /Transportation/Disposal

Drums south of Miami not included (Keys) additional costs apply

755 PRARIE INDUSTRIAL PKWY,

MULBERRY, FLORIDA, 33860

QUOTE #: 0030388

DATE: 09/07/2022 PROJECT PROPOSAL

CLIENT

DOUGLAS MALONE

ARCADIS

1500 GATEWAY BLVD, SUITE 200, BOYTON BEACH, FLORIDA,

33426

P: (561) 662-7978

PROJECT DESCRIPTION

DRUM PICKUP

VARIOUS SITES SOUTH FLORIDA

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANSPORTATION 55 GAL DRUMS

NOTES:SUBJECT TO FUEL SURCHARGE,

1.00 $50.00 DRUM $50.00

STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00

TRANSPORTATION SUBTOTAL: $100.00

DISPOSAL

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

55 GALLON NON HAZ DRUM

NOTES: Drum DOT Shippable Drum accessible on hard Surface

1.00 $80.00 EACH $80.00

ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $18.00 EACH $18.00

DISPOSAL SUBTOTAL: $98.00

TOTAL JOB ESTIMATE: $198.00

Peerless Cleaners #3416 Annual Monitoring Proposal 4-18-2022.pdf
Annual Groundwater Monitoring
Annual Groundwater Monitoring Report
Schedule
Cost Estimate
Closing Remarks
HW680_DC021B negsum.pdf
Subtask 1: Project Management

File details come from the government source that posted it. Updated .