Document Summary

This Task Assignment (TA) is a contract between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc. for environmental remediation services. The TA, numbered DC020C under master contract HW680, is effective January 24, 2025, and is associated with a hazardous waste site at 930-C Blanding Boulevard in Orange Park, Clay County, Florida, identified as the Ridgewood Laundry and Dry Cleaning facility (FACID No. 10-9501247; ERIC_4262). The Department Project Manager is Theresa Pepe (850-245-8966), and the Contractor's Project Manager is Gus Suarez (813-205-4703).

Arcadis will conduct annual groundwater monitoring from six select monitoring wells at the site, including sample collection, laboratory analysis for volatile organic compounds via EPA Method 8260, and reporting. All activities will be performed according to Arcadis's August 27, 2024 Work Plan. The contract is structured on a fixed unit rate basis with a Total TA Value of $7,274.61, consisting of three subtasks: Project Management (automatically calculated as a percentage of labor), Annual Groundwater Monitoring ($4,031.14), and Reporting ($2,561.76). The deliverable is an Annual Monitoring Report/IDW manifest/Project Management documentation with a due date of December 10, 2024. Invoice submission requires FDEP approval of the Annual Monitoring Report, at which point the full contract amount of $7,274.61 becomes due. There are no option periods or renewal terms specified in this task assignment.

View the file

Other files

File Type Posted
CN-370000-HW680-DC001C.pdf PDF
CN-370000-HW680-DC002B.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-DC004A.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC004E.pdf PDF
CN-370000-HW680-DC007A.pdf PDF
CN-370000-HW680-DC008A.pdf PDF
CN-370000-HW680-DC008B.pdf PDF
CN-370000-HW680-DC010C.pdf PDF
CN-370000-HW680-DC011B.pdf PDF
CN-370000-HW680-DC013D.pdf PDF
CN-370000-HW680-DC013E.pdf PDF
CN-370000-HW680-DC013F.pdf PDF
CN-370000-HW680-DC014A.pdf PDF
CN-370000-HW680-DC014B.pdf PDF
CN-370000-HW680-DC014G.pdf PDF
CN-370000-HW680-DC014H.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015C.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-DC015E.pdf PDF
CN-370000-HW680-DC016D.pdf PDF
CN-370000-HW680-DC016E.pdf PDF
CN-370000-HW680-DC018A.pdf PDF
CN-370000-HW680-DC019D.pdf PDF
CN-370000-HW680-DC01ACO2.pdf PDF
CN-370000-HW680-DC021C.pdf PDF
CN-370000-HW680-DC022D.pdf PDF
CN-370000-HW680-DC023A.pdf PDF
CN-370000-HW680-DC023C.pdf PDF
CN-370000-HW680-DC024C.pdf PDF
CN-370000-HW680-DC025B.pdf PDF
CN-370000-HW680-DC026A.pdf PDF
CN-370000-HW680-DC026C.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC032A.pdf PDF
CN-370000-HW680-DC032B.pdf PDF
CN-370000-HW680-DC038A.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-DC040C.pdf PDF
CN-370000-HW680-DC040D.pdf PDF
CN-370000-HW680-DC041A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC052B.pdf PDF
CN-370000-HW680-DC053A.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05ACO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW680

DC020C January 24, 2025

Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the August 27, 2024, Work Plan submitted by Arcadis.

Theresa Pepe 850-245-8966 Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_4262

930-C Blanding Blvd, Orange Park, Clay County

Ridgewood Laundry and Dry Cleaning

$ 7,274.61

$ 7,274.61

Scope of Work

Arcadis U.S. Inc.

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2024.09.19 17:11:41 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.09.19 16:57:37 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Ridgewood Laundry and Dry Cleaning

FACID NO. 10-9501247; ERIC_4262

Orange Park, Clay County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC020C (HW680) DATE: September 18, 2024

Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. All activities will be conducted in accordance with the August 27, 2024, Work Plan submitted by Doug McGlone of Arcadis.

The final task assignment total is $7,274.61. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.

Subtask 2: Annual Groundwater Monitoring A site access form was signed in 2013. No changes in ownership have occurred since that date.

Arcadis will sample six wells for drycleaning solvents based on recommendations from the previous monitoring report. IDW will be drummed and disposed by a licensed waste hauler per FDEP’s preference.

Subtask 3: Reporting An Annual Monitoring Report including recommendations for additional actions will be submitted as the final Deliverable. Reporting hours were reduced from 23 (original proposal) to 20 (final). No other changes were required.

FDEP COST ESTIMATE

Contractor: Arcadis, U.S., Inc.

Date: 8/27/24

Task #: SubTask 1 Project Management Site: Ridgewood Laundry & Cleaners SubTask 2 Groundwater Monitoring

Activity/Phase: Annual NAM SubTask 3 Reporting Project Manager: Doug McGlone SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$70.09 Project Manager McGlone, Douglas (DMc) 4 3.5

$70.09 Principal Scientist McGlone, Douglas (DMc) 7 4 3 0 0

$44.00 Project Scientist Salinas, Kendall (KS) 0 0 0 0 0

$44.00 Project Scientist Riley, Joel (JR) 23 13 10 0 0

$38.46 Staff Engineer Tran, Thuy-Min 0 0 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 4 0 4 0 0

$35.26 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0

$38.28 Project Assistant Cruz, Michele (MC) 6 3 3 0 0

$35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0

$31.20 Document Technician Embras, Susan (SRE) 0 0 0 0 0

Total Hours 44 4 20 20 0 0

Direct Labor $2,136.82 $245.83 $967.20 $923.79 $0.00 $0.00

Overhead 79.00% $1,688.09 $194.21 $764.09 $729.79 $0.00 $0.00

Gen & Admin 36.00% $769.25 $88.50 $348.19 $332.56 $0.00 $0.00

Fringe 37.10% $792.76 $91.20 $358.83 $342.73 $0.00 $0.00

Total Labor $5,386.92 $619.74 $2,438.31 $2,328.87 $0.00 $0.00

Travel

Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $120.00 $120.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW Erwin $125.00 $125.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00

Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00

Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $438.00 $438.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00

Total Laboratory $588.00 $588.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $40.00 $40.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $73.50 $73.50 $0.00 $0.00 $0.00

Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00

Equipment (Other) $290.00 $290.00 $0.00 $0.00 $0.00

Total Field Expenses $503.50 $503.50 $0.00 $0.00 $0.00

Subtotal $6,735.92 $619.74 $3,787.31 $2,328.87 $0.00 $0.00

Completion Fee $538.69 $61.97 $243.83 $232.89 $0.00 $0.00

Total Estimated Cost $7,274.61 $681.71 $4,031.14 $2,561.76 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : Ridgewood Laundry & Cleaners

SUBTASK 2: Groundwater Monitoring

DATE: 8/27/24

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title)

Principal (DMc) Access; technical analysis; oversight with field crew 4

Staff Scientist (JR) Prep for field work (1 hr), mob/demob (2 hr); round of WLs, purge & sample 6 wells (8 hrs) , pack/ship, IDW stage (2 hrs) 13

Project Asst (MMc) Process field notes, sample tracking, data entry 3

TOTAL LABOR 20

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 1 $120.00 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals

$2,000.00 Per Day 0 $0.00

Total Equip.: $0.00

Services Procurement

Name Purpose Rate Units Usage Totals

Erwin IDW $125.00 Drum 1 $125.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $125.00

TOTAL $125.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOC 8260 Aqueous $73.00 1.00 6 $438.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $438.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $150.00

TOTAL LAB $588.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 1 $40.00

Total Expendables: $40.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot 125 $37.50

Tubing, Silicon 3/16x3/8 $3.00 Per Foot 12 $36.00

55-gallon Drum $100.00 Each 1 $100.00

Total Equipment Items: $173.50

Equipment Kits

Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00

Total Equipment Kits: $290.00

Total Equipment Kits: $503.50

SITE : Ridgewood Laundry & Cleaners

SUBTASK 3: Reporting

DATE: 8/27/24

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title)

Principal (DMc) Technical analysis; sign and seal report 3

Staff Scientist (JR) Data evaluation and preparation of report 10

Project Assistant (MC) Process field notes, data entry, report assembly, ADaPT processing/upload 3

Drafter/Designer (BO) Figures production for report 4

TOTAL LABOR 20

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals

$0.00 Per Day 1 $0.00

Total Equip.: $0.00

Services Procurement

Name Purpose Rate Units Usage Totals

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples TotalsVapor $200.00 $0.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00

Equipment Items

Total Equipment Items: $0.00

Equipment Kits

Total Equipment Kits: $0.00

Total Equipment Kits: $0.00

Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.

Arcadis U.S., Inc.

1500 Gateway Blvd

Suite 200 Boynton Beach

Florida 33426

Tel 561 697 7000

Fax 561 369 4731 www.arcadis.com

Page:

1/3

Ms. Theresa Pepe, Contract Manager Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Subject:

Proposal for Annual Groundwater Monitoring & Reporting Ridgewood Coin Laundry & Cleaners 930-C Blanding Boulevard, Orange Park, FL Facility ID No. 10-9501247, ERIC_4262

Dear Ms. Pepe:

Arcadis U.S., Inc. (Arcadis) is pleased to submit this proposal/cost estimate for annual groundwater monitoring and reporting at the subject facility. This proposal includes a description of the proposed scope of services, and an estimated cost and schedule for their completion.

PROPOSED SCOPE OF WORK

Task 1: Project Management

Task 1 is reserved for project management.

Task 2: Groundwater Monitoring

Following receipt of a Task Assignment from FDEP, Arcadis will schedule the Annual Groundwater Monitoring event for September 2024 (i.e., one year after previous groundwater monitoring event and nine years after ISR activities). Per the FDEP-approved ISR Work Plan, dated October 2015, and recommendations in the October 2023, Annual Groundwater Monitoring Report, groundwater from six monitor wells (MW001R, MW005, MW007, MW008, MW009, and MW011) will be sampled in accordance with FDEP SOPs. Samples will be analyzed at a NELAP-accredited laboratory for volatile organic compounds by EPA Test Method 8260. In addition, per FDEP email dated March 28, 2017, the requirements for UIC sampling have been met, so UIC parameters will not need

ENVIRONMENTAL

Date:

August 27, 2024

Contact:

Doug McGlone

Phone:

561.662.7978

Email:

Douglas.mcglone@arcadis.c om

Our ref:

WF900229

Florida License Numbers

Engineering

Geology

GB564

Surveying

LB7062

Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.

C:\Users\pepe_t\Desktop\Ridgewood Annual GWMR Proposal_082724.docx

Theresa Pepe

27 August 2024

Page:

2/3 be monitored. Prior to collecting groundwater samples, a full round of water levels in all site wells will be measured and recorded.

Task 3: Annual Reporting

Approximately 60 days following the groundwater monitoring event, Arcadis will update data tables and figures, and submit an Annual Groundwater Monitoring Report including conclusions and recommendations.

PROPOSED SCHEDULE

Arcadis will schedule the annual groundwater monitoring event for September 2024, after our receipt of a TA from FDEP. Arcadis suggests invoicing for the fieldwork and reporting tasks.

COST ESTIMATE

Level of Effort (LOE) Forms and a Cost Estimate Form (CEF) that present estimated project costs are presented as Attachment 1.

This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.

arcadis.com C:\Users\pepe_t\Desktop\Ridgewood Annual GWMR Proposal_082724.docx

Theresa Pepe 27 August 2024

Page:

3/3

CLOSING REMARKS

Arcadis appreciates the opportunity to assist the FDEP in addressing the chlorinated solvent impacts at this Site. If you have any questions or wish to discuss this proposal, please contact us.

Sincerely, Arcadis U.S., Inc.

Douglas J. McGlone, P.G.

Senior Geologist

Enclosures:

Attachment

1 CEF-LOE

Invoice

12/6/2023 AUS085

Arcadis U.S., Inc.

Attn: Miranda Silano 1705 Metropolitan Boulevard Tallahassee, FL 32308 invoices_us@arcadis.com

P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511 ErwinRemediation@gmail.com

Site City

Orange Park

Site Name

Ridgewood Coin and Laundry

Total

Quantity Rate AmountDate Item

1 125.00 125.0011/30/2023 Drum Disp - Non-Haz Groundwater

$125.00