This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. for environmental remediation services at the former Dryclean USA #11301 site located at 2546 University Drive, Coral Springs, Broward County, Florida. The task assignment is entered pursuant to Contract Number HW680, with TA Number DC019B. The project manager for FDEP is Theresa Pepe (850-245-8966), and the contractor's project manager is Gus Suarez (813-205-4703). The underlying contract serves as an indefinite delivery vehicle through which this task assignment is executed.
The task assignment requires Arcadis to conduct annual groundwater monitoring from select wells at the site and prepare an annual monitoring report, all activities to be performed in accordance with the June 6, 2023 Work Plan submitted by Arcadis. The scope consists of three subtasks: Project Management (automatically calculated as a percentage of total labor), Annual Groundwater Monitoring (sampling twelve wells for drycleaning solvents and disposal of investigative derived waste by a licensed hauler), and Reporting (submission of an Annual Monitoring Report with recommendations). The total task assignment value is $8,881.01 on a fixed unit rate basis, with payment due upon FDEP approval of the Annual Monitoring Report, IDW manifest, and Project Management deliverables by October 31, 2023. The task assignment completion date is November 30, 2023. The cost estimate includes $5,710.20 in total labor (51 hours), $240.00 in vehicle rental, $1,026.00 in laboratory costs, $217.80 in subcontractor services for investigative derived waste disposal, and $1,116.00 in field expenses.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC019B Completion November 30, 2023
Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the June 6, 2023, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4169
2546 University Drive, Coral Springs, Broward County
Dryclean USA #11301
✔ $ 8,881.01
$ 8,881.01
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2023.06.22 08:49:56 -04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.06.20 16:51:34 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Monitoring Report/IDW manifest/Project Management 10/31/2023
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 8,881.01
$ 8,881.01
HW680
DC019B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Dryclean USA #11301
FACID NO. 06-9502107; ERIC_4169
Coral Springs, Broward County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC019B (HW680) DATE: June 13, 2023
Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. All activities will be conducted in accordance with the June 6, 2023, Work Plan submitted by Doug McGlone of Arcadis.
The final task assignment total is $8,881.01. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Annual Groundwater Monitoring A site access form was signed in 2017. No changes in ownership have occurred since that date.
Arcadis will sample twelve wells for drycleaning solvents based on recommendations from the previous monitoring report. IDW will be drummed and disposed by a licensed waste hauler per FDEP’s preference.
Subtask 3: Reporting An Annual Monitoring Report including recommendations for additional actions will be submitted as the Final Deliverable.
Hours and costs are comparable to past task assignments of similar scope.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 6/6/2023
Task #: SubTask 1 Project Management Site: Dryclean USA #11301 SubTask 2 Groundwater Monitoring
Activity/Phase: Annual NAM 2023 SubTask 3 Reporting Project Manager: Gus Suarez SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$67.07 Project Manager McGlone, Douglas (DMc) 4 3.9 $85.87 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 $67.07 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 $67.07 Principal Scientist McGlone, Douglas (DMc) 6 3 3 0 0 $39.34 Staff Scientist Riley, Joel (JR) 30 18 12 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 5 0 5 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 6 3 3 0 0
Total Hours 51 4 24 23 0 0
Direct Labor $2,265.05 $260.58 $1,021.08 $983.39 $0.00 $0.00
Overhead 79.00% $1,789.39 $205.86 $806.65 $776.88 $0.00 $0.00 Gen & Admin 36.00% $815.42 $93.81 $367.59 $354.02 $0.00 $0.00 Fringe 37.10% $840.34 $96.68 $378.82 $364.84 $0.00 $0.00 Total Labor $5,710.20 $656.93 $2,574.14 $2,479.13 $0.00 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW EnviroServe $198.00 $198.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $198.00 $198.00 $0.00 $0.00 $0.00 Handling Fee $19.80 $19.80 $0.00 $0.00 $0.00 Total Subcontractor Cost $217.80 $217.80 $0.00 $0.00 $0.00
Laboratory Analytical Costs $876.00 $876.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 Total Laboratory $1,026.00 $1,026.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $231.00 $231.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $705.00 $705.00 $0.00 $0.00 $0.00 Total Field Expenses $1,116.00 $1,116.00 $0.00 $0.00 $0.00
Subtotal $8,310.00 $656.93 $5,173.94 $2,479.13 $0.00 $0.00 Completion Fee $571.01 $65.69 $257.41 $247.91 $0.00 $0.00
Total Estimated Cost $8,881.01 $722.62 $5,431.35 $2,727.04 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Dryclean USA #11301 SUBTASK 2: Groundwater Monitoring
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GW sampling
Principal (DMc) Access; technical analysis; oversight with field crew 3
Staff Scientist (JR) Prp for field work (1 hr), mob/demob (3 hrs); round of WLs, purge & sample 12 wells, pack/ship (14 hrs) 18
Project Assistant (MC) Process field notes, sample tracking, data entry 3
TOTAL LABOR 24
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00 EnviroServe IDW $198.00 Drum 1 $198.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $198.00
TOTAL $198.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons only) 8260 Aqueous $73.00 1.00 12 $876.00Dissolved Solids, Total SM2540 C Aqueous $16.00 1.00 0 $0.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $876.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $150.00
TOTAL LAB $1,026.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Total Expendables: $80.00
Equipment Items
Tubing, Poly/HDPE $0.30 Per Foot 650 $195.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 12 $36.00 55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $331.00 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Total Equipment Kits: $705.00
TOTAL EQUIPMENT $1,116.00
SITE : Dryclean USA #11301
SUBTASK 3: Reporting
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal (DMc) Technical analysis; sign and seal report 3
Staff Scientist (JR) Data evaluation and preparation of report 12
Project Assistant (MC) Process field notes, data entry, report assembly, ADaPT processing/upload 3
Drafter/Designer (BO) Figures production for report 5
TOTAL LABOR 23
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00
Services Procurement Name Purpose Rate Units Usage Totals
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons only) 8260 Aqueous $73.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00
Total Equipment Items: $0.00 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
Arcadis U.S., Inc.
1500 Gateway Blvd
Suite 200
Boynton Beach
Florida 33426
Tel 561 697 7000
Fax 561 369 4731 www.arcadis.com
Page:
1/2
Ms. Theresa Pepe, Contract Manager Hazardous Waste Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Subject:
Proposal for Annual Groundwater Monitoring and Reporting Former Dryclean USA #11301 Site (Facility ID ERIC_4169) 2546 N. University Drive, Coral Springs, Broward County, Florida
Dear Ms. Pepe:
Arcadis U.S., Inc. (Arcadis) is pleased to submit the following proposal/cost estimate for annual groundwater monitoring and reporting for the remaining drycleaner solvents in the groundwater at the subject site (currently a vacant space). This proposal includes a description of the proposed scope of services and an estimated cost and schedule for their completion.
SCOPE OF WORK
Task 1: Project Management
This task consists of project management-related activities in relation to the completion of Tasks 2 and 3.
Task 2: Groundwater Monitoring Event
In July 2021, groundwater samples from 12 monitor wells (MW001, MW002R, MW006, MW010, MW011, MW014, MW015, MW016, MW017, MW018, MW019, and MW020) will be obtained and delivered to a NELAC-accredited laboratory for VOH analyses to determine the extent of the residual chlorinated solvent plume. A full round of water level measurements, and field water quality from the above-listed 12 monitor wells will be performed. Purge water will be containerized for offsite disposal.
Task 3: Annual Groundwater Monitoring Report
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
arcadis.com C:\Users\Pepe_T\Desktop\DC USA 11301 proposal 6-1-23.docx
Theresa Pepe 1 June 2023
Page:
2/2
SCHEDULE
Arcadis will coordinate the scope of work in July 2023, after receipt of a signed Task Assignment (TA).
The Annual Groundwater Monitoring Report will be delivered within 60 days of completion of the groundwater monitoring event.
COST ESTIMATE
Level of Effort (LOE) Forms and a Cost Estimate Form (CEF) that present estimated project costs are enclosed.
CLOSING REMARKS
Arcadis appreciates the opportunity to continue to assist the FDEP in the closure of the remaining drycleaning solvents in the subsurface at the former Dryclean USA #11301 site. If you have any questions or wish to discuss this proposal, please contact the undersigned.Sincerely, Arcadis U.S., Inc.
Douglas J. McGlone, P.G.
Senior Geologist
Attachments
CEF-LOE
ENVIRONMENT
Date:
June 1, 2023
Contact:
Doug McGlone
Phone:
561 662.7978
Email:
Douglas.mcglone@arcadis.c om
Our ref:
WF027404
Florida License Numbers
Engineering
Geology
GB564
Surveying
LB7062
09/07/2022 03:24 PM PAGE 1 OF 7
Scope of Work
Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required
TCLP Benzene and 4 Metals with Completed Profile required for each site
Drum Pickup /Transportation/Disposal
Drums south of Miami not included (Keys) additional costs apply
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0030388
DATE: 09/07/2022 PROJECT PROPOSAL
CLIENT
DOUGLAS MALONE
ARCADIS
1500 GATEWAY BLVD, SUITE 200, BOYTON BEACH, FLORIDA,
33426
P: (561) 662-7978
PROJECT DESCRIPTION
DRUM PICKUP
VARIOUS SITES SOUTH FLORIDA
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION 55 GAL DRUMS
NOTES:SUBJECT TO FUEL SURCHARGE,
1.00 $50.00 DRUM $50.00
STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GALLON NON HAZ DRUM
NOTES: Drum DOT Shippable Drum accessible on hard Surface
1.00 $80.00 EACH $80.00
ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $18.00 EACH $18.00
DISPOSAL SUBTOTAL: $98.00
TOTAL JOB ESTIMATE: $198.00
| HW680_DC019B negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Annual Groundwater Monitoring |
| Subtask 3: Reporting |
| DC USA 11301 proposal 6-1-23.pdf |
| Scope of Work |
| Task 1: Project Management |
| Task 2: Groundwater Monitoring Event |
| Task 3: Annual Groundwater Monitoring Report |
| Schedule |
| Cost Estimate |
| Closing Remarks |