This document represents a Task Assignment (TA) entered into between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc. for groundwater monitoring services at the J&D Cleaners (former) facility located at 6815 Caroline Street, Milton, Santa Rosa County, Florida. The facility identification number is ERIC_5422 (FACID NO. 57-9808602). The underlying contract is identified as HW680, with this specific task assignment designated as DC010B. The project is managed by Theresa Pepe for FDEP and Gus Suarez for Arcadis U.S. Inc.
Arcadis will conduct annual groundwater monitoring from twenty-one select monitoring wells at the site according to a Work Plan dated June 8, 2023, with activities focused on evaluating natural attenuation of contaminants and supporting potential remedial design. The total task assignment value is $12,214.75, structured as a fixed unit rate with payment contingent upon FDEP approval of the Annual Monitoring Report, IDW manifest, and project management deliverables. The deliverable is due November 30, 2023. Cost components include direct labor ($2,959.13), overhead and administrative costs ($3,403.99), travel and vehicle rental ($360.00), groundwater sample analysis ($1,606.00), sample shipping ($600.00), IDW drum transportation and disposal ($217.80), and field equipment and expendables ($1,225.00). The task assignment completion date is January 12, 2024, and was signed on June 20-22, 2023.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC010B Completion January 12, 2024
Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the June 8, 2023, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_5422
6815 Caroline Street, Milton, Santa Rosa County
J & D Cleaners (former)
✔ $ 12,214.75
$ 12,214.75
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2023.06.22 08:27:41 -04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.06.20 11:41:55 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Monitoring Report/IDW manifest/Project Management 11/30/2023
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 12,214.75
$ 12,214.75
HW680
DC010B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File J & D Cleaners (former)
FACID NO. 57-9808602; ERIC_5422
Milton, Santa Rosa County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC010B (HW680) DATE: June 16, 2023
Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur and will help to determine a path forward for groundwater remediation. All activities will be conducted in accordance with the June 8, 2023, Work Plan submitted by Mike O’Sullivan of Arcadis.
The final task assignment total is $12,214.75. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Annual Groundwater Monitoring Arcadis will sample twenty-one wells for drycleaning solvents based on recommendations from the previous monitoring report. The number of wells sampled is justified to support a potential remedial design. IDW will be drummed and disposed by a licensed waste hauler. An Annual Monitoring Report including recommendations for additional actions will be provided under this subtask.
Hours and costs are comparable to past task assignments of similar scope.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 6/8/2023
Task #: SubTask 1 Project Management Site: J&D Cleaners SubTask 2 Annual Groundwater Monitoring
Activity/Phase: Monitoring SubTask 3 Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 4 4.0 $60.88 Principal Scientist O'Sullivan, Michael (MOS) 19 19 0 0 0 $67.57 Principal Engineer Perella, John (JP) 0 0 0 0 0 $50.00 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0 $44.00 Project Engineer Romero Cotrino, Camilo (CR) 0 0 0 0 0 $44.00 Project Engineer Hays, Timothy (TH) 0 0 0 0 0 $28.94 Scientist Martineau, Duncan (DM) 42 42 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 5 5 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 2 2 0 0 0
Total Hours 72 4 68 0 0 0
Direct Labor $2,959.13 $340.43 $2,618.70 $0.00 $0.00 $0.00
Overhead 79.00% $2,337.71 $268.94 $2,068.77 $0.00 $0.00 $0.00 Gen & Admin 36.00% $1,065.28 $122.55 $942.73 $0.00 $0.00 $0.00 Fringe 37.10% $1,097.84 $126.30 $971.54 $0.00 $0.00 $0.00 Total Labor $7,459.96 $858.22 $6,601.74 $0.00 $0.00 $0.00
Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW - T&D $198.00 $198.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $198.00 $198.00 $0.00 $0.00 $0.00 Handling Fee $19.80 $19.80 $0.00 $0.00 $0.00 Total Subcontractor Cost $217.80 $217.80 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,606.00 $1,606.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $600.00 $600.00 $0.00 $0.00 $0.00 Total Laboratory $2,206.00 $2,206.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $135.00 $135.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $870.00 $870.00 $0.00 $0.00 $0.00 Total Field Expenses $1,225.00 $1,225.00 $0.00 $0.00 $0.00
Subtotal $11,468.76 $858.22 $10,610.54 $0.00 $0.00 $0.00 Completion Fee $745.99 $85.82 $660.17 $0.00 $0.00 $0.00
Total Estimated Cost $12,214.75 $944.04 $11,270.71 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : J&D Cleaners SUBTASK 2: Annual Groundwater Monitoring
DATE: 6/8/2023
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2023 Scientist Prep, local mob/demob, full round of WLs, Sample 21 MWs; manage IDW; sample delivery 42 Principal Scientist Access, GW monitoring technical oversight and offsite notice review 2 Data Evaluation and Letter Report 0 Principal Scientist Data evaluation and preparation of a brief letter report, sign and seal report 17 Drafter Figures preparation 5 Document Technician Editing; Letter report preparation 2
TOTAL LABOR 68
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals IDW Drum Transportation and Disposal IDW $198.00 Drum 1 $198.00
Handling Fee $0.00 Per Month 1 $0.00 Total Services: $198.00
TOTAL $198.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 22 $1,606.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,606.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 4 $600.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $600.00
TOTAL LAB $2,206.00
EQUIPMENT
Expendables Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 450 $135.00 55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $235.00 Equipment Kits Shallow Groundwater Sampling Kit $290.00 Day 3 $870.00Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Total Equipment Kits: $870.00
TOTAL EQUIPMENT $1,225.00
Arcadis U.S., Inc.
1705 Metropolitan
Boulevard
Suite 101
Tallahassee
Florida 32308
Phone: 850 422 2555
Fax: 850 668 0080 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
Ms. Theresa Pepe
Bureau of Waste Cleanup
Division of Waste Management
Florida Department of Environmental Protection
2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400
Date: June 8, 2023
Subject: Proposal for Annual Groundwater Monitoring at J&D Cleaners, 6815
Caroline Street, Milton, Florida, FDEP Facility Identification Number
ERIC_5422.
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the annual groundwater monitoring activities at J&D Cleaners, located at 6815 Caroline Street, Milton, Florida (FDEP Facility
Identification Number ERIC_5422; “the Site”). This proposal includes one groundwater monitoring event, and one letter report summarizing field activities. The FDEP cost estimating spreadsheets (Attachment A) is attached.
SCOPE OF WORK
Subtask 1 - Project Management
Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).
Subtask 2 - Groundwater Monitoring (2023)
Arcadis proposes to collect groundwater samples from 21 monitoring wells (DEP-1, DEP-3, DEP-5, DEP-8, DEP-
9, DEP-10, DEP-11, DEP-12, DEP-13, MW001, MW004, MW006, MW008, MW009, MW010, MW011, MW012, MW014, MW018, DW-1, and DW-1T) in accordance with FDEP SOPs. Monitoring well locations are shown on attached figure. Samples will be submitted to a certified laboratory for analysis by EPA Method 8260C or equivalent (VOHs only). Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly. Monitoring well locations are shown on attached figures.
Arcadis will incorporate the data collected during the groundwater sampling event into a letter report summarizing the field activities. The report will include laboratory analytical data, figures presenting groundwater analytical data, and recommendations for the Site.
FDEP – J&D Cleaners Proposal 2023 www.arcadis.com _J&D Cleaners AGM proposal_jun23
SCHEDULE
Arrangements for groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP.
ESTIMATED COST
A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as
Attachment A.
Please contact me if you have any questions regarding this proposal.
Sincerely, Arcadis U.S., Inc.
Mike O’Sullivan, P.G.
Senior Geologist
Email: mike.osullivan@arcadis.com
Direct Line: 850.895.4739
Mobile: 850.491.2346
Attachment:
Figures
Attachment A – Cost Estimate Form and Level of Effort forms
C a r o l i n e
S t r e
U
E s c a m b i r e e t
S a n
R o s r e e t
P i k r e e t
C a n a l
S t r e e t
Beauty's
Shop
Residential
Residential
Residential
Church
Residential
Residential
F o r m r
J
D l e a n e r s
Masonic Lodge
Former
Milton Post Office
Jewelry
Store
The Main Street Cafe
(former BP Station)
Santa Rosa County
Warehouse
Santa Rosa County
Probation Department
Vacant
Residential
Business
C o n c r e d e w a l k
C o n c r e d e w a l k
A s p h a
P r k i n g
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
(former True North Surveying)
Concrete Parking
C o n c r e d e w a l k
C o n c r e d e w a l k
C o n c r e d e w a l k
P h y s i c i a n s
B i l l i g n s u l t i n g
Storm Drain
Hydrant
Water Service
UP
UP
UP
Water Service
SS
UP
UP
SS
SS
SS
Storm Drain
Storm Drain
LP
LP
LP
SS
LP
LP
LP
Grass
Grass
G r a s s
FORMER
DUMPSTER
FORMER
DRYCLEAN
MACHINE
Asphalt Parking
O
E l m i r e e t
Residential
Residential
Salvation Army
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Restaurant
Residential
Commercial
Residential
Santa Rosa County
Clerk of Court
Commercial
Residential
Asphalt Parking
Asphalt Parking
Asphalt Parking
MW011
MW014
MW019
MW022
MW-1T
MW-2T
MW004
MW-16T
MW-5T
MW008
MW012
MW010
DEP-5
DEP-6
DEP-7
DEP-2
DEP-1
DEP-4
DEP-3
MW003
MW001
DEP-11
DEP-12
DEP-8
DEP-13
DEP-10
DEP-9
MW013
MW017
MW018
MW021
MW020
MW016
MW006
MW002
MW005
MW007
MW015
MW009
DW-1T
DW-1
FIGURE
CHLORINATED ETHENE CONCENTRATIONS
IN SHALLOW (WT-15 ft. BGS) GROUNDWATER
FORMER J&D CLEANERS
6815 CAROLINE ST.
MILTON, SANTA ROSA COUNTY, FLORIDA
FDEP FACILITY I.D. NO. 57/9808602 (ERIC_5422)
80'
160'
GRAPHIC SCALE
LP
SS
UP
SANITARY SEWER MANHOLE
SANITARY SEWER LINE
UTILITY POLE
LIGHT POLE
OVERHEAD ELECTRIC UTILITY LINE(S)
TETRACHLOROETHENE [PCE] CONCENTRATION (µg/L)
TRICHLOROETHENE [TCE] CONCENTRATION (µg/L) cis-1,2-DICHLOROETHENE [cis-1,2-DCE] CONCENTRATION (µg/L)
SAMPLE DATE
Notes:
Bold indicates Florida Department of Environmental Protection (FDEP)
Groundwater Cleanup Target Level (GCTL) exceedance, Bold Italicized indicates FDEP Natural Attenuation Default Concentration (NADC) exceedance, I indicates result is between laboratory Practical Quantitation
Limit [PQL] and laboratory Method Detection Limit [MDL], L indicates off-scale high, µg/L=micrograms per liter, * indicates duplicate sample result.
SAMPLE I.D.
VINYL CHLORIDE CONCENTRATION (µg/L)
APPROXIMATE EXTENT OF PCE
IN GROUNDWATER ABOVE GCTL
APPROXIMATE EXTENT OF TCE
IN GROUNDWATER ABOVE GCTL
DEP-9
7/12
1 U
1 U
1 U
1 U
DEP-8
7/12
1 U
1 U
1 U
1 U
MW003
8/12
9.1
260 L
1 U
DEP-13
7/12
0.90 I
0.21 I
1 U
1 U
MW001
8/12
1,400
1 U
1 U
MW-5T
7/12
0.53 I
1 U
1 U
1 U
MW016
11/12
1.1
2.0
0.48 I
1 U
MW020
11/12
1 U
1 U
1 U
1 U
LEGEND
MONITOR WELL LOCATION (9/02-1/03, SIS)
DEP-8
MONITOR WELL LOCATION (10/91, GWT)
MW-1
INTERMEDIATE MONITOR WELL LOCATION (10/12, AUS)MW013
MONITOR WELL LOCATION (10/12, AUS)
MW016
DEEP MONITOR WELL LOCATION (10/12, AUS)MW014
INTERMEDIATE MONITOR WELL LOCATIONDW-1/1T
MONITOR WELL LOCATIONMW-1T
INTERMEDIATE MONITOR WELL LOCATION (8/02, SIS)
DEP-1
C I T
Y W
P B
F
L
I V
G
R O
U P
E
N W
F E
B B
O
L I V
A
B
O
L I
C
W
V
O G
E L S
O N
G
M P
W
V
O G
E L S
O
T
P
N
O L
Y
R O p t O
N
O
F F
R
E F
C U s e r s w d b e r n d g A
R C
A D
I S
U
S A
C C
D o c s A r c a d i s A
U S
F
D E
P F
O R
M E
R
J
D
C
L E
A N
E R
S M
I L T
O o r i d a P r o j e c t
F i l e s I n
P r o g r e s s D
W G
G
W M
R
J
D
C
L E
A N
E R
S
F
F d w
Y O
U T
F
S
G W
Q
V
E D
A
D V
E R
M
S
T
E C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L E
A C
S C
O L O
R A
N A
L Y
T I C
A L C
O
T T
E D
B
E R
N D
G E
N
W
E N
D Y
MW004
7/20
70.8
0.900 I
DEP-11
7/20
0.160 U
0.190 U
0.210 U
0.190 U
MW008
7/20
0.160 U
5.10
26.1
0.190 U
MW012
DEP-10
MW010
7/20
1.29
3.02
2.24
0.190 U
7/20
45.9
11.9
60.8
0.190 U
7/20
3.15
5.52
3.05
0.190 U
MW012
7/20
0.190 U
1.29
3.02
2.24
7/21
1.0 I
0.87 I
1.2
0.26 U
9/22
7.9
3.1
0.50 U
7/21
0.29 U
2.4
5.1
0.26 U
7/21
1.0 I
2.0
1.7
0.26 U
7/21
1,900 J
1,000 J
0.26 U
7/21
2.3
1.1 I
0.97 I
0.26 U
8/22
9.4
60.8
0.50 U
9/22
1.7
1.2
0.50 U
8/22
0.90U
1.5
0.87 I
0.50 U
9/22
0.90 U
4.4
6.5
0.50 U
9/22
0.90 U
0.72 I
2.6
0.50 U
7/21
7.0
8.5
1.9
0.26 U
r o l i r e
U
E s c a m b r e e t
S a n
R s r e e t
P i r e e t
C a n a l
S t r e e t
Beauty's
Shop
Residential
Residential
Residential
Church
Residential
Residential
F o r m
J e a n e r s
Masonic Lodge
Former
Milton Post Office
Jewelry
Store
The Main Street Cafe
(former BP Station)
Santa Rosa County
Warehouse
Santa Rosa County
Probation Department
Vacant
Residential
Business
C o n c r e d e w a l k
C o n c r e d e w a l k
A s p h a r k i n g
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
(former True North Surveying)
Concrete Parking
C o n c r e d e w a l k
C o n c r e d e w a l k
C o n c r e d e w a l k
P h y s i c i a n s
B i l l i n s u l t i n g
Storm Drain
Hydrant
Water Service
UP
UP
UP
Water Service
SS
UP
UP
SS
SS
SS
Storm Drain
Storm Drain
LP
LP
LP
SS
LP
LP
LP
Grass
Grass
G r a s s
FORMER
DUMPSTER
FORMER
DRYCLEAN
MACHINE
Asphalt Parking
O
E l m i r e e t
Residential
Residential
Salvation Army
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Restaurant
Residential
Commercial
Residential
Santa Rosa County
Clerk of Court
Commercial
Residential
Asphalt Parking
Asphalt Parking
Asphalt Parking
MW011
MW014
MW019
MW022
MW-1T
MW-2T
MW004
MW-16T
MW-5T
MW008
MW012
MW010
DEP-5
DEP-6
DEP-7
DEP-2
DEP-1
DEP-4
DEP-3
MW003
MW001
DEP-11
DEP-12
DEP-8
DEP-13
DEP-10
DEP-9
MW013
MW017
MW018
MW021
MW020
MW016
MW006
MW002
MW005
MW007
MW015
MW009
DW-1T
DW-1
FIGURE
CHLORINATED ETHENE CONCENTRATIONS
INTERMEDIATE (15-46 ft. BGS) GROUNDWATER
FORMER J&D CLEANERS
6815 CAROLINE ST.
MILTON, SANTA ROSA COUNTY, FLORIDA
FDEP FACILITY I.D. NO. 57/9808602 (ERIC_5422)
80'
160'
GRAPHIC SCALE
LP
SS
UP
SANITARY SEWER MANHOLE
SANITARY SEWER LINE
UTILITY POLE
LIGHT POLE
OVERHEAD ELECTRIC UTILITY LINE(S)
DEP-1
7/12
1 U
1 U
1 U
1 U
MW002
8/12
6.6
1 U
1 U
1 U
DEP-4
8/12
0.27 I
1 U
1 U
1 U
MW005
8/12
2.2
1.6
3.3
1 U
MW007
8/12
8.8
1 U
DEP-6
7/12
0.29 I
1 U
1 U
1 U
DEP-7
7/12
1 U
1 U
1 U
1 U
DW-1T
7/12
0.20 I
0.20 I
1 U
1 U
DW-1
7/12
1 U
1 U
1 U
1 U
TETRACHLOROETHENE [PCE] CONCENTRATION (µg/L)
TRICHLOROETHENE [TCE] CONCENTRATION (µg/L) cis-1,2-DICHLOROETHENE [cis-1,2-DCE] CONCENTRATION (µg/L)
SAMPLE DATE
SAMPLE I.D.
VINYL CHLORIDE CONCENTRATION (µg/L)
LINE OF CROSS SECTION
APPROXIMATE EXTENT OF PCE/TCE
IN GROUNDWATER ABOVE GCTL
APPROXIMATE EXTENT OF PCE
IN GROUNDWATER ABOVE NADC
MW017
11/12
1 U
1 U
1 U
1 U
MW018
11/12
1 U
1 U
1 U
1 U
MW021
11/12
0.21 I
1 U
1 U
1 U
MW013
11/12
1 U
1 U
1 U
1 U
LEGEND
MONITOR WELL LOCATION (9/02-1/03, SIS)
DEP-8
MONITOR WELL LOCATION (10/91, GWT)
MW-1
INTERMEDIATE MONITOR WELL LOCATION (10/12, AUS)MW013
MONITOR WELL LOCATION (10/12, AUS)
MW016
DEEP MONITOR WELL LOCATION (10/12, AUS)MW014
INTERMEDIATE MONITOR WELL LOCATIONDW-1/1T
MONITOR WELL LOCATIONMW-1T
INTERMEDIATE MONITOR WELL LOCATION (8/02, SIS)
DEP-1
Notes:
Bold indicates Florida Department of Environmental Protection (FDEP)
Groundwater Cleanup Target Level (GCTL) exceedance, Bold Italicized indicates FDEP Natural Attenuation Default Concentration (NADC) exceedance, I indicates result is between laboratory Practical Quantitation
Limit [PQL] and laboratory Method Detection Limit [MDL], L indicates off-scale high, µg/L=micrograms per liter, * indicates duplicate sample result.
C I T
Y W
P B
V
G
R O
U P
E
N W
F E
B
O
L I
B
O
L I
C
W
V
O G
E L S
O
P
W
V
O G
E L S
O
P
N
O L
R O p t O
N
O
F F
R
E F
C U s e r s w d b e r n d g A
R C
A D
I S
U
S A
C C
D o c s A r c a d i s A
U S
F
D E
P F
O R
M E
R
J
D
C
L E
A N
E R
S M
I L T
O o r i d a P r o j e c t
F i l e s I n
P r o g r e s s D
W G
G
W M
R
J
D
C
L E
A N
E R
S
F
F d w
Y O
U T
F
I G
W Q
V
E D
A
D V
E R
M
S
T
E C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L E
A C
S C
O L O
R A
N A
L Y
T I C
A L C
O
T T
E D
B
E R
N D
G E
N
W
E N
D Y
DEP-5
MW006
MW011
MW009
7/20
0.190 U
7/20
64.4
0.190 U
7/20
45.1
91.7
35.8
0.190 U
7/20
1,970
36.1
0.190 U
7/20
0.160 U
0.190 U
0.210 U
0.190 U
0.160 U
0.190 U
0.210 U
MW011
7/20
45.1
91.7
35.8
0.190 U
DEP-3
7/21
2.5
1.4
0.26 U
7/21
0.26 U
7/21
0.26 U
7/21
0.26 U
3.5
9/22
3.7
0.50 U
9/22
0.50 U
9/22
5.0 U
9/22
0.50 U
9/22
0.50 U
7/21
2.7
2.4
0.32 U
0.26 U
1,100
APPROXIMATE EXTENT OF CIS-1,2-DCE
IN GROUNDWATER ABOVE GCTL
09/07/2022 03:24 PM PAGE 1 OF 7
Scope of Work
Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required
TCLP Benzene and 4 Metals with Completed Profile required for each site
Drum Pickup /Transportation/Disposal
Drums south of Miami not included (Keys) additional costs apply
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0030388
DATE: 09/07/2022 PROJECT PROPOSAL
CLIENT
DOUGLAS MALONE
ARCADIS
1500 GATEWAY BLVD, SUITE 200, BOYTON BEACH, FLORIDA,
33426
P: (561) 662-7978
PROJECT DESCRIPTION
DRUM PICKUP
VARIOUS SITES SOUTH FLORIDA
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION 55 GAL DRUMS
NOTES:SUBJECT TO FUEL SURCHARGE,
1.00 $50.00 DRUM $50.00
STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GALLON NON HAZ DRUM
NOTES: Drum DOT Shippable Drum accessible on hard Surface
1.00 $80.00 EACH $80.00
ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $18.00 EACH $18.00
DISPOSAL SUBTOTAL: $98.00
TOTAL JOB ESTIMATE: $198.00
| HW680_DC010B negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Annual Groundwater Monitoring |