Task Assignment DC010A Summary
This is a Task Assignment (TA) document between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S., Inc., executed pursuant to underlying Contract Number HW680. The task assignment was signed on March 25, 2022, and involves groundwater monitoring services at the J&D Cleaners facility located at 6815 Caroline Street, Milton, Santa Rosa County, Florida (FDEP Facility ID: ERIC_5422). The Department Project Manager is Theresa Pepe, and the Contractor's Project Manager is Gus Suarez of Arcadis U.S., Inc.
Arcadis will conduct annual groundwater monitoring from twelve select monitoring wells at the site and prepare an Annual Monitoring Report, all activities performed according to the March 10, 2022 Work Plan submitted by Arcadis. The task assignment uses a Fixed Unit Rate pricing structure with a Total TA Value of $7,774.17. The deliverable—consisting of the Annual Monitoring Report, Investigative Derived Waste (IDW) manifest, and Project Management—is due on August 31, 2022, with payment contingent upon FDEP approval. The cost breakdown includes $4,760.16 in total labor (project management and groundwater monitoring), $612.00 in travel expenses, $1,026.00 in laboratory analytical costs (VOC analysis of 12 samples at $73.00 per sample), $735.00 in field equipment and expendables, and $165.00 for IDW disposal services through subcontractor Erwin Remediation. The completion fee of $476.01 brings the total to $7,774.17.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC010A Completion September 30, 2022
Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the March 10, 2022, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_5422
6815 Caroline Street, Milton, Santa Rosa County
J & D Cleaners (former)
✔ $ 7,774.17
$ 7,774.17
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.03.25 15:37:54 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.03.25 15:22:24 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Monitoring Report/IDW manifest/Project Management 08/31/2022
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 7,774.17
$ 7,774.17
HW680
DC010A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File J & D Cleaners (former)
FACID NO. 57-9808602; ERIC_5422
Milton, Santa Rosa County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC010A (HW680) DATE: March 25, 2022
Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. All activities will be conducted in accordance with the March 10, 2022, Work Plan submitted by Mike O’Sullivan of Arcadis.
The final task assignment total is $7,774.17. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Annual Groundwater Monitoring Arcadis will sample twelve wells for drycleaning solvents based on recommendations from the previous monitoring report. IDW will be drummed and disposed by a licensed waste hauler per FDEP’s preference. An Annual Monitoring Report including recommendations for additional actions will be provided under this subtask.
Hours and costs are comparable to past task assignments of similar scope.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 3/10/2022
Task #: SubTask 1 Project Management
Site: J&D Cleaners SubTask 2 Annual Groundwater Monitoring 2022
Activity/Phase: Monitoring SubTask 3
Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$50.00 Project Manager O'Sullivan, Mike (MO) 4 4.3
$50.00 Senior Scientist O'Sullivan, Mike (MO) 16 16 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 25 25 0 0 0
$31.48 Drafter/Designer Berndgen, Wendy (WDB) 3 3 0 0 0
$26.52 Document Technician Embras, Susan (SRE) 2 2 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0
Total Hours 50 4 46 0 0 0
Direct Labor $1,888.21 $217.23 $1,670.98 $0.00 $0.00 $0.00
Overhead 79.00% $1,491.68 $171.61 $1,320.07 $0.00 $0.00 $0.00
Gen & Admin 36.00% $679.75 $78.20 $601.55 $0.00 $0.00 $0.00
Fringe 37.10% $700.52 $80.59 $619.93 $0.00 $0.00 $0.00
Total Labor $4,760.16 $547.63 $4,212.53 $0.00 $0.00 $0.00
Travel
Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $372.00 $372.00 $0.00 $0.00 $0.00
Total Travel $612.00 $612.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $150.00 $150.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $150.00 $150.00 $0.00 $0.00 $0.00
Handling Fee $15.00 $15.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $165.00 $165.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $876.00 $876.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00
Total Laboratory $1,026.00 $1,026.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $80.00 $80.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $655.00 $655.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $735.00 $735.00 $0.00 $0.00 $0.00
Subtotal $7,298.16 $547.63 $6,750.53 $0.00 $0.00 $0.00
Completion Fee $476.01 $54.76 $421.25 $0.00 $0.00 $0.00
Total Estimated Cost $7,774.17 $602.39 $7,171.78 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : J&D Cleaners SUBTASK 2: Annual Groundwater Monitoring 2022
DATE: 3/10/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2022 Scientist Prep, local mob/demob, full round of WLs, Sample 12 MWs; manage IDW; sample delivery 24 Senior Scientist Access, GW monitoring technical oversight and offsite notice review 2
Data Evaluation and Letter Report Senior Scientist Technical review; sign and seal report 2 Senior Scientist Data evaluation and preparation of a brief letter report 12 Scientist Data evaluation 1 Drafter Figures preparation 3 Document Technician Editing; Letter report preparation 2
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals Scientist $36.00 Per Day 2 $72.00
Hotel Category/Staff Rate Unit Usage Totals
Scientist $150.00 Per Day 2 $300.00
Total Meal/Hotel: $372.00
TOTAL PER DIEM $372.00
SUBCONTRACTOR COSTS
Equipment Procurement Services Procurement
Name Purpose Rate Units Usage Totals Erwin Remediation IDW $150.00 Drum 1 $150.00
Total Services: $150.00
TOTAL $150.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 12 $876.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $876.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00
Total Shipping: $150.00
TOTAL LAB $1,026.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00
Total Expendables: $80.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 250 $75.00
Total Equipment Items: $75.00 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 0 $0.00 Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 2 $580.00
Total Equipment Kits: $580.00
TOTAL EQUIPMENT $735.00
Arcadis U.S., Inc.
1705 Metropolitan
Boulevard
Suite 101
Tallahassee
Florida 32308
Phone: 850 422 2555
Fax: 850 668 0080 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
Ms. Theresa Pepe
Bureau of Waste Cleanup
Division of Waste Management
Florida Department of Environmental Protection
2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400
Date: March 10, 2022
Our Ref: TL006028
Subject: Proposal for Annual Groundwater Monitoring at J&D Cleaners, 6815
Caroline Street, Milton, Florida, FDEP Facility ID No. ERIC_5422.
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the annual groundwater monitoring activities at the J&D Cleaners facility located at 6815 Caroline Street, Milton, Florida, (FDEP Facility ID No. ERIC_5422; “the Site”). This proposal includes one groundwater monitoring event, and one letter report summarizing field activities. The FDEP cost estimating spreadsheets (Attachment A) and subcontractor quote (Attachment B) are attached.
SCOPE OF WORK
Subtask 1 - Project Management
Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).
Subtask 2 - Groundwater Monitoring (2022)
Arcadis proposes to collect groundwater samples from twelve monitoring wells (DEP-3, DEP-5, DEP-10, DEP-11, MW004, MW006, MW008, MW009, MW010, MW011, MW012, and MW014). Samples will be submitted to a certified laboratory for analysis by EPA Method 8260B or equivalent (VOHs only). Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly. Monitoring well locations are shown on the attached Figures.
Arcadis will incorporate the data collected during the groundwater sampling event into a letter report that summarizes the field activities and laboratory analytical data, including figures presenting groundwater analytical data, and recommendations for the Site.
FDEP – J&D Cleaners Proposal 2022 www.arcadis.com _J&DCleaner GW Mon proposal_Mar2022
SCHEDULE
Arrangements for groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP.
ESTIMATED COST
A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as
Attachment A.
Please contact me if you have any questions regarding this proposal.
Sincerely, Arcadis U.S., Inc.
Mike O’Sullivan, P.G.
Senior Geologist
Email: mike.osullivan@arcadis.com
Direct Line: 850.895.4739
Mobile: 850.491.2346
Attachment:
Figures
Attachment A – Cost Estimate Form and Level of Effort forms
Attachment B – Subcontractor quote
Figures
C a r o l i n e
S t r e
U
E s c a m b i r e e t
S a n
R o s r e e t
P i k r e e t
C a n a l
S t r e e t
Beauty's
Shop
Residential
Residential
Residential
Church
Residential
Residential
F o r m r
J
D l e a n e r s
Masonic Lodge
Former
Milton Post Office
Jewelry
Store
The Main Street Cafe
(former BP Station)
Santa Rosa County
Warehouse
Santa Rosa County
Probation Department
Vacant
Residential
Business
C o n c r e d e w a l k
C o n c r e d e w a l k
A s p h a
P r k i n g
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
(former True North Surveying)
Concrete Parking
C o n c r e d e w a l k
C o n c r e d e w a l k
C o n c r e d e w a l k
P h y s i c i a n s
B i l l i g n s u l t i n g
Storm Drain
Hydrant
Water Service
UP
UP
UP
Water Service
SS
UP
UP
SS
SS
SS
Storm Drain
Storm Drain
LP
LP
LP
SS
LP
LP
LP
Grass
Grass
G r a s s
FORMER
DUMPSTER
FORMER
DRYCLEAN
MACHINE
Asphalt Parking
O
E l m i r e e t
Residential
Residential
Salvation Army
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Restaurant
Residential
Commercial
Residential
Santa Rosa County
Clerk of Court
Commercial
Residential
Asphalt Parking
Asphalt Parking
Asphalt Parking
MW011
MW014
MW019
MW022
MW-1T
MW-2T
MW004
MW-16T
MW-5T
MW008
MW012
MW010
DEP-5
DEP-6
DEP-7
DEP-2
DEP-1
DEP-4
DEP-3
MW003
MW001
DEP-11
DEP-12
DEP-8
DEP-13
DEP-10
DEP-9
MW013
MW017
MW018
MW021
MW020
MW016
MW006
MW002
MW005
MW007
MW015
MW009
DW-1T
DW-1
FIGURE
CHLORINATED ETHENE CONCENTRATIONS
IN SHALLOW (WT-15 ft. BGS) GROUNDWATER
2012-2021
FORMER J&D CLEANERS
6815 CAROLINE ST.
MILTON, SANTA ROSA COUNTY, FLORIDA
FDEP FACILITY I.D. NO. 57/9808602 (ERIC_5422)
80'
160'
GRAPHIC SCALE
LP
SS
UP
SANITARY SEWER MANHOLE
SANITARY SEWER LINE
UTILITY POLE
LIGHT POLE
OVERHEAD ELECTRIC UTILITY LINE(S)
TETRACHLOROETHENE [PCE] CONCENTRATION (µg/L)
TRICHLOROETHENE [TCE] CONCENTRATION (µg/L) cis-1,2-DICHLOROETHENE [cis-1,2-DCE] CONCENTRATION (µg/L)
SAMPLE DATE
Notes:
Bold indicates Florida Department of Environmental Protection (FDEP)
Groundwater Cleanup Target Level (GCTL) exceedance, Bold Italicized indicates FDEP Natural Attenuation Default Concentration (NADC) exceedance, I indicates result is between laboratory Practical Quantitation
Limit [PQL] and laboratory Method Detection Limit [MDL], L indicates off-scale high, µg/L=micrograms per liter, * indicates duplicate sample result.
SAMPLE I.D.
VINYL CHLORIDE CONCENTRATION (µg/L)
APPROXIMATE EXTENT OF PCE/TCE
IN GROUNDWATER ABOVE GCTL
APPROXIMATE EXTENT OF PCE
IN GROUNDWATER ABOVE NADC
DEP-9
7/12
<1
<1
<1
<1
DEP-8
7/12
<1
<1
<1
<1
MW003
8/12
9.1
260 L
<1
DEP-13
7/12
0.90 I
0.21 I
<1
<1
MW001
8/12
1,400
<1
<1
MW-5T
7/12
0.53 I
<1
<1
<1
MW016
11/12
1.1
2.0
0.48 I
<1
MW020
11/12
<1
<1
<1
<1
LEGEND
MONITOR WELL LOCATION (9/02-1/03, SIS)
DEP-8
MONITOR WELL LOCATION (10/91, GWT)
MW-1
INTERMEDIATE MONITOR WELL LOCATION (10/12, AUS)MW013
MONITOR WELL LOCATION (10/12, AUS)
MW016
DEEP MONITOR WELL LOCATION (10/12, AUS)MW014
INTERMEDIATE MONITOR WELL LOCATIONDW-1/1T
MONITOR WELL LOCATIONMW-1T
INTERMEDIATE MONITOR WELL LOCATION (8/02, SIS)
DEP-1
C I T
Y W
P B
F
L
I V
G
R O
U P
E
N W
F E
B B
O
L I V
A
B
O
L I
C
W
V
O G
E L
S O
N G
M P
W
V
O G
E L
S O
T
P
N
O L
Y R
O p t O
N
O
F F
R
E F
C B
I M
O n e
D r i v
R C
A D
I S
B c s F
L O
R I D
A
D
E P
T
O
F
E
N V
I R
O N
M E
N T
O
T E
C T
I O
N F
D E
P F o r m e r
J
D
C l e a n e r s
G
W
M
D
W G
G
W M
R
J
D
C
L E
A N
E R
S
F
F d w
Y
O U
T
F
S G
W Q
V
E D
A
D V
E R
S
L
E C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L
E
A C
S C
O L
O R
A
N A
L Y
T I C
A L
C
O
T T
E D
B
E R
N D
G E
N
W
E N
D Y
MW004
8/12 4/16 4/16* 6/17 6/18 7/19 7/20
360 L <1 6.06 7.40 4.60 3.3 130
130 L 3.52 <1 15 19 77.4 70.8
43 <1 <1 34 30 33.3 126
<1 <1 <1 <1 <1 0.190 U 0.900 I
DEP-11
7/12 4/16 6/17 6/18 7/19
180 22 36 31 52.6
100 20.6 4.0 38 53.1
15 3.65 5.90 5.80 6.52
<1 <1 <1 <1 0.190 U
7/20
0.160 U
0.190 U
0.210 U
0.190 U
MW008
8/12 4/16 6/17 6/18 6/18* 7/19
1.3 2.48 <1 2.0 2.1 0.160 U
29 6.39 7.40 12 15 10.2
40 16.2 20 20 2.1 28.6
<1 <1 <1 <1 <1 0.190 U
7/20
0.160 U
5.10
26.1
0.190 U
MW012
8/12 4/16 6/17 6/18 7/19
1.6 2.30 <1 2.0 0.880 I
1.5 <1 <1 3.6 2.72
0.77 I 2.82 3.90 2.10 4.03
<1 <1 <1 <1 0.190 U
DEP-10
7/12 4/16 6/17 6/18 7/19
130 5.77 11 9 46.9
13 <1 11 8 12.1
24 <1 14 8 9.03
<1 <1 <1 <1 0.190 U
MW010
8/12 4/16 6/17 6/18 7/19
5.2 2.01 3.90 4.20 3.11
7.4 <1 6.30 7.20 5.2
3.6 <1 3.20 4.50 2.58
<1 <1 <1 <1 0.190 U
7/20
1.29
3.02
2.24
0.190 U
7/20
45.9
11.9
60.8
0.190 U
7/20
3.15
5.52
3.05
0.190 U
MW012
7/20
0.190 U
1.29
3.02
2.24
7/21
1.0 I
0.87 I
1.2
0.26 U
7/21
7.0
8.5
1.9
0.26 U
7/21
0.29 U
2.4
5.1
0.26 U
7/21
1.0 I
2.0
1.7
0.26 U
7/21
1,900 J
1,000 J
0.26 U
7/21
2.3
1.1 I
0.97 I
0.26 U
r o l i r e
E s c a m b r e e t
S a n r e e t
P i r e e t
C a n a l
S t r e e t
Beauty's
Shop
Residential
Residential
Residential
Church
Residential
Residential
F o r m e a n e r s
Masonic Lodge
Former
Milton Post Office
Jewelry
Store
The Main Street Cafe
(former BP Station)
Santa Rosa County
Warehouse
Santa Rosa County
Probation Department
Vacant
Residential
Business
C o n c r e d e w a l k
C o n c r e d e w a l k
A s p h a r k i n g
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
(former True North Surveying)
Concrete Parking
C o n c r e d e w a l k
C o n c r e d e w a l k
C o n c r e d e w a l k
P h y s i c i a n s
B i l l i n s u l t i n g
Storm Drain
Hydrant
Water Service
UP
UP
UP
Water Service
SS
UP
UP
SS
SS
SS
Storm Drain
Storm Drain
LP
LP
LP
SS
LP
LP
LP
Grass
Grass
G r a s s
FORMER
DUMPSTER
FORMER
DRYCLEAN
MACHINE
Asphalt Parking
O
E l m i r e e t
Residential
Residential
Salvation Army
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Restaurant
Residential
Commercial
Residential
Santa Rosa County
Clerk of Court
Commercial
Residential
Asphalt Parking
Asphalt Parking
Asphalt Parking
MW011
MW014
MW019
MW022
MW-1T
MW-2T
MW004
MW-16T
MW-5T
MW008
MW012
MW010
DEP-5
DEP-6
DEP-7
DEP-2
DEP-1
DEP-4
DEP-3
MW003
MW001
DEP-11
DEP-12
DEP-8
DEP-13
DEP-10
DEP-9
MW013
MW017
MW018
MW021
MW020
MW016
MW006
MW002
MW005
MW007
MW015
MW009
DW-1T
DW-1
FIGURE
CHLORINATED ETHENE CONCENTRATIONS
INTERMEDIATE (15-46 ft. BGS) GROUNDWATER
2012-2021
FORMER J&D CLEANERS
6815 CAROLINE ST.
MILTON, SANTA ROSA COUNTY, FLORIDA
FDEP FACILITY I.D. NO. 57/9808602 (ERIC_5422)
80'
160'
GRAPHIC SCALE
LP
SS
UP
SANITARY SEWER MANHOLE
SANITARY SEWER LINE
UTILITY POLE
LIGHT POLE
OVERHEAD ELECTRIC UTILITY LINE(S)
DEP-1
7/12
<1
<1
<1
<1
MW002
8/12
6.6
<1
<1
<1
DEP-4
8/12
0.27 I
<1
<1
<1
MW005
8/12
2.2
1.6
3.3
<1
MW007
8/12
8.8
<1
DEP-6
7/12
0.29 I
<1
<1
<1
DEP-7
7/12
<1
<1
<1
<1
DW-1T
7/12
0.20 I
0.20 I
<1
<1
DW-1
7/12
<1
<1
<1
<1
TETRACHLOROETHENE [PCE] CONCENTRATION (µg/L)
TRICHLOROETHENE [TCE] CONCENTRATION (µg/L) cis-1,2-DICHLOROETHENE [cis-1,2-DCE] CONCENTRATION (µg/L)
SAMPLE DATE
SAMPLE I.D.
VINYL CHLORIDE CONCENTRATION (µg/L)
LINE OF CROSS SECTION
APPROXIMATE EXTENT OF PCE/TCE
IN GROUNDWATER ABOVE GCTL
MW017
11/12
<1
<1
<1
<1
MW018
11/12
<1
<1
<1
<1
MW021
11/12
0.21 I
<1
<1
<1
MW013
11/12
<1
<1
<1
<1
LEGEND
MONITOR WELL LOCATION (9/02-1/03, SIS)
DEP-8
MONITOR WELL LOCATION (10/91, GWT)
MW-1
INTERMEDIATE MONITOR WELL LOCATION (10/12, AUS)MW013
MONITOR WELL LOCATION (10/12, AUS)
MW016
DEEP MONITOR WELL LOCATION (10/12, AUS)MW014
INTERMEDIATE MONITOR WELL LOCATIONDW-1/1T
MONITOR WELL LOCATIONMW-1T
INTERMEDIATE MONITOR WELL LOCATION (8/02, SIS)
DEP-1
Notes:
Bold indicates Florida Department of Environmental Protection (FDEP)
Groundwater Cleanup Target Level (GCTL) exceedance, Bold Italicized indicates FDEP Natural Attenuation Default Concentration (NADC) exceedance, I indicates result is between laboratory Practical Quantitation
Limit [PQL] and laboratory Method Detection Limit [MDL], L indicates off-scale high, µg/L=micrograms per liter, * indicates duplicate sample result.
C I T
Y W
P B
V
G
R O
U P
E
N W
F E
B
O
L I
B
O
L I
C
W
V
O G
E L
S O
P
W
V
O G
E L
S O
P
N
O L
R
O p t O
N
O
F F
R
E F
C B
I M
O n e
D r i
R C
A D
I S
B c s F
L O
R I D
A
D
E P
T
O
F
E
N V
I R
O N
M E
N T
O
T E
C T
I O
N F
D E
P F o r m e r
J
D
C l e a n e r s
G
W
M
D
W G
G
W M
R
J
D
C
L E
A N
E R
S
F
F d
Y
O U
T
F
I G
V
E D
A
D V
E R
S
L
C
G
E S
E T
U P
O
T S
T Y
L E
T A
B L
E
A C
S C
O L
O R
A
N A
L Y
T I C
A L
C
O
T T
E D
B
E R
N D
G E
N
W
E N
D Y
DEP-5
7/12 4/16 6/17 6/18 7/19
110 167 1,400
120 86
61 93.3 82 82 62.5
6.8 13.6 25 24 19.8
<5 <1 <1 <1 0.190 U
MW006
8/12 4/16 6/17 6/18 7/19
64 70.4 75 100 75.4
64 75.2 92 140 148
12 <1 21 60 75.1
<1 <1 <1 <1 0.190 U
MW011
8/12 4/16 6/17 6/18 7/19 7/19*
96 80.3 69 86 50.3 47.8
64 51 54 84 77.2 73.8
6.1 5.91 8.50 26 28.8 28.1
<1 <1 <1 <1 0.190 U 0.190 U
7/12 4/16 6/17 6/18 7/19
2,540 1,400 2,100 1,480
63 429 550 860 705
2.0 7.74 25 39 34.2
<1 <1 <1 <1 0.190 U
MW009
8/12 4/16 6/17 6/18 7/19
110 <1 23 16 35.6
11 <1 3.60 3.30 12.7
0.73 I <1 <1 <1 0.830 I
<1 <1 <1 <1 0.190 U
7/20
0.190 U
7/20
64.4
0.190 U
7/20
45.1
91.7
35.8
0.190 U
7/20
1,970
36.1
0.190 U
7/20
0.160 U
0.190 U
0.210 U
0.190 U
0.160 U
0.190 U
0.210 U
MW011
7/20
45.1
91.7
35.8
0.190 U
DEP-3
7/21
2.5
1.4
0.26 U
7/21
0.26 U
7/21
0.26 U
7/21
0.26 U
3.5
7/21
2.7
2.4
0.32 U
r o l i r e
E s c a m b r e e t
S a n r e e t
P i r e e t
C a n a l
S t r e e t
Beauty's
Shop
Residential
Residential
Residential
Church
Residential
Residential
F o r m e a n e r s
Masonic Lodge
Former
Milton Post Office
Jewelry
Store
The Main Street Cafe
(former BP Station)
Santa Rosa County
Warehouse
Santa Rosa County
Probation Department
Vacant
Residential
Business
C o n c r e d e w a l k
C o n c r e d e w a l k
A s p h a r k i n g
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
Asphalt Parking
(former True North Surveying)
Concrete Parking
C o n c r e d e w a l k
C o n c r e d e w a l k
C o n c r e d e w a l k
P h y s i c i a n s
B i l l i n s u l t i n g
Storm Drain
Hydrant
Water Service
UP
UP
UP
Water Service
SS
UP
UP
SS
SS
SS
Storm Drain
Storm Drain
LP
LP
LP
SS
LP
LP
LP
Grass
Grass
G r a s s
FORMER
DUMPSTER
FORMER
DRYCLEAN
MACHINE
C
C'
Asphalt Parking
O
E l m i r e e t
Residential
Residential
Salvation Army
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Restaurant
Residential
Commercial
Residential
Santa Rosa County
Clerk of Court
Commercial
Residential
Asphalt Parking
Asphalt Parking
Asphalt Parking
MW011
MW014
MW019
MW022
MW-1T
MW-2T
MW004
MW-16T
MW-5T
MW008
MW012
MW010
DEP-5
DEP-6
DEP-7
DEP-2
DEP-1
DEP-4
DEP-3
MW003
MW001
DEP-11
DEP-12
DEP-8
DEP-13
DEP-10
DEP-9
MW013
MW017
MW018
MW021
MW020
MW016
MW006
MW002
MW005
MW007
MW015
MW009
DW-1T
DW-1
FIGURE
CHLORINATED ETHENE CONCENTRATIONS
IN DEEP (50-70 ft. BGS) GROUNDWATER
2012-2020
FORMER J&D CLEANERS
6815 CAROLINE ST.
MILTON, SANTA ROSA COUNTY, FLORIDA
FDEP FACILITY I.D. NO. 57/9808602 (ERIC_5422)
80'
160'
GRAPHIC SCALE
LP
SS
UP
SANITARY SEWER MANHOLE
SANITARY SEWER LINE
UTILITY POLE
LIGHT POLE
OVERHEAD ELECTRIC UTILITY LINE(S)
TETRACHLOROETHENE [PCE] CONCENTRATION (µg/L)
TRICHLOROETHENE [TCE] CONCENTRATION (µg/L) cis-1,2-DICHLOROETHENE [cis-1,2-DCE] CONCENTRATION (µg/L)
SAMPLE DATE
SAMPLE I.D.
VINYL CHLORIDE CONCENTRATION (µg/L)
LINE OF CROSS SECTION
MW019
11/12
<1
<1
<1
<1
MW022
11/12
<1
<1
<1
<1
MW015
11/12
<1
<1
<1
<1
LEGEND
MONITOR WELL LOCATION (9/02-1/03, SIS)
DEP-8
MONITOR WELL LOCATION (10/91, GWT)
MW-1
INTERMEDIATE MONITOR WELL LOCATION (10/12, AUS)MW013
MONITOR WELL LOCATION (10/12, AUS)
MW016
DEEP MONITOR WELL LOCATION (10/12, AUS)MW014
INTERMEDIATE MONITOR WELL LOCATIONDW-1/1T
MONITOR WELL LOCATIONMW-1T
INTERMEDIATE MONITOR WELL LOCATION (8/02, SIS)
DEP-1
Notes:
Bold indicates Florida Department of Environmental Protection (FDEP)
Groundwater Cleanup Target Level (GCTL) exceedance, Bold Italicized indicates FDEP Natural Attenuation Default Concentration (NADC) exceedance, I indicates result is between laboratory Practical Quantitation
Limit [PQL] and laboratory Method Detection Limit [MDL], L indicates off-scale high, µg/L=micrograms per liter, * indicates duplicate sample result.
C I T
Y W
P B
V
G
R O
U P
E
N W
F E
B
O
L I
B
O
L I
C
W
V
O G
E L
S O
P
W
V
O G
E L
S O
P
N
O L
R
O p t O
N
O
F F
R
E F
C B
I M
O n e
D r i
R C
A D
I S
B c s F
L O
R I D
A
D
E P
T
O
F
E
N V
I R
O N
M E
N T
O
T E
C T
I O
N F
D E
P F o r m e r
J
D
C l e a n e r s
G
W
M
D
W G
G
W M
R
J
D
C
L E
A N
E R
S
F
F d
Y
O U
T
F
D G
V
E D
A
D V
E R
S
L
C
G
E S
E T
U P
O
T S
T Y
L E
T A
B L
E
A C
S C
O L
O R
A
N A
L Y
T I C
A L
C
O
T T
E D
B
E R
N D
G E
N
W
E N
D Y
MW014
11/12 4/16 6/17 7/19
5.0 1.97 <1 0.160 U
0.35 I <1 <1 0.190 U
<1 <1 2.20 3.66
<1 <1 <1 0.190 U
7/20
0.160 U
0.190 U
2.17
0.190 U
MW014
7/20
0.160 U
0.190 U
2.17
0.190 U
7/21
0.29 U
0.61 U
3.5
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Mike O’Sullivan
Arcadis U.S., Inc.
1705 Metropolitan Blvd
Tallahassee, FL 32308
March 10, 2022
Re: Drum Disposal Quote – J&D Cleaners – ERIC_5422 - Milton, FL
Mr. O’Sullivan:
The price for transportation and disposal of a single (1) 55-gallon drum of non-hazardous VOH impacted groundwater located in Milton, FL will be $100.00 per drum, total, for both transportation and disposal.
Good used drums are available free of charge when picked up from our location in Pensacola, FL.
Delivery of an empty drum to your jobsite in Milton, FL will be an additional $50.00.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
| HW680_DC010A negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Annual Groundwater Monitoring |
File details come from the government source that posted it. Updated .