This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. for groundwater monitoring services at the Butler Cleaners facility located at 1268 South McDuff Avenue, Jacksonville, Duval County, Florida. The task assignment is issued pursuant to Contract Number HW680 and is designated as TA Number DC006C. The project manager for FDEP is Theresa Pepe, and the contractor's project manager is Gus Suarez.

The task assignment requires Arcadis to conduct annual groundwater monitoring including sampling for PFAS compounds from select wells at the site, with all activities performed according to the January 9, 2025 Work Plan submitted by Arcadis. The work is divided into four subtasks: Project Management (automatically calculated as a percentage of total labor), PFAS sampling from nine monitoring wells using FDEP's laboratory, annual groundwater monitoring of twelve wells for drycleaning solvents with an attempt to locate missing monitoring well MW001, and preparation of an annual monitoring report with recommendations for additional actions. The total task assignment value is $18,358.91 on a fixed unit rate basis. Invoicing is contingent upon FDEP approval, with $5,310.21 due upon approval of PFAS sampling (due 05/16/2025) and $13,048.70 due upon approval of the Annual Monitoring Report and project management deliverables (due 06/27/2025). The task assignment is effective through August 8, 2025.

View the file

Other files

File Type Posted
CN-370000-HW680-DC001C.pdf PDF
CN-370000-HW680-DC002B.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-DC004A.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC004E.pdf PDF
CN-370000-HW680-DC007A.pdf PDF
CN-370000-HW680-DC008A.pdf PDF
CN-370000-HW680-DC008B.pdf PDF
CN-370000-HW680-DC010C.pdf PDF
CN-370000-HW680-DC011B.pdf PDF
CN-370000-HW680-DC013D.pdf PDF
CN-370000-HW680-DC013E.pdf PDF
CN-370000-HW680-DC013F.pdf PDF
CN-370000-HW680-DC014A.pdf PDF
CN-370000-HW680-DC014B.pdf PDF
CN-370000-HW680-DC014G.pdf PDF
CN-370000-HW680-DC014H.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015C.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-DC015E.pdf PDF
CN-370000-HW680-DC016D.pdf PDF
CN-370000-HW680-DC016E.pdf PDF
CN-370000-HW680-DC018A.pdf PDF
CN-370000-HW680-DC019D.pdf PDF
CN-370000-HW680-DC01ACO2.pdf PDF
CN-370000-HW680-DC021C.pdf PDF
CN-370000-HW680-DC022D.pdf PDF
CN-370000-HW680-DC023A.pdf PDF
CN-370000-HW680-DC023C.pdf PDF
CN-370000-HW680-DC024C.pdf PDF
CN-370000-HW680-DC025B.pdf PDF
CN-370000-HW680-DC026A.pdf PDF
CN-370000-HW680-DC026C.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC032A.pdf PDF
CN-370000-HW680-DC032B.pdf PDF
CN-370000-HW680-DC038A.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-DC040C.pdf PDF
CN-370000-HW680-DC040D.pdf PDF
CN-370000-HW680-DC041A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC052B.pdf PDF
CN-370000-HW680-DC053A.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05ACO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW680

DC006C Completion August 8, 2025

Arcadis will conduct annual groundwater monitoring including sampling for PFAS compounds from select wells at the site. All activities will be performed according to the January 9, 2025, Work Plan submitted by Arcadis.

Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor

Contractor Gus Suarez Contractor 813-205-4703

ERIC_4573

1268 South McDuff Avenue, Jacksonville, Duval County

Butler Cleaners

Contractor Contractor

✔ $ 18,358.91

$ 18,358.91

Scope of Work

Arcadis U.S. Inc.

Contractor Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2025.02.05 09:50:56 -05'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.02.05 09:02:44 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Annual Monitoring Report/IDW manifest/Project Management 06/27/2025

PFAS sampling 05/16/2025

FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 13,048.70

FDEP approval of PFAS sampling $ 5,310.21

$ 18,358.91

HW680

DC006C

FFLORIDA DEPARTMENT OF

EEnvironmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DDeSantis Governor

Jeanette NNuñez

Lt. Governor

AAlexis A. Lambert Secretary

Memorandum

TO: Negotiation File Butler Cleaners

FACID NO. 16-9502315; ERIC_4573

Jacksonville, Duval County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC006C (HW680) DATE: February 3, 2025

Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. Additionally, select wells will be sampled for PFAS compounds. All activities will be conducted in accordance with the January 9, 2025, Work Plan submitted by Mike O’Sullivan of Arcadis.

The final task assignment total is $18,358.91. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.

Subtask 2: PFAS sampling FDEP obtained a signed site access form from the current property owner in June 2022.

Arcadis will conduct expanded PFAS sampling. They will sample nine wells for PFAS compounds using FDEP’s laboratory in Tallahassee. The wells have been chosen based on prior PFAS results and FDEP’s new guidance/flow chart.

Subtask 3: Annual Groundwater Monitoring Arcadis will sample twelve wells for drycleaning solvents based on recommendations from the previous monitoring report. Additionally, they will attempt to locate missing monitor well MW001. IDW will be removed by a licensed waste hauler.

Butler Cleaners

ERIC_4573

Subtask 4: Reporting An Annual Monitoring Report including recommendations for additional actions will be provided under this subtask. The DEP project manager reduced total reporting hours by ten.

Hours and costs are comparable to past task assignments of similar scope.

FDEP COST ESTIMATE

Contractor: Arcadis, U.S., Inc.

Date: 1/9/25

Task #: SubTask 1 Project Management Site: Butler Cleaners SubTask 2 Groundwater Monitoring (PFAS)

Activity/Phase: Monitoring SubTask 3 Groundwater Monitoring (VOHs) Project Manager: Mike O'Sullivan SubTask 4 Reporting (PFAS & VOHs)

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$63.17 Project Manager O'Sullivan, Mike (MOS) 9 9.3 $63.17 Principal Scientist O'Sullivan, Mike (MOS) 27 6 5 16 0 $38.15 Staff Scientist Martineau, Duncan (DM) 52 20 26 6 0 $39.67 Drafter/Designer Oliva, Brian (BO) 6 0 0 6 0 $38.28 Project Assistant Cruz, Michele (MC) 13 5 5 3 0 $35.00 Document Technician Ballheim, Debra (DJB) 3 0 0 3 0

Total Hours 110 9 31 36 34 0

Direct Labor $5,118.96 $588.91 $1,333.42 $1,499.15 $1,697.48 $0.00

Overhead 79.00% $4,043.98 $465.24 $1,053.40 $1,184.33 $1,341.01 $0.00 Gen & Admin 36.00% $1,842.82 $212.01 $480.03 $539.69 $611.09 $0.00 Fringe 37.10% $1,899.14 $218.49 $494.70 $556.18 $629.77 $0.00 Total Labor $12,904.90 $1,484.65 $3,361.55 $3,779.35 $4,279.35 $0.00

Travel Vehicle Rental $480.00 $240.00 $240.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $240.00 $240.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $125.00 $125.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00 Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00

Laboratory Analytical Costs $876.00 $0.00 $876.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $300.00 $0.00 $300.00 $0.00 $0.00 Total Laboratory $1,176.00 $0.00 $1,176.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $80.00 $80.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $450.00 $225.00 $225.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $1,660.00 $830.00 $830.00 $0.00 $0.00 Total Field Expenses $2,370.00 $1,235.00 $1,135.00 $0.00 $0.00

Subtotal $17,068.40 $1,484.65 $4,974.05 $6,330.35 $4,279.35 $0.00 Completion Fee $1,290.51 $148.47 $336.16 $377.94 $427.94 $0.00

Total Estimated Cost $18,358.91 $1,633.12 $5,310.21 $6,708.29 $4,707.29 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : Butler Cleaners SUBTASK 2: Groundwater Monitoring (PFAS)

DATE: 1/9/25

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Annual Groundwater Monitoring - 2024 Principal Scientist Property owners verification, notification and site access agreement updates. Lab coordination. Field personnel ovesight. Staffing. 6 Scientist Mob/demob, prepare sampling kits/equipment, DTW/field measurements, purge and sample 9 MWs. Pack and ship samples 20 Project Assistant Sample container ordering, preparation, electronic transcriptions of field data 5

TOTAL LABOR 31

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00

TOTAL VEHICLE $240.00

SUBCONTRACTOR COSTS

Services Procurement Name Purpose Rate Units Usage Totals

Erwin Remediation IDW T&D $125.00 Per Drum 1 $125.00 Handling Fee 10% 1 $12.50

Total Services: $137.50

TOTAL $137.50

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 0 $0.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Item Rate Unit Usage Totals Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00

Total Expendables: $80.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 750 $225.00 55-gallon Drum $100.00 Each 1 $100.00

Total Equipment Items: $325.00 Deep Groundwater Sampling Kit $415.00 Day 2 $830.00

Total Equipment Kits: $830.00

Total Equipment $1,235.00

SUBTASK 3: Groundwater Monitoring (VOHs)

DATE: 1/9/25

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Annual Groundwater Monitoring - 2024 Principal Scientist Property owners verification, notification and site access agreement updates. Lab coordination. Field personnel ovesight. Staffing. 5 Scientist Mob/demob, prepare sampling kits/equipment, DTW/field measurements, purge and sample 13 MWs. Pack and ship samples 25 Scientist Locate, uncover, and open MW001 1 Project Assistant Sample container ordering, preparation, electronic transcriptions of field data 5

TOTAL LABOR 36

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00

TOTAL VEHICLE $240.00

SUBCONTRACTOR COSTS

Services Procurement Name Purpose Rate Units Usage Totals

Erwin Remediation IDW T&D $125.00 Per Drum 0 $0.00 Handling Fee 10% 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 12 $876.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $876.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 2 $300.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $300.00

TOTAL LAB $1,176.00

EQUIPMENT

Item Rate Unit Usage Totals Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00

Total Expendables: $80.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 750 $225.00 55-gallon Drum $100.00 Each 0 $0.00

Total Equipment Items: $225.00 Deep Groundwater Sampling Kit $415.00 Day 2 $830.00

Total Equipment Kits: $830.00

Total Equipment $1,135.00

SUBTASK 4: Reporting (PFAS & VOHs)

DATE: 1/9/25

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Data Evaluation and Letter Report Principal Scientist Data evaluation. Preparation of an Annual GW Monitoring Report, sign and seal report 16 Scientist Data evaluation 6 Drafter Figures preparation 6 Document Technician Editing; Report preparation 3 Project Assistant Report editing/formatting, and report production/submittal/delivery 3

TOTAL LABOR 34

Arcadis U.S., Inc.

1705 Metropolitan Boulevard Suite 101 Tallahassee Florida 32308 Phone: 850 422 2555 Fax: 850 668 0080 www.arcadis.com

FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062

Ms. Theresa Pepe Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400

Date: January 9, 2025

Subject: Proposal for Annual Groundwater Monitoring at Butler Cleaners, 1268 South McDuff Avenue, Jacksonville, Florida, FDEP Facility ID No. ERIC_4573.

Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the 2024 annual groundwater monitoring activities at the Butler Cleaners located at 1268 South McDuff Avenue, Jacksonville, Florida (FDEP Facility Identification Number ERIC_4576; “the Site”). This proposal includes one groundwater monitoring event for PFAS and one groundwater monitoring event for VOHs with an email summarizing the PFAS results, and one letter report summarizing field activities and results of the VOH monitoring. The FDEP cost estimating spreadsheets (Attachment A), and subcontractor quote (Attachment B) are attached.

SCOPE OF WORK

Subtask 1 - Project Management Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).

Subtask 2 - Groundwater Monitoring (PFAS) Arcadis proposes to mobilize to the Site to conduct an expanded annual groundwater monitoring event to delineate PFAS to the PGCTL and determining whether there are contributing offsite sources of PFAS. Based on the results from the 2023 monitoring event Arcadis recommends additional PFAS sampling of monitoring wells MW151, MW154, and MW194. Arcadis also recommends PFAS sampling of shallow monitoring wells MW303, MW003, and MW130; and intermediate monitoring wells MW124, MW302, and MW304.

Monitoring well locations are shown on the attached figures. Groundwater samples will be collected in accordance with FDEP SOPs and submitted to FDEP’s Laboratory for PFAS analysis. Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly.

Subtask 3 - Groundwater Monitoring (VOHs) Arcadis proposes to mobilize to the Site and collect groundwater samples from shallow monitoring wells MW001, MW003, MW151, MW305, MW307, and MW317; and intermediate monitoring wells MW124, MW154, MW194, MW302, MW304, and MW308. Monitoring wells will be sampled in accordance with FDEP SOPs.

Monitoring well locations are shown on the attached figures. Samples will be submitted to a certified laboratory for analysis by EPA Method 8260C or equivalent (VOHs only). Monitoring well purge water will be contained in

FDEP – Butler Cleaners AGM Proposal Jan 2025 www.arcadis.com _Butler Cleaners AGM proposal_dec24

55-gallon drums, sampled for characterization, and disposed of properly. Arcadis proposes additional time to search for monitoring well MW001 using a metal detector because it could not be located during the last monitoring event. If MW001 can be located Arcadis proposes to collect a groundwater sample to be analyzed for VOHs. Monitoring well locations are shown on the attached Figures.

Subtask 4 - Reporting (PFAS and VOHs) Arcadis will incorporate the data collected during the groundwater sampling event into a letter report summarizing the field activities. The report will include laboratory analytical data, figures presenting groundwater analytical data, a summary of the data, conclusions, and recommendations for future work at the Site.

SCHEDULE

Arrangements for groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP. Arcadis will schedule the PFAS sampling event with the FDEP Lab.

ESTIMATED COST

A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as Attachment A.

Please contact me if you have any questions regarding this proposal.

Sincerely, Arcadis U.S., Inc.

Mike O’Sullivan, P.G.

Principal Geologist Email: mike.osullivan@arcadis.com Direct Line: 850.895.4739 Mobile: 850.491.2346

Attachment:

Figures Attachment A – Cost Estimate Form and Level of Effort Forms Attachment B – Subcontractor quote

408 Ditmar Street

Pensacola, FL 32503

To: Mr. Mike O’Sullivan Arcadis US, Inc 1705 Metropolitan Boulevard Tallahassee, FL 32308

November 21, 2024

Re: Drum Disposal – 1268 South McDuff Avenue – Jacksonville, FL

Mr. O’Sullivan:

The price for the transportation and disposal (T&D) of one (1) 55-gallon drum of non-hazardous water impacted with drycleaning solvents at your site located in Jacksonville, FL will be $125.00 per drum/total.

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.

This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.