About this file
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for groundwater monitoring services at the Butler Cleaners site located at 1268 South McDuff Avenue, Jacksonville, Duval County, Florida. The task assignment is designated as DC006A under underlying Contract Number HW680 and was executed on March 7-8, 2022. The FDEP Project Manager is Theresa Pepe, and the contractor's Project Manager is Gus Suarez. The site is identified by FDEP Facility ID No. ERIC_4573.
Arcadis will conduct annual groundwater monitoring from select monitoring wells at the Butler Cleaners site according to the March 3, 2022 Work Plan. The scope includes two subtasks: Subtask 1 covers project management costs calculated as a percentage of total labor, and Subtask 2 involves annual groundwater monitoring activities including sampling of thirteen wells for drycleaning solvents, one well for manganese per UIC requirements, groundwater elevation measurements, and preparation of an Annual Monitoring Report with recommendations. The total task assignment value is $8,088.49 on a fixed unit rate basis. Payment is contingent upon FDEP approval of the Annual Monitoring Report, IDW manifest, and project management deliverables, with a deadline of June 10, 2022. The cost estimate reflects direct labor of $1,879.30, overhead charges of 79 percent, general and administrative costs of 36 percent, fringe benefits of 37.1 percent, travel expenses of $240.00, laboratory costs of $1,337.00, subcontractor services for IDW disposal of $165.00, and field equipment expenses of $1,135.00, with a completion fee of $473.77.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC006A Completion July 15, 2022
Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the March 3, 2022, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4573
1268 South McDuff Avenue, Jacksonville, Duval County
Butler Cleaners
✔ $ 8,088.49
$ 8,088.49
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.03.08 08:05:23 -05'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.03.07 15:31:04 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Monitoring Report/IDW manifest/Project Management 06/10/2022
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 8,088.49
$ 8,088.49
HW680
DC006A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Butler Cleaners
FACID NO. 16-9502315; ERIC_4573
Jacksonville, Duval County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC006A (HW680) DATE: March 7, 2022
Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. All activities will be conducted in accordance with the March 3, 2022, Work Plan submitted by Mike O’Sullivan of Arcadis.
The final task assignment total is $8,088.49. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Annual Groundwater Monitoring Arcadis will sample thirteen wells for drycleaning solvents based on recommendations from the previous monitoring report. One well will be sampled for manganese per UIC requirements. IDW will be drummed and disposed by a licensed waste hauler per FDEP’s preference. Prior to disposal, one IDW sample will be collected and if determined to be hazardous, Arcadis will submit a change order to cover the additional costs An Annual Monitoring Report including recommendations for additional actions will be provided under this subtask.
Hours and costs are comparable to past task assignments of similar scope.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 3/2/2022
Task #: SubTask 1 Project Management
Site: Butler Cleaners SubTask 2 Annual Groundwater Monitoring 2022
Activity/Phase: Monitoring SubTask 3
Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$50.00 Project Manager O'Sullivan, Mike (MO) 4 4.3
$50.00 Senior Scientist O'Sullivan, Mike (MO) 17 17 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 23 23 0 0 0
$31.48 Drafter/Designer Berndgen, Wendy (WDB) 3 3 0 0 0
$26.52 Document Technician Embras, Susan (SRE) 2 2 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0
Total Hours 49 4 45 0 0 0
Direct Labor $1,879.30 $216.20 $1,663.10 $0.00 $0.00 $0.00
Overhead 79.00% $1,484.65 $170.80 $1,313.85 $0.00 $0.00 $0.00
Gen & Admin 36.00% $676.55 $77.83 $598.72 $0.00 $0.00 $0.00
Fringe 37.10% $697.22 $80.21 $617.01 $0.00 $0.00 $0.00
Total Labor $4,737.72 $545.04 $4,192.68 $0.00 $0.00 $0.00
Travel
Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $240.00 $240.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $150.00 $150.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $150.00 $150.00 $0.00 $0.00 $0.00
Handling Fee $15.00 $15.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $165.00 $165.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $1,037.00 $1,037.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $300.00 $300.00 $0.00 $0.00 $0.00
Total Laboratory $1,337.00 $1,337.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $80.00 $80.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $1,055.00 $1,055.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $1,135.00 $1,135.00 $0.00 $0.00 $0.00
Subtotal $7,614.72 $545.04 $7,069.68 $0.00 $0.00 $0.00
Completion Fee $473.77 $54.50 $419.27 $0.00 $0.00 $0.00
Total Estimated Cost $8,088.49 $599.54 $7,488.95 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Butler Cleaners SUBTASK 2: Annual Groundwater Monitoring 2022
DATE: 3/2/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2022 Scientist Prep; local mob/demob; 13 WLs; sample 13 MWs; manage IDW; sample delivery 23 Senior Scientist Access, GW monitoring technical oversight and offsite notice review 3
Data Evaluation and Letter Report Senior Scientist Technical review; sign and seal report 2 Senior Scientist Data evaluation and preparation of a brief letter report 12 Scientist Data evaluation 0 Drafter Figures preparation 3 Document Technician Editing; Letter report preparation 2
TOTAL LABOR 45
VEHICLE TYPE RATE UNIT USEAGE
Van/Truck $120.00 Per Day 2 $240.00 $240.00
TOTAL VEHICLE $240.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals Erwin Remediation IDW $150.00 Drum 1 $150.00
Total Services: $150.00
TOTAL $150.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 13 $949.00 IDW 8260C Aqueous $73.00 1.00 1 $73.00SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00 MN 6020 Aqueous $15.00 1.00 1 $15.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,037.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 2 $300.00 Total Shipping: $300.00
TOTAL LAB $1,337.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00
Total Expendables: $80.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 750 $225.00
Total Equipment Items: $225.00 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 2 $830.00
Total Equipment Kits: $830.00
TOTAL EQUIPMENT$1,135.00
Arcadis U.S., Inc.
1705 Metropolitan
Boulevard
Suite 101
Tallahassee
Florida 32308
Phone: 850 422 2555
Fax: 850 668 0080 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
Ms. Theresa Pepe
Bureau of Waste Cleanup
Division of Waste Management
Florida Department of Environmental Protection
2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400
Date: March 3, 2022
Our Ref: TL006015
Subject: Proposal for Annual Groundwater Monitoring at Butler Cleaners, 1268
South McDuff Avenue, Jacksonville, Florida, FDEP Facility ID No. ERIC_4573.
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the annual groundwater monitoring activities at the Butler Cleaners located at 1268 South McDuff Avenue, Jacksonville, Florida (FDEP Facility Identification Number ERIC_4576; “the Site”; Figure 1). This proposal includes one groundwater monitoring event, and one letter report summarizing field activities. The FDEP cost estimating spreadsheets (Attachment A) and subcontractor quote (Attachment B) are attached.
This proposed annual groundwater monitoring will aid in the continued evaluation of site conditions relative to the proposed Remedial Action Plan (RAP) Modification for enhanced bioremediation. Based on the 2020 and 2021 groundwater monitoring results and discussions with FDEP, the implementation of the RAP Modification was postponed until additional assessment and groundwater monitoring results source area results are conducted.
SCOPE OF WORK
Subtask 1 - Project Management
Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).
Subtask 2 - Groundwater Monitoring (2022)
Arcadis will conduct one annual groundwater monitoring event to collect groundwater samples from shallow monitoring wells MW151, MW303, MW305, MW307, MW309, and MW311; intermediate monitoring wells MW124, MW153, MW154, MW194, MW302, MW304, and MW318; and one equipment blank. Fourteen samples will be collected in accordance with the FDEP SOPs and submitted to a certified laboratory for analysis by EPA Method
8260C or equivalent (VOHs only). Additionally, one sample (MW164) will be analyzed for manganese to evaluate compliance with UIC variance requirements. Arcadis proposes to collect groundwater elevation measurements in the same wells that are being sampled. Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly. Monitoring well locations are shown on Figure 1.
FDEP – Butler Cleaners Proposal 2022 www.arcadis.com _Butler AGM proposal_Feb2022
Arcadis will incorporate the data collected during the groundwater sampling event into a letter report summarizing the field activities. The report will include laboratory analytical data, figures presenting groundwater analytical data, and recommendations for the Site.
Based on the groundwater results, Arcadis recommends evaluating the need to implement the FDEP-approved
Remedial Action Plan (RAP) Modification, dated October 19, 2010, for enhanced dechlorination through substrate addition as FDEP priorities and funding allow. Prior to implementation of the RAP Modification, Arcadis recommends conducting a baseline sampling event to evaluate the distribution of chlorinated ethenes at the Site, particularly in the vicinity of the MW150-series monitoring wells, for consideration in the implementation of the
RAP Modification. Also, the RAP Modification should be reviewed prior to implementation relative to advances in remediation technologies to verify that the selected approach is consistent with these advances.
SCHEDULE
Arrangements for monitoring well replacement and groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP.
ESTIMATED COST
A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as
Attachment A.
Please contact me if you have any questions regarding this proposal.
Sincerely, Arcadis U.S., Inc.
Mike O’Sullivan, P.G.
Senior Geologist
Email: mike.osullivan@arcadis.com
Direct Line: 850.895.4739
Mobile: 850.491.2346
Attachment:
Figure
Attachment A – Cost Estimate Form and Level of Effort forms
Attachment B – Subcontractor quote
Figures
L
Y
D
I
A
S
T
R
E
E
T
MW150
W
I
L
L
O
W
B
R
A
N
C
H
V
E
N
U
E
C
O
N
C
R
E
E
D
E
W
A
L
K
A
L
L
Y
CONCRETE
A
S
P
H
A
M
P
R
A
M
P
C
O
N
C
R
E
T
E
G
R
A
V
L
E
Y
C
O
N
C
R
E
T
E
C
O
N
C
R
E
T
E
S
T
O
N
D
E
W
A
L
K
E
D
G
F
P
H
A
L
T
U
T
T
E
R
S
Y
D
N
I L
L O W B
R A N C H P A R K
P
A
R
K
I
T
BUTLER
B
A
J
A
L
RESIDENCE
RESIDENCE
CLEANERS
S
T
R
E
E
T
MW315
MW309
MW313
MW311
MW301
MW303
MW315
MW316
MW304
MW310
MW312
MW308
MW302
MW316
MW304
S
O
U
M c
D
U
V
E
N
U
E
S
Y
D
N
R
E
E
T
G
A
R
A
G
E
MW317
MW001
MW003
MW002
MW317
MW318MW318
MW311
MW305
MW306
MW001
MW002
MW003
R
E
A
L
T
Y
MW307
MW308
MW307
MW302
MW301
MW421
MW306
MW314
MW310
MW314
MW309
MW313
MW231
MW110 ABANDONED
MW131
MW132
MW133
MW134
MW111 ABANDONED
MW501
MW506
MW111R
MW121
MW221
29.7
7/08
4.2 2.5
1/08 7/08
NS
NS
BDL BDL
1/08 7/08
10.0
1/09
3.4 1.3
1/08 7/08 1/09
BDL
NS
7/08 1/09
NS
NS NS
NS NS
NS NS
NS NS
BDL
MW122
MW123
MW124
MW182
MW183
MW184
NS
1/08 7/08
279 24
12/08
1/08 7/08
BDL 1.8
12/08
BDL
1/08
7/08
12/08
BDL
12/08
BDL
NS
NS
4.7
7/08
6.3
1/09
NS
NS
1/10
BDL
1/10
14.3
1/10
MW190
MW191
MW192
MW193
MW194
MW201
1/10
1/10
9.1
1/10
BDL
1/10
5.5 6.7
1/08 7/08
6.7
1/10
MW151
13.6
2/11
BDL
2/11
MW181
2.4
2/11
MW312
MW303
RW001
3/12
4/15
4/15
NS
NS
NS
NS
MW304
MW130
MW180
6/18
NS
NS
NS
2.1
BDL
6/17
NS
NS
NS
NS
6/18
NS
NS
NS
NS
6/18
6/18
1.034
6/19
NS
NS
NS
38.39
85.08
6/19
NS
NS
NS
NS
6/19
NS
NS
NS
19.61
6/19
5.58
6/19
NS
NS
NS
NS
17.24
6/19
BDL
2/11
0.96 U
6/20
8.51
6/19
79.93
6/20
NS
NS
NS
MW160
MW161
MW162
MW163
MW164
NS
44.12
NS
0.96 U
225.57
6/20
NS
NS
NS
NS
58.65
6/20
8.75
6/20
1.69
6/20
0.96 U
6/20
MW305
MW311
1,115
6/21
NS
65.7
NS
12.15
NS
NS
NS
NS
95.3
6/21
2.4
6/21
1.87 U
6/21
121.3
6/21
NS
NS
NS
6/21
1.87 U
6/21
MW152
MW153
MW154
FIGURE
TOTAL CHLORINATED ETHENES
IN GROUNDWATER
JUNE 2021
BUTLER CLEANERS
1268 SOUTH McDUFF AVENUE
JACKSONVILLE, FLORIDA
FDEP FACILITY ID# 169502315
X R
E F
S
P R
O J E
C T
N A
M
C I T
Y R e q d
D
V
G
R O
U P
R e q
R e q
O p t
P
C
O p
R e q
O p
R
O p t O
N
O
F F
R
E F
C U s e r s w d b e r n d g A
R C
A D
I S
U
S A
C C
D o c s A r c a d i s A
U S
F
D E
P B
U T
L E
R
C
L E
A N
E R
S J A
C K
S O
N V
I L L
E
F l o r i d a P r o j e c t
F i l e s n r o g r e s s
D
W G
T
L
B
J
F
A
L L d w g
Y
O U
T
F
E
V
E D
A
D V
E R
M
S
T
E C
G
E S
E T
U P
P L
O T
S T
Y L E
T A
B L E
F
D E
P C
O
T T
E D
B
E R
N D
G E
N
W
E N
D Y
1/08
NS
RW001
RECOVERY WELL LOCATION
FOR CHLORINATED ETHENES (JUNE 2020)
GROUNDWATER CLEANUP TARGET LEVELS (GCTLs)
ESTIMATED EXTENT OF GROUNDWATER EXCEEDING
TOTAL CHLORINATED ETHENE CONCENTRATION (µg/L)
BDL
BELOW DETECTION LIMITS
MICROGRAMS PER LITER
LEGEND
MW001 SHALLOW MONITORING WELL LOCATION
DEEP MONITORING WELL LOCATIONMW302
MW130
MW200
MONITORING WELL CLUSTER LOCATION
EXISTING MONITORING WELL LOCATION
NS
NOT SAMPLED
NS
7/08
SCALE IN FEET
120'60'30' µg/L
U ANALYTE NOT DETECTED ABOVE MDL
Attachment B
Subcontractor Quote
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Mike O’Sullivan
Arcadis U.S., Inc.
1705 Metropolitan Blvd
Tallahassee, FL 32308
February 17, 2022
Re: Drum Disposal Quote – Butler Cleaners – Jacksonville, FL
Mr. O’Sullivan:
The price for transportation and disposal of a single (1) 55-gallon drum of non-hazardous VOH impacted groundwater located in Jacksonville, FL will be $100.00 total for both transportation and disposal.
Good used drums are available free of charge when picked up from our location in Pensacola, FL.
Delivery of an empty drum to your jobsite in Tallahassee, FL will be an additional $50.00.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
| negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Annual Groundwater Monitoring |
File details come from the government source that posted it. Updated .