Attachment 8 AF Form 66.xlsx

Air Force Form XLSX spreadsheet 24 KB Posted

Attached to
Repair/Restore Pest Management Facility
Solicitation number
FA481922R0015
Issued by

About this file

This document contains a material submittals schedule template and details of a federal contract opportunity for repair and restoration of a Pest Management Facility.

The material submittals schedule template outlines the process for submitting and tracking required documentation for a construction project. It includes fields for item descriptions, required submission dates, dates received by contracting and civil engineering offices, return suspense dates, submittal numbers, approval notifications, and resubmittal tracking.

The federal contract opportunity is a design-build project solicited by the Department of the Air Force Air Combat Command. It involves repair and restoration work at the Pest Management Facility on Tyndall AFB, with a period of performance of 365 calendar days from notice to proceed. The work is covered by NAICS code 236220 for commercial and institutional building construction. The contract will be firm-fixed price and follow FAR Part 15 procedures as a HUBZone small business set-aside with a value between $800,000 and $2,000,000. Performance and payment bonds are required. Davis-Bacon prevailing wage rates apply. The period of performance is 365 days from notice to proceed.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
R00015 Q and A Part 2 Answered.xlsx XLSX spreadsheet
Attachment 5 Section L and M 29 Jun 22.docx DOCX document
Solicitation Amendment FA481922R00150003 SF 30.pdf PDF
Solicitation Amendment FA481922R00150002 SF 30.pdf PDF
R00015 Q and A - Answered.xlsx XLSX spreadsheet
Attachment 5 Section L and M 15 June 2022 Update.docx DOCX document
1. RFP SOW Title_XLWU 19-8195_13Jun2022.docx DOCX document
3. RFP APPENDIX - B Drawings 13Jun2022.pdf PDF
2. RFP APPENDIX - A Title_XLWU 20-8195_20220610.docx DOCX document
Site Visit Sign in Sheet.pdf PDF
Solicitation Amendment FA481922R00150001 SF 30.pdf PDF
Solicitation - FA481922R0015.pdf PDF
Attachment 15 AF Form 813 Demolish and Construct Pest Management Facility.pdf PDF
Attachment 1 RFP SOW Repair Pest Management Facility_XLWU 19-8195_20Apr2022.pdf PDF
Attachment 5 Section L and M.docx DOCX document
Attachment 7 Wage Determination Building - FL20220005.pdf PDF
Attachment 16 Division Cost Estimate Worksheet.xlsx XLSX spreadsheet
Attachment 12 Sample RFI.PDF PDF
Attachment 6 Other Contract Requirements.pdf PDF
Attachment 3 RFP APPENDIX - B Drawings.pdf PDF
Attachment 14 Proof of Financial Responsibility.pdf PDF
Attachment 11 AF3065.pdf PDF
Attachment 2 RFP APPENDIX - A Repair Pest Management Facility_XLWU 20-8195_20Apr2022.pdf PDF
Attachment 4 RFP APPENDIX - C Repair Pest Management Facility_XLWU 20-8195.pdf PDF
Attachment 10 AF 3064.pdf PDF
Attachment 9 AF Form 3000.pdf PDF
Attachment 13 Base Access Request EAL.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
[ enter here ]Project Title:
[ enter here ]Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).

&P of &N

File details come from the government source that posted it. Updated .