Attachment 8 AF Form 66.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Repair/Restore Pest Management Facility Federal contract opportunity
- Solicitation number
- FA481922R0015
About this file
This document contains a material submittals schedule template and details of a federal contract opportunity for repair and restoration of a Pest Management Facility.
The material submittals schedule template outlines the process for submitting and tracking required documentation for a construction project. It includes fields for item descriptions, required submission dates, dates received by contracting and civil engineering offices, return suspense dates, submittal numbers, approval notifications, and resubmittal tracking.
The federal contract opportunity is a design-build project solicited by the Department of the Air Force Air Combat Command. It involves repair and restoration work at the Pest Management Facility on Tyndall AFB, with a period of performance of 365 calendar days from notice to proceed. The work is covered by NAICS code 236220 for commercial and institutional building construction. The contract will be firm-fixed price and follow FAR Part 15 procedures as a HUBZone small business set-aside with a value between $800,000 and $2,000,000. Performance and payment bonds are required. Davis-Bacon prevailing wage rates apply. The period of performance is 365 days from notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| [ enter here ] | Project Title: | ||
| [ enter here ] | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 25 |
&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).