R00015 Q and A Part 2 Answered.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Repair/Restore Pest Management Facility Federal contract opportunity
Solicitation number
FA481922R0015
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains questions and answers related to a Design-Build project to repair and restore a Pest Management Facility at Tyndall Air Force Base. The project will reutilize existing communications equipment and utilities. Lighting occupancy sensors will be required rather than a full lighting control system. Exterior lighting for open sheds is not required to be turtle friendly. The existing pump control system and roof will be replaced, requiring a new lightning protection system but not a counterpoise grounding system. Relevant past performance from key subcontractors is acceptable. The solicitation number is FA481922R0015 and is a HUBZone set-aside with a period of performance of 365 days from notice to proceed and requiring performance and payment bonds. The construction wage requirements statute applies.

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Restore Pest Management Facility, newest first.
File Type Posted
Solicitation Amendment FA481922R00150003 SF 30.pdf PDF
Attachment 5 Section L and M 29 Jun 22.docx DOCX document
Solicitation Amendment FA481922R00150002 SF 30.pdf PDF
R00015 Q and A - Answered.xlsx XLSX spreadsheet
2. RFP APPENDIX - A Title_XLWU 20-8195_20220610.docx DOCX document
Attachment 5 Section L and M 15 June 2022 Update.docx DOCX document
1. RFP SOW Title_XLWU 19-8195_13Jun2022.docx DOCX document
Solicitation Amendment FA481922R00150001 SF 30.pdf PDF
3. RFP APPENDIX - B Drawings 13Jun2022.pdf PDF
Site Visit Sign in Sheet.pdf PDF
Attachment 14 Proof of Financial Responsibility.pdf PDF
Solicitation - FA481922R0015.pdf PDF
Attachment 2 RFP APPENDIX - A Repair Pest Management Facility_XLWU 20-8195_20Apr2022.pdf PDF
Attachment 4 RFP APPENDIX - C Repair Pest Management Facility_XLWU 20-8195.pdf PDF
Attachment 8 AF Form 66.xlsx XLSX spreadsheet
Attachment 9 AF Form 3000.pdf PDF
Attachment 10 AF 3064.pdf PDF
Attachment 13 Base Access Request EAL.xlsx XLSX spreadsheet
Attachment 1 RFP SOW Repair Pest Management Facility_XLWU 19-8195_20Apr2022.pdf PDF
Attachment 6 Other Contract Requirements.pdf PDF
Attachment 11 AF3065.pdf PDF
Attachment 12 Sample RFI.PDF PDF
Attachment 16 Division Cost Estimate Worksheet.xlsx XLSX spreadsheet
Attachment 3 RFP APPENDIX - B Drawings.pdf PDF
Attachment 5 Section L and M.docx DOCX document
Attachment 7 Wage Determination Building - FL20220005.pdf PDF
Attachment 15 AF Form 813 Demolish and Construct Pest Management Facility.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question OwnerQuestionAnswer
325 CESDoes “Attachment 3 RFP Appendix B Drawings” supersede “Attachment 15 AF Form 813 Demolish and Construct Pest Management Facility” in terms to Pest Management Facility demo plan and building location.Yes
325 CESIn reference to SOW Para. 6.1.5.1.1.2.B:
What site chages are proposed to create the required vehicular stand-off distance?None. Ignore this reference.
325 CESIn reference to SOW Para. 6.1.5.1.1.2.B:
Are we to design blast resistance to the existing building enclosure?No. Ignore this reference. Design windows to meet the design wind speed.
325 CESIn page 58 of 68 in the RFP it states in part B. "Blast resistant as per UCF 4-010-01(12 December 2018) DoD Minimum

Antiterrorism Standards for Buildings. The design criteria based on a secure site, existing building, and inhabited occupancy; the “Design Basis Threat” and “Level of Protection” as established by the Tyndall AFB Antiterrorism Plan or unless otherwise as directed by the Contracting Officer".

What site changes are proposed to create the required vehicular stand-off distances?

Are we to design blast resistance to the existing building enclosure?No. Ignore this reference. Design windows to meet the design wind speed.
325 CESIt was discussed at the jobsite walk-through that the existing Comm utilities would remain and be re-used for the building, and that a comm room will be required for the project. Will the existing wall-mounted Comm cabinet remain and be utilized as-is, or will a new free-standing 2-post rack, 4-post rack, or a cabinet be required?We will reutilize the existing wall rack for this project.
325 CESIf a new free-standing rack or cabinet is required will the existing Comm splicing/terminating and patch panels be re-used, since the utilities are existing and are to be re-used, or will new patch panels and equipment be required?We will reutilize the existing wall rack, switch, and patch panels.
325 CESIf a new free-standing rack or cabinet is required, are the existing Comm entrance cables long enough to reach the free-standing rack or cabinet? Please confirm.N/A
325 CESIn the Appendix A Description of Work 2.5 Electrical para. 2.5.3.b. states that “Switched receptacles shall be provided per ASHRAE 90.1.”. We assume that Siemens is providing the switching control relays, since the switching of the receptacles is part of the lighting control system that controls the receptacles? Please confirm.There will not be a lighting control system in the Siemens requirements for this building. Lighting occupancy sensors will be required.
325 CESDuring the walk-through it was discussed that exterior turtle lighting was not required for the sheds that were to be constructed on the East side of the building. Para. 2.5.4.E states that all Exterior Lighting will be Turtle Friendly and will comply with the Florida Fish and Wildlife Commission. Is the lighting for the open sheds considered to be exterior lighting, and therefore required to be “turtle friendly”? Please confirmThe lighting for the open sheds are NOT considered to be exterior lighting and will not be required to be "turtle friendly".
325 CESThe outside chemical storage area has an existing pump control system that has an electrical enclosure that used to be an explosion-proof enclosure but has been modified and is no longer explosion-proof and has existing PVC conduit entering it. Is this existing pump and control system to remain as-is?Remains as is.
325 CESIt was discussed that the facility will be brought up to the new Tyndall standards. Since the existing building roof is to be replaced, is a new lightning protection system be required for the building?Yes
325 CESIf a new lightning protection system is required, will a new exterior counterpoise grounding system be required?A counterpoise grounding system is not required.
325 CONSThe solicitation does not appear to have any language regarding the use of Past Performance references from key sub-contractors and I wanted to see if we could use key sub-contractor past performance references in place of prime past performance references.The use of relevant past experience as a key subcontractor is acceptable.