Attachment 8 AF Form 66.pdf
PDF 73 KB Posted
- Attached to
- Paint Blue Juice Tank E-43, B13272
- Solicitation number
- FA500020Q0081
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
FXSB 17-4051
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
PREFERENCE, TYPE OF SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
D R
A W
IN
G
S
PL
A
N
M
SD
S
M A
N F'
R R
EC
O
M M
EN
D
A
TI
O N
S
R
EQ
U
ES
T
LE
TT
ER
C A
TA
LO
G D
A
TA
R
EP
O R
TS
O
TH
ER
D
A
TA
TE
ST
R
ES
U
LT
S
REQUIRED
SUBMISSION DATE
DATE RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENSE
DATE FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL FINAL APPROVAL REMARKS
Notice of Start of Work
1 10 days prior to start of any work
Quality Control Plan
20 Days after NTP
HAZMAT Approval, General Specs 01500, para. 5.1.3 and 5.1.5.
NLT 10 working days prior to material being brought onto installation.
4 HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5.
NLT 7 working days after Final Acceptance.
Project Schedule
10 Days after NTP
Safety Data Sheets
2 30 days before brought on Base
7 Paint Chips/Color Selection 1 1 10 Days after NTP
Material submital coatings with manufacturer’s information. 1 10 Days prior to use
Material submital coatings with Instructions. 1 1 10 Days prior to use
10 Material submital sealants Instructions 1 1 10 Days prior to use
Material submital sealants manufacturer’s information. 1 1 10 Days prior to use
12 Material submital sealants Instructions 1 1 10 Days prior to use
13 Environmental Checklist 1 10 Days before
NTP
Maintain - Inspect Repair Exterior Tank
E-43 BLDG 13272
File details come from the government source that posted it. Updated .