Attachment 9 Drawings.pdf

PDF 3 MB Posted

Attached to
Paint Blue Juice Tank E-43, B13272 Federal contract opportunity
Solicitation number
FA500020Q0081
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBER - ELMENDORF, ALASKA

PROJECT LOCATION

KEY PLAN

(SEE KEY PLAN)

TRUE

NORTH

SCHEDULE OF DRAWINGS

SHEET REFERENCE NUMBER SHEET TITLE

G-001 COVER SHEET, VICINITY MAP & GENERAL NOTES

A-101 FLOOR PLAN AND ELEVATIONS

MAP KEY

LOCATION DESCRIPTION

BLDG 13272 TANK E-43

PROJECT NOTES:

1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

2. AT NO TIME WILL THE CONTRACTORS WORK, STORAGE OF MATERIALS, PARKING OF VEHICLES OR OTHER ACTIVITIES BE ALLOWED TO INTERFERE WITH THE WORK ACTIVITIES OF

GOVERNMENT PERSONNEL OR TO DAMAGE GOVERNMENT OR PRIVATE PROPERTY.

3. PARKING SHALL BE ALLOWED IN APPROVED PARKING SPACES ONLY. VEHICLES OTHERWISE PARKED SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.

4. THE CONTRACTOR'S MATERIALS AND EQUIPMENT SHALL NOT BE STORED WITHIN 20 FEET O F ANY BUILDING, OBSTRUCT FIRE EXITS OR OTHERWISE INTERFERE WITH FIRE FIGHTING

FACILITIES. ANY MATERIALS, EQUIPMENT OR VEHICLES DOING SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.

5. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE WORK AREA FREE FROM ACCUMULATION OF WASTE MATERIALS. DEBRIS SHALL BE REMOVED ON A DAILY BASIS.

6. ALL WELDING AND / OR THE USE OF FLAME PRODUCING DEVICES SHALL BE CLEARED THROUGH THE FIRE DEPARTMENT.

7. ALL CONSTRUCTION PERMITS, FEES AND COORDINATION OF ANCILLARY ITEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

8. THE WORK OF THIS CONTRACT SHALL COMPLY WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES OR STANDARDS. ALL WORK SHALL COMPLY WITH THE MOST RECENT ADOPTED

EDITION OF THE CODES OR STANDARDS THAT FOLLOW:

EPA STANDARDS INTERNATIONAL BUILDING CODE INTERNATIONAL FUEL GAS CODE INTERNATIONAL MECHANICAL CODE INTERNATIONAL PLUMBING CODE

NATIONAL ELECTRICAL CODE NATIONAL ELECTRICAL SAFETY CODE NATIONAL FIRE PROTECTION ASSOCIATION OSHA STANDARDS

SHEET METAL AND AIR CONDITIONING CONTRACTOR'S NATIONAL ASSOCIATION INC. FIRE CODES

A B C D E F G H

F I L

E

N

O

I

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

D E

S C

R I P

T I O

N

R E

V I S

I O

N S

RICHARDSON, ALASKA

AF CONTRACT NUMBER:

FACILITY NO:

D A

T E

A P

P R

O V

E R

JOINT BASE ELMENDORF

PROJ. MGR:

DRAFTER:

CHECKER:

PROJ. ENGR:

DATE:

DATE:

DATE:

DATE:

DESIGNER LOGO

AIR FORCE

S Y

M B

O L

D A

T E

G-001

13272 E-43

FXSB 17-4051

25 JUN 2020

WRC

MAINTAIN - INSPECT REPAIR EXTERIOR TANK E-43 B.13272

Project No. FXSB 17-4051

A B C D E F G H

F I L E

N

O

I

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

D E

S C

R I P

T I O

N

R E

V I S

I O

N S

RICHARDSON, ALASKA

AF CONTRACT NUMBER:

FACILITY NO:

D A

T E

A P

P R

O V

E R

JOINT BASE ELMENDORF

PROJ. MGR:

DRAFTER:

CHECKER:

PROJ. ENGR:

DATE:

DATE:

DATE:

DATE:

DESIGNER LOGO

AIR FORCE

S Y

M B

O L

D A

T E

13272

FXSB 17-4051

1-1

22 JUN 2020

WRC

5'-11"

11'-11"

3'-1"

7'-3"

27'

32'-5"

7' -3"

27'

11'-11"

Exhibit Drawing FOR BID PURPOSES ONLY

Contractor shall field verify all measurements, quantities, or value stated by the Government.

Notes:

1. Strip all existing finishes from the exterior of tank to SSPC- SP10 Near-White Blast Cleaning standard. If coating manufacturer allows a lower SP rating, then their recommended rating shall be sufficient (see SOW 2.2.1).

2. Guard all lock hardware, hinge hardware, Ladder rung surfaces, and vent openings from sand blasting media injection.

Following blast cleaning of the doors, door frames, and ventilators, contractor must visually inspect all members and welds for defects.

If any components appear to be damaged or inoperable the contractor must immediately notify the Government (see SOW 2.2.2).

3. Following blast cleaning of exterior of the tank, contractor must visually inspect all members and welds for defects. If any components appear to be damaged or inoperable the contractor must immediately notify the Government (see SOW 2.2.3).

4. Apply a new three-coat system to exterior of the tank (See Supplemental Specifications, Specification 09910 Field Painting Structural Steel, 2.2. Paint). Coating system shall consist of the following: Prime Coat: Epoxy polyamide, MIL-DTL-24441/19 (Formula 159, Type III), Intermediate Coat: Epoxy polyamide, MIL- DTL-24441/31 (Formula 152, Type IV, White (Tinted)), Top Coat:

Polyurethane coating topcoat of MIL-PRF-85285, Type II. Each coat must be contrasting colors in order to determine 100% coverage was achieved. Top coat color selection, provide physical samples to project manager for selection (See SOW 2.2.4).

A-101

FLOOR PLAN AND

ELEVATIONS

G-001 TANK-Layout1
Sheets and Views
Layout1
A-101_Drawing
Sheets and Views
Layout1