Attachment 3_FXSB 23-1040S AF Form 66.pdf
PDF 67 KB Posted
- Attached to
- AMENDED 2_ HAZMAT Survey for B10435 Federal contract opportunity
- Solicitation number
- FA500023Q0073
About this file
This document is a submittal schedule for a federal contract to conduct a HAZMAT survey at Building B10435. The schedule outlines six required submissions including project-specific forms, a start work notification, destructive sampling plan, methods of testing, survey and analysis report, and project schedule. Submissions are due to the contracting officer between 10-15 days after notice to proceed with the exception of the survey and analysis report which requires approval from both the contractor and project engineer. The solicitation number for the related HAZMAT survey opportunity is FA500023Q0073 and was issued by the Department of the Air Force Pacific Air Forces.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_Sampling Data.pdf | ||
| Solicitation Amendment FA500023Q00730001.pdf | ||
| Solicitation Amendment FA500023Q00730001 SF 30.pdf | ||
| Attachment 9 Wage Determination 21 July 2023.pdf | ||
| Attachment 5_FXSB 23-1040S LIQDG.pdf | ||
| Attachment 6_FXSB 23-1040S Open Mkt Gen Specs 20230601.pdf | ||
| Attachment 1_FXSB 23-1040S Price Schedule.pdf | ||
| Attachment 2_FXSB 23-1040S SOW.pdf | ||
| Attachment 9_Davis-Bacon Act WD AK20230001 23 June 2023.pdf | ||
| Attachment 7_Contractors Fire Safety Guide (2017 ed).pdf | ||
| Attachment 8_JBER ENVR Specs 01500_01600 20220622.pdf | ||
| Solicitation - FA500023Q0073.pdf | ||
| Attachment 4_FXSB 23-1040S exhibit drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LI
N
E N
U M
B ER Note: 3 copies required per submittal.
Government will retain all submittals.
Provide an electronic copy for each submittal.
C
ER
TI
F.
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
TU
R
U R
'S R
EC
O
M M
EN
D
AT
IO
C
AT
AL
O
G D
AT
A
O &M
R
EC
O M
M
EN
D
AT
IO
N
S
C
AL
C U
LA
TI
O N
S
W
AR
R
AN
TY
D R
AW
IN
G S
O
TH
ER
TE
ST
R
ES
U
LT
S
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E
TO
C O
N
TR
AC
TI
N G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
AP
PR
O
VE
D
D
IS
AP
PR
O
VE
D
C O
N
TR
AC
TO
R S
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
NOTES
1 Project Specific Form 66 X NTP + 10 KTR to include any items they believe require review and approval.
2 Start Work Notification Request X NTP + 10 SOW Para 5.b.i.
3 Destructive Sampling Plan X NTP + 15 SOW Para 5.d.i.
4 Methods of Testing X NTP + 15 SOW Para 5.e.i.
5 Survey and Analysis Report X X SOW Para 5.f.i.
6 Project Schedule X NPT +10 SOW Para 10.
SOLICITATION /CONTRACT NUMBERPROJECT NAME
Repair HAZMAT Survey B10435
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NUMBER
FXSB 23-1040S
AF FORM 66, OCT 99 Previous Edition Will Be Used
File details come from the government source that posted it. Updated .